MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

SCHEDULE OF RATES
NON REC GENERAL WORKS
for the year 2007


MANGALORE ELECTRICITY SUPPLY COMPANY
LIMITED










SCHEDULE OF RATES FOR NON-REC, GENERAL
WORKS

For the year 2007.










MANGALORE ELECTRICITY SUPPLY COMPANY LIMITED
Schedule of Rates effective from 01-06-2007
Preface:
1.0 The last revision of SR for labour was given effect from 01-05-2005 and for Materials from 01-12-
2005.
2.0 MESCOM in its O.M No. AGM(A)/ AO(A)/ AAO(A)/ F-1039/ 21504-513, dated 05-03-2007
constituted a Committee comprising of the following members to study and revise the SR-2005
and submit a proposal for the year 2007.
i. Director (Technical) - Chairman
ii. Superintending Engineer (Ele) (Proc) - Member, Convener
iii. Superintending Engineer (Ele) (Tech) - Member
iv. Chief Engineer (Electy), Mangalore Zone - Member
v. Executive Engineer (Civil) - Member
vi. Executive Engineer (Purchase) - Member
vii. Accounts Officer (I/A), O&M Division, Mangalore - Member
3.0 The assistance of two retired Executive Engineers is also taken to prepare the report which is
verified by Technical and Accounts Committees formed for this purpose vide T.O O.M No:
MESCOM/SEE(P)/EE(W)/ 2007-08/217-221, dated 04-04-2007.
3.1 Now the revised SR for Materials and Labour have been prepared on the following basis:
a) In respect of materials which have been procured by MESCOM during the year 2006-
07 and the purchase order includes the PV clause, the PO rate updated upto February
2007 is proposed.
b) In respect of materials, which have not been procured during 2006-07, the prevailing SR
updated using the relevant PV and proposed, IEEMA price indices of April 2005 and
February 2007 are considered.
c) In respect of materials, which have not been procured and have no PV formula, the
market rates obtained from the manufacturers/dealers is proposed.
d) In respect of some of the MS items like cross arms, clamps etc. the actual manufacturing
cost has been worked out based on the cost of raw materials and labour charges as there
was a large difference in the prices obtained from the above methods.
e) For materials like 250kVA and 500kVA Distribution transformer and 11 KV UG cable,
which have not been procured, by MESCOM and the rates worked out through
application of relevant PV, but is observed to differ largely with the current market
rates, the schedule of rates of BESCOM and KPTCL, which were revised, recently have
been proposed.
f) In respect of some of the items for which application of both MESCOM and BESCOM
SR rates is possible, the rate, which is nearer to the market rate, has been adopted.
g) The BESCOM/KPTCL rates have been proposed for some of the new items and the
existing items for which the PV formula is not available as the above SRs were revised
recently.
3.2 The Labour charges of SR-2007 is based on Labour Index. Hence labour rates were increased by
11%.
4.0 The proposed Schedule of Rates (SR-2007) for Materials and Labour have been approved in the
22
nd
Board Meeting held on 11-05-2007. The SR-2007 will come into effect from 01-06-2007.
The following general guidelines may please be kept in view:
1) Squirrel ACSR (2 ACSR) conductor shall not be used for any new works and in accordance with
B.O. No. B19/6723/95-96/21.6.2000 of KEB.
2) Minimum Size of the conductor to be used for all new 11KV lines shall be Rabbit ACSR only.
3) The Average span for new 11 KV lines in Urban areas shall be 40 Mtrs. instead of the present 67
Mtrs. in Rural areas the average span length shall be 50 Mtrs. instead of the present 85 Mtrs. The
cost sheets have been worked out based on the above concepts.
4) Minimum size of the conductor to be used for all new L.T lines shall be Rabbit ACSR only in
urban areas and Weasel Conductor in Rural areas.
5) For attending to the BREAK DOWN works for speedy restoration of Power supply payment of
25% more Labour charges than specified in the SR is continued.
6) Material code number for almost all materials have been provided in the SR and the same has to be
used while preparation on the estimate.
7) All the field officers and inspecting officers should ensure that the materials used shall conform to
the relevant ISI specifications and the works executed are in accordance with the approved
drawings/stipulated norms. The UG cable/PVC wires used for the work shall carry ISI markings.
8) Guy set includes Anchor Rod, Turn buckle, Guy wire, Strain insulator, Guy clamp with Bolts, Nuts
and Washer.
9) As per Government electrical inspectorate order No. CEG/D/T/13306/ 86-87
dated:17-12-1986 E.G Stirrups shall be used in the following locations:-
a) Within the town / village limits.
b) In the factory premises.
10) Provision for ACSR conductor includes sag at 1.5% and conductor accessories at 3% have been
given separately in the cost data sheet.
11) Provision for inspectorate charge shall be made as a separate item in the estimate as per the rates
that are inforce. The rate of inspectorate charges that are inforce is provided in the SR.
12) For short lines less than 1 Km the estimates shall be prepared for actual requirement of the
materials.
13) If concreting of poles is required separate provision has to be made in the estimate the rates for
which have being provided in the SR.
14) All transformers upto and inclusive of 25 KVA capacity are to be provided with GOS and HG fuse
units.
15) As per Board No. KEB/308/3/(82-83) dated:25-02-1993 of KEB and as per the decision of
Technical Committee meeting held on 25-06-1993, 25/63/100 KVA transformer shall be provided
with LT protection kit. Transformers with 250 KVA capacity and above shall be provided LT
distribution with MCCB. In city limits transformers with 100 KVA capacity shall be provided with
LT distribution box with MCB the rate for which has been furnished in the SR.
16) The LECs carrying out works on labour contract basis are authorised to purchase small items such
as Bolts and Nuts at SR rates where ever the execution of the work is held up due to non
availability of such materials provided the cost of such purchase is limited to 3% of the estimated
quantity.
17) If the scrap value of the cable proposed to be released is less than the sum of estimated labour for
such release, Depreciated value of the cable, road cutting charges payable to BMP and other civic
bodies than the releasing of the cable need not be resorted to. Otherwise the releasing work has to
be taken up as per the prevailing rates in SR.
18) The rates for new materials such as Metering Box, LT Capacitor etc., have been provided in the
SR.
19) Cost data sheets for erection of 25, 63 & 100 KVA DT on single pole 9.0 Mtr. RCC structure,
250 KVA on 11 Mtr. Spun pole structure, Installing RLMU for 15/25/63/100 KVA
Transformer, Compact RMUs, 11 KV and LT AB Cable, 11/0.43 KV Packaged Sub-stations
& LT capacitors to Distribution Transformers have been worked out and included in the SR
for easy reference.
20) Commonly used spares for conventional RMUs and for 11 KV GOS have been incorporated
in the new SR.
21) Relevant drawing have been incorporated in this new SR for easy reference.
22) Labour charges for releasing of materials shall be at 90% of the cost of erection.
23) The following additional components have to be included while preparing estimates for
APDRP/Distribution works which are executed on turnkey basis:-
a) Service tax @ 12.36% on labour cost.
b) IDC (Interest During Construction) @ 5% on materials +labour cost.
c) Transportation cost from Stores to Site @ 2% on materials cost.
d) Watch and ward cost @ 1% on material cost.
e) Insurance charges @ 1% on material cost against theft & accidents.
f) Performance guarantee and loss of interest on margin money for Bank Guarantee (BG) @
2.5% of the value of BG.
g) Statutory charges as per actuals (For Inspectorate, Civic body etc.,)
h) Compensation cost as per approved norms for tree cutting, crop insurance etc.

24) In estimates to be executed on Labour contract basis provision for Provident Fund @ 12% and ESI
(at the prevailing rates wherever applicable) on Total Labour cost shall be included in the estimate
as a separate item.




