Fluors delayed coking experience spans more than 40 years. The coker unit has numerous safety issues and unique processing requirements with which our veteran personnel are intimately familiar. We have the experience to deal with these issues based on innovative designed solutions to safely address these requirements. The following is a list of some of Fluors innovations for delayed coking.
DELAYED COKER EXPERIENCE Fluor has a long history of involvement in the engineering, construction and innovation of delayed coker facilities. We provide veteran personnel with recent, relevant experience and an established knowledge base to quickly and competently execute such projects. In order to maintain and improve our knowledge base, we continually evaluate the operating data from delayed coking units that we have designed and constructed, reviewing the field for the latest developments that we can bring to future projects. Our extensive coker experience together with Fluors renowned world-class engineering talent combine to allow us to deliver integrated delayed coker unit designs with: Short cycle times Efficient operation throughout all stages of the coke drum cycle Reliability and safety in operation Fluors experience in the field of delayed coking includes over 80 projects, ranging from feasibility studies to detailed project execution encompassing feasibility, engineering, procurement, construction, commissioning and start-up. Revamp projects have emphasized debottlenecking, instrumentation modernization, and rebuilding of fire-damaged facilities. Fluor's experience in the design and construction of delayed cokers combined with our continuing program to stay in the forefront of coker technology enables us to bring proven engineering and the latest developments in the field to any project. Contacts Les Antalffy Les.Antalffy@Fluor.com, (281) 263-3056 Mike Knowles Mike.Knowles@Fluor.com, (281) 263-3713
www.fluor.com
What What we we have have done done for for you! you!
FLUOR DELAYED COKING EXPERIENCE
Client / Location KNPC Kuwait Valero Port Arthur, Texas Valero Port Arthur, Texas Valero St. Charles, Louisiana Valero Wilmington, California Flint Hills Resources Pine Bend, Minnesota Marathon Petroleum Detroit, Michigan Total Port Arthur, Texas ConocoPhillips Roxana, Illinois
Fluor Services E E, P
DeltaValve
4
E, P, CM
2009
Houston
X
2009 Houston N/A E, P, C CM E, P, CM
6 4 2 2 (A&B)
Exist 4 BUD 4 BUD Exist 2 BUD 2 TUD 4 BUD 4 TUD 4 BUD (Z&J) 4 TUD (Z&J) 2 BUD 2 TUD
X
Revamp 2 Drums
2009
Houston
Fluor
2010
Houston
N/A
E, P
X
2010 Aliso Viejo ConocoPhillips E, P, CM
2
2010 Aliso Viejo Foster Wheeler ConocoPhillips E, P, CM
4
FEED, E, Pdrums
2010
Houston
4
Marathon Petroleum Garyville, Louisiana CITGO Coker 1 Lake Charles, La. CITGO Coker 1 Lake Charles, La. Sasol Secunda, S.Africa ENI Gela, Sicily, Italy ConocoPhillips Carson, CA CITGO Needle Coker Lemont, Illinois Fort Hills Energy Fort McMurray, Alberta, Canada Tesoro Martinez, California, USA 2009 Houston ConocoPhillips E, P, CM
2
2008 Houston N/A E, P
X
2007 Houston N/A FEED
X
2007 Houston N/A E, P
X
2007 2006 2006 Houston Aliso Viejo Houston N/A N/A N/A FEED FEED FEED
X X X
2006
Calgary
Foster Wheeler
FEED
2006
Aliso Viejo
Conoco Phillips
E, P
4 BUD 4 TUD
www.fluor.com
Client / Location Tesoro Anacortes, Washington, USA Flint Hills Resources Pine Bend, Minnesota Flint Hills Resources Pine Bend, Minnesota
Licensor ConocoPhillips
Fluor Services E
DeltaValve
2
2005 2005 Houston Houston N/A N/A S E
X (E&F) X (A, B, C, D) X X X
Petrozuata Jose, Venezuela CITGO Sponge Coker Lemont Illinois Hovensa St. Croix, Virgin Islands Conoco Humber North Lincolnshire, England Conoco Immingham, England CITGO Coker 2 Lake Charles, Louisiana Chevron Pascagoula, Mississippi BP Oil Company Toledo, Ohio Frontier El Dorado, Kansas Chevron Salt Lake, Utah Petrozuata Jose, Venezuela CITGO Coker 1 Lake Charles, Louisiana Flint Hills Resources Pine Bend, Minnesota Phillips Sweeny, Texas SASOL Secunda, South Africa Petrolera Ameriven Jose, Venezuela BP Oil Company Toledo, Ohio Cenco Santa Fe Springs, CA
E E, P, CM FEED
2004
Haarlem
ConocoPhillips
2004
Haarlem
ConocoPhillips
E, P, CM
X
2004 Houston N/A E, P
X
2003 Houston N/A E, P, C
X
2003 2002 2001 2001 2001 Houston Aliso Viejo Houston Houston Houston N/A N/A N/A Conoco N/A S E, P E, P FEL E, P
X X 2 BUD
X
2000 2000 2000 1999 Houston Houston Johannesburg Aliso Viejo N/A N/A N/A Foster Wheeler S FEED, CM E, P, C E ,P, C
1 ABC X (E&F)
X 4 4 FDHD 2 FDHD
1999 1998
BP / Fluor N/A
E, P, C S
www.fluor.com
Client / Location
Year of Completion
Office
Licensor
DeltaValve
Equilon 1998 Aliso N/A S Wilmington, Viejo California CITGO Coker 2 1998 Houston N/A E, P Lake Charles, X 4 FDHD Louisiana Koch Refining 1998 Houston N/A E, P Pine Bend, X 2 4 HCDHD Minnesota CITGO Coker 1 1996 Houston N/A E, P Lake Charles, X 4 4 FDHD Louisiana ExxonMobil 1995 Houston N/A E, P, Baton Rouge, CM X 4 4 FDHD Louisiana Fluor Services: S = Study, FEED = Front-End Engineering & Design, FEL = Front-End Loading, E = Engineering, P = Procurement, C = Construction, CM = Construction Management, BUD = Bottom Unheading Device, TUD = Top Unheading Device, FDHD = Fluor Deheading Device, ABC = Fluor Automated Boltless Closure, HCDHD = Hahn & Clay Deheading Device, Z&J = Zimmerman & Jansen Deheading Device
www.fluor.com
What What we we have have done done for for you! you!
FLUOR DEHEADING VALVE EXPERINECE
Client Marathon Total Valero Valero Marathon COP CITGO (Coker Unit #1) COP ENI CITGO (Coker Unit #1) Tesoro Sasol Hovensa CITGO (Needle Unit) FHR CITGO (Sponge Unit) Petrozuata CITGO (Coker Unit #2) Chevron Chevron Location Detroit, MI Port Arthur, TX St. Charles, LA Wilmington, CA Garyville, LA Woodriver, IL Lake Charles, LA Carson, CA Gela, Sicily, Italy Lake Charles, LA Martinez, CA Secunda, S. Africa St. Croix Lemont, IL Pine Bend, MN Lemont, IL Jose, Venezuela Lake Charles, LA Pascagoula, MS Salt Lake City, UT Totals 4 2 4 2 4 6 4 4 6 2 70 38 6 4 BUD 2 4 4 4 2 4 4 4 4 4 4 4 4 2 4 TUD 2 4 Remark Engineering in Progress Engineering in Progress Engineering In Progress Engineering Complete Installation In Progress FEED Package Operating FEED Package FEED Package FEED Package Operating Operating FEED Package FEED Package Operating Operating Operating Operating Operating Operating 70 BUD + 38 TUD = 108 Total
www.fluor.com