Convener SR Committee
Superintending Engineer (Ele) (Proc)
MESCOM, Mangalore.
Page No.
Part-1
Cost sheets for 13.2/11 KV Distribution Lines and
Transformer Centres 2007
Part- 2
Schedule of Rates for Standard Stock
Materials 2007 .
Part- 3
Schedule of Rates for Labour 2007 ..
Part- 4
Schedule of rates for Labour 33 KV
System .
Part- 5
Technical Specification for Overhead and Underground
Service Connection Works for the year 2007
.
Part-6
Scale of Inspection Fees of Electrical Inspectorate Schedule
..
Part- 7
Sketches and Drawings
mangalore electricity supply company limited
Index
Non- REC General Works
Cost sheets for 13.2/11 KV Distribution Lines
and Transformer Centres 2007
Part-1
SL.No Particulars Unit Qty Rate
1 2 3 4 5
1 Materials cost
2 Labour charges
3
Employees cost @ 60% on labour
charges
4
Contingencies @ 3% on material +
labour cost
5 Service tax @ 12.36% on labour charges
6
IDC( Interest During Construction) @ 5%
on material cost + labour cost
7
Transportation cost from stores to site
@ 2% on material cost
8
Watch and ward cost @ 1% on material
cost
9
Insurance cost against theft & accident
@ 1% on material cost
10
Performance guarantee and loss of
interest on margin money for BG @ 2.5%
of the value of BG
11
Statutory charges as per
actuals(Inspectorate charges, civic body
charges etc.,)
12
Compensation cost for tree cutting etc.,
as per approved norms
13 Total cost in Rs.
TYPICAL COST DATA SHEET FOR TURNKEY WORK
Description of the work
Note:- Service tax is calculated at12.36% on Total labour charges
SL.No Particulars Amount (in Rs.)
1 Materials cost
2 Labour charges
3 Locality Allowance @ ..% on Labour charges
4 Employees cost @ 60% on Total labour charges (2+3)
5
Transportation cost from stores to site @ 2% on
Material cost
6 Service Tax @ 12.36% on Total Labour Charges (2+3)
7
Provident Fund charges @ 12% on Total Labour
charges (2+3)
8
ESI Charges @.....% (wherever applicable) on Total
Labour charges (2+3)
9 Total cost of Estimate in Rs.
Note:-
Typical Cost Data Sheet for Labour contract work
This Cost Data Sheet is for preparing Estimates for awarding work on Labour
Contract basis only.
SL.NO
Particulars
Unit
Materials
rate in Rs.
Labour
charges
(Casual)
in Rs
1 2 3 4 5
I RCC Poles
a) 9M 145kg WL (Using Tor-50 Steel) No 3492 397
b) 9M 150kg WL(Using Tor-50 Steel) sq. sec. No 4820 397
c) 8M 115kg WL (Using Tor-50 Steel) No 2356 318
II PCC Poles
8M PCC Poles 140kg WL No 1517 318
III PSC Poles
a) 8M 200kg WL No 1845 318
b) 9M 200kg WL No 2281 397
IV Pre-Stressed Tubular Spun Pole
11M Long No 8365 675
V
Double Pole Structure complete
using
a) 8M RCC Poles Set 8450 1162
b) 9M RCC Poles Set 10820 1218
c) For double circuit line using 9 M RCC Poles Set 11820 1366
VI
Three Pole structure complete
using
a) 8M RCC Poles Set 14000 2267
b) 9M RCC Poles Set 17410 2351
VII
Transformer Structure complete
with cross arms braces, clamps,
bolt&nuts and washers,
1) For 100 / 250 kVA
a) Using 2 nos 8M RCC Poles Set 15200 1428
b) Using 2nos 9M RCC Poles Set 17470 1586
2) For 63 / 25 kVA
a) Using 2 nos 8M RCC Poles Set 10960 1332
b) Using 2nos 9M RCC Poles Set 13230 1542
3)
Single pole mounted transformer
kit on 9 mtr RCC pole (square sec)
a) for 25/63 kVA Transformer Set 3335 380
b) for 100 kVA Transformer Set 5730 380
4)
For Single pole mounted
transformer kit for 100/250kVA on
11 mtr spun pole
Set 17275 760
Note: The items V, VI, VII includes the cost of poles, structure materials
& about 10 to 12 kg of G.I wire required for earthing of structure materials.
Rates of various Line materials and Labour charges used in cost sheets for
general works
1
SL.NO
Particulars
Unit
Materials
rate in Rs.
Labour
charges
(Casual)
in Rs
VIII
11 kV Horizontal cross arm with
H.T.Single top support, clamp,bolts,
nuts and washers
a) For RCC/PSC Poles Set 360 37
b) For PCC Poles Set 355 37
IX
11 kV Horizontal cross arm,
clamp,bolts, nuts and washers for
DC Lines
Set 275 37
X
4-Pin cross arm with pole clamp ,
bolts, nuts and washers without
braces
a) RCC / PSC Poles Set 229 37
b) PCC Poles Set 224 37
XI
2-Pin cross arm with pole clamp ,
bolts, nuts and washers without
braces
a) RCC / PSC Poles Set 142 37
b) PCC Poles Set 135 37
XII
HT Special Cross arm with cross
arm for EG Stirrups, braces, clamps
, bolts, nuts and washers
Set 1350 260
XIII
LT Cross arm for vertical
configuration with
clamps,bolts,nuts and washers
Set 550 37
XIV
HT Single Top support with
bolt,nuts and washers
Set 75 37
XV
LT Single Top support with
bolt,nuts and washers
Set 63 37
XVI Insulators
a) 11kV Pin insulator No 73 **
b) No.15 Strain Insulator No 23 **
c) No.8 Strain Insulator No 11 **
d) 1.1 kV Pin Insulator No 28 **
e) 45 kN Disc Insulator No 350 **
f) 70 kN Disc Insulator(Ball&Socket type) No 360 **
g) 90 kN Disc Insulator(Ball&Socket type) No 360 **
h) 11 kV Solid core Insulator No 100 **
i) 11 kV Post Insulator No 255 **
j) Silcon rubber composite insulator No 270 **
GI Barbed wire 12 swg MT 48800 **
XVII Conductor
a) Weasel ACSR km 19700 715
b) Rabbit ACSR km 32500 977
c) Coyote ACSR km 86700 1571
XVIII
Gaurding material using 10 SWG G I wire
(excluding cost of cross arms)
mtr 20 7
2
SL.NO
Particulars
Unit
Materials
rate in Rs.
Labour
charges
(Casual)
in Rs
XIX Guy set Set 565 132
XX EG Stirrup With GI Lacing Set/2Nos. 290 37
XXI Spiral Earth Electrode Set 185 35
XXII
Distribution Transformer,
3-Phase, 11kV/433 V with oil
a) 15 kVA No 47100 426
b) 25 kVA No 64100 715
c) 63 kVA No 95300 715
d) 100 kVA No 116330 1426
e) 250 kVA No 239600 2140
f) 500 kVA No 450000 2613
XXIII
Distribution Transformer,
Single Phase,15 kVA, 11kV/250V,
with oil
No 56600 426
XXIV 11 kV G O S
a) 200 A Single break Set 5350 165
b) 400 A Double break Set 12850 165
c) 200 A Single break vertical operation Set 6260 165
XXV 11 kV Solid Core HG Fuse Unit Set (3 Nos) 2325 84
XXVI 11kV Class DOLO Cutouts Set (3 Nos) 1500 84
XXVII Lightning Arresters
i) 9 kV , 5kA Metal oxide Type 3 Nos 1470 48
ii) 9 kV , 5kA Polymeric Type 3 Nos 2610 48
XXVIII Transformer grounding
a) Pipe Type Set 1350 214
b) Rod Type Set 1612 122
XXIX
Concreting Material ( 1:4:8) as per
DRG No.CES / DIS / 021
a) Pole base 500x650x150 mm 120 **
b) 9M Supports(pole concreting) 400X400X1850 mm 730 **
c) 11M Tubular Supports(pole concreting) 400X400X2450 mm 966 **
d) 8 M Supports 400x400x1680 mm 662 **
e) Guy concreting 300x300x150 mm 33 **
3
SL.NO
Particulars
Unit
Materials
rate in Rs.
Labour
charges
(Casual)
in Rs
XXX 11 kV , 3 Core XLPE UG Cable
a) 95 Sq.mm km 859000 22312
b)120 Sq.mm km 1286000 22312
c) 240 Sq.mm km 1539000 23552
d) 400 Sq.mm km 2412500 24790
XXXI
Fixing 3-phase LT Capacitor
housed in a enclosure with
necessary Fusses, wiring,
mounting arrangement for
1 15/25 kVA DTC, 3 kVAr
No. 750 170
2 63 kVA DTC, 9 kVAr
No. 1330 170
3 100 kVA DTC, 18 kVAr
No. 2475 200
4 250 kVA DTC, 27 kVAr
No. 3940 235
5 500 kVA DTC, 54 kVAr
No. 6975 245
XXXII
Providing Electronic Trivector
Meters with associated CT's
Metering Box etc., on LT side of
Distribution Transformer Center
1 for 15/25 kVA DTC with CT ratio 50/5
Set
12325
500
2 for 50/63 kVA DTC with CT ratio 100/5
Set
11635
500
3 for 100 kVA DTC with CT ratio 150/5
Set
11440
500
4 for 250 kVA DTC with CT ratio 400/5
Set
11410
500
5 for 500 kVA DTC with CT ratio 800/5
Set
11590
500
XXXIII
Installing RLMU for the existing
Distribution T.C
a) for 25 kVA Set 42200 1470
b) for 63 kVA Set 50000 1470
c) for 100 kVA Set 61800 1470
4
RCC PSC RCC PSC
1 2 3 4 5 6
1
11 kV 3-Ph SC line with 40 mtrs span on
9 mtr supports using Rabbit conductor
255703 226639 17469 17469
2
11 kV 3-Ph SC line with 50 mtrs span on
9 mtr supports using Rabbit conductor
228925 205916 14939 14939
3
11 kV 3-Ph SC line with 50 mtrs span on
8 mtr supports using Rabbit conductor
202480 ** 13382 **
4
11 kV 3-Ph SC line with 40 mtrs span on
9 mtr supports using coyote conductor
456898 431085 21062 21062
5
11 kV 3 Ph. SC Line and 3 phase - 4 wire LT
line on 9.0 mtr RCC Poles with an average
span of 50mtrs using Rabbit Conductor for
H.T. and WEASEL for L.T Lines
361267 ** 26063 **
6
11 kV 3 Ph. SC Line and 3 phase - 4 wire LT
line on 9.0 mtr RCC Poles with an average
span of 40 mtrs using Rabbit Conductor for
H.T. and L.T Lines
446283 ** 31637 **
7
3 Ph. 4 wire LT line on 8 mtr PCC Supports
with 60 mtrs span using Weasel Conductor
134590 ** ** 10199
8
3 Ph. 4 wire LT line on 8 mtr PSC Supports
with 40 mtrs span using Rabbit Conductor
219621 ** ** 14773
9
3 Ph. 4 wire LT line on 9 mtr Supports with
40 mtrs span using Rabbit Conductor
263956 ** 16748 **
10
3 Ph. 5 wire LT line on 9.0 mtr supports
Using Rabbit conductor with a span of
40mtrs (For Cities, Towns and Residential
layouts)
310631 280357 18874 18874
11
3 Ph. 5 wire LT line with 8.0 mtr Supports
Using Rabbit with an span of 50 mtrs
260395 250176 14764 14764
12
1 Ph. 3 wire LT line with 8.0 mtr Supports
Using Weasel with an span of 50 mtrs
144244 134024 10979 10979
ABSTRACT OF COST DATA SHEET
Labour Charges
Total cost using Spiral
Earth Electrode/steel
Grounding system
PARTICULARS
Cost
Data
Sheet
No.
1
RCC PSC RCC PSC
1 2 3 4 5 6
Labour Charges
Total cost using Spiral
Earth Electrode/steel
Grounding system
PARTICULARS
Cost
Data
Sheet
No.
13
L.T 3 Ph. 5 wire LT line with continuous
earth wire on 9.0 mtr RCC Poles Using
RABBIT for phase, netural and street light
control and 8 SWG G.L wire for continous
ground wire with 40 mtrs span in vertical
configuration
319408 ** 18540 **
14
11 kV 3 ph. SC line on 9 mtr RCC pole using
rabbit conductor with 40 mtrs span with
vertical configuration in congested area
280665 ** 22388 **
15
Providing 2 pole structrue at the tapping
point using RCC pole
a) 8 mtr RCC 32023 ** 1817 **
b) 9 mtr RCC 34483 ** 1873 **
16 ERECTION OF 3 POLE STRUCTURE
a) 8 mtr RCC 24125 ** 2900 **
b) 9 mtr RCC 27669 ** 2984 **
17
PROVIDING METAL HOUSING BOX TO I.P
SETS
2900 ** ** **
18
Laying of 1km length of 11kV 3 core 95
Sq.mm XLPE UG Cable
1137444 ** 105396 **
19
Laying of 1km length of 11kV 3 core 240
Sq.mm XLPE UG Cable
1822743 ** 106636 **
20
Laying of 1km length of 11kV 3 core 400
Sq.mm XLPE UG Cable
2701008 ** 107874 **
21
a) Erection of 3-ph, 11 kV/433V Distribution
Transformer center using 8M Supports with LA
a) 25 kVA 118851 ** 4586 **
b) 63 kVA 152556 ** 4586 **
c) 100 kVA 202497 ** 5393 **
d) 250 kVA 334409 ** 6107 **
b) Erection of 3-ph, 11 kV/433V Distribution
Transformer center using 9mtr Supports with LA
a) 25 kVA 121457 ** 4796 **
b) 63 kVA 155162 ** 4796 **
c) 100 kVA 205020 ** 5551 **
d) 250 kVA 336932 ** 6265 **
2
RCC PSC RCC PSC
1 2 3 4 5 6
Labour Charges
Total cost using Spiral
Earth Electrode/steel
Grounding system
PARTICULARS
Cost
Data
Sheet
No.
22
Erection of 25 kVA , 11kV/433V , Single pole
mounted transformer centre
115225 ** 3707 **
23
Erection of 63 kVA , 11kV/433V , Single pole
mounted transformer centre
148794 ** 3706 **
24
Erection of 100 kVA , 11kV/433V , Single
pole mounted transformer centre
182342 ** 4992 **
25
Erection of 250 kVA, 11kV/433V, Single pole
mounted Distribution Transformer on 11mtrs
spun pole with 3 GOS system
374396 ** 6225 **
26
Installing RLMU for the existing 15/25 kVA
Distribution Transformer centre
44552 ** 1470 **
27
Installing RLMU for the existing 63 kVA
Distribution Transformer centre
52352 ** 1470 **
28
Installing RLMU for the existing 100 kVA
Distribution Transformer centre
64152 ** 1470 **
29
Providing Compact RMU 11kV class
VCB/SF6 Type (1 Incomer+2 Breakers+1
Outgoing)
1061900 ** ** **
30
Providing Compact RMU 11kV class
VCB/SF6 Type (1 Incomer+1Breakers+1
Outgoing)
661215 ** ** **
31
Providing Compact RMU 11kV class
VCB/SF6 Type (1OD)
133173 ** ** **
32
Providing Compact RMU 11kV class
VCB/SF6 Type (1VL)
402173 ** ** **
33
Running Single Circuit 11 kV 3 Phase Power
line on 9 mtr RCC supports with average
span of 30 mtrs using 3x95 Sqmm+1x95
Sqmm Aerial Bunched Cables (ABC)
956287 ** 88539 **
34
Running Single Circuit 1.1 kV 3 Phase 5
wire Power line on 9 mtr RCC supports with
average span of 40 mtrs using 3x70 +1x16
+1x50 Sqmm Aerial Bunched Cables (ABC)
483383 ** 47299 **
35
Erection of Compact Pre-fabricated
Packaged Sub-station 11kV / 433 V
a) With 500 kVA oil cooled transformer 1900000 ** 6000 **
b) With 750 kVA oil cooled transformer 2200000 ** 6000 **
3
RCC PSC RCC PSC
1 2 3 4 5 6
Labour Charges
Total cost using Spiral
Earth Electrode/steel
Grounding system
PARTICULARS
Cost
Data
Sheet
No.
c) With 990 kVA oil cooled transformer 2350000 ** 6000 **
36
providing Electronic Trivector Meters with
associated CT's Metering Box etc., on LT
side of Distribution Transformer Center
a) 15/25 kVA 12325 ** 500 **
b) 50/63 kVA 11635 ** 500 **
c) 100 kVA 11440 ** 500 **
d) 250 kVA 11410 ** 500 **
e) 500 kVA 11590 ** 500 **
37
providing LT Capacitors to the Distribution
Transformers
a) 3 kVAr 750 ** 170 **
b) 9 kVAr 1330 ** 170 **
c) 18 kVAr 2475 ** 200 **
d) 27 kVAr 3940 ** 235 **
e) 54 kVAr 6975 ** 245 **
4
RCC PSC
1 Line Supports Nos. 24 83808 54744
2
Horizontal cross arms with clamps, HTST
supports bolts, nuts and washers
Sets 24 8640 8640
3 D.P.Structure with 9 mtr RCC Poles Set 1 10820 10820
4 11 kV Pin insulators with GI pins No 72 5256 5256
5 45 kN Disc insulators No 6 2100 2100
6 Guy sets Set 6 3390 3390
7 Rabbit ACSR Conductor kms 3.045 98963 98963
8 Wedge connector for Rabbit conductor No 6 2808 2808
9 Spiral earth electrode No 26 4810 4810
10 EG Stirrups with G.I. wire lacing Set 24 6960 6960
11 Concreting materials for guy sets No 6 198 198
12 Labour charges
a) Casual 17469 17469
b) Regular 10481 10481
13 255703 226639
COST DATA SHEET - 1
Particulars
SL.
No
Qty
9.0 Supports
Unit
Running Single circuit 11 kV , 3-Phase power line on 9.0 mtr supports with an average
span of 40 mtrs using Rabbit ACSR conductor
Total cost / km in Rs.
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer
to Sl. No. 23 of general guidelines.
RCC PSC
1 Line supports No 19 66348 43339
2
Horizontal cross arms with clamps, HTST
supports, bolts, nuts and washers
Set 19 6840 6840
3 D.P.Structure with 9 mtr RCC Poles Set 1 10820 10820
4 Pin Insulators 11 kV class with pins No 57 4161 4161
5 45 kN Disk Insulators No 6 2100 2100
6 Guy sets Set 6 3390 3390
7 Rabbit Conductor km 3.045 98963 98963
8 Wedge connector for Rabbit conductor No 6 2808 2808
9 Spiral earth Electrode No 21 3885 3885
10 EG Stirrups with G.I. wire lacing Set 19 5510 5510
11 Concreting material for guy sets No 6 198 198
12 Labour charges
a) casual 14939 14939
b) Regular * 8963 8963
13 228925 205916
Running Single circuit 11 kV , 3-Phase power line on 9.0 mtr supports with an average
span of 50 mtrs using Rabbit ACSR conductor
COST DATA SHEET - 2
SL.
No
Particulars
9.0 mtr Supports
Unit Qty.
Total cost / km in Rs.
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer
to Sl. No. 23 of general guidelines.
Rate
/Unit
Cost
Rate
/Unit
Cost
1 Line supports No 19 2356 44764 318 6042
2
Horizontal cross arms with clamps, HTST
supports , bolts, nuts and washers
Set 19 360 6840 37 703
3 RCC D.P.Structure on 8.0M Supports Set 1 8450 8450 1162 1162
4 Pin Insulators 11 kV class with pins No 57 73 4161 * *
5 45 kN Disk Insulators No 6 350 2100 * *
6 Guy sets Set 6 565 3390 132 792
7 Spiral earth Electrode No 21 185 3885 35 735
8 Rabbit Conductor km 3.045 32500 98963 977 2974.97
9 Wedge connectors for Rabbit conductor No 6 468 2808 45 270
10 EG Stirrups with G.I. wire lacing Set 19 290 5510 37 703
11 Concreting Materials No 6 33 198 * *
12 Labour charges
a) casual 13382 13382
b) Regular * 8029
13 202480
Qty Particulars
COST DATA SHEET -3
LabourCost
Running Single Circuit 11 kV 3 Phase Power Line on 8 mtr RCC supports with average span of 50 mtrs
using Rabbit ACSR Conductor
Unit
SL.
No
Total cost / km in Rs.
Material cost
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No. 23 of
general guidelines.
RCC PSC
1 Line supports No 23 80316 52463
2
Horizontal cross arms with clamps, HT ST
Supports , bolts, nuts and washers
Set 23 8280 8280
3 D.P.Structure with 9 mtr RCC Poles Set 2 21640 21640
4 Pin Insulators 11 kV class with GI pins No 69 5037 5037
5
70/90 kN Disk Insulators ball and socket
type
No 12 4200 4200
6
Strain clamps 3-bolt type for Disc
insulators
No 12 6012 6012
7 Guy sets Set 6 3390 3390
8 Strut poles with fish plates, clamps etc., No 4 7120 7120
9 Coyote ACSR Conductor km 3.045 264002 264002
10 Wedge connector for Coyote conductor No 12 11340 13380
11 Spiral earth electrode No 27 4995 4995
12 EG Stirrups with G.I. wire lacing Set 23 6670 6670
13 Concreting Materials No 6 198 198
14 Labour charges
a) casual 21062 21062
b) Regular * 12637 12637
15 456898 431085
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer
to Sl. No. 23 of general guidelines.
Total cost / km in Rs.
Qty
9 mtr Supports
COST DATA SHEET -4
SL.
No
Particulars Unit
Running Single Circuit 11 kV 3 Phase Power Line on 9 mtr supports with average span
of 40 mtrs using COYOTE ACSR Conductor
SL.
No
Unit Qty
1 No 19
2 Set 19
3 Set 20
4 Set 1
5 No 57
6 No 76
7 No 6
8 No 8
9 Set 8
10 km 3.045
11 km 4.06
12 No 21
13
span 20
Sets 20
14 Wedge connectors for Rabbit conductor No 6
15 No 8
16
17
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer
to Sl. No. 23 of general guidelines.
Weasel for LT lines
Spiral earth electrode
Guarding between HT & LT Lines
a) Guarding Materials
b) L.T.4 Pin cross arms, with pole clamps,
bolts, nuts and washers
Concreting Materials for guy sets
Labour charges
Total cost / km in RS.
No.8 Strain Insulators
Guy sets
Rabbit for H.T. Lines
COST DATA SHEET - 5
Running single circuit 11 kV 3 Phase Power Line and 3 phase - 4 wire secondary line
on 9 mtr RCC Poles (145 kg. W.L) with an average span of 50 mtrs using Rabbit
Conductor for H.T. and WEASEL for L.T Lines
Amount
66348
6840
Particulars
Line supports
11kV Horizontal cross arms with clamps,
HTST Supports , bolts, nuts and washers
10820
4161
2128
2100
L.T.4 Pin cross arms, with pole clamps,
bolts, nuts and washers
4580
Pin Insulators 11 kV class withGI Pins
Pin Insulators 1.1. kV class with GI Pins
45 kN Disk Insulators
D.P Structure with 9 mtr RCC Poles
264
27500
4580
2808
88
4520
98963
79982
3885
26063
15638
361267
a) casual
b) Regular *
SL.
No
Unit Qty
1 No 24
2 Set 24
3 Set 25
4 No 1
5 No 72
6 No 96
7 No 6
8 No 8
9 Set 8
10 km 7.105
11 No 26
12
span 25
Sets 25
13 Wedge connectors for Rabbit conductor No 6
14 No 8
15
16
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer
to Sl. No. 23 of general guidelines.
45 kN Disk Insulators
No.8 Strain Insulators
Guy sets
Pin Insulators 1.1. kV class with GI Pins
a) Guarding Materials
b) L.T.4 Pin cross arms, with pole clamps,
bolts, nuts and washers
L.T.4 Pin cross arms, with pole clamps,
bolts, nuts and washers
D.P.Structure with 9 mtr RCC Poles
83808
Particulars
8640
Rabbit for H.T.and LT Lines
Spiral earth electrode
Guarding between HT & LT Lines
Concreting Materials for guy sets
Pin Insulators 11 kV class with GI Pins
11kV Horizontal cross arms with clamps,
HTST Supports , bolts, nuts and washers
Line supports
Running single circuit 11 kV 3 Phase Power Line and 3 phase - 4 wire secondary line
on 9 mtr RCC Poles (145 kg. W.L) with an average span of 40 mtrs using Rabbit
Conductor for H.T. and L.T Lines
Amount
Labour charges
a) casual
b) Regular *
Total cost / km in Rs.
COST DATA SHEET -6
446283
5725
10820
5256
2688
4520
230913
18982
27500
5725
4810
264
31637
2808
2100
88
Amount
PCC
Poles
1 Line supports No 15 22755
2
4 Pin cross arms with pole clamps bolts
nuts and washers
Set 16 3584
3 No 1 2439
3 Pin Insulators 1.1. kV class No 60 1680
4 No.8 Strain Insulators No 8 88
5 Guy sets Set 8 4520
6 Weasel ACSR Conductor km 4.06 79982
7 Spiral earth electrode No 16 2960
8 Concreting Materials for guy sets No 8 264
9 Labour charges
a) casual 10199
b) Regular * 6119
10 134590
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis
please refer to Sl. No. 23 of general guidelines.
COST DATA SHEET NO-7
Running LT 3 phase 4-Wire power line on 8 mtr Long PCC Poles using
Weasel conductor with an average span of 60 mtrs
SL.
No
Particulars
8 mtr RCC Pole
Total cost / km in Rs.
Unit Qty
SL.
No
Unit Qty Amont
1 No 25 46125
2 Set 25 5725
3 No 96 2688
4 No 8 88
5 Set 8 4520
6 km 4.06 131950
7 Spiral earth electrode No 25 4625
8 No 8 264
14773
8864
10 219621
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis
please refer to Sl. No. 23 of general guidelines.
9
Labour charges
a) Casual
b) Regular
Rabbit ACSR Conductor
Concretting materials for Guy sets
Total cost / km in Rs.
4 Pin cross arms with clamps, bolt & nuts
washers etc.,
COST SHEET - 8
Running LT 3-Phase 4-Wire line on 8 mtr Long PSC Poles using Rabbit
conductor with an average span of 40 mtrs.
Guy sets
1.1 kV Pin insulator with GI pins
No.8 Strain insulators
Particulars
Line Supports
SL.
No
Unit Qty Amont
1 No 25 87300
2 Set 25 5725
3 No 96 2688
4 No 8 88
5 Set 8 4520
6 km 4.06 131950
7 Spiral earth electrode No 25 4625
8 No 8 264
16748
10049
10 263956
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis
please refer to Sl. No. 23 of general guidelines.
4 Pin cross arms with clamps, bolt & nuts
washers etc.,
No.8 Strain insulators
Concretting materials for Guy sets
b) Regular
Labour charges
a) Casual
1.1 kV Pin insulator with GI pins
Particulars
Line Supports
COST SHEET - 9
Running LT 3-Phase 4-Wire line on 9 mtr Long RCC Poles using Rabbit
conductor with an average span of 40 mtrs.
Guy sets
Rabbit ACSR Conductor
Total cost / km in Rs.
9
RCC PSC
1 Line supports No 25 87300 57025
2
4 Pin cross arms with pole clamps bolts
nuts and washers
Set 25 5725 5725
3
2 Pin cross arm with clamps, bolts and
nuts
Set 25 3550 3550
4 Pin Insulators 1.1. kV class with GI Pins No 120 3360 3360
5 No.8 Strain Insulators No 10 110 110
6 Guy sets Set 8 4520 4520
7
Rabbit ACSR conductor for Phases,
Neutral and Street light control
km 5.075 164937.5 164938
8 Spiral earth electrode No 25 4625 4625
9 Concreting Materials for guy sets No 8 264 264
10
Street light meter housing box with CT
Ratio 50/5A, Accuracy class-2
No 1 2570 2570
11 Energy meter Single phase 5-20A No 1 836 836
12
Automatic control switch for switching
ON/OFF of St.Lights
No 1 1850 1850
13 PVC Pipe 40 mm dia mtrs 6 186 186
14
PVC Insulated wire 25 Sq.mm Single core
multi stranded
mtrs 25 599 599
Labour charges
a) casual 18874 18874
b) Regular * 11325 11325
16 310631 280357
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer
to Sl. No. 23 of general guidelines.
Unit
SL.
No
Particualrs Qty
Running L.T 3 Phase 5 wire power line on 9 mtr supports Using Rabbit ACSR
conductor with a span of 40 mtrs (For Cities, Towns and Residential layouts)
COST DATA SHEET -10
9 mtr Supports
15
Total cost / km in Rs.
SL.
No
Particulars Unit Qty
8 mtr
RCC
8 mtr
PSC
1 Line supports No 20 47120 36900
2
4 Pin cross arms with pole clamps bolts,
nuts and washers
Set 20 4580 4580
3 2 pin cross arm with clamps, bolts and nuts Set 20 2840 2840
4 Pin Insulators 1.1 kV class with GI Pins No 95 2660 2660
5 No.8 Strain Insulators No 10 110 110
6 Guy sets Set 8 4520 4520
7 Rabbit ACSR conductor km 5.075 164937.5 164938
8 Spiral earth electrode No 20 3700 3700
9 Concreting Materials for guy sets No 8 264 264
10
Street light Meter housing box with CT ratio
50/5A with accuracy class-2
No 1 2570 2570
11 Energy meter single phase 5-20A No 1 836 836
12
Automatic control switch for switching
ON/OFF of St.lights
No 1 1850 1850
13 PVC Pipe 40 mm dia mtr 6 186 186
14
PVC Insulated wire 25 Sq.mm Single core
multistrand
mtr 25 599 599
Labour charges
a) casual 14764 14764
b) Regular * 8859 8859
16 260395 250176
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer
to Sl. No. 23 of general guidelines.
Running L.T 3 Phase 5 wire line on 8 mtr Supports Using Rabbit ACSR with an
average of 50 mtrs span
COST DATA SHEET -11
15
Total cost per km in Rs.
RCC PSC
1 Line supports No 20 47120 36900
2
4 Pin cross arms with pole clamps bolts
nuts and washers
Set 20 4580 4580
3 Pin Insulators 1.1 kV class No 57 1596 1596
4 No.8 Strain Insulators No 6 66 66
5 Guy sets Set 6 3390 3390
6 WEASEL ACSR conductor km 3.045 59987 59987
7 Spiral earth electrode No 20 3700 3700
8 Concreting Materials for guy sets No 6 198 198
9
Street light meter housing box with CT ratio
50/5A accuracy class -2
No 1 2570 2570
10 Energy meter single phase 5-20A No 1 836 836
11
Automatic control switch for switching
ON/OFF of St/lights
No 1 1850 1850
12 PVC Pipe 40 Sq.mm dia mtr 6 186 186
13
PVC Insulated wire 25 Sq.mm single core
multistrand
mtr 25 599 599
Labour charges
a) casual 10979 10979
b) Regular * 6588 6588
15 144244 134024
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer
to Sl. No. 23 of general guidelines.
Unit
COST DATA SHEET -12
SL.
No
14
Total cost per km in Rs.
Running L.T single Phase 3 wire power line on 8 mtr supports with an average span of
50 mtrs Using Weasel Conductor
Qty.
8 mtr Supports
Particulars
SL.
No
Particulars Unit Qty 9 mtr RCC
1 Line supports No 25 87300
2
Fabricated verical cross arms with pole
clamps, bolts, nuts and washers
Set 26 14300
3 Pin Insulators 1.1 kV class No 104 2912
4 No.8 Strain Insulators No 48 528
5 Guy sets Set 12 6780
6 Rabbit ACSR conductor km 5.075 164938
7
No.8 SWG GI wire for continous Earth
wire
km
1.015
(103kgs)
4491
8 8 SWg GI wire for guard loops kg 26 1134
9 Concreting Materials for guy sets No 12 396
10
Street light meter housing box with CT ratio
50/5A, accuracy class-2
No 1 2570
11 Energy meter single phase 5-20A No 1 836
1`2
Automatic control switch for switching
ON/OFF of street lights
No 1 1850
13 PVC Pipe 40 mm dia mtr 6 186
14
PVC Insulated wire 25 Sq.mm single core
multistrand
mtr 25 599
15 Spiral earth electrode Nos. 5 925
Labour charges
a) casual 18540
b) Regular * 11124
17 319408
While preparing estimates for APDRP/ Distribution Works on turnkey basis
please refer to Sl. No. 23 of general guidelines.
Running L.T 3 Phase 5 wire power line with continous earth wire on 9 mtr
RCC Poles (145 kg.W.L) Using RABBIT for phase, netural and street light
control and 8 SWG G.I wire for continous ground wire with 40 mtrs span in
vertical configuration
Total cost per km in Rs.
Note: Only in congested narrow lanes/areas vertical formation with continous earth wire
multi-earthed neutral be adopted. Guard loop between continous earth wire, on top mutli-
earthed netural at bottom enclosing all active conductors are to be provided at 1 m
distance on either side of pole.
16
COST DATA SHEET -13
SL.
No
Particulars Unit Qty 9 mtr RCC
1 R.C.C Pole 9.0 M No 25 87300
2
Special cross arm with cross arm for E.G
Stirrups Braces, clamps Bolts & Nuts
Washers
Set 25 33750
3 11 kV pin insulators No 75 5475
4 45 kN Disc insulator No 6 2100
5 Guy set complete Set 9 5085
6 Spiral Earth Electrode No 25 4625
7 EG Stirrups with G.I. wire lacing Set 25 7250
8 Rabbit ACSR conductor km 3.045 98963
9 Concrete for Guy set Nos. 9 297
10 labour charges
a) Casual 22388
b) Regular 13433
11 280665
Note
1
2
3
4
5
6
Brace 50x50x6 mm MS Angle 0.850 mtr long- 1 No.
Support piece for fixing EG stirrup 50x50x6 mm MS Angle 0.865 mtr long- 1 No.
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please
refer to Sl. No. 23 of general guidelines.
Cross Arm for fixing E.G Stirrups 1N0.
RCC Pole Clamps- No 5. -1No.
50x6 mm Flat 1.8 mtr, long- 1 No.
Special cross arms 50x50x6 mm MS 0.715 mtr long 3-Nos.
Item 2 includes, the following
Running single circuit 11 kV 3 phase power line on 9 mtr RCC pole using
rabbit conductor with 40 mtrs span with vertical configuration in congested
area
Total Cost per km in Rs.
COST DATA SHEET -14
SL.
No
Paritculars Unit Qty 8mtr RCC 9mtr RCC
1 RCC D.P structure Set 1 8450 10820
3 45 kN Disc Insulators No 6 2100 2100
4 Guy Set Set 2 1130 1130
5 Spiral Earth Electrode No 2 370 370
6 Concrete for Guy set No 2 66 66
7 Labour Charges
a) Casual 1496 1552
b) Regular 898 931
Total (A) 14510 16969
Part -B SWITCH GEAR
8 11 kV 400 A D/B GOS Set 1 12850 12850
9 H-Frame for mounting GOS No 1 2650 2650
10 DOLO Cut Out Set 1 1500 1500
11 Labour Charges
a) Casual 321 321
b) Regular 193 193
12 17514 17514
13 32023 34483
Providing 2 pole structrue at the tapping point using RCC poles
Total (B)
Total (A+B)
Part- A. Lines
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No.
23 of general guidelines.
COST DATA SHEET -15
SL.
No
Particulars Unit Qty 8mtr RCC 9mtr RCC
1 3 pole structure complete Set 1 14000 17410
2 Spiral Earth Electrode No 3 555 555
3 45 kN Disc Insulator No 6 2100 2100
4 Guy set Set 4 2260 2260
5 11 kV Pin Insulator with GI Pins No 6 438 438
6 Concrete for Guy set No 4 132 132
7 Labour Charges
a) Casual 2900 2984
b) Regular 1740 1790
8 24125 27669
ERECTION OF 3 POLE STRUCTURE
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No.
23 of general guidelines.
COST DATA SHEET -16
Total cost / km in Rs.
SL.
No
Particualrs Unit Qty Amount
1
Supplying and provide metal meter
housing box as per ESCOM's design and
specification and fixing it with, clamps bolts
and nuts and provide 3 phase meter
supplied by MESCOM
No 1 1878
2
Supplying fixing and wiring phase, 4 wire
with 10 Sq.mm Al. wire single core of
grade 650/1100 V in 32 to 40 mm dia PVC
pipe with necessary water tight bends etc.
the PVC pipe should be of not less than 2
mm thick
mtr 4 800
3
Supplying and providing spiral earth
electrodes with 8 SWG G.I wire as per
ESCOM's specification for earthing the
meter and the base
No 1 222
2900 Total cost / Box
ESTIMATE FOR PROVIDING METAL HOUSING BOX TO I.P SETS
COST DATA SHEET -17
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please
refer to Sl. No. 23 of general guidelines.
SL.
No
Description Unit QTY Amount
1 11 kV Class 3X 95 Sq.mm XLPE UG Cable km 1 859000
2
Straight through jointing kits HS Type
suitable for 95 Sq.mm Cable
No 3 11010
3
Cable termination kit Out door / In door HS
Type Suitable for 95 Sq.mm
No 2 4350
4 Cable covering tiles 250X250X40 mm No 4000 16400
5 Sand Cmt 60 54000
6
RCC Hume pipe, 2000 mm long, 150 mm
dia
No 50 12500
7 Collars for RCC Hume pipe No 30 1500
8
GI Pipe, 150 mm dia for drain crossing,
cable raising etc.,
mtr 8 7200
9 Route and joint indicating stones No 30 2850
968810
10 Labour charges
a) Cable trench excavation,
1000x0.6x1=600, Ordinary soil
Cmt 600 50400
b) Laying of cable in trench km 1 22312
c) Refilling and consolidation Cmt 550 15400
d) Making of straight through joints No 3 4836
e) Making of cable terminations No 2 2726
f) Covering the cable with tiles km 1 1363
g) Spreading Sand and forming with Sand
round the cable
km 1 4957
h) Laying of RCC Hume pipes mtr 100 2100
i) Laying of GI Pipe mtr 8 192
j) Laying of Route and J oint indicating
stones
No 30 1110
Total Labour Charges
a) Casual 105396
b) Regular 63238
11 Rates for Reinstatements of Roads
13 1137444 Total cost / km in Rs.
As per the prevailing rates of respective
Municipalties/City Corporation
COST DATA SHEET NO - 18
For laying of 1km length of 11kV 3 core 95 Sq.mm UG Cable
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please
refer to Sl. No. 23 of general guidelines.
Total
SL.
No
Description Unit QTY Amount
1
11 kV Class 3X 240 Sq.mm XLPE UG
Cable
km 1 1539000
2
Straight through jointing kits HS Type
suitable for 240 Sq.mm Cable
No 3 13275
3
Cable termination kit Out door / In door HS
Type Suitable for 240 Sq.mm
No 2 5400
4 Cable covering tiles 250X250X40 mm No 4000 16400
5 Sand Cmt 60 54000
6
RCC Hume pipe, 2000 mm long, 150 mm
Dia
No 50 12500
7 Collars for RCC Hume pipe No 30 1500
8
GI Pipe, 150 mm dia for drain crossing,
cable raising etc.,
mtr 8 7200
9 Route and joint indicating stones No 30 2850
1652125
10 Labour charges
a) Cable trench excavation,
1000x0.6x1=600, Ordinary soil
Cmt 600 50400
b) Laying of cable in trench km 1 23552
c) Refilling and consolidation Cmt 550 15400
d) Making of straight through joints No 3 4836
e) Making of cable terminations No 2 2726
f) Covering the cable with tiles km 1 1363
g) Spreading Sand and forming with Sand
round the cable
km 1 4957
h) Laying of RCC Hume pipes mtr 100 2100
i) Laying of GI Pipe mtr 8 192
j) Laying of Route and J oint indicating
stones
No 30 1110
11 Total Labour Charges
a) Casual 106636
b) Regular 63982
12 Rates for Reinstatements of Roads
13 1822743
For laying of 1km length of 11kV 3 core 240 Sq.mm XLPE UG Cable
Total cost / km in Rs.
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please
refer to Sl. No. 23 of general guidelines.
COST DATA SHEET NO - 19
Total
As per the prevailing rates of respective
Municipalties/City Corporation
SL.
No
Description Unit QTY Amount
1
11 kV Class 3X 400 Sq.mm XLPE UG
Cable
km 1 2412500
2
Straight through jointing kits HS Type
suitable for 400 Sq.mm Cable
No 3 16020
3
Cable termination kit Out door / In door HS
Type Suitable for 400 Sq.mm
No 2 5440
4 Cable covering tiles 250X250X40 mm No 4000 16400
5 Sand Cmt 60 54000
6
RCC Hume pipe, 2000 mm long, 150 mm
Dia
No 50 12500
7 Collars for RCC Hume pipe No 30 1500
8
GI Pipe, 150 mm dia for drain crossing,
cable raising etc.,
mtr 8 7200
9 Route and joint indicating stones No 30 2850
2528410
10 Labour charges
a) Cable trench excavation,
1000x0.6x1=600, Ordinary soil
Cmt 600 50400
b) Laying of cable in trench km 1 24790
c) Refilling and consolidation Cmt 550 15400
d) Making of straight through joints No 3 4836
e) Making of cable terminations No 2 2726
f) Covering the cable with tiles km 1 1363
g) Spreading Sand and forming with Sand
round the cable
km 1 4957
h) Laying of RCC Hume pipes mtr 100 2100
i) Laying of GI Pipe mtr 8 192
j) Laying of Route and J oint indicating
stones
No 30 1110
11 Total Labour Charges
a) Casual 107874
b) Regular 64724
12 Rates for Reinstatements of Roads
13 2701008
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please
refer to Sl. No. 23 of general guidelines.
As per the prevailing rates of respective
Municipalties/City Corporation
Total cost / km in Rs.
For laying of 1km length of 11kV 3 core 400 Sq.mm UG Cable
COST DATA SHEET NO - 20
Total
Rate
/Unit
Cost
Rate
/Unit
Cost
1 R.C.C Poles 9.0 mtr long Nos. 34 3492 118728 397 13498
2
11kV Class 3phase Aerial Bunched Cable
3x95 Sq mm +95 Sq mm
kms 1.015 541310 549430 19500 19792.5
3
Cable Straight thru' joint kits suitable for 95
Sq mm
Sets 3 4100 12300 1617 4851
4 T-J ointing kits Sets 12 5200 62400 2020 24240
5 Termination kits Sets 15 2600 39000 1367 20505
6
Suspension clamp assembly including pole
clamps
Sets 30 450 13500 75 2250
7
Dead end clamp / Anchor clamp assembly
including brackets, pole clamps
Sets 12 400 4800 100 1200
8
11 kV lightning Arrester, for Aerial
Bunched Cables
Set (3Nos) 2 2010 4020 70 140
9 Guy sets Sets 6 565 3390 132 792
10 Grounding connection for messenger wire Nos. 4 162 648 17 68
11 Anchor sleave for messenger wire Nos. 4 30 120 3 12
12 Spiral earth electrodes Nos. 34 185 6290 35 1190
13 Labour Charges
a) Casual 88539
b) Regular 53123
14 956287
Unit Qty
Material cost LabourCost
Running Single Circuit 11 kV 3 Phase Power Line on 9 mtr RCC supports with average span of 30 mtrs
using 3x95 Sqmm+1x95 Sqmm Aerial Bunched Cables (ABC)
COST DATA SHEET - 33
SL.
No
Particulars
Total cost / km in Rs.
Rate
/Unit
Cost
Rate
/Unit
Cost
1 R.C.C Poles 9.0 mtr long Nos. 25 3492 87300 397 9925
2
1.1kV Class 3phase Aerial Bunched Cable
of size 3x70+1x16+1x50 Sq mm
kms 1.015 216020 219260 17500 17762.5
3
Three phase Distribution box for 6
connections
Nos. 20 1500 30000 350 7000
4
Piercing connector suitable for 16 Sq.mm-
70 Sq.mm AB Cable- Service connections
& streetlight connections
Nos. 25/60 210/300 23250 50 4250
5
Suspension clamp assembly including pole
clamps
Sets 20 450 9000 75 1500
6
Dead end clamp / Anchor clamp assembly
including brackets, pole clamps
Sets 16 400 6400 100 1600
7 Universal hook, Bolts & nuts Nos. 16 200 3200 75 1200
8 T-connector KZ3 95 Nos. 8 515 4120 85 680
9
Cable Straight thru' joint kits suitable for 70
Sq mm
Sets 5 400 2000 100 500
10 Pre-Insulated lugs-CPTAU for 70 Sq.mm Nos. 8 400 3200 100 800
11 End cap for 50/70 Sqmm Nos. 50 25 1250 3 150
12 Guy sets Sets 8 565 4520 132 1056
13 PVC Insulated wire i6/25 Sq mm mtrs 400 23.95 9580 * *
14 Spiral earth electrodes Nos. 25 185 4625 35 875
15 Labour Charges
a) Casual 47299
b) Regular 28379
483383 Total cost / km in Rs.
COST DATA SHEET - 34
Running Single Circuit 1.1 kV 3 Phase 5 Wire Power Line on 9 mtr RCC supports with average span of 40
mtrs using 3x70+1x16+1x50 Sqmm Aerial Bunched Cables (ABC)
SL.
No
Particulars Unit Qty
Material cost LabourCost
Sl.
No
Particulars Unit Qty 250kVA 100kVA 63kVA 25kVA
1 A. Transformer
a) 9 mtr RCC DP
Transformer Structure
Set 1 17470 17470 13230 13230
b) 8 mtr RCC DP
Transformer Structure
Set 1 15200 15200 10960 10960
2 11 kV Pin insulators No 3 219 219 219 219
3 45 kN disc insulators No 3 1050 1050 1050 1050
4 Guy set Set 4 2260 2260 2260 2260
5
11 kV/433 V 3 phase 50
Cys Distribution
Transformer with oil
Off Load Tap changer
No 1 239600 116330 95300 64100
6
Earthing materials pipe
type for grounding
Set 3 4050 4050 4050 4050
7
AC devices, Danger Board,
Bird guards etc
Ls 1000 1000 1000 1000
8 Concreting for Guy sets No 4 132 132 132 132
9 GI Wire 10 SWG kg 40 1610 1610 1610 1610
10 Guy wire 7/10 SWG kg 40 1752 1752 1752 1752
Total using 9 mtr Poles 269143 145873 120603 89403
Total using 8 mtr Poles 266873 143603 118333 87133
11 Labour Charges
I) using 9 mtr Poles
a) Casual 4896 4182 3427 3427
b) Regular 2938 2509 2056 2056
ii) using 8 mtr poles
a) Casual 4738 4024 3217 3217
b) Regular 2843 2414 1930 1930
COST DATA SHEET -21
ERECTION OF 3 PHASE11 kV/433 V DISTRIBUTION TRANSFORMER CENTRE
12 Total for A
I) Using 9 mtr Poles 276977 152564 126086 94886
ii) using 8 mtr poles 274454 150041 123480 92280
13
B. 11 kV lightning
Arrester , Metal oxide,
9 kV, 5 kA
Set
(3No
s)
1 1470 1470 1470 1470
14 Labour Charges
a) Casual 48 48 48 48
b) Regular 29 29 29 29
15 Total for B 1547 1547 1547 1547
C-Switch gear
a) LT Protection kit for 25
kVA/ 63 kVA/ 100 kVA &
Distribution box for 100 &
250kVA with MCBs
No 1 18675 18675 1630 1630
b) LT witing kit for LT
protection kit (Please see
B.o.M - 8 & 9)
No 1 18535 11005 4475 1280
c) LT Metering box for
housing ETV Meter with
CT(Please see C.D.S -24)
No 1 11410 11440 11635 12325
17
HG Fuse, 11 kV Solid Core
Type ( 3Nos)
Set 1 2325 2325 2325 2325
18 GOS 200 A single break No 1 5350 5350 5350 5350
19 Labour Charges
a) Casual 1321 1321 1321 1321
b) Regular 793 793 793 793
20 Total for C 58409 50909 27529 25024
21 Total (A+B+C)
336932 205020 155162 121457
334409 202497 152556 118851
Note: Provision for actual quantity of additional materials viz 45 kN disc insulator 11 kV pin insulators
ACSR/AAA Conductor, Transparent Alkathin Tube, PG Clamps and Terminal Connectors etc.
Whenever required may be made in the estimate separately for formation of bus and tapping the OH
line to HT side terminals of transformer.
1) Using 9 mtr Poles
2) Using 8 mtr Poles
16
Set 1900000
Set 2200000
Set 2350000
Set 6000
1
Packaged Sub-station 11kV/433 V consisting of 3 way SF6/VCB insulated
compact RMU, oil cooled type copper wound transformer and L.T section
with one ACB as incoming and 7 nos. outgoing MCCB feeders, and with
encloser made of electronically Galvanized sheets as per the technical
specifications
Providing Compact Pre-fabricated Packaged Sub-station 11kV / 433 V
COST DATA SHEET -35
Installing & fixing the compact pre-fabricated packaged sub-station
500/750/990 kVA transformer on the existing concrete plinth.(This does not
include the cost of plinth, cable duct,laying & termination of cable etc.
provision for the same shall be made separately as per the prevailing rates
depending on the site conditions)
2
(i) With 500 kVA oil cooled transformer
(ii) With 750 kVA oil cooled transformer
(iii) With 990 kVA oil cooled transformer
Rate /
unit
Cost
Rate /
unit
Cost
1
9 mtr long RCC pole ( Square
Section)
Nos 1 4820 4820 397 397
2 11kV Pin insulators with pins Nos 3 73 219 ** **
3 45 kN Disc insulator Nos 3 350 1050 ** **
4 Guy set complete Set 1 565 565 132 132
5
Single pole TC set suitable for
25 kVA Transformer
Set 1 3335 3335 380 380
6
25 kVA,11kV/433Volts 3 phase
50 cycles Dist. Tr. with Oil
Nos 1 64100 64100 715 715
7
Earthing materials pipe type for
grounding
Set 3 1350 4050 214 642
8
Concreting materials for 9 mtr
RCC Pole
Nos 1 730 730 ** **
9
Concreting materials for Guy
sets
Nos 1 33 33 ** **
10 GI Wire 10 SWG kg 40 40.25 1610 ** **
11 Guy wire 7/10 SWG kg 40 43.8 1752 ** **
12 Lightning Arresters 9 kV(3 Nos) Set 1 1470 1470 48 48
13
LT Metering Box for housing the
ETV Meter with CT's
Set 1 12325 12325 500 500
14 a) LT Protection kit Nos 1 1630 1630 572 572
b) LT Wiring kit Set 1 1280 1280 * *
15
HG Fuse, 11 kV Solid Core
Type (3 Nos)
Set 1 2325 2325 84 84
16
11 kV, 200 Amps, single break
GOS
Set 1 5350 5350 165 165
17 H-Frame for mounting GOS Set 1 2650 2650 72 72
18 Labour Charges
a) Casual 3707
b) Regular 2224
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl.
No. 23 of general guidelines.
Total cost for erection of a single pole mounted 25kVA
Transformer in Rs
115225
COST DATA SHEET - 22
Erection of 25 kVA , 11kV/433V , Single pole mounted transformer centre
Sl.
No
Materials Unit Qty.
Material cost Lobour Cost
Rate /
unit
Cost
Rate /
unit
Cost
1
9 mtr long RCC pole ( Square
Section)
Nos 1 4820 4820 397 397
2 11kV Pin insulators with pins Nos 3 73 219 ** **
3 45 kN Disc insulator Nos 3 350 1050 ** **
4 Guy set complete Set 1 565 565 132 132
5
Single pole TC set suitable for
63 kVA Transformer
Set 1 3335 3335 380 380
6
63 kVA,11kV/433Volts 3 phase
50 cycles Dist. Tr. with Oil
Nos 1 95300 95300 715 715
7
Earthing materials pipe type for
grounding
Set 3 1350 4050 214 642
8
Concreting materials for 9 mtr
RCC Pole
Nos 1 730 730 ** **
9
Concreting materials for Guy
sets
Nos 1 33 33 ** **
10 GI Wire 10 SWG kg 40 40.25 1576 ** **
11 Guy wire 7/10 SWG kg 40 43.8 1752 ** **
12 Lightning Arresters 9 kV(3 Nos) Set 1 1470 1470 48 48
13
LT Metering Box for housing the
ETV Meter with CT's
Set 1 11635 11635 500 500
14 a) LT Protection kit Nos 1 1630 1630 572 572
b) LT Wiring kit Set 1 4475 4475 * *
15
HG Fuse, 11 kV Solid Core
Type (3 Nos)
Set 1 2325 2250 84 84
16
11 kV, 200 Amps, single break
GOS
Set 1 5350 5350 165 165
17 H-Frame for mounting GOS Set 1 2650 2650 71 71
18 Labour Charges
a) Casual 3706
b) Regular 2198
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl.
No. 23 of general guidelines.
COST DATA SHEET - 23
Erection of 63 kVA , 11kV/433V , Single pole mounted transformer centre
Material cost Lobour Cost
Total cost for erection of a single pole mounted 63kVA
Transformer is Rs
148794
Sl.
No
Materials Unit Qty.
Rate /
unit
Cost
Rate /
unit
Cost
1
9 mtr long RCC pole ( Square
Section)
Nos 1 4820 4820 397 397
2 11kV Pin insulators with pins Nos 3 73 219 ** **
3 45 kN Disc insulator Nos 3 350 1050 ** **
4 Guy set complete Set 1 565 565 132 132
5
Single pole TC set suitable for
100 kVA Transformer
Set 1 5730 5730 380 380
6
100 kVA,11kV/433Volts
3 phase 50 cycles Dist. Tr. with
Oil
Nos 1 116330 116330 1426 1426
7
Earthing materials pipe type for
grounding
Set 3 1350 4050 215 645
8
Concreting materials for 9 mtr
RCC Pole
Nos 1 730 730 ** **
9
Concreting materials for Guy
sets
Nos 1 33 33 ** **
10 GI Wire 10 SWG kg 40 40.25 1576 ** **
11 Guy wire 7/10 SWG kg 40 43.8 1752 ** **
12 Lightning Arresters 9 kV(3 Nos) Set 1 1470 1470 48 48
13
LT Metering Box for housing the
ETV Meter with CT's
Set 1 11440 11440 500 500
14 a) LT Protection kit Nos 2 1630 3260 572 1144
b) LT Wiring kit Set 1 11005 11005 * *
15
HG Fuse, 11 kV Solid Core
Type (3 Nos)
Set 1 2325 2325 84 84
16
11 kV, 200 Amps, single break
GOS
Set 1 5350 5350 165 165
17 H-Frame for mounting GOS Set 1 2650 2650 71 71
18 Labour Charges
a) Casual 4992 4992
b) Regular 2995
Total cost for erection of a single pole mounted 100
kVA Transformer is Rs
182342
COST DATA SHEET - 24
Erection of 100 kVA , 11kV/433V , Single pole mounted transformer centre
Sl.
No
Materials Unit Qty.
Material cost Lobour Cost
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl.
No. 23 of general guidelines.
Rate/
unit
Cost Rate/Unit Cost
1
LT CT's Class-1 accuracy ring
type ratio 50/5 for 15/25 kVA
DTC
Set
(3
Nos)
1 1965 1965 85 85
2
LT CT's Class-0.5 accuracy ring
type ratio 100/5 for
50/63 kVA DTC
Set
(3
Nos)
1 1275 1275 85 85
3
LT CT's Class-0.5 accuracy ring
type ratio 150/5 for
100 kVA DTC
Set
(3
Nos)
1 1080 1080 85 85
4
LT CT's Class-0.5 accuracy ring
type ratio 400/5 for
250 kVA DTC
Set
(3
Nos)
1 1050 1050 85 85
5
LT CT's Class-0.5 accuracy ring
type ratio 800/5 for
500 kVA DTC
Set
(3
Nos)
1 1230 1230 85 85
6
Electronic Trivector Meter
3-phase 4 wire
No 1 6710 6710 250 250
7
LT Tamper proof Box for
housing the ETV Meters with
Busbars, wiring etc.,
No 1 3650 3650 165 165
Total Cost (Rs.)
a)15/25 kVA DTC
b) 63 kVA DTC
c)100 kVA DTC
d) 250 kVA DTC
e) 500 kVA DTC
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl.
No. 23 of general guidelines.
Material cost Labour cost
Sl.
No
Materials Unit QTY.
COST DATA SHEET-36
For providing Electronic Trivector Meters with associated CT's Metering Box etc., on
LT side of Distribution Transformer Center
12325
11440
11410
11590
11635
Rate/
unit
Cost Rate/Unit Cost
1
Fixing 3 kVAr 3-phase LT
Capacitor housed in a enclosure
with necessary Fusses, wiring,
mounting arrangement for 15/25
kVA DTC
Set 1 750 750 170 170
2
Fixing 9 kVAr 3-phase LT
Capacitor housed in a enclosure
with necessary Fusses, wiring,
mounting arrangement for 63
kVA DTC
Set 1 1330 1330 170 170
3
Fixing 18 kVAr 3-phase LT
Capacitor housed in a enclosure
with necessary Fusses, wiring,
mounting arrangement for 100
kVA DTC
Set 1 2475 2475 200 200
4
Fixing 27 kVAr 3-phase LT
Capacitor housed in a enclosure
with necessary Fusses, wiring,
mounting arrangement for 250
kVA DTC
Set 1 3940 3940 235 235
5
Fixing 54 kVAr 3-phase LT
Capacitor housed in a enclosure
with necessary Fusses, wiring,
mounting arrangement for
300/500 kVA DTC
Set 1 6975 6975 245 245
For providing L.T Capacitor to the Distribution Transformer
COST DATA SHEET-37
Material cost Labour cost
Sl.
No
Materials Unit QTY.
Rate/
unit
Cost
Rate/
unit
Cost
1 Spun pole 11.0 mtr long No 1 8365 8365 675 675
2
Single pole transformer
structure kit for 250kVA
Set 1 17275 17275 760 760
3
HT Single top support with
bolts, nuts & washers
No 9 75 675 37 333
4 11kV pin insulator with pins No 9 73 657 ** **
5
Rabbit ACSR Conductor for
jumps
mtr 50 32.5 1625 1 50
6
Alkathene tube 19mm dia
and in coils of 30 mtrs
Coil 2 480 960 ** **
7 Cement concretting Cmt 1.4 966 1352 ** **
8 GI Wire 10 SWG kg 50 40.25 2013 ** **
9 Guy wire 7/10 SWG kg 50 43.8 2190 ** **
10
Copper terminals 95 Sq.mm
for jumps
No 6 45 270 ** **
11 GI Pipe 100 mm dia mtr 10 850 8500 ** **
12 PVC Pipe 150 mm dia mtr 20 262 5240 ** **
13 PVC bend 150 mm dia No 8 40 320 ** **
14 PVC pipe (25mm dia) mtr 40 21 840 ** **
15
250 kVA Distribution
Transformer, 11kV/433V
with Oil
No 1 239600 239600 2140 2140
16 200A Single break GOS Set 3 5350 16050 165 495
17
HG Fuse unit 11kV Solid
core type
Set
(3 Nos.)
1 2325 2325 84 84
18
Rod earthing with 40 mm
dia 3 mtrs long MS Rod as
per specification & drawing
Nos 3 1612 4836 122 366
19
LT Metering Box for housing
the ETV Meter with CT's
Set 1 11410 11410 500 500
20
LT Distribution box for
250 kVA including wiring
No 1 18675 18675 572 572
21 LT Wiring kit for 250 kVA Set 1 18535 18535 * *
22 11kV Lightning Arresters
Set
(3 Nos.)
1 1470 1470 48 48
23
PVC Insulation tape in rolls
of 10 mtrs
Roll 3 14 42 ** **
24 Horizontal cross arms No 4 206 824 37 148
25 MS Fish plate No 9 43 387 6 54
26 Labour Charges
a) Casual 6225 6225
b) Regular 3735
27 374396 Total cost in Rs
Note: While preparing estimates for APDRP/ Distribution Works on turnkey basis please refer to Sl. No.
23 of general guidelines.
COST DATA SHEET-25
Erection of 250 KVA, 11kV/433V, Single pole mounted Distribution Transformer on
11.0 mtr spun pole with GOS system
Sl.
No
Materials Unit Quantity
Material cost Labour cost
Rate/
unit
Cost
1 No. 1 1044600 1044600
2 cmt 2.0 84 168
3 cmt 1.0 2308 2308
4 cmt 1.5 3011 4517
5 cmt 2.0 87 174
6 Sq. mtr 15.0 93 1395
7 Nos. 4 1240 4960
8 Set 1 310 310
9 Set 2 1734 3468
1061900
RMU (4way), One In comer +Two Breakers
+one out going (2OD +2 VL), 350 MVA, 630A
Unit Quantity
COST DATA SHEET-29
Providing Compact RMU 11kV Class SF6/VCB Type
(1 Incomer+2 Breakers+1 Outgoing)
Sl.
No
Material cost
Materials
Rod type earthing with 40 mm dia 3 mtrs long
MS rod as per specification & drawing including
Labour charges
Total cost in Rs
Earth Excavation for R.M.U. Foundation
depositing of earth on bank up to a lead of
50 mtrs and with a lift up to 1.5 mtrs
Providing and Laying Granite or Basalt or trap
jelly concrete 1:4:8 proporation using 40 mm
and down size jelly for foundation laid in 15 cm
thick layers and well compacted including curing
complete (including material rate for cement,
jelly, sand and labour)
Lettering the RMU with enamel paint and also
writing single line diagram of each panel, caution
Board, Danger Board etc., including cost of
Paint, Brush etc.,
Providing and laying granite basalt or trap jelly
cement concrete 1:2:4 proportion using 20 mm
and down size jelly including Mixing laying
Tamping. Curing and finished for exposed faces
with necessary centering and form work etc.,
complete (including material rate for cement,
sand, jelly and labour)
Lifting of excess earth up to distance of 10 km
Plastering concrete surface in cement mortar
1:4, 20 mm thick inclusive of smooth rendering
curing etc., complete.
Fixing foundation frame of MS channel
100X50mm and MS angle 40X40X5mm
welding, fixing in concrete, aligning the
RMU on foundation bed, assembly of units,
connecting Bus Bars from panel to panel
etc., complete.
Rate/
unit
Cost
1 No. 1 647000 647000
2 cmt 1.5 84 126
3 cmt 0.75 2308 1731
4 cmt 1.2 3011 3613
5 cmt 1.5 87 131
6 Sq. mtr 12.0 93 1116
7 Nos. 3 1240 3720
8 Set 1 310 310
9 Set 2 1734 3468
661215
COST DATA SHEET-30
RMU (3way), One In comer +one Breaker +one
out going (2OD +1 VL), 350 MVA, 630A
Earth Excavation for R.M.U. Foundation
depositing of earth on bank up to a lead of
50 mtrs and with a lift up to 1.5 mtrs
Providing and Laying Granite or Basalt or trap
jelly concrete 1:4:8 proporation using 40 mm
and down size jelly for foundation laid in 15 cm
thick layers and well compacted including curing
complete (including material rate for cement,
jelly, sand and labour)
Providing and laying granite basalt or trap jelly
cement concrete 1:2:4 proportion using 20 mm
and down size jelly including Mixing laying
Tamping. Curing and finished for exposed faces
with necessary centering and form work etc.,
complete (including material rate for cement,
sand, jelly and labour)
Providing Compact RMU 11kV Class SF6/VCB Type
(1 Incomer+1 Breaker+1 Outgoing)
Sl.
No
Materials Unit Quantity
Material cost
Rod type earthing with 40 mm dia 3 mtrs long
MS rod as per specification & drawing including
Labour charges
Total cost in Rs
Lifting of excess earth up to distance of 10 km
Plastering concrete surface in cement mortar
1:4, 20 mm thick inclusive of smooth rendering
curing etc., complete.
Fixing foundation frame of MS channel
100X50mm and MS angle 40X40X5mm
welding, fixing in concrete, aligning the RMU on
foundation bed, assembly of units, connecting
Bus Bars from panel to panel etc., complete.
Lettering the RMU with enamel paint and also
writing single line diagram of each panel, caution
Board, Danger Board etc., including cost of
Paint, Brush etc.,
Rate/
unit
Cost
1 No. 1 126000 126000
2 cmt 0.5 84 42
3 cmt 0.25 2308 577
4 cmt 0.38 3011 1144
5 cmt 0.5 87 44
6 Sq. mtr 3.75 93 349
7 No. 1 1240 1240
8 Set 1 310 310
9 Set 2 1734 3468
133173
COST DATA SHEET-31
Providing Compact RMU 11kV Class SF6/VCB Type (1OD)
Material cost
Compact RMU 11kV Class SF6/VCB Type
(1OD)
Earth Excavation for R.M.U. Foundation
depositing of earth on bank up to a lead of
50 mtrs and with a lift up to 1.5 mtrs
Providing and Laying Granite or Basalt or trap
jelly concrete 1:4:8 proporation using 40 mm
and down size jelly for foundation laid in 15 cm
thick layers and well compacted including curing
complete (including material rate for cement,
jelly, sand and labour)
Sl.
No
Materials Unit Quantity
Lettering the RMU with enamel paint and also
writing single line diagram of each panel, caution
Board, Danger Board etc., including cost of
Paint, Brush etc.,
Rod type earthing with 40 mm dia 3 mtrs long
MS rod as per specification & drawing including
Labour charges
Total cost in Rs
Providing and laying granite basalt or trap jelly
cement concrete 1:2:4 proportion using 20 mm
and down size jelly including Mixing laying
Tamping. Curing and finished for exposed faces
with necessary centering and form work etc.,
complete (including material rate for cement,
sand, jelly and labour)
Lifting of excess earth up to distance of 10 km
Plastering concrete surface in cement mortar
1:4, 20 mm thick inclusive of smooth rendering
curing etc., complete.
Fixing foundation frame of MS channel
100X50mm and MS angle 40X40X5mm
welding, fixing in concrete, aligning the RMU on
foundation bed, assembly of units, connecting
Bus Bars from panel to panel etc., complete.
Rate/
unit
Cost
1 No. 1 395000 395000
2 cmt 0.5 84 42
3 cmt 0.25 2308 577
4 cmt 0.38 3011 1144
5 cmt 0.5 87 44
6 Sq. mtr 3.75 93 349
7 No. 1 1240 1240
8 Set 1 310 310
9 Set 2 1734 3468
402173
Material cost
Compact RMU 11kV Class SF6/VCB Type
(1VL) 350 MVA, 630A
Earth Excavation for R.M.U. Foundation
depositing of earth on bank up to a lead of
50 mtrs and with a lift up to 1.5 mtrs
Providing and Laying Granite or Basalt or trap
jelly concrete 1:4:8 proporation using 40 mm
and down size jelly for foundation laid in 15 cm
thick layers and well compacted including curing
complete (including material rate for cement,
jelly, sand and labour)
Providing and laying granite basalt or trap jelly
cement concrete 1:2:4 proportion using 20 mm
and down size jelly including Mixing laying
Tamping. Curing and finished for exposed faces
with necessary centering and form work etc.,
complete (including material rate for cement,
sand, jelly and labour)
COST DATA SHEET-32
Providing Compact RMU 11kV Class SF6/VCB Type (1VL)
Sl.
No
Materials Unit Quantity
Rod type earthing with 40 mm dia 3 mtrs long
MS rod as per specification & drawing including
Labour charges
Total cost in Rs
Lifting of excess earth up to distance of 10 km
Plastering concrete surface in cement mortar
1:4, 20 mm thick inclusive of smooth rendering
curing etc., complete.
Fixing foundation frame of MS channel
100X50mm and MS angle 40X40X5mm
welding, fixing in concrete, aligning the RMU on
foundation bed, assembly of units, connecting
Bus Bars from panel to panel etc., complete.
Lettering the RMU with enamel paint and also
writing single line diagram of each panel, caution
Board, Danger Board etc., including cost of
Paint, Brush etc.,
1 Metallic Enclosure with Busbars No 1 6255 6255
2
Programmable Logic Controllers with
communication ports
No 1 12370 12370
3 GSM Modem No 1 6680 6680
4 MCCB- 40 Amps for 15/25 kVA DTC No 1 1605 1605
5 MCB 6 amps No 1 247 247
6
Contactors- 40 Amps for 15/25 kVA
DTC
No 2 2200 4400
7
Current Transformers 50/5 amps for
15/25 kVA DTC
No 3 655 1965
8 Energy meter ETV type No 1 6710 6710
9
Transformer wiring kit to Connect RLM
Unit box to the transformer using PVC
aluminium lead wire, Lugs etc.,
Set 1 1280 1280
10 Miscellaneous materials L/s 688
11 Labour Charges
a) Casual 1470
b) Regular 882
12 44552 Total Cost
Note:(1) For 15 /25 kVA Transformer feeding to individual IP sets, use only one
contactor & without MCCB .
(2) For 15 kVA transformer under own your transformer scheme (OYT), The RLM
Units shall house 2/4 output without MCCB. One contactor of 30 amps rating in
conjunction with the PLC is sufficient.
COST DATA SHEET - 26
Installing RLMU for the existing 15/25 kVA Distribution Transformer Center
Sl
No
Particulars Unit Qty
Rate/
Unit
Cost
1 Metallic Enclosure with Busbars No 1 6255 6255
2
Programmable Logic Controllers with
communication ports
No 1 12370 12370
3 GSM Modem No 1 6680 6680
4 MCCB-100 Amps for 63 kVA DTC No 1 1605 1605
5 MCB 6 amps No 1 247 247
6 Contactors- 100 Amps for 63 kVA DTC No 2 4700 9400
7
Current Transformers 100/5 amps for 63
kVA DTC
No 3 425 1275
8 Energy meter ETV type No 1 6710 6710
9
Transformer wiring kit to Connect RLM
Unit box to the transformer using PVC
aluminium lead wire, Lugs etc.,
Set 1 4665 4665
10 Miscellaneous materials L/s 793
11 Labour Charges
a) Casual 1470
b) Regular 882
12 52352 Total Cost
COST DATA SHEET - 27
Installing RLMU for the existing 63 kVA Distribution Transformer Center
Sl
No
Particulars Unit Qty
Rate/
Unit
Cost
1 Metallic Enclosure with Busbars No 1 6255 6255
2
Programmable Logic Controllers with
communication ports
No 1 12370 12370
3 GSM Modem No 1 6680 6680
4 MCCB-160 Amps for 100 kVA DTC No 1 3100 3100
5 MCB 6 amps No 1 247 247
6 Contactors- 160 Amps for100 kVA DTC No 2 6550 13100
7
Current Transformers 150/5 amps for
100 kVA DTC
No 3 360 1080
8 Energy meter ETV type No 1 6710 6710
9
Transformer wiring kit to Connect RLM
Unit box to the transformer using PVC
aluminium lead wire, Lugs etc.,
Set 1 11365 11365
10 Miscellaneous materials L/s 893
Labour Charges
a) Casual 1470
b) Regular 882
12 64152
11
Total Cost
Rate/
Unit
Cost
COST DATA SHEET - 28
Installing RLMU for the existing 100 kVA Distribution Transformer Center
Sl
No
Particulars Unit Qty
Schedule of Rates for Standard Stock Materials
2007
Part-2
Page 1
Line Supports
1 RCC Pole-9.0M Long, 145 kg WL 200105 3235 No. 3492
2 RCC Pole-9.0M Long, 145 kg WL sq. section 200106 New Item No. 4820
3 RCC Pole-8.0M Long, 115 kg WL 200103 2165 No. 2356
4 PCC Pole-8.0M Long, 140 kg WL 200003 1382 No. 1517
5 PSC Pole-8.0M Long, 200 kg WL 200004 1712 No. 1845
6 PSC Pole -9.0M Long, 200 kg WL 200006 2081 No. 2281
7 Pre-Stressed Tubular Spun Pole 11M Long 200120 6600 No. 8365
8 RCC Pole-9.5M Long, 350 kg WL for 33kV Lines 200107 3910 No. 4163
9
Strut pole made of released MS Rail pole or
Tubular pole along with clamp fish plate, bolts &
nuts
200514 1650 No. 1780
10
11 Mtrs. Long pole made of I Beam (MS) section
size 200x100mm 25.9kg/mtr.
200621 New Item No. 13300
11
11 Mtrs. Long pole made of I Beam (MS) section
size 175x85mm 19.5kg/mtr.
200610 New Item No. 9100
Cross Arms (MS)
1 11kV Horizontal X arms 279020 150 No 206
2 11kV Special 3pin X arm 279013 395 No 500
3 L.T. 4Pin X arms 279014 125 No 160
4 L.T. 2Pin X arms 279012 55 No 73
5 L.T.S.T Support 50X6mm flat 279091 30 No 38
6 H.T.S.T Support 50X6mm flat 279092 44 No 50
7 Brace for LT 4pin X arm (600mm long) 279082 95 No 102
8 Brace for 11 kV special 3pin X arm (900mm long) 279083 130 No 140
9 L.T.Cross arms for vertical configuration 279017 320 No 345
10 EG Stirrups (MS) with GI wire lacing 279130 139 No 145
11 Spiral Earth Electrode 281683 160 No 185
Clamps (MS)
1 RCC Pole clamp 279523 38 No 44
2 PCC Pole clamp 279503 37 No 39
3 PSC Pole clamp 279510 38 No 44
4 PCC Pole clamp type A for LT X arm 279502 35 No 39
5
PCC Pole clamp type A for X arm upto 1M from
pole top
279522 35 No 39
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sc hedul e of Rat es f or St andar d St oc k Mat er i al s 2007
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
Page 2
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
6
Clamps for fixing MV Lamp control box, fuse box/St
light fixture on rail pole
279550 45 No 52
7 Guy clamp 279650 40 No 46
8 Turn buckle (GI) 279146 115 No 134
9 Rcc pole type C clamp for GOS operating handle 279524 40 No 43
10 MS Fish Plate 279800 40 No 43
11
Strain Clamps, 3 Bolt type for 70/90 kN Disc
Insulator
285076 400 No 501
Insulators
1 11kV Pin Insulatror (Shell only) 283005 30 No 34
2 11kV Pin Insulatror (G.I Pin only) 283055 38 No 39
3 1.1kV Pin Insulatror (Shell only) 283003 9 No 10
4 1.1kV Pin Insulatror (G.I Pin only) 283053 18 No 18
5 NO.8 Strain Insulator 283158 9 No 11
6 NO.15 Strain Insulator 283166 20 No 23
7 DISC Insulators 45kN 283040 268 No 350
8 DISC Insulators 70kN, Ball & Socket type 283017 300 No 360
9 DISC Insulators 90kN, Ball & Socket type 283018 300 No 360
10 DISC Insulators 120kN, Ball & Socket type 283021 365 No 390
11 11kV Solid Core Insulator 283321 95 No 100
12 11kV Post Insulator 283101 240 No 255
13 Silcon rubber composite insulator 283320 New Item No 270
Conductor
1 Weasel ACSR 284105 14930 km 19700
2 Rabbit ACSR 284108 25490 km 32500
3 Coyote ACSR 284116 67216 km 86700
4 Lynx ACSR 284120 New Item km 242080
Guy Wire & G.I.Wire
1 7/10 SWG Guy Wire 281110 43500 MT 43800
2 8 SWG G.I.Wire 281008 42000 MT 43600
3 10 SWG G.I.Wire 281010 36800 MT 40250
4 Anchor Rod using 12mm rounds 279140 90 No 100
5 G.I Barbed Wire 12 SWG 281205 42010 MT 48800
P.G.Clamps
1 Coyote to Coyote 285515 210 No 240
2 Rabbit to Rabbit 285510 55 No 70
3 Weasel to Rabbit 285549 55 No 70
4 Weasel to Weasel 285509 55 No 58
5 Squirrel to Weasel 285548 54 No 56
Page 3
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
6
T-Clamps for Rabbit conductor with hot dipped
galvanized bolts, Nuts and Washers
285600 175 Set 219
7 Single Tension Clamp Suitable for Rabbit 285068 441 No 498
8 Single Tension Clamp Suitable for Coyote 285076 572 No 716
DTs-3Phase, 11kV/433V
1 Distribution Transformer-15kVA, Copper Winding 321301 36790 No 47100
2 Distribution Transformer-25kVA, Almunium Wdg. 321304 35560 No 64100
3 Distribution Transformer-63kVA, Almunium Wdg. 321306 51269 No 95300
4 Distribution Transformer-100kVA, Almunium Wdg. 321310 62849 No 116330
5 Distribution Transformer-250kVA, Almunium Wdg. 321325 127310 No 239600
6 Distribution Transformer-500kVA, Almunium Wdg. 321350 216730 No 450000
Distribution Transformer- Amorphous Core
11kV/433V
1 Distribution Transformer-25kVA 321376 63174 No 94350
2 Distribution Transformer-63kVA 321377 97162 No 145000
3 Distribution Transformer-100kVA 321380 97162 No 145000
Distribution Transformer Self Protected
11kV/433V
1 100 kVA 321365 New Item No 118500
2 250 kVA 321370 New Item No 238300
DTs-Single phase, 11kV/250V
1
Distribution Transformer- 15 kVA,
11kV/1.73/0.25, with MCCB
321302 37210 No 56600
2
Distribution Transformer 15 kVA, 11kV/0.25kV
Amorphouse core copper winding with MCCB
321303 41673 No 61200
3
Distribution Transformer- 10 kVA, Copper
winding, 11kV/250V
321300 New Item No 35500
Transformer Oil
1 EHV Grade Transformer oil -new 601400 39842 k.Ltr 44100
2 Reclaimed oil 601410 17700 k.Ltr 19400
3 Contaminated oil 601420 14000 k.Ltr 15400
L.T.Protection
1 L.T.Protection kit for 25kVA to 100kVA DTCs 301107 1523 No. 1630
L.T.Distribution Box
2
L.T.Distribution Box for 100 / 250 kVA DTC with
MCBs
301230 13714 No. 18675
L.T.Wiring kit for LT protection kit
1 For 25 kVA DTC 301151 800 Set 1280
Page 4
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
2 For 63 kVA DTC 301152 2165 Set 4475
3 For 100 kVA DTC 301153 8500 Set 11005
4 For 250 kVA DTC 301154 12800 Set 18535
Lightning Arresters
1 L.A. 9kV, 5kA, Metal Oxide 303200 487 No 490
2 L.A. 9kV, 5kA, Polymeric type 303205 891 No 870
H.G.Fuse Unit
1 11kV Class, Solid core 720 720 No. 775
T.C.Sets
1 25/63kVA T.C.Sets 279110 5340 Set 5720
2 100/300 kVA T.C.Sets 279120 9960 Set 9960
3
Single Pole Mounted Transformer kit for 250 kVA on
11 mtr spun poles
279125 16410 Set 17275
4
Single Pole Mounted Transformer kit for 25/63kVA
for RCC Poles
279115 3335 Set 3335
5
Single Pole Mounted Transformer kit for 100kVA for
RCC Poles
279125 5350 Set 5730
G.O.S
1 11kV G.O.S 200A Single break 304212 4700 Set 5350
2 11kV G.O.S 200A Single break, vertically operated 304213 5813 Set 6260
3 11kV G.O.S 400A Double break 304224 11920 Set 12850
4
11kV G.O.S.Mounting H-Frame set for 200A Single
break
279149 2060 Set 2650
5
Male and female contacts with Bolts and Nuts for 11
KV 200A GOS (3 Male and 3 Female contacts each)
New Item ** Set 1990
6 11 kV DOLO Cutouts 302011 1395 Set 1500
7 11 kV 400A Special Roaster GOS 304204 7960 Set 8575
D.P.Sets
1 D.P.Sets 279100 2827 Set 3400
3 Pole Structure Kit
1 3 Pole Structure material 279015 6068 Set 6500
C-Type fired wedge Boltless connector
1 Rabbit to Rabbit ACSR conductor 285570 466 No 468
2 Coyote to Coyote ACSR conductor 285575 908 No 945
3 Rabbit to Coyote ACSR conductor 285572 New Item No 790
H-Clamps
1 Rabbit to Rabbit 285585 New Item No. 70
2 Coyote to Coyote 285587 New Item No. 360
Page 5
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
3 Rabbit to Coyote 285586 New Item No. 340
4 Two hole paddle( Rabbit ACSR) 285590 New Item No. 285
5 Microweg Connector 285594 New Item No. 90
L.T.Feeder piller box
1 LT Feeder Piller box 8 way with cutouts 31380 31380 No 33585
2 LT Feeder Piller box 12way with cutouts 36130 36130 No 38670
L.T.Spacers
1 L.T.Line Spacers 284502 47 No 47
2 LT Spacer for TC Wiring 284503 New Item No 28
Armoured L.T.UG Cable 1.1kV Class
1 6 Sq.mm, 2 Core 287054 32970 km 34135
41510 km 43700
54300 km 59260
40290 km 44730
66220 km 74300
62650 km 68700
75130 km 89200
5 50 Sq.mm, 4 core 287209 109870 km 136000
6 70 Sq.mm, 4 core 287210 181040 km 214000
7 95 Sq.mm, 4 core 287211 263730 km 307100
8 120Sq.mm , 4 core 287212 289190 km 345500
9 150 Sq.mm, 4 core 287213 313330 km 386500
10 185Sq.mm, 4 core 287214 407650 km 497000
11 240 Sq.mm, 4 core 287216 578370 km 692000
12 400 Sq. mm 4 Core 287218 812450 km 996000
Compression type Aluminium Tubular in line
connector for Aluminium conductor
1 10 288605 12 No. 2
2 16 288606 15 No. 2
3 25 288607 18 No. 3
4 35 288608 22 No. 4
5 50 288609 31 No. 5
6 70 288610 55 No. 9
7 95 288611 57 No. 10
8 120 288612 84 No. 15
4 25 Sq.mm, 2Core/4 Core
2 10 Sq.mm, 2Core /4Core
3 16 Sq.mm, 2Core/4 Core
287055/
287205
287056/
287206
287057/
287207
Page 6
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
9 150 288613 118 No. 21
10 185 288614 144 No. 25
11 240 288616 237 No. 41
12 400 288617 501 No. 85
Epoxy Straight through jointing kits suitable for
1.1 kV class LT UG Cables Size in SQ.MM
1 10 Sq.mm, 2 Core 288170 336 Set 510
2 10 Sq.mm, 4 Core 288174 390 Set 595
3 16 Sq.mm, 2 Core 288171 390 Set 595
4 16 Sq.mm, 4 Core 288175 390 Set 595
5 25 Sq.mm, 2 Core 288172 390 Set 595
6 25 Sq.mm, 4 Core 288176 412 Set 640
7 50 Sq.mm, 4 core 288178 492 Set 730
8 70 Sq.mm, 3.5/4 core 288179 510 Set 900
9 95 Sq.mm, 3.5/4 core 288180 618 Set 900
10 120 Sq mm 3.5/4 core 288181 690 Set 1420
11 185 Sq mm 3.5/4 core 288183 1092 Set 1465
12 240 Sq.mm,3.5/4 core 288185 1896 Set 1870
13 400 Sq. mm 3.5/4 Core 288187 2190 Set 2770
Epoxy Terminating kit ( pothead) suitable for 1.1
kV class LT UG Cables
1 Up to 4C x 50 sq.mm 288150 New Item Set 330
2 3.5 x 70/95/120 sq. mm 288159 New Item Set 390
3 3.5 x 150/185 sq. mm 288163 New Item Set 490
4 3.5 x 225/240/300 sq. mm 288165 New Item Set 600
5 3.5 x 400/500 sq. mm 288166 New Item Set 730
Cast Iron Terminating kit ( pothead)
suitable for 1.1 kV class LT UG Cables
1 2.5 to 25 sq.mm 288168 New Item Set 180
2 35 to 95 sq.mm 288169 New Item Set 280
11kV 3 Core XLPE UG Cable
1 11kV 3 Core XLPE UG Cable-95Sq.mm 287340 655270 km 859000
2 11kV 3 Core XLPE UG Cable-120 Sq.mm 287342 905990 km 1286000
3 11kV 3 Core XLPE UG Cable-240Sq.mm 287345 1060800 km 1539000
4 11kV 3 Core XLPE UG Cable-400Sq.mm 287350 1606800 km 2412500
Conventional RMUs (VCB Type)
Page 7
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
1(a)
RMU, One In comer +3 Breakers +one out going
(2OD +3VL), 350 MVA, 800A with Cu Bus
302310 1481000 Set 1493665
1(b)
RMU, One In comer +3 Breakers +one out going
(2OD +3VL), 350 MVA, 800A with Al Bus
302311 New Item Set 1436470
2(a) One Breaker (VL) panel with Cu Busbar 302315 294809 No 296010
2(b) One Breaker (VL) panel with Al Busbar 302316 New Item No 292725
3(a)
RMU, One In comer +One Breakers +one out
going(2OD +1 VL), 350 MVA, 800A with Cu Bus
302320 877840 Set 885395
3(b)
RMU, One In comer +One Breakers +one out
going(2OD +1 VL), 350 MVA, 800A with Al Bus
302321 New Item Set 851070
4(a)
RMU (2OD +1 VL), 250 MVA, 400A, VCB Type with
Cu Busbar
302325 877840 Set 885395
4(b)
RMU (2OD +1 VL), 250 MVA, 400A, VCB Type with
Cu Busbar
302326 New Item Set 851070
Conventional RMU Spares (VCB Type)
1 Bus support insulator with stem 506505 605 No 800
2
CTs trom bone type, 11kV Class, 200-100/5A, VA-
15, Class 5P-10
506520 11715 No 15500
3
CTs resin cast, 11kV Class,400-200/5A, UA15,
Class 5P-10
506525 11715 No 15500
4 Spout grid Insulator assembly (Back) 506530 2660 No 3510
5 Spout grid Insulator assembly (Front) 506535 2660 No 3510
6 PT Insulator (Spout) 3 Nos 506540 355 No 370
7 Shunt trip coil 506545 625 No 825
8 Closing coil 506550 625 No 825
9 Plug assembly for grid 800A , 6 Nos 506555 990 No 1305
10 Para plast compound 506560 475 kg 620
11
PT Fuse(NT) 11kV/V3 Amps with out stem, VTF
Type-11
506565 1650 No 2175
12 Insulated housing 506510 New Item No 29845
13 Switch insulators left/ right/ centre 506515 New Item No 3830
14 Vacuum interruptor 20 kA 506570 New Item No 26000
15 Shower contact 506580 New Item No 880
Compact RMUs, (VCB / SF6 Type) with Al Busbar
1
RMU (3 way), One In comer +One Breaker +one
out going (2OD +1 VL), 350 MVA, 650A
302340 698485 Unit 647000
2
RMU(4way), One In comer +Two Breakers +one out
going (2OD +2 VL), 350 MVA, 650A
302345 1036850 Unit 1044600
3
RMU(5way), One In comer +Three Breakers +one
out going (2OD +3 VL), 350 MVA, 650A
302350 1375214 Unit 1408500
4
RMU (6Way), One In comer +Four Breakers+one
out going (2OD +4 VL), 350 MVA, 650A
302355 1713579 Unit 1840000
Page 8
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
Aerial Bunched Cable(ABC)
1
11kV Class 3 phase Aerial Bunched Cable 3x95+
95Sq mm
284795 255000 km 541310
2
11kV Class 3 phase Aerial Bunched Cable 3x35+50
Sq mm
284735 New Item km 323215
3
11kV Class 3 phase Aerial Bunched Cable 3x70+70
Sq mm
284770 New Item km 451275
4
11kV Class 3 phase Aerial Bunched Cable
3x120+120 Sq mm
284802 New Item km 631000
5
LT 3 phase 5Wire Aerial Bunched Cable of Size
3X25+1X16+1X25+1x35
284804 98000 km 116360
6
LT 3 phase 5Wire Aerial Bunched Cable of Size
3X50+1x16+1x25+1x50
284806 135900 km 185505
7
LT 3 phase 5Wire Aerial Bunched Cable of Size
3X70+1X16+1x35+1x55
284808 195000 km 275520
8
LT single phase 3 Wire Aerial Bunched Cable of
Size 1X25+1X16+1X25
284810 New Item km 54625
9
LT 3 phase 5Wire Aerial Bunched Cable of Size
3X25+1X16+1X25
284816 New Item km 97770
10
LT 3 phase 5Wire Aerial Bunched Cable of Size
3X50+1x16+1x35
284818 New Item km 157710
11
LT 3 phase 5Wire Aerial Bunched Cable of Size
3X70+1X16+1x50
284819 ** km 216020
12
LT 3 phase 5Wire Aerial Bunched Cable of Size
3X95+1X16+1x70
284814 ** km 286930
Accessories for ABC Cables
1
11kV AB Cable Straight thru' joint kit suitable for
95-120 sqmm
284853 New Item set 4100
2 11kV ABC-T J ointing kit 95-120 sqmm 284863 New Item set 5200
3 11kV ABC Termination kit 95-120 sqmm 284873 New Item set 2600
4 Surg Arrester 303100 New Item No. 670
5 Ground connection for messenger wire 284880 New Item No. 162
6 Anchor sleeve for messenger wire 284885 New Item No. 30
7 Single phase Distribution box for 20 connections 284820 750 No 1350
8 Three phase Distribution box for 6 connections 284821 800 No 1500
9
Piercing connector suitable for 16 Sq.mm-95 Sq.mm
AB Cable- Service connections
284822 210 No. 300
10
Piercing connector suitable for 16 Sq.mm-95 Sq.mm
AB Cable- Street light connections
284223 205 No. 210
11
Piercing connector suitable for 25 Sq.mm-95 Sq.mm
AB Cable- main to main connections
284855 New Item No. 350
12
Piercing connector suitable for 50 Sq.mm-150
Sq.mm AB Cable- main to main connections
284865 New Item No. 400
13 Universal hook & Bolts & nuts 284284 50 No 200
Page 9
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
14
Dead end clamp / Anchor clamp assembly 25 to 95
sq.mm bare messenger
284825 440 No 400
15
Suspension clamp assembly 25 to 95 sq.mm bare
messenger
284826 505 No 450
16 Pre-Insulated lugs-CPTAU for 120 Sq.mm ** New Item No 500
17 Pre-Insulated lugs-CPTAU for 95 Sq.mm ** New Item No 450
18 Pre-Insulated lugs-CPTAU for 70 Sq.mm 284827 265 No 400
19 Pre-Insulated lugs-CPTAU for 50 Sq.mm 284828 310 No 375
20 Pre-Insulated lugs-CPTAU for 25 Sq.mm 284829 New Item No 185
21 Pre-Insulated lugs-CPTAU for 16 Sq.mm 284834 ** No 130
22 Tee-connectors- KZ3 95 284829 320 No 515
23
Straight joints suitable for 95 Sq.mm, LT ABC -
MJ PT type
284832 New Item No. 400
24
Straight joints suitable for 70 Sq.mm, LT ABC -
MJ PT type
284830 118 No 400
25
Straight joints suitable for 50 Sq.mm,LT ABC-MJ PT
type
284831 210 No 375
26
Straight joints suitable for 16 Sq.mm,LT,ABC-MJ PT
type
284832 70 No 250
27 End cap for 54/70 Sq.mm 284833 10 No 25
11kV Jointing and Cable termination kits
a)
Heat Shrinkable type transition jointing kit for
XLPE cable
1) 3X95 Sq.mm 288312 6288 Set 6290
2) 3X240 Sq.mm 288314 7780 Set 7780
3) 3x400 Sq.mm 288315 7920 Set 7920
b)
Cold Shrinkable type transition jointing kit for
XLPE cable
1) 3X95 Sq.mm 288317 7471 Set 7470
2) 3X240 Sq.mm 288319 7930 Set 7930
3) 3x400 Sq.mm 288320 8370 Set 8370
c)
Heat Shrinkable indoor type cable termination kit
for XLPE cable
1) 3X95 Sq.mm 288332 1743 Set 1745
2) 3X240 Sq.mm 288334 1860 Set 1860
3) 3x400 Sq.mm 288336 1900 Set 1900
d)
Cold Shrinkable indoor type cable termination
kit for XLPE cable
1) 3X95 Sq.mm 288370 3871 Set 3870
2) 3X240 Sq.mm 288372 4265 Set 4265
3) 3x400 Sq.mm 288374 4423 Set 4425
Page 10
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
e)
Heat Shrinkable outdoor type cable termination
kit for XLPE cable
1) 3X95 Sq.mm 288302 2175 Set 2175
2) 3X240 Sq.mm 288304 2702 Set 2700
3) 3x400 Sq.mm 288305 2719 Set 2720
f)
Cold Shrinkable outdoor type cable termination
kit for XLPE cable
1) 3X95 Sq.mm 288360 4920 Set 4920
2) 3X240 Sq.mm 288362 6787 Set 6785
3) 3x400 Sq.mm 288364 5988 Set 5990
g)
Heat Shrinkable indoor type cable termination kit
for PILC cable
1) 3X95 Sq.mm 288462 1650 Set 1650
2) 3X240 Sq.mm 288464 1766 Set 1765
3) 3x400 Sq.mm 288465 1805 Set 1805
h)
Cold Shrinkable indoor type cable termination
kit for PILC cable
1) 3X95 Sq.mm 288482 3923 Set 3925
2) 3X240 Sq.mm 288484 4220 Set 4220
3) 3x400 Sq.mm 288485 4310 Set 4310
i)
Heat Shrinkable outdoor type cable termination
kit for PILC cable
1) 3X95 Sq.mm 288456 2088 Set 2090
2) 3X240 Sq.mm 288458 2614 Set 2615
3) 3x400 Sq.mm 288460 2532 Set 2630
j)
Cold Shrinkable outdoor type cable termination
kit for PILC cable
1) 3X95 Sq.mm 288476 5332 Set 5330
2) 3X240 Sq.mm 288478 6768 Set 6770
3) 3x400 Sq.mm 288480 6770 Set 6770
k)
Heat Shrinkable Straight through jointing kits for
XLPE cable with Aluminum lugs& ferrules
1) 3X95 Sq.mm 288322 3669 Set 3670
2) 3X240 Sq.mm 288324 4425 Set 4425
3) 3x400 Sq.mm 288329 5341 Set 5340
l)
Heat Shrinkable Straight through jointing kits for
PILC cable with Aluminum lugs& ferrules
1) 3X95 Sq.mm 288450 3959 Set 3960
2) 3X240 Sq.mm 288452 4623 Set 4625
3) 3x400 Sq.mm 288453 5580 Set 5580
m) Tapex type termination kit for XLPE cable
1) 3 X 95 Sqmm - indoor 288423 1531 Set 1530
Page 11
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
2) 3 X 240 Sqmm - Indoor 288424 1786 Set 1785
3) 3X 400 Sqmm - Indoor 288425 2073 Set 2075
4) 3 X 95 Sqmm- outdoor 288427 1645 Set 1645
5) 3 X 240 Sqmm outdoor 288428 2120 Set 2120
6) 3X 400 Sqmm outdoor 288429 2314 Set 2315
n)
Tapex type strainght through joniting kit for
XLPE / PILC Cable
1) 3 X 95 Sqmm -XLPE 288433 2800 Set 2800
2) 3 X 240 Sqmm - XLPE 288434 4475 Set 4475
3) 3X 400 Sqmm - XLPE 288435 5105 Set 5105
4) 3 X 95 Sqmm - PILC 288437 2800 Set 2800
5) 3 X 240 Sqmm - PILC 288438 3556 Set 3555
6) 3X 400 Sqmm - PILC 288439 4390 Set 4390
o) Tapex type transition kit for XLPE& PILC cable
1) 3 X 95 Sqmm 288443 2895 Set 2895
2) 3 X 240 Sqmm 288444 3960 Set 3960
3) 3X 400 Sqmm 288445 4145 Set 4145
p) Push-on type Cable termination kits
1) 3X95 Sq.mm- Indoor (XLPE) 288350 1596 Set 1595
2) 3X240 Sq.mm- Indoor (XLPE) 288352 1822 Set 1820
3) 3x400 Sq.mm- Indoor (XLPE) 288356 2227 Set 2225
1) 3X95 Sq.mm- outdoor (XLPE) 288340 2600 Set 2600
2) 3X240 Sq.mm- outdoor (XLPE) 288342 2764 Set 2765
3) 3x400 Sq.mm-outdoor (XLPE) 288346 3146 Set 3145
1) 3X95 Sq.mm- outdoor (PILC) 288472 1453 Set 1455
2) 3X240 Sq.mm outdoor (PILC) 288474 2056 Set 2055
3) 3x400 Sq.mm-outdoor (PILC) 288475 2296 Set 2300
Service Connection accessories
1
Pole mounted fibre glass reinforced aerial fuse
board 60A -3 way
612614 520 No 535
2
Pole mounted fibre glass reinforced aerial fuse
board 30A -3way
612615 450 No 470
3 FGRP Aerial fuse boards 30A -4 way 612617 New Item No 545
4 FGRP Aerial fuse boards 30A -5 way 612618 New Item No 620
5 FGRP Aerial fuse boards 30A -6way 612616 635 No 670
6 L.T.Service Connector for Weasel 2885502 18 No 24
7 L.T.Service Connector for Rabbit 288503 19 No 24
PVC Pipes
Page 12
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
1 PVC Pipe-20 mm dia 778020 15 Mtr 16
2 PVC Pipe-25 mm dia 778025 24 Mtr 21
3 PVC Pipe-32 mm dia 778032 41 Mtr 24
4 PVC Pipe-40 mm dia 778040 57 Mtr 31
5 PVC Pipe-50 mm dia 778050 64 Mtr 38
6 PVC Pipe-63 mm dia 778063 76 Mtr 53
7 PVC Pipe-75 mm dia 778075 105 Mtr 62
8 PVC Pipe-80 mm dia 778080 152 Mtr 87
9 PVC Pipe-100 mm dia 778100 224 Mtr 119
10 PVC Pipe-150 mm dia 778105 450 Mtr 262
11 PVC Pipe-200 mm dia 778110 760 Mtr 390
GI Pipes B-Class
1 GI Pipe-20 mm dia 768040 74 Mtr 81
2 GI Pipe-25 mm dia 768042 100 Mtr 114
3 GI Pipe-32 mm dia 768043 142 Mtr 155
4 GI Pipe-40 mm dia 768044 150 Mtr 163
5 GI Pipe-50 mm dia 768046 200 Mtr 215
6 GI Pipe-63 mm dia 768047 210 Mtr 229
7 GI Pipe-65 mm dia 768048 270 Mtr 302
8 GI Pipe-100 mm dia 768052 730 Mtr 850
9 GI Pipe-150 mm diaA Cl 768058 770 Mtr 900
A
PVC Insulated & Sheathed Aluminium Wires,
Single core multi strand 1.1 kV class
1 PVC Wire-2.5 Sq.mm 289022 350 100mtr 460
2 PVC Wire-4 Sq.mm 289023 490 100mtr 630
3 PVC Wire-6 Sq.mm 289024 598 100mtr 765
4 PVC Wire-10 Sq.mm 289025 950 100mtr 1165
PVC Insulated & Un-Sheathed Aluminium Wires,
Single core multi strand 1.1 kV class
5 PVC Wire-16 Sq.mm 289026 1340 100mtr 1645
6 PVC Wire-25 Sq.mm 289027 1973 100mtr 2395
7 PVC Wire-35 Sq.mm 289028 2063 100mtr 2630
8 PVC Wire-50 Sq.mm 289029 2713 100mtr 3430
9 PVC Wire-70 Sq.mm 289030 4598 100mtr 5495
10 PVC Wire-95 Sq.mm 289031 5196 100mtr 6465
11 PVC Wire-120 Sq.mm 289032 7630 100mtr 9130
Page 13
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
12 PVC Wire-150 Sq.mm 289033 9420 100mtr 11220
13 PVC Wire-185 Sq.mm 289034 9967 100mtr 12310
14 PVC Wire-240 Sq.mm 289036 12570 100mtr 15625
Fuse wires
1 Tinned Copper Fuse wire, 5A 625020 353 kg 475
2 Tinned Copper Fuse wire, 10A 625030 430 kg 475
3 Tinned Copper Fuse wire, 20A 625050 430 kg 475
4 Tinned Copper Fuse wire, 100A 625075 460 kg 475
Porcelain cut outs (500volts)
1 15A 300003 30 No. 35
2 30A 300005 36 No. 48
3 60A 300007 101 No. 142
4 100A 300010 146 No. 255
5 200A 300020 236 No. 405
6 300A 300030 450 No. 744
Grounding Materials for RMUs & Transformers
Pipe Grounding
1
G.I.Grounding pipe, B-Class, 40 mm dia,2.5 mtrs
long, 2.9mm thick with bolts nuts,GI Strips and
washers complete
281674 420 No 490
2
Good Quality well burnt Charcoal for grounding
purposes packed in non returnable gunny bags of
30kg each
600095 250 No 300
3
Good Quality Salt for grounding purposes packed in
50kg gunny bags
607054 130 Bag 130
Rod Earthing
1
Rod type of earthing using 40 mm dia, 3 mtr long
MS rod as ground rod, in earth pit of 300 mm width
and 3300mm depth and using 50x6mm flat welded
to ground rod as terminal & connected to equipment
ground terminal using pvc Al wire as specified
281685 1190 No 1300
2 Bentonite clay slurry for earthing in 50 kg bags 607220 207 50 kg Bag 312
Alkathine tube
1
Transparent Alkathine tube 19mm dia, 2mm thick in
coils of 30 mtrs
821900 425 Coil 480
Measuring Equipments
1
High precision Single phase Electromechanical
meters with magnetic suspension 2.5-10A, class-2
accuracy
357001 626 No 836
Page 14
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
2
High precision 3 phase. Electromechanical meters
with magnetic suspension 5-20A, Class-2 accuracy
357121 3700 No 3933
3
L.T. Electronic Tri-Vector Meter 5A, Class-0.5/1.0
accuracy
357511 6200 No 6710
4
H.T. Electronic Tri-Vector Meter 5A, Class-0.5
accuracy
357512 7300 No 7300
5
H.T. Electronic Tri-Vector Meter 5A, Class-0.2
accuracy with ABT features
357500 New Item No 24000
6
Electronic Meter, 5-10A/5-20A, S.Ph Class-1
Accuracy
357003 1350 No 1000
7
Electronic Meter, 5-20/ 30A, 3 Ph 4 wire Class-1
Accuracy (whole current)
357200 3820 No 3820
8
Electronic Meter, 10-40/ 60A, 3 Ph Class-1,4 wire
Accuracy (whole current)
357201 4275 No 4275
9
Electromechanical Energy Meter-3 Ph, 5-20A, Class-
2 Accuracy, for I.P. Sets
357122 1198 No 1200
1
Meter Protection box with busbar, for L.T. 3 Ph with
C.T. Ratio 50/5A, Class-1 Accuracy
358040 5530 No 5220
2
Meter Protection box with busbar, for L.T. 3 Ph with
C.T. Ratio 75/5A, Class-1 Accuracy
358023 5060 No 4400
3
LT Metering Box for housing the ETV Meters with
busbar wiring etc;
358050 2050 No 3650
4 Pillfer proof box for below 40HP Installations 612655 280 No 290
1 Lead Seal (Round type) 626231 1.3 No 1.50
2 Sealing lead square type numbered 626230 New Item No. 3.00
3 Meter Sealing Wire 626500 125 kg 140
4 High security lable seal 357590 New Item No 6
L.T.Current Transformers
1 CT Ratio-50/5A, Class-1 accuracy, 2.5VA Ring type 336010 677 No 655
2 CT Ratio-75/5A, Class-1 accuracy, 2.5VA,Ring type 336015 352 No 380
3
CT Ratio-100/5A, Class-0.5 accuracy, 2.5VA, Ring
type
336020 339 No 425
4
CT Ratio-150/5A, Class-0.5 accuracy, 2.5VA, Ring
type
336025 339 No 360
5
CT Ratio-200/5A, Class-0.5 accuracy,2.5VA, Ring
type
336030 332 No 310
6
CT Ratio-300/5A, Class-0.5 accuracy,2.5VA, Ring
type
336035 New Item No 420
7
CT Ratio-400/5A, Class-0.5 accuracy,2.5VA, Ring
type
336040 400 No 350
8
CT Ratio-600/5A, Class-0.5 accuracy,2.5VA, Ring
type
336046 New Item No 355
Page 15
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
9
CT Ratio-800/5A, Class-0.5 accuracy,2.5VA, Ring
type
336050 400 No 410
P.T and C.Ts
1
P.T 11kV/110V,50VA, Insulation level 15/35/95 kV
as per IS 3156, Accuracy class 0.5
335230 5585 No 9160
2 C.T- 11kV, 2.5/5A, Accuracy class 3.75 VA 336292 3065 No 3925
3 C.T- 11kV, 5/5A, Accuracy class 3.75 VA 336294 3065 No 3925
4 C.T- 11kV, 7.5/5A, Accuracy class 3.75 VA 336296 3062 No 3925
5 C.T- 11kV, 10/5A, Accuracy class 3.75 VA 336302 3062 No 3925
6 C.T- 11kV, 12.5/5A, Accuracy class 3.75 VA 336303 3062 No 3925
7 C.T- 11kV, 15/5A, Accuracy class 3.75 VA 336304 3062 No 3925
8 C.T- 11kV, 20/5A, Accuracy class 3.75 VA 336306 New Item No 3925
9 C.T- 11kV,25/5A, Accuracy class 3.75 VA 336308 3062 No 3925
10 C.T- 11kV, 30/5A, Accuracy class 3.75 VA 336310 New Item No 3925
11 C.T- 11kV, 50/5A, Accuracy class 3.75 VA 336309 3065 No 3925
12 C.T- 11kV, 75/5A, Accuracy class 3.75 VA 336315 New Item No 3925
13 C.T- 11kV, 100/5A, Accuracy class 3.75 VA 336321 3174 No 4055
14 C.T- 11kV, 200/5A, Accuracy class 3.75 VA 336325 3174 No 4320
15 C.T- 11kV, 400/5A, Accuracy class 3.75 VA 336335 3175 No 4320
H.T.Metering Equipments
1
HT Metering cubicle, 11kV Class, All single ratio
CTs
a) without load breakswitch 358320 61470 No 76275
b) with load breakswitch 358350 New Item No 122400
a) Heavy duty Copper terminals
1 25 Sq.mm Copper terminals 288507 10.5 No 16
2 35 Sq.mm Copper terminals 288508 New Item No. 17
3 50 Sq.mm Copper terminals 288509 24 No 22
4 70 Sq.mm Copper terminals 288510 36 No 36
5 95 Sq.mm Copper terminals 288511 49 No 45
6 120 Sq.mm Copper terminals 288512 New Item No 62
7 150 Sq.mm Copper terminals 288513 64 No 75
8 185 Sq.mm Copper terminals 288514 71 No 113
9 225 Sq.mm Copper terminals 288515 74 No 130
10 240 Sq.mm Copper terminals 288516 79 No 132
11 400 Sq.mm Copper terminals 288518 New Item No. 348
b) Heavy duty Copper terminals long barrel
Page 16
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
1 25 Sq.mm Copper terminals 288527 New Item No 16
2 35 Sq.mm Copper terminals 288528 New Item No 24
3 50 Sq.mm Copper terminals 288529 New Item No 39
4 70 Sq.mm Copper terminals 288530 New Item No 59
5 95 Sq.mm Copper terminals 288531 New Item No 90
6 120 Sq.mm Copper terminals 288532 New Item No 124
7 150 Sq.mm Copper terminals 288533 New Item No 154
8 185 Sq.mm Copper terminals 288534 New Item No 223
9 225 Sq.mm Copper terminals 288535 New Item No 300
10 240 Sq.mm Copper terminals 288536 New Item No 313
11 400 Sq.mm Copper terminals 288538 New Item No 714
c) Al end terminals ( Lugs)
1 10 Sq mm 288605 New Item No 2
2 16 Sq mm 288606 New Item No 3
3 25 Sq mm 288607 New Item No 4
4 32 Sq mm 288608 New Item No 5
5 50 Sq mm 288609 New Item No 7
6 70 Sq mm 288610 New Item No 11
7 95 Sq mm 288611 New Item No 12
8 120 Sq mm 288612 New Item No 18
9 150 Sq mm 288613 New Item No 23
10 185 Sq mm 288614 New Item No 28
11 225 Sq mm 288615 New Item No 40
12 240 Sq mm 288616 New Item No 48
13 400 Sq mm 288617 New Item No 82
Materials required for 33kV Sub stations
1
5 MVA, 33/11 kV Transformer with all fittings and
accessories, OLTC,RTCC, First filling of oil and 10
% Spare oil
322205 2125000 No. 3589000
2
10 MVA, 33/11 kV Transformer with all fittings and
accessories, OLTC,RTCC, First filling of oil and 10
% Spare oil
322210 New Item No. 8568000
3 33 kV Circuit Breaker SF6 type 800A, 25kA 311610 New Item No 511700
A) 11kV Switch Gear
1
11 kV, 500 MVA, (1600A, for incomer & 1250 A for
feedder) outdoor Switch gear, comprising of
2I+1BC+12 f +1 AP3 VCBs
309204 New Item No 7669200
Page 17
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
2
11 kV, 500 MVA, (1600A, for incomer & 1250 A for
feedder) outdoor Switch gear, comprising of
2I+1BC+10 f +1 AP3 VCBs
309202 New Item No 6682300
3
11 KV, 500 MVA, 1250 A, (I/C) and 800 A (feeder),
outdoor Switch Gear, comprising of
21+1BC+8F+1AP3 VCBs
309200 New Item No 5687500
4
11 kV Switch gear, 350 MVA, 800 Amps Outdoor
MCVCB comprising of 1 I +5 f +1 AP3
309206 2308680 Set 3051200
5 11 KV 500 MVA 1250 Amps 25 KA feeder panel 309208 New Item No. 414800
6
11 KV 500 MVA 1250 Amps SWG 11+5F+1AP3
MCVCB
309210 New Item Set 3217000
B) 11kV Kiosk
1
11 kV 350 MVA, 800A Outdoor Type, kiosk
comprising of 1 I +4 f +1 AP3 PCVCB
309214 1610840 Set 2118000
2 11 kV, 350 MVA, 800A Outdoor type, kiosk PCVCB 309218 New Item No 325300
1
33 kV class CT With 0.2 accuracy class 400 - 200/1-
1A for lines
336470 18970 No 19850
2
33 kV class CT With 0.2 accuracy class 200 - 100/1-
1-1A for Transformer
336472 18970 No 18860
3 33 kV class CT 30/5A 336400 12730 No 12730
4 11kV NCTs 800-400/1-1-1A (for 350 MVA SWG) 330210 New Item No 12000
5 11kV NCTs 600-300/1-1-1A (for PCVCBs) 330220 New Item No 12000
1 33kV Voltage Transformer 33kV /V3 110/V3- 110/V3 335510 12730 No 30770
2 11kV Voltage Transformer 11kV / 110V-110V 335235 New Item No 5000
1
a) 30 kV Lightning Arrester Normal Duty Metal oxide
(Discharge Class-2)
303510 9970 No 9185
2
b) 30 kV Lightning Arrester Normal Duty Metal oxide
(Discharge Class-3)
303512 New Item No 7145
3 30 kV Lightning Arrester Normal Duty polymeric 303520 8194 No 8194
1
Isolators 33kV 800A, 25kA Upright with Earth
Switch complete metallic portion with insulator
304524 New Item Set 76000
2
Isolators 33kV 800A, 25kA Upright without Earth
Switch complete metallic portion with insulator (live
point height 3750mm)
304536 New Item Set 70000
3
Isolators 33kV 800A, 25kA Upright without Earth
Switch complete metallic portion with insulator (live
point height 4750mm)
304537 New Item Set 76000
1 Battery Set (Tubular) 48 V, 100 Ah 344008 New Item Set 36300
2 Battery Set (Tubular) 110 V, 100 Ah 344010 New Item Set 57440
3 Battery Set (Maintance free VRLA) 48 V, 100 Ah 344108 New Item Set 31200
Page 18
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
4 Battery Set (Maintance free VRLA) 110 V,100 Ah 344110 New Item Set 70500
5 Battery Charger 48 V, 100 Ah 344408 New Item Set 44400
6
Battery Charger 110V, 100 Ah (with float cum boost
charger working on 230V 1ph AC supply along with
integral DCDB consisting 4 nos. O/G feeders as per
specifications)
344410 53015 Set 66100
1
Capacitor Bank with 0.2% Series reactor & NCT
12.1kV 2.5 MVAr star connected Capacitor Bank
333545 New Item Set 230377
1 33 kV Line panel (Duplex) 340500 110000 No 253000
2 33 /11kV Transformer Panel (Duplex) 340530 306000 No 460000
3 33 kV Line Panel (Simplex) 339500 169000 No 253000
4 33/11kV Transformer Panel (Simplex) 339530 305000 No 457000
1 33 kV Capacitor Bank Panel 339540 134000 No 163000
1
Outdoor type meter box to house ETV meters,
made of CRCA steel mounted on angle iron
frame work
a Meter box suitable for fixing 6 ETV meters 358046 New Item No 11475
b Meter box suitable for fixing 4 ETV meters 358044 New Item No 6750
c Meter box suitable for fixing 3 ETV meters 358043 New Item No 4725
ACCESSORIES for 33kV
1 Phase Plates 278760 New Item No 135
2 Number /Circuit Plate 278790 New Item No 135
3 Danger Board/Caution Plate 278813 New Item No 183
Insulators
1 Solid Core Insulator 33kV 283333 2130 No 2085
2 33 kV Pin Insulator (Shell only) 283006 280 No 284
3 33 kV Pin Insulator (Pin only) 283056 157 No 114
4 33kV Composit Disc Insulator 283433 New Item No 530
HARDWARE CLAMPS FOR STATION
MATERIALS
A) Bolted Type Tension Clamp
1 Single Lynx ACSR conductor 70/90 kN 16mm 285080 New Item No 692
2 Single Coyote ACSR conductor 70/90 kN 16mm 285079 New Item No 641
3 Single Rabbit ACSR conductor 70/90 kN 16mm 285078 New Item No 546
B) Bolted Type Suspension Clamp
1 Single Lynx ACSR conductor 70/90 kN 16mm 285050 New Item No 664
2 Single Coyote ACSR conductor 70/90 kN 16mm 285046 New Item No 585
3 Single Rabbit ACSR conductor 70/90 kN 16mm 285038 New Item No 567
C) Ground Wire Clamp 7/3.15mm 2 bolt 281410 New Item No 528
Page 19
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
D) Post Insulator Clamp
1 Single Lynx ACSR conductor 127/76mm 285699 New Item No 470
2 Single Coyote ACSR conductor 127/76mm 285692 New Item No 480
3 Single Rabbit ACSR conductor 76mm 285691 New Item No 461
E) " T" Clamp for ACSR Conductor
1 Single Lynx to Single Lynx 285610 New Item No 279
2 Single Coyote to Single Coyote 285605 New Item No 270
F) Terminal connector clamp for ACSR Conductor
1 Single Lynx 282620 New Item No 376
2 Single Coyote 282616 New Item No 336
STATION STRUCTURES
1
Fabrication, galvanization and supply of Station
Structures
276110 New Item MT 116170
2 Supply of galvanization Bolts & Nuts 276120 New Item MT 142000
1 Double pole structure for 33kV 279103 4261 Set 4600
2 V-Shape X arm for 33 kV 279016 750 No 803
3 HT ST Support for 33 kV 279093 330 No 353
TOOLS AND PLANT
1 Battery Hydrometer 429810 100 No 100
2 Multimeter ElectronicType 359215 850 No 900
3 Rubber Hand gloves 15kV seamless 427252 170 Pair 280
4 Thermometer ( Wall Mounted) 430395 570 No 450
5 Portable drilling machine 410020 3200 No 4500
6 Megger 500 V 359400 New Item No 2250
7 Megger 2.5kV-5kV 359450 2500 No 4500
8 Silica gel 607056 112 kg 170
9 Grounding Sticks 427210 1500 Set 1700
10 Panel Indication lamps 611940 10 No 12
A
1 33 kV 3 Core XLPE UG Cable-95 Sq.mm ** New Item Km 2063000
2 33 kV 3 Core XLPE UG Cable-150 Sq.mm ** New Item Km 2425000
3 33 kV 3 Core XLPE UG Cable-240Sq.mm ** New Item Km 2658000
4 33 kV 3 Core XLPE UG Cable-300Sq.mm ** New Item Km 3585000
5 33 kV 3 Core XLPE UG Cable-400Sq.mm ** New Item Km 4212000
B
1
33kV Jointing and Cable termination kits for XLPE cable
33 kV 3 Core XLPE UG Insulated Aluminium Cable
Heat Shrinkable type transition jointing kit
Page 20
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
a 33 kV 3 Core XLPE UG Cable-95 Sq.mm ** New Item No. 20340
b 33 kV 3 Core XLPE UG Cable-150 Sq.mm ** New Item No. 20340
c 33 kV 3 Core XLPE UG Cable-240Sq.mm ** New Item No. 30000
d 33 kV 3 Core XLPE UG Cable-300Sq.mm ** New Item No. 30000
e 33 kV 3 Core XLPE UG Cable-400Sq.mm ** New Item No. 34800
C
a 33 kV 3 Core XLPE UG Cable-95 Sq.mm ** New Item No. 4750
b 33 kV 3 Core XLPE UG Cable-150 Sq.mm ** New Item No. 4750
c 33 kV 3 Core XLPE UG Cable-240Sq.mm ** New Item No. 6500
33 kV 3 Core XLPE UG Cable-300Sq.mm ** New Item No. 6500
d 33 kV 3 Core XLPE UG Cable-400Sq.mm ** New Item No. 7110
D
a 33 kV 3 Core XLPE UG Cable-95 Sq.mm ** New Item No. 6500
b 33 kV 3 Core XLPE UG Cable-150 Sq.mm ** New Item No. 6500
c 33 kV 3 Core XLPE UG Cable-240Sq.mm ** New Item No. 7700
33 kV 3 Core XLPE UG Cable-300Sq.mm ** New Item No. 7700
d 33 kV 3 Core XLPE UG Cable-400Sq.mm ** New Item No. 9150
E
a 33 kV 3 Core XLPE UG Cable-95 Sq.mm ** New Item No. 17700
b 33 kV 3 Core XLPE UG Cable-150 Sq.mm ** New Item No. 17700
c 33 kV 3 Core XLPE UG Cable-240Sq.mm ** New Item No. 21940
33 kV 3 Core XLPE UG Cable-300Sq.mm ** New Item No. 21940
d 33 kV 3 Core XLPE UG Cable-400Sq.mm ** New Item No. 26130
Miscellaneous Materials
1 Cable covering Tiles 250x250x40 mm 801035 3600 per 1000 4100
2 RCC hume pipes 2000 mm long 150mm dia 820672 200 No 250
3 RCC hume pipes 2000 mm long 200 mm dia 820673 270 No 330
4 Collars for RCC home pipe 150mm dia 820703 40 No 50
5 Collars for RCC home pipe 200 mm dia 820704 54 No 64
6 M S pipe 200mm dia with collars 765050 863 mtr 900
7 River Sand 800650 570 cmt 900
8 Cement in 50KG Bags 800030 170 per bag 217
9
Route and J oint indicating stone with MS anchor
rods
802460 115 No 95
10
Black Cambric tape 25 mm wide 7mil thick and in
rolls of 50 Mtr
622675 90 Roll 160
11
PVC Insulation Tapes19 mm wide and in rolls of 10
Mtrs
622720 15 Roll 14
Heat Shrinkable Straight through jointing kits with Aluminum lugs & ferrules
Heat Shrinkable outdoor type cable termination kit
Heat Shrinkable indoor type cable termination kit
Page 21
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
12 ACB Paint 632030 48 Ltr 125
13 Aluminium Paint 632013 85 Ltr 160
14 Grey Enamel Paint smoke/battle ship
632050
/632040
92 Ltr 125
15 Red Oxide Paint 632020 62 Ltr 80
16 Cotton Tapes 19 mm wide and in rolls of 50 Mtrs 622020 25 Roll 35
17 Cotton Waste 627520 34 kg 40
18 Hack saw blade 300x12.5 mm 418185 10 No 10
19
T.W plate 300x300x25 mm with 20mm dia holes at
the corners and coated with two coats of varnish on
one side
612621 190 No 190
20
T.W.Meter Board, 300x300x75mm, coated with
varnish
612623 90 No 90
21 Monoplast 506559 New Item kg 45
1
Providing, Fabricating and fixing 8 SWG Chain link
fencing (TATA Make) 50 mm Size GI Chain link
Mesh fencing for transformer, made out of 50 mm x
50 mm x 6 mm MS angle as per specification, at a
height of 1.8 Mtr. above GL and 0.45 Mtr. below GL
embeded in CC 1:2:4, 0.45 x 0.45 x 0.45 Mtr.
including curing, coping etc., & angles spacing at 8
ft intervals and also in corners with MS Gate of 0.75
x 1.8 Mtr. with locking arrangement etc., complete.
782302 535 Sq. mtr
As per KPWD
S.R
Copper Control cables 1.1 kV Class
a) 2 Core 2.5 Sq.mm 289352 24000 km 29100
b) 4 Core 2.5 Sq.mm 289354 39000 km 48700
c) 10 Core 2.5 Sq.mm 289360 84000 km 108000
d) 14 Core 2.5 Sq.mm 289364 130000 km 162300
e) 19 Core 2.5 Sq.mm 289369 175000 km 218200
f ) 2 Core 6 Sq.mm 289452 57740 km 68000
g) 4 Core 4 Sq.mm 289404 New Item km 102000
h) 4 Core 6 Sq.mm 289454 New Item km 133000
j ) 4 Core 10 Sq.mm 289474 116300 km 153700
k) 4 Core 16 Sq.mm 289484 174000 km 232800
3 Flurocent light fitting 446024 175 No 225
4 Flurocent tube 611530 45 No 40
5 Sodium Vapour lamp 611730 450 No 650
6 Automatic Switches for Street lights 612645 1680 No 1850
7 GI Bracket for Flurocent tube 446044 260 No 300
8 Sodium Vapour lamp ignitors 612240 200 No 225
2
Page 22
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
9 Caution / Danger board
278832/
278811
80 No 90
10 Standard Torch cell 1.5V 613050 ** No 13
11
Street light metering box made of MS sheet steel/
SMC
612660 New Item No. 1915
Compact Fluorescent Lamps
a) 11 watts 611551 New Item No 100
b) 14 watts 611554 New Item No 115
c) 18 watts 611558 New Item No 155
d) 23 watts 611563 New Item No 180
M.S.Bolts & Nuts
1 B & N Size 16X40mm 733612 49260 MT 49260
2 B & N Size 16X50mm 733613 49260 MT 49260
3 B & N Size 16X65mm 733616 49260 MT 49260
4 B & N Size 16X75mm 733618 49260 MT 49260
5 B & N Size 16X85mm 733620 48324 MT 48330
6 B & N Size 16X100mm 733623 48324 MT 48330
7 B & N Size 16X125mm 733625 48324 MT 48330
8 B & N Size 16X150mm 733628 48324 MT 48330
9 B & N Size 16X175mm 733630 48324 MT 48330
10 B & N Size 16X200mm 733633 48324 MT 48330
11 B & N Size 16X225mm 733634 48324 MT 48330
Scrap Materials Auction Rate
1 Copper wire 791220 162 kg 353
2 Copper conductor 791200 ** kg 342
3 Copper Ingots 791205 ** kg 213
4 Aluminium 791000 62 kg 65
5 ACSR conductor 791100 ** kg 83
6 Scrap Al Released From UG Cable 791530 34 kg 35
790100 18 kg 21
791000 23 kg 18
790101 20 kg 14
790104 ** kg 13
8 Brass 791300 92 kg 92
9 Baliga Poles 793510 45 Rmtr 45
10 Empty barrel of 210 litres capacity-Good 442120 328 No 331
11 Empty barrel of 210 litres capacity-Bad 795030 272 No 273
12 Lead 791400 ** kg 41
13 HT Metering cubicle 795240 ** No 2075
7
Iron
a) SM Rail pole, I beam
b)Ladder pole,Tower parts,Tubular poles
c)Cross arms,Clamps etc d)Rleased
Page 23
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
14 Energy meters(Electro mech) Single/3 phase
795910/
795920
** No 75
15 CTs & PTs 795500 ** No 597
Faulty Distribution Transformer of Aluminium
winding (without oil)
1) 25kVA 795104 6643 Each 11370
2) 63kVA 795106 12692 Each 19345
3) 100kVA 795110 16600 Each 26235
4) 200kVA 795120 33180 Each 49770
5) 250kVA 795125 41785 Each 62675
6) 300kVA 795130 41785 Each 62675
7) 500kVA 795150 55714 Each 83570
8) Released Al winding of Distribution transformers. 791175 95 kg 87
Faulty Distribution Transformer of Copper
winding ( without oil)
1) 25kVA 795164 15300 Each 22950
2) 50kVA 795165 18810 Each 28200
3) 63kVA 795166 45000 Each 58455
4) 100kVA 795170 32400 Each 81000
5) 200kVA 795180 51525 Each 92745
6) 300kVA 795190 60000 Each 112950
7) 500kVA 795195 90675 Each 187560
C.S.P. 11kV Distribution Transformer
1) 25 kVA 795158 6000 Each 9000
2) 63 kVA 795160 9000 Each 13500
Additional Materials Included
LT Brass Terminal connector for Transformer
1) 250 kVA 542180 450 No 500
2) 500 kVA 542185 450 No 500
PG Clamps Rabbit to PVC Insulated wire
1) 95 Sq mm 285555 95 No 97
2) 120 Sq mm 285557 188 No 192
3) 150 Sq mm 285559 220 No 225
4) 185 Sq mm 285562 240 No 245
5) 240 Sq mm 285565 280 No 285
Brass Cable Glands
1) 25 mm 542190 32 No 48
Page 24
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
2) 32 mm 542192 43 No 58
3) 40 mm 542194 68 No 90
4) 45 mm 542196 82 No 120
LT Capacitor 3 Ph. Housed in a encloser with
necessary fusses, wiring, mounting arrangement
as per tech. Spec.
1 3 kVAr 333103 750 Set 750
2 9 kVAr 333109 1330 Set 1330
3 18 kVAr 333118 2475 Set 2475
4 27 kVAr 333127 3940 Set 3940
5 54 kVAr 333154 6975 Set 6975
Tamper proof Box for housing the ETV Meter 3
phase 4 wire 5A, with associated LT CTs class
0.5 accuracy, ring type, Busbars, wiring,
clamps,B&N etc.,
1
With CT ratio 50/5 for 15/25 kVA Distribution
Transformer Centre
358055 10600 Set 12325
2
With CT ratio 100/5 for 50/63 kVA Distribution
Transformer Centre
358060 9560 Set 11635
3
With CT ratio150/5 for 100 kVA Distribution
Transformer Centre
358065 9560 Set 11440
4
With CT ratio 400/5 for 250 kVA Distribution
Transformer Centre
358070 9720 Set 11410
5
With CT ratio 800/5 for 500 kVA Distribution
Transformer Centre
358075 9720 Set 11590
Installing RLMU for the existing Distribution
Transformer Center
1 Metallic Enclosure with Busbars 358086 5945 No 6255
2
Programmable Logic Controllers with
communication ports
358098 11890 No 12370
3 GSM Modem 447662 6680 No 6680
4 MCCB
i) for 25 kVA, 40 Amps 358088 1660 No 1605
ii) for 63 kVA, 100 Amps 358090 1660 No 1605
iii) for 100 kVA,160 Amps 358092 2350 No 3100
5 MCB 6 Amps 358094 250 No 247
6 Contactors
i) for 25 kVA, 40 Amps 352440 2180 No 2200
ii) for 63 kVA, 100 Amps 352460 4650 No 4700
iii) for 100 kVA,160 Amps 352480 6540 No 6550
Compact Pre-fabricated Packaged Sub-station 11kV / 433 V
Page 25
Rate in Rs.
Rate as
per S.R
2005 (in
Rs.)
Sl No Name of the Material
Material
Code
Unit of
Measure
ment
(i) With 500 kVA oil cooled transformer 276550 New item No. 19,00,000
(ii) With 750 kVA oil cooled transformer 276575 New item No. 22,00,000
(iii) With 990 kVA oil cooled transformer 276590 New item No. 23,50,000
(i) With 500 kVA dry type transformer 276560 New item No. 21,72,000
(ii) With 750 kVA dry type transformer 276585 New item No. 25,80,000
(iii) With 990 kVA dry type transformer 276599 New item No. 28,00,000
Breakup prices
Copper wound Oil Cooled Distribution Transformer
500 kVA 321450
New item No.
7,75,000
750 kVA 321475
New item No.
10,84,000
990 kVA 321490
New item No.
12,97,000
LT ACB 2000A 310520
New item No.
1,15,000
MCCB 400A 358097
New item No.
30,500
Packaged Sub-station 11kv/433V consisting of 3 way SF6/VCB insulated compact RMU, oil
cooled/dry type copper wound transformer and L.T. section with one ACB as incoming and 7 no.
outgoing MCCB feeders, and with encloser made of electronically Galvanized
SL.No Particulars M.S Angle/Flat in mm Qty
Total wt/set
in kgs
16 mm
Hexogonal
Bolt & Nut
Qty
20 mm
Class
'A' G.I
Pipe in
Length
1 2 3 4 5 6 7
2 27.14 175 mm long 6
120
mm, 2
nos
50 mm long 6
60 mm,
3 Nos
2
Brace X-arm (Horizontal member)
50x50x6 size 1.6 mtrs long
2 14.4 65 mm long 8
3
Brace X-arm (cross member)
50x50x6 size 2.9 mtrs long
2 25.2 50 mm long 5
4
Strain Plate
50x8 size 0.375 mtrs long
3 3.49
1
H.T power x-arm out of
65x65x6 size 2.34 mtrs long
type-CDP-2
2 Nos.
2.56 kg/set
6 mm thick
washer 1No.
BILL OF MATERIALS-1
for 11 kV DP structure Kit as per Drg No. SIC/DL/WSO 18/29-7-85
Clamps
made out of
50x6 mm
M.S. flat
8
type-CDP-1
2 Nos.
2.16 kg/set
Note :
1. All holes are of 18 mm for 16 mm bolts
SL.No Particulars Qty
MS Angle Flat
in mm
Length/
piece in
mm x Nos
total
wt/set in
kgs
16 mm
dia
Hexagana
l Bolt &
Nut
Length in
mm
Qty
in
No.
20 mm
dia. Class
'A' G.I
Pipe
Length in
mm/Qty
50x6 2,700 X 2 31.2 175 4 0
65x65x6 375 X 3 2.7 50 6 0
45x45x6 2,350 X 2 18.8 75 4 0
40x40x5 340 X 2 2.04 0 0 0
40x40x5 70 X 4 0.84 0 0 0
40x40x5 60 X 6 1.08 0 0 0
b) Pin insulator support 1 Set 50x6 400 X 3 2.88 0 0 0
50x50x6 2,350 X 1 10.58 0 0 0
45x45x6 70 X 2 0.56 0 0 0
65x65x6 1,025 X 2 11.86 0 0 0
50x6 436 X 2 2.15 65 4 0
e) G.O.S & L.A Supporting Brace 1Set 45x45x6 1,260 X 2 10.08 50 4 0
65x65x6 2,350 X 1 13.63 0 0 0
65x65x6 70 X 2 10.08 85 2 0
65x65x6 925 X 2 10.73 0 0 0
50x6 496 X 2 2.27 65 4 4
45x45x6 1,360 X 2 10.88 0 0
50x6 463 X 1 2.41 0 0
0 285 X 2 1.37 65 4
45x45x6 2,700 X 2 21.6 0 0
45x45x6 500 X 2 4 40 4
50x6 493 X 2 2.44 65 4
100x50 2,700 X 2 49.69 225 7 185 mm
65x65x6 310 X 2 3.6 0 0 3 No.
50x6 523 X 2 2.44 65 4 0
65x65x6 1,150 X 1 5.89 0 0 0
50x6 548 X 1 1.32 65 2 0
b)Handle supporting X-arm brace & clamp
for fixing on to pole
1 Set
45x45x6
50x6
50x6
1800 X 1
560 X 1
320 X 1
4
1.34
0.77
0
0
65
0
0
2
0
0
0
Note :
a) G.O.S Frame 1 No.
BILL OF MATERIALS -2
FOR 100 TO 300 kVA TRANSFORMER CORE KIT ( For double pole TC Structure)
1) The bill of materials are prepared as per Dgr No..KEB/SIC/WS/022/date :12.9.86
2) The weights given are for raw materials as per ISI structural Hand book.
2
1 H.T Power Cross arm & strain plate 1 Set
c) L. A. Fixing X-arm 1 Set
3) All holes are of 18 mm & solt holes 18x35 mm to suit 16 mm unless otherwise stated
5) LT.4 pin X-arm & clamp are also not included as they are readily available.
4) Bolts required to fix LA's & G.O.S down take off pipe are not included as the same are to be supplied along with equipments,
d) G.O.S & L.A Support X-arm & Clamp for f 1 Set
f) H.G Fuse Fixing X-arm 1 Set
0
h) G.O.S , L.A & HG Fuse supporting brace
& clamp for fixing to pole
1 Set 4
g) H.G Fuse support X-arm & Clamp for
fixing on to pole
1 Set
5
a) G.O.S Handle supporting X-arm & clamp
for fixing on to pole G.O.S
1 Set
3
Transformer belting angle Clamp for fixing
on to pole
1 Set
4
a)Transformer seating channel supporting
cleat X-arm & clamp for fixing on to pole
G.O.S
1 Set
Sl. NO Particulars Unit
MS Angle
Flat in mm
Length /Nos
in mm
Wt / Set
1 2 3 4 5 6
1
HT Side power Cross-arm and
strain plate
1 Set
50x50x6
50x6
1280 X 3
463 X 2
17.28
2.22
2
GOS Support Cross arm & Clamp
for fixing on to the pole
1Set
65x65x6
50x6
2000 X 2
463 X 2
23.2
2.09
3 GOS Frame 2 Nos
45x45x5/6
45x45x5/6
45x45x5/6
45x45x5/6
2350 X 4
310 X 4
70 X 8
60 X 12
37.6
4.96
2.24
2.28
4
GOS Supporting Cross arm and
Clamp
1 Set
45x45x5/6
50x6
50x6
1360 X 4
498 X 2
285 X 2
21.76
2.39
1.37
5
a) GOS Handle Supporting Cross
arm Brace and Clamps
1 No
65x65x6
50x6
2000 X 1
423 X 2
11.6
1.26
b) GOS Handle Supporting Cross
arm brace and Clamps
45x45x5/6
50x6
50x6
1000 X 2
50 X 1
320 X 1
8.00
1.34
0.77
6 Brace Cross Member and Clamps 1 Set
50x50x6
50x6
2700 X 2
493 X 2
24.3
2.31
BILL OF MATERIALS-3
3 Pole Structure for Transformer
Sl.No Particulars Unit
MS Angle
Flat in mm
Length in
mm
Wt/kg
1 2 3 4 5 6
1 GOS- H Frame Fixing Cross-Arm No 65x65x6
1350 x 1
1200 x 1
5.933
2 GOS Frame Set 45x45x5 2350 x 2 15.98
310 x 2 2.108
70 x 4 0.95
60 x 6 1.227
3
GOS Handle Frame Fixing Cross-
arm
No 45x45x5 1100 x 1 3.74
4
GOS H Frame Fixing Cross arm
Clamps Brace Fish Plate
Set
45x45x5
50x6
50x6
50x6
1360 x 2
473 x 2
503 x 2
285 x 2
9.248
2.27
2.41
1.368
5
GOS Handle Frame Fixing Cross
set arm Brace Clamps Fish Plate
Set
45x45x5
50x6
50x6
50x6
1000 x 1
548 x 1
558 x 1
320 x 1
3.4
1.315
1.339
0.768
H.FRAME
BILL OF MATERIALS-5
Sl.
No
Particulars Qty
MS
Angle/
Flat
Length/
Piece in
mtr x No
Total
Wt/Set in
kgs
16 mm dia
Hexgonal
No.Bolt &
Nut
Qty
20 mm
class 'A'
GI pipe
Qty
Clamp made
out of 50x6
mm MS flat
No.
Qty
wt/set in
kgs
1
HT +LT side power
X-arm
1 Set
2 No
65x65x6 2.7 X 2 31.32 175 7 120 3 ** ** **
2 P.I support X-arm 1 No 50x50x6
2.7 X 2
(0.06x3)
12.96 65 4 ** ** 460 2 2.16
3
Belting cross arm and
belting support X-arm
1 Set
4 No
45x45x6
50x50x6
2.7 x 2
0.5 x 2
21.6 4.5
50
65
4
4
**
**
**
**
**
465
**
2
**
2.23
4
Transformer Seating
and Transformer
seating angle support
X-arm
1 Set
4 No
65x65x6
2.7 x 2
0.285 x 2
31.32
3.19
12
50
7
4
**
160
**
3
**
465
**
2
**
2.23
5
Distribution box Fixing
Clamps
** ** ** ** 120 ** 3 536 2 2.6
6 G.I Pipe ** 20x5 ** ** 160 ** 3 ** ** **
7 H Frame Set ** 1 No ** ** ** ** ** ** ** **
Note :
BILL OF MATERIALS-4
FOR 25 TO 63 kVA TRANSFORMER CENTRE KIT
1. The bill of materials are prepared as per DRG No.SIC/WS/017/date 28.6.85.
2.The weights given are for raw materials as per ISI structural steel Hand book.
3. All holes are of 18 mm for 16 mm bolts.
4. All slotted holes are of 18x35 mm long.
5. Bolts required to fix Las are not included as the same are to be supplied along with LAs
6 Since the D.O.L.O cut out is being fixed on the pervious support of the T.C and depending on whether it is single support & DP structure
provision for D.O.L.O fixing X arm shall have be made in the Estimate, Separately as the same is not include in the Kit.
Sl.
No.
Particulars
Quantity/
Length
a
Single core 240 sq. mm 1100 Volts, PVC Al LT Lead 5 mtrs. with crimped CU lug at
both ends for TC to distribution box via Metering Box (2 ckt)
7 Nos.
35.0 mtrs
b
Single core 240 sq. mm 1100 Volts, PVC Al LT Lead 6 mtrs. with crimped CU lug at
one end for LT Distribution Box to LT O/H line (1st Ckt)
4 Nos.
24.0 mtrs
c
Single core 240 sq. mm 1100 Volts, PVC Al LT Lead 6.5 mtrs. with crimped long
body lug at one end. For LT Distribution Box to LT O/H line (2nd Ckt)
3 Nos.
19.5 mtrs
d
Single core 240 sq. mm 1100 Volts, PVC Al LT Lead 3 mtrs with crimped long body
lug at one end. For TC to LT O/H Line (2nd Ckt)
1 No.
3.0 mtrs
e
P.G. Clamps suitable for 240 sq.mm to Rabbit ACSR. For One O/H take of lines
1 No./Phase
8 Nos
f
Fibre glass spacers for LT Al cable support with 2 Nos. 6 mm dia 40 mm long
(full thread) Hexagonal bolts as per DRG KEB/SIC/MISC/004 RI dated:26-12-86
12 Sets
g
Fish plate for fixing spacer to pole (as per drawing KEB/SIC/WS/022 RI dt:12-09-86)
made out of 40x6 mm MS Plate 250 mm long
8 Nos.
h
Bolts 175 mm long 12 mm dia
16 Nos
I
Bolts 65 mm long 12 mm dia (Full thread)
8 Nos.
BILL OF MATERIALS - 6
LT Kit for use in Metering and Distribution Box for 250 kVA TC using 2 pole structure
Sl.
No.
Particulars
Quantity/
Length
a
Single core 120 sq. mm 1100 Volts, PVC aluminium LT Lead 5 mtrs. with crimped long body lug at both
ends for TC to distribution box via Metering Box(2 Ckt)
7 Nos.
35.0 Mts
b
Single core 120 sq. mm 1100 Volts, PVC aluminium LT Lead 6 mtrs. with crimped long body lug at one
end for LT Distribution Box to LT O/H line (1st Ckt)
4 Nos.
24.0 Mts
c
Single core 120 sq. mm 1100 Volts, PVC aluminium LT Lead 6.5 mtrs. with crimped long body lug at one
end. For LT Distribution Box to LT O/H line (2nd Ckt)
3 Nos.
19.5 Mts
d
Single core 120 sq. mm 1100 Volts, PVC aluminium LT Lead 3 mtrs. with crimped long body lug at one
end. For TC to LT O/H Line (2nd Ckt)
1 No.
3.0 Mts
e
P.G. Clamps suitable for 120 sq.mm to Rabbit ACSR. For one O/H take of lines 1
No./Phase 8 Nos
f
Fibre glass spacers for LT aluminium cable support with 2 Nos. 6 mm dia 40 mm long (full thread)
Hexagonal bolts as per DRG KEB/SIC/MISC/004 RI dated:26-12-86 12 Sets
g
Fish plate for fixing spacer to pole (as per drawing KEB/SIC/WS/022 RI dt:12-09-86) made out of 40x6
mm MS Plate 250 mm long 8 Nos.
h
Bolts 175 mm long 12 mm dia
16 Nos
I
Bolts 65 mm long 12 mm dia (Full thread)
8 Nos.
BILL OF MATERIALS - 7
LT Kit for use in Metering and Distribution Box for 100 kVA TC using 2 pole structure
Sl.
No.
Particulars
Quantity/
Length
a
Single core 95 sq. mm 1100 Volts, PVC aluminium LT Lead 4 mtrs. with crimped long body lug at both
ends for TC to LT Kit via Metering Box(2 ckts)
6 Nos.
24.0 Mts
b
Single core 95 sq. mm 1100 Volts, PVC aluminium LT Lead 3 mtrs. with crimped long body lug at both
ends for LT Kit to LT O/H line (2 ckts)
6 Nos.
18.0 Mts
c
Single core 95 sq. mm 1100 Volts, PVC aluminium LT Lead 3 mtrs. with crimped long body lug at one
end. For TC to LT O/H Line(1st Ckt)
1 No.
3.0 Mts
d
Single core 95 sq. mm 1100 Volts, PVC aluminium LT Lead 5 mtrs. with crimped long body lug at one
end. for TC to LT O/H Line via metering Box
1 No.
5.0 Mts
e
P.G. Clamps suitable for Rabbit/Weasel ACSR. For one O/H take off lines 1
No./Phase
8 Nos
f
Fibre glass spacers for LT aluminium cable support with 2 Nos. 6 mm dia 40 mm long (full thread)
Hexagonal bolts as per DRG KEB/SIC/MISC/004 RI dated:26-12-86
4 Sets
Sl.
No.
Particulars
Quantity/
Length
a
Single core 50 sq. mm 1100 Volts, PVC aluminium LT Lead 4 mtrs. with crimped long body lug at both
ends for TC to LT kit via Metering Box
3 Nos.
12.0 Mts
b
Single core 50 sq. mm 1100 Volts, PVC aluminium LT Lead 3 mtrs. with crimped long body lug at both
ends for LT Kit LT O/H line
3 Nos.
9.0 Mts
c
Single core 50 sq. mm 1100 Volts, PVC aluminium LT Lead 4 mtrs. with crimped long body with lug at
one end from TC to O/H line via Metering box
1 No.
4.0 Mts
d P.G. Clamps suitable for Rabbit/Weasel ACSR. For One O/H take off lines 1 No./Phase 4 Nos
e
Fibre glass spacers for LT aluminium cable support with 2 Nos. 6 mm dia 40 mm long (full thread)
Hexagonal bolts as per DRG KEB/SIC/MISC/004 RI dated:26-12-86
2 Sets
BILL OF MATERIALS - 9
LT Kit for use in Metering and Distribution Box for 25 kVA TC using 2 pole structure
BILL OF MATERIALS - 8
LT Kit for use in Metering and Distribution Box for 63 kVA TC using 2 pole structure
Part No.
MS Angle size
in mm
Length in
mm
Quantity Wt / Mtr.
Weight in
kg.
1 50x50x6 850 3 4.5 11.48
2 50x50x6 1150 4 4.5 20.7
3 50x50x6 850 2 4.5 7.65
4 45x45x5 900 2 3.4 6.12
5 45x45x5 1500 2 3.4 10.20
6 45x45x5 1321 2 3.4 8.98
7 8th Plate 250X150 5 2.355 11.78
8 65x65x6 485 2 5.8 5.63
9 65x65x6 850 2 5.8 9.86
10 65x65x6 485 2 5.8 5.63
11 45x45x5 1350 2 3.4 9.18
12 45x45x5 1000 2 3.4 6.8
BILL OF MATERIALS-10
SINGLE POLE MOUNTED TRANSFORMER STRUCTURAL
MATERIALS ON 9 MTRS. LONG RCC POLE ( SQ. SECTION) FOR
25/63/100 kVA TC SET.
Length in
mm
Quantity Wt / Mtr.
Weight in
kg.
850 5 9.2 39.10
2400 4 7.1 68.16
850 5 3.4 14.45
1040 2 7.1 14.77
2000 2 4.5 18.00
1000 2 4.5 9.00
1440 2 5.8 16.70
1110 1 23.4 25.97
1200 2 9.2 22.08
1110 2 23.4 51.95
1750 2 6.8 23.80
1260 2 5.8 14.62
1110 2 7.1 15.76
1640 6 3.4 33.46
60 6 3.4 1.22
335 6 3.4 6.83
1000 2 5.9 11.80
1000 8 3.0 24.00
17 kgs
Approx.
MS Hexagonal bolts, nuts,
washers of different sizes
in sufficient quantity for
fixing clamps
45x45x5 M.S. Angle
45x45x5 M.S. Angle
(cleat)
40x40x5 M.S. Angle
Round Clamps of different
sizes made out of flats
a) 75x10 M.S. Flat
75x75x6 M.S. Angle
65x65x6 M.S. Angle
75x40x5 M.S.Channel
GOS Mounting Structure
(Ladder)
a) 75x6 M.S. Flat
65x65x6 M.S. Angle
Transformer Centre
130x130x12 M.S. Angle
100x50x6 M.S. Channel
130x130x12 M.S. Angle
(with side plate)
100x100x6 M.S. Angle
75x40x5 M.S. Channel
45x45x5 M.S. Angle
75x40x5 M.S. Channel
50x50x5 M.S. Angle
50x50x5 M.S. Angle
BILL OF MATERIALS-11
SINGLE POLE MOUNTED TRANSFORMER STRUCTURAL
MATERIALS ON 11 MTRS. LONG SPUN POLE 250 kVA TC SET.
Size of Steel Section in
mm
Top Bract
Schedule of Rates for Labour 2007
Part-3
Page 1
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
1
a) Ordinary Soil Per Pit 142
b) Hard Soil Per Pit 484
c) Hard latterite Soil Per Pit 537
2
a) Ordinary Soil Per Pit 114
b) Hard Soil Per Pit 391
c) Hard latterite Soil Per Pit 434
3
a) Ordinary Soil Per Pit 153
b) Hard Soil Per Pit 484
c) Hard latterite Soil Per Pit 576
4
DIGGING OF PITS
Digging of Pits 2 mtr Depth for errection of 9.5 mtr Long RCC support (350kg WL
for 33kV) as per approved Drawing.
Digging of Pit 2.5 mtr depth for errection of 11mtr long tubular spun pole as per
d D i
Digging of Pits 1.5 mtr Depth for errection of 7.5/8 mtr Long Steel/RCC/PSC/PCC
supports as per approved Drawing.
Digging of Pits 1.8/2 mtr Depth for errection of 9 to 10 mtr Long Steel/ RCC/PSC
supports as per approved Drawing.
Det ai l s of Labour Rat e 2007
4
a) Ordinary Soil Per Pit 220
b) Hard Soil Per Pit 670
c) Hard latterite Soil Per Pit 794
5
a) Ordinary Soil Per Pit 171
b) Hard Soil Per Pit 670
c) Hard latterite Soil Per Pit 744
6
a) Ordinary Soil Per Pit 73
b) Hard Soil Per Pit 186
c) Hard latterite Soil Per Pit 206
7
1
Providing Foundation and Pole with cement concert
1:4:8 proporation and coping the top surface curing
as per approved drawing (excluding the cost of
materials)
Per Pit 123
2
Providing Foundation for Guy set with Cement
Concret as per approved Drawing (excluding the cost
of materials)
Per Pit 75
ERECTION OF POLES
Digging of pit For providing GI Pipe type Earthing
approved Drawing.
Digging of Pit for GUY SET
Note: For Hard Latterite Soil and Hard Soil works have to be certified by Executiuve Engineer,
Ele. O&M Division, whereever these types of soil encountered.
CONCRETE WORKS
Page 2
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
1
Erection of steel supports 9.0 to 10.00 mtr long such
as 22.68 kgs (50 lbs) Rail, 27.22 kgs (60 Lbs) Rail, I
Beam of sizes 200x100mm, 175x90 mm, 125x100
mm Fabricates poles tubular poles in pits of 1.8 mtr
Depth, Aligning, Refilling with soil and ramming as
per approved drawing.
No 114
2
Same as above but erection of 7.5 to 8.0 mtr long
steel supports 18.75 kgs (41Lbs) Rail, 125x75 mm I
beam in pit of 1.5 mtr Depth.
No 101
3
Same as above but erection of RCC/PSC/PCC poles
of 7.5 to 8 mtr long in a pit of 1.5 mtr Depth.
No 204
4
Erection of RCC/PSC poles 9 to 10 mtr long in a pit
of 1.8 mtr Depth
No 255
5
Erection of RCC pole 9.5 mtr long 350kg WL (using
Tor-50) in a pit of 1.9 mtr Depth for 33 kV Lines
No 366
6
Erection of Pre-Stressed RCC Tubular spun pole 11
mtr long in a pit of 2.5 mtr Depth
No 455
7
Erection of 2 poles structure formed out of SM rails
or I Beam of sizes 200x100 175x90 mm, 225x100mm
of 9 to 10 mtr long in pits of 1.8 mtr depth for line
deviation with necessary foundation, inclusive of
fixing of cross Arms, Braces, Strain Insulators or Disc
insulators complete.
Per Structure 715
8 Same as above using RCC poles 9 mtr to 10 mtr long Per Structure 934
9
Same as above using RCC poles 8 mtr long in pits of
1.5 mtr depth.
Per Structure 934
a.
Providing spiral Earth Electrode type Earthing along
with pole.
Per Structure 21
b. Erection of H Frame. Per Structure 72
10
Transformer Platform: Errection of 2 poles structure
as in 7 above with platform for mounting transformers
as per approved drawing using I beams or MS rail 8
mtr long.
Per Structure 938
11 Same as item No. 10 with RCC pole 9/8 mtr long.
i) 1258
1104
ii) 1302
1200
iii) 1439
1289
12
i]
for 250 kVA Transformer on the existing 11 mtrs.
Spun pole
Per structure 760
ii] for 100 kVA on the existing 9 mtrs. RCC pole Per structure 380
iii] for 25/63 kVA on the existing 9 mtrs. RCC pole Per structure 380
100/250 kVA Per Structure
Erection of single pole mounted Transformer structures
Above 250 kVA Per Structure
Per Structure Upto 63 kVA
Page 3
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
14
3 Pole structure: Erection of 3 pole structure formed
with 3 Nos 9 mtr RCC Pole with platform for mounting
100 to 500 kVA transformers as per approved
Drawing.
Per Structure 1925
15
4 Pole Structure: Erection of 4 pole structure formed
with SM Rail or I Beam of size 200x100 mm 175x90
mm, 225x100 mm size, 9 to 10 mtr long pits for line
deviation with necessary foundation, including fixing
of cross arm, braces, strain/disc insulators.
Per Structure 1588
16
Erection of 4 Pole structure as in item, 15, with
platform for mounting of Transformer.
Per Structure 1819
17
Construction of platform with size stone, cement
concert for erection of 500 kVA
Transformer/Heavy Equipment.
Construction of platform (1.5x1.5x1.2) mtr in size
stone, for erection of transformer/Heavy equipment
including all materials, labour. Excavation of
(1.5x1.5x1) mtr pit for foundation, providing and
laying cement concrete 1:4:8 proporation for
foundation laid in 15 cm thick layers, well
compacted curing etc., complete. Providing and
construction of stone masonary 0.9 mtr below ground
level and 1.2 mtr above ground level, neatly hammer
Per Structure 9795
dressed, in cement morter 1:6 cutting complete
providing pointing to stone masonary in cement
morter 1:3 after racking joint and nicely lining curing
etc.and laying 10cm cement concrete at top.
Plastering the concrete surfaces in cement mortor
1:4 including smooth randering curing etc.
Fixing of Cross arm and stringing of Conductor.
18 Fixing of 2 Pin cross arm with insulator and Braces. each 37
19 Fixing of 4 Pin cross arm with insulator and Braces. each 37
20
Fixing of V-Shape/Horizontal cross arm including
single top support Braces and Insulators.
each 37
21
Fixing of V-Shape/Horizontal cross arm D.C.A.
including Braces and Insulators.
each 73
22
Fixing of single top support with insulators for street
light control.
each 24
23 Fixing of Earth Guard Stirrup perset /2Nos. 37
24 Fixing of Anticlimbing Device per set 9
25
Fixing of GUY Sets with break insulators making use
of 7/3.25 mm (7/10 swg) galvanised steel wire with
turn buckle and anchoring arrangement as per
approved drawing.
per set 59
Page 4
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
26
Providing and Earthing of metal parts and pole
supports as required by IE rules with spiral type
electrodes.
per set 16
27
Fixing guarding including fixing of necessary cross
arms for existing HT and LT line at Road Crossing,
Telephone Line Crossings up to span of 60 mtrs.
per set 225
28
Fixing guarding including fixing of necessary cross
arms between HT and LT line up to a span of 60
mtrs.
per set 396
29
Stringing of conductor wren, Squirrel, Weasel,
Binding of conductor on each insulators and dead
ending on strain or Suspension insulators by means
of clamps.
per km 715
a) do - for Rabbit ACSR per km 977
b) do - for Coyote ACSR per km 1571
30
a) Erection of 25 to 63 kVA Transformer on
Transformer
each 715
b) -do- 100 kVA Transformer each 1426
c) -do- 200-250 kVA Transformer each 2140
d) -do- 300-500 kVA Transformer each 2613
Providing GI Pipe Earthing for lightning arresters,
Erection of Transformer
31
Providing GI Pipe Earthing for lightning arresters,
Transformer Neutral and Transformer Metal parts (
excluding digging of pits)
per set 43
32
Hiring of crane up to 10 km ( to and from) for erection
of 250/500 kVA Transformer
Per
Transformer
2378
33
Hiring of crane up to 10 km ( to and fro) for releasing
existing Transformer and erection of new 250 to 500
kVA Transformers.
No. 2970
34
Construction of Platform as in item 17 for erection of
HT metering cubicle.
No. 9795
35 Erection of HT metering Cubicle on Platform. No. 1140
36
Erection of LT Feeder box including necessary civil
works like soil excavation & concreting etc. complete
i] upto 8 ways No. 370
ii] above 8 ways No. 400
37 a)
Fixing LT distribution box for 100/250 kVA capacity
and wiring the same from the transformer to the
switch and from the switch to the conductor, inclusive
of Fixing of Pipe/Spacers from the transformer to the
switch box and switch to the line.
Set 572
b) -do- For 500 kVA Set 1140
c)
HT Metering
Additional cost for making termination using H/Wedge Clamps
Page 5
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
i] Rabbit to Rabbit No 45
ii] Coyote to Coyote No 60
iii] Rabbit to Coyote No 60
d)
Additional cost for making termination using H-
Clamps along with 2 hole Paddle/In-Line
Connector/Micro wedge connector.
set 124
e)
1) 25/63 kVA TC Set 500
2) 100 kVA TC Set 500
3) 250 kVA TC Set 500
4) 300/500 kVA TC Set 500
f)
1 3 kVAr for 15/25 kVA DTC No 170
2 9 kVAr for 63 kVA DTC No 170
3 18 kVAr for 100 kVA DTC No 200
4 27 kVAr for 250 kVA DTC No 235
5 54 kVAr for 500 kVA DTC No 245
Fixing LT Tamper proof Box for housing the ETV Meter 3 phase 4 wire 5A, with
associated LT CTs class 0.5 accuracy, ring type, Busbars, wiring, etc.,
LT Capacitor 3 Ph. Housed in a encloser with necessary fusses, wiring, mounting
arrangement as per tech. Spec.
g)
i) for 25 kVA per set 1470
ii) for 63 kVA per set 1470
iii) for 100 kVA per set 1470
38
Fixing DOLO cutouts or Horn Gap Fuses including
fixing of cross arms and wiring
Set /3Nos. 84
39 Fixing of GOS including wiring Set 165
40 Fixing of 3 Nos lightning arresters including wiring. Set 48
41 Fixing Pole Fuse Box Set 49
42
Fixing PVC pipe for taking the leads form the
conductor to the pole fuse box.
Set 49
43
Fixing and Wiring Incandescent street Light Fitting
with two Clamps.
Set 142
44
Wiring and fixing of FTL with suitable clamps bracket
bolts and nuts using departmental material and
departmental lader vehicle under supervision of
departmental Staff.
Set 142
Street Light and Other Works
Installing RLMU for the existing Distribution Transformer Centre for:
Page 6
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
45
Wiring and fixing as SV/MV light Fittings with suitable
clamps Brackets, lamps, Bolts and nuts using
departmental Materials and departmental Lalder
vehicle under super vision of departmental Staff.
Set 228
46
Fixing of Mercury Vapour Lamp fitting/Ornamental
Light Fitting with Contral Boxes etc.,
Set 167
47
Wiring of Two circuits by Fixing LT protection Kit for
25 kVA to 100 kVA TC.
No. 572
48 Surveying for construction of HT and LT Lines. km 212
49 Numbering and Scheduling of poles km 160
50 Magpying km 64
51 (a) Dismanting of Steel / I Beam No.
90% of the
Erection charge
b) Straighting of Slant / inclined poles per set
100 % of the
Erection charge
c) Releasing of baliga pole per set
75 % of the
Erection of 8m
RCC pole
52
i) Weasel/Squirrel km
ii) Rabbit km
iii) Coyote km
53 Dismantling of 2 B&S to I/O copper or equivalent km 281
54 Dismantling of copper conductor above 2 B&S. km 452
55 Any Dismantling work No.
90% of Stringing
/ Erection
56
Providing Foundation with cement concrete 1:4:8
proportion and coping the TOP surface as per
approved drawing and curing
No. 123
57
Providing concrete for Anchor Rod in Marshy/Black
Cotton Soil.
No. 75
58
a)
i)
In Malnad/hilly areas if J ungle / trees / Plants /
Shrubs exists only (once in a year ) & Bamboos exist
(once in 6 months)
km 1188
Trimming of trees and branches and clearing as per IE Rules.
3 mtrs corridor (1.5 mtrs on either side of line)
Note: Work has to be recorded in register maintained at SO/SD/Division office,
Record has to be verified before issuing award, has to be certified by Ex. Engineer.
90% of Corresp.
Stringing /
Erection charge.
Releasing of Conductor and Restringing, Binding, straightning of inclined pole etc.
Page 7
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
ii) In Maidan ( In accordance with necessity ) km 430
b)
i) Maland/Hill Area km 2125
ii) Maiden Area km 1270
59
i) Maidan Area ( Twice in year) Sq.mtr. 1.4
ii) Maland Area (Once in Three Months) Sq.mtr. 1.4
60
a)
Poles: for Transporting one pole upto 100 mtr
Distance.
101
b)
i)
For Transporting 1 km Length Conductor upto
maximum of 100 mtr by Head Load.
101
As above for construction of new line (HT & LT) including Trimming of Trees, if
Jungle/Tree/Plant/ Shrubs Exists.
NOTE: Locality allowance noted under Sl. No. 64, is not applicable to item No. 58 & 59
Transporation by Head Load
Conductor:
Cutting, Clearing of Vegetation Grass/shrubs such other small plants, including
removal of Roots etc., in station yard/store yard.
Transportaion Rates:
y
c)
i)
For Transporting 25 kVA Transformer upto a
maximum of 100 mtr distance.
No. 186
ii)
For Transporting 63 kVA transformer upto a
maximum of 100 mtr distance.
No. 367
iii)
for Transporting 100 kVA Transformer upto a
maximum of 100 mtr distance.
No. 403
61
1 Transportation 7.5/10 Tons Lorry km
Rs. 17/km
subject to
minimum of
Rs. 833 in a day
2 Transportation using mini Lorry/Tempo km
Rs. 11/km
subject to min.
of a) Rs.440/-
upto 4 hrs.
b) Rs. 833/- for
above 4 hrs in a
day
62 a)
Loading of any type of material not covered
specifically
MT 456
b)
UnLoading of any type of material not covered
specifically
MT 456
63 a)
Loading of Power Transformer and other similar
materials like switchgear cable drums, drake link s,
conductors etc.,
MT 845
Transformer:
Hire Charges
Page 8
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
b)
Unloading of Power Transformer and other similar
materials like switchgear cable drums, drake links,
conductors etc.
MT 845
64
1
Bantwala, Mangalore, Sulya, Puttur, Belthangadi
Taluk
35%
2
Udupi, Kundapura, Karkala Taluk. 35%
3 Chickmagalur District
Kadur, Chickmagalur, Koppa, Tarikere, Mudigere,
Narasimharajapura, Sringeri Taluk
25%
4
a)
Hosanagara, Thirthalli, Sagara, Soraba, Shikaripura
Taluk
25%
b) Shimoga, Bhadrawathi Taluks 15%
65
1 7.5/8 mtr RCC/PSC poles No 56
2 9 mtr RCC/PSC poles No 63
South Kanara District
Shimoga District
a) Loading and unloading of poles loading of poles to vehicles at stores and
unloading at workspot
Udupi District
Locality allowance : In Maland area, locality allowance at the rate noted below be given
over and above Schedule of Labour.
2 9 mtr RCC/PSC poles No 63
3 7.5/8 mtr PCC poles No 32
66
1 25 kVA No. 204
2 63 kVA No. 313
3 100 kVA No. 376
4 250/300 kVA No. 862
5 500 kVA No. 1212
1 25 kVA No. 204
2 63 kVA No. 313
3 100 kVA No. 376
4 250/300 kVA No. 862
5 500 kVA No. 1212
67
1 S.Ph IP Set with Pump House Per IP Set 406
2 3Ph IP Set with Pump House Per IP Set 562
Fixing of energy meter to nonmetered I.P. sets 10HP and below: Including cost of
materials like Meter Board, Channel cutouts and necessary wires required for the
work.
a) Loading of Transformer
b) Un loading of Transformer
Page 9
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
3
IP set without Pump House where power supply
availed directly and weather proof meter housing box
is required including cost of WP box.
Per IP Set 1878
68
1
a) In Ordinary Soil cmt 84
b) In Hard Soil cmt 109
c) In Ordinary Rock without Blasting cmt 349
d) In Ordinary Rock with Blasting cmt 265
e) Hard Rock/Latterite rock/Latterite Soft cmt 505
2
Refilling the cable trenches with selected available
earth from trench excavation including watering,
consolidation in layers of 15 cm. Thickness including
depositing of the surplus earth with a lead of 200
Mtrs.
cmt 28
3
Earth work excavation for cable trenche of 0.5 to 0.75 mtrs. Width and Depth upto 1
meter including trial pits, depositing on bank upto a lead of 50 mtrs, Supplying and
Displaying Nece essary Danger Boards and Lighting, Using sight Rails and Sign Boards
at every 100 mtrs wheever necessary as directed.
UG Cable Works
Note: Works have to be certified by Executive Engineer Elec of the respective O&M
Division
Cutting of Road surface for cable trenches and disposing of the excavated earth, as
3
a) Macadum Road cmt 134
b) Tar Road cmt 222
c) Cement Concrete Road cmt 446
4
Removing the Existing Stone Slabs pavement and
stocking the materials for excavating the trench with
a lead of 50 mtr Refixing the stone slab after refilling
the trenches as in item 2.
Sq.mtr. 79
5
a) RCC Pipe mtr 21
b) Stone Ware Pipe mtr 16
6
Laying the GI Pipe 80mm to 150 mm dia at Drainage
Water Supply Crossing including fixing collars
elbows, bends, Tees and other fitting with Cuts and
Threads wherever necessary complete.
mtr 24
7
Removing and Refixing stone Masonary with
necessary patch up and cementing drain works for
Culvert, Water Valve Crossing etc.including cost of
materials.
cmt 310
8 Covering the Cable with Tiles km. 1363
9
Spreading and forming with sand all round the cable
to a depth of 75 mm and width of 500 mm.
km 4957
Laying and J ointing the pipes (100-150 mm), dia including lowering in Position: Fixing
Collars etc., J oining with mud mortor complete
directed including Barricading Danger Lighting then Refilling the Cable Trenches.
Page 10
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
10
Removing the kerb Stones and Refixing at the
original place with necessary earthwork.
R.mtr 4
11 Fixing of Route J oint indicating Slabs. No 37
12
(a)
1) 3x95 to150 Sq.mm km 6198
2) 3x185 to 3x240 Sq.mm km 7438
3) 1x300 to 1x1000 Sq.mm km 7438
4) 3x300 to 3x500 Sq.mm km 8677
(b)
1)
2.5 to 25 Sq.mm
(S.C. Cable 4 core 3.5 core)
km 1240
2)
35 to 90 Sq.mm
(4 core/3.5 core)
km 2480
3)
120 to 240 Sq.mm
( 4 Core/3.5 core)
km 2480
(c)
(d)
1) 3x95 to 150 Sq.mm km 22312
2) 3x185 to 240 sq.mm km 23552
-do- for LT Cables
Transporting HT cable from Store to work spot including loading and unloading.
HT Cable
Laying of cable in Existing trench/GI pipe/Stone Ware/RCC Hume pipe using
Wooden/Aluminum Rollers as directed by the departmental staff.
2) 3x185 to 240 sq.mm km 23552
3) 1x500 to 1x1000 Sq. mm km 23552
4) 3x300 to 3x500 Sq.mm km 24790
(e)
1) 2.5 to 25 Sq.mm km 7961
2) 35 to 95 Sq.mm km 11651
3) 120 to 240 Sq.mm km 11897
13
(a)
i) 3x95 to 3x150 Sq.mm No. 1052
ii) 3x185 to 3x240 Sq.mm No. 1052
iii) 3x300 to 3x300 to 3x400 Sq.mm No. 1052
(b)
i) 3x95 to 3x150 Sq.mm No. 1612
ii) 3x185 to 3x240 Sq.mm No. 1612
iii) 3x300 to 3x340 Sq.mm No. 1612
14
(a)
i) 3x95 to 3x150 Sq.mm No. 1045
Epoxy type
Cable Joint and wiring ( for HT Cable only)
LT Cable
Heat shrinkable type joint
Epoxy straight through joint
Making and Fixing pot head for HT Cable only
Page 11
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
ii) 3x185 to 3x240 Sq.mm No. 1045
iii) 3x300 to 3x300 to 3x400 Sq.mm No. 1045
(b)
i) 3x95 to 3x150 Sq.mm No. 1363
ii) 3x185 to 3x240 Sq.mm No. 1363
iii) 3x300 to 3x340 Sq.mm No. 1363
15
Releasing of HT cable after excavation refilling,
Consolidation Rewinding to the Drum etc.
km 22311
16 -do- for LT cable km 7666
69
1
i) Ordinary Soil cmt 84
ii) In hard soil cmt 109
iii) In ordinary Rock without Blasting cmt 349
iv) In ordinary Rock with Blasting cmt 265
v) Hard Rock/Lattirite Rock/Lattirite Soft cmt 505
Heat shrinkable type
Note: Works have to be certified byExecutive Engineer Elec of the respective O&M
Earth Excavation for RMU Foundation Depositing of earth on Bank up to a lead of 50mtr
and with a lift up to 1.5 mtr
Ring Main Units
2
Refilling the RMU foundation with the approved new
earth with initial lead of 50 mtr including watering and
tamping layers of 15 cm thick etc., complete.
cmt 28
3 Lifting of Excess Earth up to distance of 10 Km cmt 87
4
Providing and Laying Granite or Basalt or trap jelly
concrete 1:4:8 proporation using 40 mm and down
size jelly for foundation laid in 15 cm thick layers and
well compacted including curing complete (including
material rate for cement concrete, cement, sand jelly
labour)
cmt 2308
5
Providing and laying granite or 2046 basalt or trap
jelly cement concrete 1:2:4 proportion using 20 mm
and down size jelly including mixing laying tamping.
Curing and finished for exposed faces with
necessary centering and form work etc., complete
(including material rate for cement jelly sand labour)
cmt 3011
6
Providing and constructing granite or trap or basalt
size stone masonary in stones hammer dressed in
course not less than 20 cm high with bond stones 2
mtr apart in each course in cement motor 1:6
including curing etc., complete including materials
rate for cement jelly sand and labour.
cmt 1640
Note: Works have to be certified by Executive Engineer Elec of the respective O&M
Division
Page 12
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
7
Providing and constructing granite or trap or basalt
stone masonary in course not less than 15 cm high
with bond stones 2 mtr apart in each course edges of
stone chistle dressed and all quoions 2 line dressed
5 cms wide on each face including materials rate
forcement, jelly sand and labour.
cmt 1965
8
Providing pointing to stone masonary in cement
motor 1:3 after racking the joints to 2.5 cms and
nicely lining curing etc., complete.
Sq.mtr. 55
9
Plastering concrete surface in cement mortar 1:40:20
mm thick inclusive of smooth rendering curing etc.,
complete.
cmt 93
10
Providing and constructing Brick Masonary with
approved quality of Non-modular bricks of standard
size with necessary scaffolding and curing for
foundation complete
cmt 3029
11
i) 5 panels No. 4957
ii) 1 panel No. 992
2
i) 5 panels No 6198
1. Transporting RMU unit from store to work spot including loading, unloading.
Fixing foundation frame of channels and angle iron welding fixing in concrete aligning the
RMU on foundation bed, assembly of units, connecting Bus Bars from panel to panel
initial filling of oil etc., complete.
i) 5 panels No 6198
ii) 1 panel No. 1240
12
Lettering the RMU with enamel paint and also writing
single line diagram of each panel, caution Board,
Danger Board etc., including cost of Paint, Brush
etc.,
per set 310
13
Providing, Fabricating and fixing 8 SWG Chain link
fencing (TATA Make) 50 mm Size GI Chain link
Mesh fencing made out of 50 mm x 50 mm x 6 mm
MS angle as per specification, at a height of 1.8 Mtr.
above GL and 0.45 Mtr. below GL embeded in CC
1:2:4, 0.45 x 0.45 x 0.45 Mtr. including curing,
coping etc., & angles spacing at 8 ft intervals and
also in corners with MS Gate of 0.75 x 1.8 Mtr. with
locking arrangement etc., complete.
Sq.mtr.
AS PER KPWD
SR
14 Cleaning of Bitumen type pothead bus joint (All sizes) No. 474
15
Breaking and cleaning of straight through joint (All
sizes)
No. 474
16
Sealing of cable ends including supply of plumbing
lead, plumbing materials.
i) PILC No. 474
ii) XLPE No. 474
Sl. No. Item Description Unit Rate in Rs.
STD PRICE - LABOUR for Aerial Bunched Conductor & Accessories
Page 13
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
1
Stringing of 11kV grade aerial bunched 3 core cable
of XLPE insulation & black LDPE sheathing having a
standard aluminum conductor, standard around a
weather resistant black XLPE insulated AAA
messenger wire (size 3x95 sq.mm+1x95 sq.mm)
km 19500
2
Stringing of 1.1kV grade aerial bunched 3 core cable
of XLPE insulation standard aluminum conductor,
standard around a weather resistant black XLPE
insulated AAA messenger wire (size 3x25 sq.
mm+1x16 sq.mm+1x25 sq. mm+1x25 sq. mm)
km 10000
3
Stringing of 1.1kV grade aerial bunched 3 core cable
of XLPE insulation standard aluminum conductor,
standard around a weather resistant black XLPE
insulated AAA messenger wire (size 3x50
sq.mm+1x16 sq.mm+1x50 sq. mm+1x35 sq. mm)
km 14500
4
Stringing of 1.1kV grade aerial bunched 3 core cable
of XLPE insulation standard aluminum conductor,
standard around a weather resistant black XLPE
insulated AAA messenger wire (size 3x70 sq.
mm+1x16 sq.mm+1x95 sq. mm+1x50 sq. mm)
km 17500
Stringing of 1.1kV grade aerial bunched single core
cable of XLPE insulation standard aluminum
5 conductor, standard around a weather resistant black
XLPE insulated AAA messenger wire (size 1x25 sq.
mm+1x16 sq.mm+1x25 sq. mm)
km 7500
1
Erection of Suspension Clamp - 25 to 95 sqmm bare
messenger
No. 75
2
Erection of Anchor Clamp - 25 to 95 Sq. mm bare
messenger
No. 75
3
Erection of Suspension Clamp -95 to 185 sqmm bare
messenger
No. 100
4
Erection of Anchor Clamp - 95 to 185 Sq. mm bare
messenger
No. 100
5 Fixing of Universal Hook No. 75
6 Pole Clamp-145mmx95 No. 125
7
Installation of Insulation piercing connector for main
to street light
Main : 16-95sqmm, Tap : 1.5-10sqmm(EP95)
No. 35
8
Installation of Insulation piercing connector for main
to service line
Main : 16-95sqmm, Tap : 4-35sqmm(P2X95)
No. 50
9
Installation of Insulation piercing connector for main
to service line
Main : 25-95sqmm, Tap : 25-95sqmm(P3X95)
No. 50
10
Installation of Insulation piercing connector for main
to service line
Main : 50-150sqmm, Tap : 4-35sqmm(P4X150D)
No. 50
11
Installation of Pre-insulated straight thru' joints-MJ PT
for 16sqmm cable
No. 100
Page 14
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
12
Installation of Pre-insulated straight thru' joints-MJ PT
for 25sqmm cable
No. 100
13
Installation of Pre-insulated straight thru' joints-MJ PT
for 50sqmm cable
No. 100
14
Installation of Pre-insulated straight thru' joints-MJ PT
for 70sqmm cable
No. 100
15
Installation of Pre-insulated straight thru' joints-MJ PT
for 95sqmm cable
No. 125
16 Installation of Pre-insulated lugs-CPTAU for 16sqmm No. 100
17 Installation of Pre-insulated lugs-CPTAU for 25sqmm No. 100
18 Installation of Pre-insulated lugs-CPTAU for 50sqmm No. 100
19 Installation of Pre-insulated lugs-CPTAU for 70sqmm No. 100
20 Installation of Pre-insulated lugs-CPTAU for 95sqmm No. 100
21
Installation of Pre-insulated lugs-CPTAU for
120sqmm
No. 125
22
Distribution box suitable for 20 single phase
connections
No. 250
23 Distribution box suitable for 6 3 phase connections No. 350
24 T-connector KZ3 95 No. 85
25 End cap for 50/70 Sqmm No 3 25 End cap for 50/70 Sqmm No. 3
26 11kV AB Cable T-joint installation for 3 Core No. 2020
27
11kV AB Cable Straight thru' joint installation for 3
Core
No. 1617
28 11kV AB Cable Termination installation for 3 Core No. 1367
29 Surg Arrester for ABC No. 70
30 Ground connection for messenger wire No. 17
31 Anchor sleeve for messenger wire No. 3
1
A
i) Normal soil 5'' bore size Rmtr. 605
ii) Rock soil 5'' bore size Rmtr. 1100
iii) Normal soil 8'' bore size Rmtr. 825
iv) Rock soil 8'' bore size Rmtr. 1650
B
i) Normal soil 5'' bore size Rmtr. 770
ii) Rock soil 5'' bore size Rmtr. 1265
iii) Normal soil 8'' bore size Rmtr. 990
ii) Rock soil 8'' bore size Rmtr. 1815
Without HDPE Pipe
With HDPE Pipe
Laying of UG Cables by trenchless technology by adopting horizontal boring
Boring & Drawing of cable including preparation at site
Page 15
SL.
No.
Particulars Unit
Proposed Rates
(in Rs.)
1
Installing & fixing the compact pre-fabricated
packaged sub-station 500/750/990 kVA transformer
on the existing concrete plinth.(This does not include
the cost of plinth, cable duct,laying & termination of
cable etc. provision for the same shall be made
separately as per the prevailing rates depending on
the site conditions)
set 6000
1
a
b
c
2
Erection of Compact Pre-fabricated Packaged Sub-station 11kV / 433 V
The Labour charges for erection of Poles, Guy Sets, DP Structures etc., involving
excavation of soil provided in the cost sheet for general works is for ordinary soil only.
Wherever other type of soil is encountered, the difference in rates for excavation in such
soil provided in the Schedule of labour shall be worked out and adopted.
For Transformers and Conductor - As per the rates provided in the S.R.
NOTE:
For all other materials excluding transformers and conductors - 10% of the rates
provisioned for Loading and unloading of poles in the estimate.
For Poles - As per the rates provided for Loading and unloading of poles in the S.R.
The loading and unloading charges shall be included at the following rates in all
estimates.
Schedule of rates for Labour 33 KV Sub-station
& Lines
Part-4
Sl.
No.
Description Unit Rates in Rs.
A1 Detailed Survenying on Turn-Key:
1)
Reconnoitary Survey-cum-walk over Survey along with
Departmental Staff to determine the feasible routeo of the line on
topo sheet. An alternate route if available should be indicated.
The route of the line is to be indicated and got approved by the
competent authority (Rates include the cost of Toposheet and
Transportation)
a) Hilly terrain KM 430
b) Plain terrain KM 405
2)
Detailed Survey: Fixing anchor points and taking levels at 20
Mtrs intervals drawing route profile on Graphy paper indicating
geographical features like Nalas, Rivers, Gardens, P&T Lines,
Railway-Crossings etc., and enroute villages
a) Hilly terrain KM 2060
b) Plain terrain KM 1375
3)
Fixing marking stones with approved marks including painting
above the ground level and Yellow Lettering and marking the
direction of incoming line and out going lines are to be clearly
marked on the top with red colour. If the distance between two
anchor points is more than 1 KM, one more directional stone is
to be fixed/ So also for the road crossing, railway crossing, River
Crossing, HT crossing and nala crossing for all on both the
sides.
Per Stone 205
4)
Burgie details for identification for all Anchor towers with existing
permanent marks like poles, telephone lines, buildings etc.,
Per Anchor
Tower
185
5) Conducting soil resistivity tests Per Test 355
6)
Clearing of bushes, tree branches of trees crops and shrubs
wherever encountered for detailed survey to enroute the corridor
width of 3 Mtrs (including vewing for fixing anchor towers etc.,)
a) Hilly terrain Per KM 310
b) Plain terrain Per KM 205
7)
a) Submission of reports in the form of good binding including
the preparation of sketches for burgie details for each anchor
points, scheduling of line details, S.R. Values, soil classification
reports, tower schedule, abstract of towers etc., complete.
125
b) Drawing the route profile on graph sheet, including geographic
feature like Nalas, rivers, gardens, P&T lines railway crossing
etc, inclusive of all stationaries.
125
(Normal requirement is 5 Sets)
8) a) Preparing the Schedules:
PTCC Proposal: Containing PTCC questionaire, topo sheet
extracts with marking of the proposed line, S.R.Report, tower
sketch, station single line diagram etc., (30 Copies/Sets)
Per KM 495
b) Railway Crossing proposal with drawing are inclusive of graph
sheets and other stationery materials, labour etc., (10 Sets)
Per Crossing 495
c) Tree Schedule Containing the details like name of tree, girth
size of tree, distance from central line of the alignment,
approximate height of the tree etc., complete
Per Hectare 355
LABOUR CHARGES FOR 33 KV SYSTEM
Per set
Sl.
No.
Description Unit Rates in Rs.
d) Forest Proposals: Inclusive of all works like fixing of stones
at every 20 Mtrs in the centre line and both ends of the corridor,
painting of each tree after chipping, writing the numbers on the
tree, taking girth size of all the trees coming in the corridor at 1
Mtr height from GL, approximate height of the tree and forest
clearance proposals etc., complete (10 Sets)
Per KM 2310
Note: This applies to forest area only.
A2 check survey by using their own Equipment
a) Hilly terrain Per KM 1025
b) Plain terrain Per KM 685
2 Taking block levels for Sub-Stations:
a)
Running Peripheral Theodolite traverse along periphery and
coordinating and heightening of all corners/turning points,
establishing permanent co-ordinate axis formation of grids at
50M grid intersection for preparing plot plan of the entire area
with contours. Including existing structure location
Acre 555
b)
Establishing datum level and bench marks at every 100M/50M
intervals both longitudinal and laterally and all corners/turning
points with stone pillars of size not less than 0.2M X 2M x1.0M
buried on the ground and exposed top engraved for painting RL,
and coordinates of that point.
Nos. 555
c)
Taking level at 5M/ Suitable grid interval in the sub-station area
for plotting block levels, contour map
Nos. 11
d)
Preparation of CAD drawings, generating the contours using
appropriate software and submissing of 6 Sets of blue prints and
one tracing sheet (original) and one soft copy etc., complete.
Per Project 5550
e)
Furnishing cutting and filling quantities using appropriate
software for earth work calculation
1665
f)
Super imposing GA drawings on contour maps in Co-ordination
with departmental engineers and supply of 12 sets of blue print
drawings etc., complete.
4440
3 Geo Technical Investigations:
a)
Making 150mm nominal diameter bore holes at various lacations
in soil using suitable approved method of boring including,
cleaning providing Bore holes at interval and at change of strata,
collections of water samples, observation such as ground water
etc., Collection of undisturbed solid samples at ever 2.0M/3.0M
interval and at change of strata, transportation of all the collected
samples to the laboratory and back filling of bore holes on
completion of the work, complete as per specification and
instruction of the engineers, for depths upto 6.0 M below natural
ground level or refusal strata.
Per Mtr 850
b)
Conducting various laboratory tests on soil samples at approved
laboratory includinmg preparation of soil smaples for
determination of soil, proparties etc., Complete as per
specification.
Note: Laboratory identified shall be approved by KPTCL
Engineers not below the rank of EE(Civil).
i) Bulk density and moisture content Each 335
ii) sieve analysis Each 335
iii) Hydrometer Analysis Each 335
iv) Liquid limit and plastic limit Each 335
v) Shrinkage limits Each 390
vi) Specific gravity Each 390
vii) Standard proctor density test Each 390
viii) Swell pressure Each 450
ix) Free swell index Each 450
Sl.
No.
Description Unit Rates in Rs.
x) Uncombined compressive strength Each 450
xi) Triaxial shear test Each 450
xii) One dimentional consolidation test Each 450
xiii) California bearing ratio Each 450
C)
Submitting final report in 6 copies including all field records and
laboratory test results, graphs and recommendations etc.,
complete as per specifications.
Per J ob 6660
Note: The above rates are unclusive of mobilization of plant
equipment & Materials for, Topographical survey, block leveling
and Geotechnical investigation works, and Demobilisation. No
extra rate is admisible for mobilisation & Demobilisation.
4 Excavation for station structure:
Excavation of pits as per specifications for lattice type of station
structures. Tr. Plinth, control panels, mounting structures for
breakers, CT's, PT's Isolators, LA's etc., Excavation of trenches
for control cables, U.G. Cables, Ground Mat etc.,
i) Normal Soil Cmt
Rate for hard
soil of KPWD
SR
ii) B.C.Soil Cmt
Rate for hard
soil of KPWD
SR
iii) Partially Submerged soil Cmt
Rate for hard
soil of KPWD
SR+10% Extra
for watery
situations.
iv) Fully sumerged soil Cmt
Rate for hard
soil of KPWD
SR+10% Extra
for watery
situations.
v) Wet black cotton soil Cmt
Rate for hard
soil of KPWD
SR+10% Extra
for watery
situations.
vi) Dry fissured/Ordinary rock Cmt
Rate for
ordinary rock
without
blasting of
KPWDSR
vii) Latterite soil Cmt
Rate for
ordinary rock
without
blasting of
Hard rock with blasting / Hard latterite Cmt
Rate for hard
rock with
blasting of
KPWD SR.
Note 1: For Excavation purposes measurement shall be as per
actuals.
Note 2: For foundation purposes predominant soil shall be
considered.
5 Back Filling:
1) Corresponding Rates in
against each soil classification
below shalll be adapted. 2) Area
weightages applicable for the
respective areas as per KPWD
SR shall be added to arrive at
final figures.
Sl.
No.
Description Unit Rates in Rs.
i)
Back Filling with excavated earth available near the tower and
consolidation layer by layer of 150mm depth with adequate
quantity of water.
Cmt
Rates as per
KPWD SR
ii)
Supplying and back filling with external hard murrum soil with
proper consolidation including lead and lift.
Cmt
Rates as per
KPWD SR
Note: This item is applicable only when Black cotton soil, wet
black cotton soil, dry fissured rock, ordinary rock, Hard rock are
encountered.
6
Concreting and curing (For Both Transmission lines and
station structures)
Concreting and curing as per specifications including the cost of
materials, T&P materials and labour charges with all lead and lift,
for transformer line towers lattice type station structures,
transformer Plinth, control panels, mounting structures for
Breakers, CT's PT's Isolators, LA' s etc.,
i) 1:4:8 Concrete Cmt
Rate under
plain concrete
for foundation
of KPWD SR
ii) 1:3:6 Concrete Cmt
Rate under
plain concrete
for foundation
of KPWD SR
iii) 1:2:4 Concrete Cmt
Rate under
plain concrete
for foundation
of KPWD SR
iv) 1:1.5:3 Concrete (M-20) Cmt
Rate under
plain concrete
for foundation
of KPWD SR
Note: a) Extra rate of Rs.20 per CMTr may be allowedo for
providing concrete in watery situation including cost of bailing out
water and removing slush.
b) Only machine mixing is to be used for concreting
c) J elly to be used is 20mm and down size for 1:1.5:3, 1:2:4 and
1:3:6 concrete and 40mm and down size for CC 1:4:8
7 a) Fixing Danger Board Nos. 20
b) Fixing Number Plate Nos. 20
8 Station Structures
a)
Errection, assembly and alignment of Station structure as per the
directions of site Engineer.
Mt 1210
b)
Erection, alignment & assembly of fabricated steel lattice
structure, pedestal structures & Mounting structures, for G.O.S.,
CT's, PT's LA's etc.,
Mt 913
9 Erection of Transformers
a)
Moving the Transformer on to the plinth (Maximum allowable
distance is 50 Mtrs) (More than 50 Mtrs. Approval of the CEE,
O&M Zone has to be obtained)
Per MT/Mtr 19
b) i)
Assembly of Transformer parts like bushings, radiators, filling oil
into Tr. Etc., (for the total wt. of the Tr.)
MT 437
ii)
Filling oil to the power Tr. Conservator and radiator (for
maintenance purpose only). For 5MVA to 20MVA Tr.
Litre 0.7
iii)
Filteration of oil using filter set of the contractor, to bring the
insulation value ot I.E. Specifications.
Litre 1.3
1) Corrresponding rates in KPWD
SR as mention against each
proportion classification shall be
adopted
2) For the above basic rate add
the actual adimissible lead for
sand and jelly and area
weightage applicable as per
KPWD SR.
Sl.
No.
Description Unit Rates in Rs.
iv) Filtering Oil as above but with the filter set supplied by the board. Litre 0.7
c)
Wiring of Transformer marshalling box, bucholtz relay, fixing
Thermometer, OLTC upto control panel and assisting in testing
and commissioning by RT/MT/Firm Engineers.
i) 5MVA to 6.3/8 MVA Transformer L/s 2015
10
Fabrication of Transformer railing and embedding in Transformer
plinth. (Rails to be supplied by the ESCOM)
L/s 403
11 Fixing of H.T. fuse units and wiring Per Set (3 Nos) 471
12
Wiring Testing & commissioning of 5 MVA 33/11 KV Power
Transformers
a) Wiring : Identification of wires, Ferruling crimping and
termination of wires, Wiring of Protecting Devices, Cooling fans,
Oil flow Pumps, OLTC, RTCC
b) Testing:
1 Ratio Test
2 SC Test
3 Excitation test
4 Magnetic Balance test
5 Vector group test
6 Induced high voltage test
7 OLTC operation
8 Protective devices operation checks
9 Stability checks:- for differential and REFR protection
Erection of Breakers/11KV Kiosks with CTs on Mounting
Structures
13 BREAKERS
a)
Erection, assembly, alignment & interpole wiring of breakers with
its connected equipments including movement from the point of
unloading to the point of erection.
Per set 2850
b) Assisting in Testing and Commissioning Each 570
c) Testing & Commissioning:
Wiring: Identification, of wires Ferruling crimping and termination
of wires in Breaker & Wiring upto control panel/Relay panels
Testing: Test foro insulation level, gas leakage, testing for travel
time, Trip and close timings. Local Trip close Test, Remote trip
and close test, Tripping through relays, operation of interlocks
etc.,
14 Erection of Ct's and PT's
a)
Erection of Ct's and PT's and wiring including movement from
the point of unloading to the point of erection.
set (3
Nos.)
712
b) Assisting in Testing and Commissioning
set (3
Nos.)
215
15 Testing & Commissioning:
a) Current Transformers:
Wiring: Identification, of wires Ferruling crimping of lugs
connections upto marshalling box and control panel.
set (3
Nos.)
8790
Tests: Insulation polarity, Ratio, Excitation
b) Potential Transformers:
Wiring: Identifiation of wires Ferruling Crimping of lugs
connections upto marshalling box
set (3
Nos.)
8790
Tests: Insulation polarity Ratio
16 Erection of NCTS
a)
Erection of NCTS with ground including movement from the point
of unloading to the point of erection
Set 208
b) Assisting in Testing and Commissioning Set 28
17 Erection of Isolators
Each 26370
Each 25600
Sl.
No.
Description Unit Rates in Rs.
a)
Assembly, Errection alignment and wiring including movement
from the point of unloading to the point of erection (upright)
Set 427
b) Assisting in Testing and Commissioning(Upright) Set 43
Note:1) Assisting in testing and commissioning for item no. 13 to
18 means contractors should provide labourers for testing and
commissioning by RT/MT/Firm engineers.
2) Testing & Commissioning in item 13 to 18 means the testing
will be carried out by the firms themselves using their own testing
equipments and staff in presence of the MRT staff who will
witness the tests.
18 erection of Lightning Arrestors
erection of Lightning Arrestors and wiring including movement
from the point of unloading to the point of erection
Set 108
19 Fixing of Solid Core Insulator Per Stack 37
20 Testing & Commissioning: Capacitor bank with reactors Each 8790
21 Control Cables and U.G.Cables
a) Formation of Cable Duct
i)
Burnt brick/size stone/RCC Cable duct including form box, back
filling the sides, removing the excess excavated soil, duct
covering with RCC slabs. Cmt as per PWD SR applicable to
respective area.
Cmt
As per PWD
SR applicable
to respective
area
ii)
Supplying 300 mm dia 1.5" to 2" thucj RCC Hume pipes
including loading unloading, and transportation charges and
laying at required level and gradient as per the direction of field
engineer
Rmtr
As per PWD
SR applicable
to respective
area
iii)
Providing, laying and jointing PVC pipes conforming to IS 4085 -
1960, AND 7634 - 1975, and approved makes with necessary
specials such as collars, bends, Elbows, Tee, Nipples, Plugs
with cuts and threads using jointing ring with solutions,m
wherever necessary as per the derections of the field Engineer
including all lead and lift.
25 mm dia (outer) 2mm to 2.5mm thick Mtr
32 mm dia (outer) 2mm to 2.5mm thick Mtr
63 mm dia (outer) 2mm to 2.5mm thick Mtr
75 mm dia (outer) 2mm to 2.5mm thick Mtr
90 mm dia (outer) 2mm to 2.5mm thick Mtr
110 mm dia (outer) 2mm to 2.5mm thick Mtr
140 mm dia (outer) 2mm to 2.5mm thick Mtr
160 mm dia (outer) 2mm to 2.5mm thick Mtr
b) Laying of control cables from wquipments to control panels Rmtr 3
22 Control Panels
a)
Erection of control panels, auxilary panels, carrier cabinets etc.,
alignment and fixing properly to foundation base including
movement from the point of unloading to the point of erection
Per Panel 570
b) Wiring & assisting in testing and commissioning of panels. Per Panel 1424
c) Test & Commissioning:
i) C&R Panels Wiring & Testing:
Wiring: Identification, Ferruling, Crimping, termination of wires in
C&R panels
Testing: Testing for insulation level, Testing of relays, control
operations for closing tripping etc., interlocks alarm, annunciation
and Indication Checks.
23 11KV Switchgear
a)
Erection, alignment and fixing to theo foundation, indoor/outdoor
11 KV switchgear Panel/Unit including movement from the point
of unloading to the point of erection.
As per PWD
SR applicable
to respective
area
Each 26374
Sl.
No.
Description Unit Rates in Rs.
i) 11KV Indoor/Outdoor Switchgear Per Panel 855
ii) 11KV Kiosk Per Panel 712
b) Wiring & assisting in testing and commissioning
i) 11KV Indoor/Outdoor Switchgear Per Panel 284
ii) 11KV Kiosk Per Panel 284
c) Testing & Commissioning:
Wiring: Identification of wires, Ferruling Crimping & Termination
of wires for annunciation, etc/. Testing of Relays, CT's. PT's &
Breaker for operation
i) For Indoor/Outdoor panel comprising of 2L+8F+1BC+1AP3 Per Set 43956
ii) For single 11KV panel Indoor/Outdoor type/Kiosk Nos. 8791
iii) For additional 11 KV panel indoor Nos. 4396
iv) For each additional 11KV panel outdoor type/Kiosk Nos. 6716
Note:Assisting in testing & commissioning for item 19 to 21
means contractors should provide labourers for wiring &
Commissioning by RT/MT/Firm Engineers.
24 Busbar Formation
Main bus/cross bus (all the three phases in a segment) of using
Coyote-single/double conductors with fixing of insulator spacers,
levelling of string conductors to the reuired height above the
equipment, including providing jumps to interconnect different
segments of the main bus
a) Main bus as above using Lynx/Coyote Conductor Per Bay 1429
b)
Formation of cross bus in each individual bay using Lynx/Coyote -
Single/Double conductor with fixing of insulators, spacers,
levelling the strung conductors to the required height above the
equipment including providing jumps to interconnect different
segments of the main bus.
Per Bay 2850
25 Faradays Cage Formation as per specification: Per Bay 108
26 Battery Set and Charger
a)
Installing, assembling, filling of acid, wiring, assisting, test-
charging and discharging Battery set.
a) 110 Volts Set 3560
b) 48/24 Volts Set 1425
b) Erection of battery charger and wiring
a) 110 Volts Set 570
b) 48/24 Volts Set 570
B) Testing & Commissioning of Battery Charger wiring:
Identification, Ferruling, Crimping & connecting i) AC Supply
cable upto 2 sources ii) Load Cables, connection at charger end
upto 10 load points.
Testing:
i) AC Supply Voltage Phase Sequence
ii)
Testing of Output DC Voltages in Boost/Float/Trickle/Variations
as per the order/requiremtn.
iii) Testing for Ripple Factor
Commissioning:
i) Fixing of Boost Voltage Level
ii) Fixing of Float Voltage Level
iii) Fixing of Tricle Voltage Level
iv)
Testing of alarm indication and load circuits Auto/Manual change
overs etc.,
v) Full Load test in Boost & Trickle modes
a) 110V DC:
(1 Set for 110KV, 66KV & 33KV Stations) Per Set 17582
27 Fencing:
Colony and Station yard Boundary fencing including
erection of supports
Sl.
No.
Description Unit Rates in Rs.
a) Security fencing using 8G chainlink/50mm Mesh
b) Barbed wire fencing
28 PLCC Equipments
a) Erection of mounting structures for coupling capacitors Set 911
b) Erection of coupling capacitors/wave traps/LMU. Set 214
c) Wiring, testing & Commissioning Set 28
29 Yard Levelling
Yard Levelling and filling up of soil and consolidation Cmtr
As per PWD
SR applicable
to respective
area
30 Watch and Ward
Emoluments for watch and ward including pay and DA for 8
hours duty
Per Shift 90
As per PWD SR applicable to
respective area
As per PWD SR applicable to
respective area
Technical Specification for Overhead and
Underground Service Connection Works for the
year 2007
Part-5
PART - 5
Technical Specification for Overhead
and Underground Service Connection
works for the Year 2005


Technical Specification for Overhead and underground Service
connection works for the year 2003
In view of Board Notification vide No.KEB/B11/B10/2195/84-87 and amendment and Regulation-5 of KEB
Electricity Supply Regulation, only specification have been furnished in respect of U.G.Cable & over head
service connection works to be get done through the licenced electrical contractors.
Note : The materials referred to in the specifications of various works dealt in this section shall confirm to
the latest ISS as detailed below :
1. PVC insulated PVC sheathed Aluminium wires of 650/1100 V Class shall confirm to IS 604 and bear
the ISI certification mark.
2. PVC insulated PVC sheathed Aluminium conductor underground cables with steel rope/steel wire
armouring of 1100 V class shall confirm to IS 1544 and shall bear the ISI certification mark.
3. Brazed conduit pipes - IS 1653
4. PVC conduit pipes - IS 2509
5. Class A (light) G.I. Pipe - IS 1239
6. Stoneware pipe - IS 300
7. ACC pipe - IS 1626
8. G.I. Wire - IS 1280
9. G.I.Bolts & Nuts - IS 6639
10. G.I.Heavy Washers - IS 6610
11. G.I.Plain Washers - IS 2016
12. Other materials shall confirm to the relevant Indian standard specification wherever applicable.
A) SPECIFICATIONS FOR OVERHEAD SERVICE MAINS
1. Short poles
(Where clearence between messenger wire and ground is Inadequate)
a) Supplying and fixing 40 mm 2.90 thick G.I. Pipe 1.8 mm long complete with at least 2 nos of through
bolts 12 mm dia with M.S.back plate 100x100x6 mm with eye bolt fixed at the top for dead ending
messenger wire with masonry patch work complete as per approved drawing (for single phase
installations)
2. Guy set for short poles as in (a)/(b)
Supplying and fixing guy set for items(a) & (b) (wherever span exceeds 10 mtr) formed out of not
less than 4 mm (8 SWG) G.I. wire with eye bolt or anchor bolt of not less than 12 mm dia with
cement concerting work including one break insulator as per approved drawing. If suitable wall or
R.C.C. roof is not available for anchoring guy sets, the anchoring has to be done by fixing G.I. wire
to the rafter of the tile or asbestos roof.
3. Eye bolt :
(If building height is sufficient to string service man from pole)
Supplying and fixing M.S.EYE BOLT 16mm dia of sufficient length to cover the thickness of the wall
but not less than 375 mm long with one M.S. back plate of 150x150x60 mm and M.S. washer of 3
mm thick in front, inclusive of masonry patch work etc. complete as per approved drawing.
4. Clamp for supporting messenger wire
Supplying and fixing on the pole support 25x6 mm clam with bolts nuts and flat iron strap for
supporting the messenger wire on the pole.
5. Insulated wire on messenger wire :
(Single phase and Three phase)
Using 2 single/1 Twin core wires for single phase and 4 single/2 Twin core wires for 3 phase.
Supplying and stringing PVC insulated and PVC sheathed 650/1100 V class aluminium
conductor of sizes supported by 3.14 mm (10 SWG) G.I. messenger wire with two break insulator one at
each end of the span and with suspenders at intervals of 0.75 mtr. Each suspender shall be porcelain
reel insulator of suitable bore through which insulated wire shall pass (single core or twin core as the
case may be) and this reel insulator shall be fixed to the messenger wire using 2 mm. (No.14 SWG) G.I.
wire suitably bent and twisted. Separate reel insulators shall be provided for each wire. The messenger
wire shall be dead ended on the clamp provided to the departmental pole vide item No.4 above.
Size of Insulated wire in
Sq. mm
2.50 4.00 6.00 10.00 16.00 25.00 50.00
Single phase - use 2
nos. single core Wire/
one no. 2 core



Three phase - use 4 nos. single core Wire/ Two no. Twin core

6. Insulated wire in pipe
(Single phase and three phase)
Supply fixing and wiring service mains in pipe of the following sizes with necessary threaded water
tight bends, collars hooks wooden plugs bushing and screws etc.,
a) 16 SWG braised conduit pipe finished with black stove enameling both inside and outside.
b) PVC conduit pipe
c) Class A (light) G.I.Pipe
d) PVC insulated aluminium wire of 650/1100 V grade
(single core or twin core as the case may be) with necessary length of loose wire not less
than 1 meter long to be terminated inside the meter board without joints and connected to the
main side of the energy meter, using bi-metallic connectors, accessories, sleeves etc., inclusive of
masonry patch work. The conduit shall be connected to the earth electrode by means of G.I. wire not less
than 4 mm (8 SWG) and tinned copper clamp of width 25 mm and 24 gauge with GI bolt nut and
washers.
a) Single Phase Service
Sized of insulated wire in Sq.
mm
2.5 4.0 6.0 10.0 16.0 25.0 50.0
Diameter of pipe in mm 19 19 19 25 40 40 40

In Braised Conduit /PVC Conduit 1) Using 2 single core wires
2) Using twin core wires

b) Three phase service;
Sized of insulated wire in Sq.
mm
2.5 4.0 6.0 10.0 16.0 25.0 50.0
Diameter of pipe in mm 19 19 19 32 40 40 50

In Braised Conduit/PVC Conduit/G.I.Pipe 1) Using 4 single core wires
2) Using 2 twin core wires

7. Meter Board
1. Single phase
a) Supplying, fixing and wiring, T.W. Meter board 300x300x65 mm made out of 15 mm thick plank for
the front and 12 mm thick plank for the pack with 40x20 mm batten around using well seasoned
teak wood, fixing them with screws, and smooth finishing with 2 coats of high grade varnish. The
back of meter board shall be fixed to the wall by means of screws on at least 2 Nos of wooden plugs
of 40x25x100 mm long well fixed in the wall with necessary masonry patch work etc., complete. The
planks for both front and back of the meter board shall be made out of not more than two pieces.
b) -do- 375x300x65 mm.
2. Three Phase :
- do - 500 x 500 x 65 mm T.W. meter board as in item 7(a) but using at least 4 Nos. of plugs.
The planks for both front and back of the meter board shall be made out of not more than
three pieces.

8. Earthing :
a) Supplying, fixing and wiring earth electrodes for grounding conduits, IC cut outs and other
equipments on the meter board using 40 mm dia, 2.90 mm thick G.I. pipe 2.5 mtr long burred in a
pit. The pit should be filled in with equal proportion of salt and charcoal 150 mm around the pipe to
complete depth. The connection from the pipe to the conduit etc. is to be established through G.I.
wire of size as per clause. 7.33 of S 732 using 12 mm dia bolts, nuts washers and checks nuts etc.
The pipe shall have 16 through holes of 12 mm dia as per our drawing.
b) - do - using 40mm dia 2.90 mm G.I. Pipe 5.5 mtr long buried horizontally where rock is encountered
at a depth less than 2 mtr depth burial shall be not less than 0.75 mtr.
c) -do- using 2 Nos. of 40 mm dia 2.90 thick G.I.Pipe 1.25 mtr long buried in pits, 2.5 mtr apart and
connected in parallel.
Note : Wherever the specified ground resistance (as per IS 3043 or its latest version thereof) is not
obtained by the groundings, extra grounds are to be provided until the specified resistance value is
obtained, in all such cases concerned. Assistant Executive Engineer must himself inspect and pass order
as to where the additional earthing is to be provided.
B) L.T. Underground cables
1. Laying underground cable in New/Existing trench :
Supplying and laying PVC insulated sheathed steel wire/steel tape armoured UG cable with PVC
outer sheathing 1.1 KV Class. The work shall include digging of trench 0.5 mtr wide 0.6 mtr deep laying
the cable in trench refilling and consolidating the soil.

Size of Cable
in Sq. mm
6 16 25 35 50 95 120 150 185 225 240

In trench
(New of Existing)
Using 2 core Cables
For single phase
Using 3 core cable for 3 phase
Using 4 core cable
For 3 phase

2. Laying underground cable in ground inside stoneware pipe in New/Existing trench.
Supplying and laying UG cable in stoneware pipe of size 101.6 mm dia 0.6 mtr long (4 dia 2 long)
at road crossing in trench of 0.50 mtr width and 0.60 mtr depth.
(size of cable to be used are as in B(1)]
3. Laying UG cable in ground inside ACC pipe in New/existing trench
Supplying and laying UG cable in ACC pipe of size 101.6 mm dia (4 dia) in trench of 0.5 mtr width
and 0.6 mtr depth.
(size of cables to be used as in B(1)]
4. Running the cable above ground :
Supplying running and connecting the UG cable up to meter board.
a) Above ground in 2.90 mm thick G.I. pipe with necessary clamps, bolts nuts & washers etc. for fixing
the pipe on the pole and drain crossing only (40 mm dia pipe for 6, 10 and 16 Sq. mm size cables
and 50 mm dia pipe for 25.35 and 50 Sq mm 65 mm dia pipe for 95, 120, 150 Sq. mm size cables
and 80 mm dia pipe for 185, 225 & 240 Sq. mm size cables.
5. Fixing of pot heads :
Supplying and fixing LT cast iron pot-heads suitable for 1.1 KV class UG cable filled with
necessary bitumen/insulating compound complete with terminals, clamps, bolts and nuts & washers etc.,

Size of Cable
in Sq. mm
6 10 16 25 35 50 70 95 120 150 185 225 240
No. of Cores 2 2 2 4 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5


c) Sealable Cutouts
Fixing of ironclad sealable cutouts at consumers premises
Supply fixing and wiring of sealable cutouts with MS. Sheet cover of not less than 0.9 mm
(20 SWG) thick, painted with grey enameled paint both inside and outside on the meter board including
porcelain fuse cutouts 600/500 V grade of different capacities conforming to the relevant latest Indian
Standard Specifications.

Capacity of cutouts complete in Amps 15 30 60 100 200 300

Average rate of Over Head Service main wire and UG Cable per meter


a) Over Head Service main wire
Average rate per meter Average rate per meter
Sl.
No
Insulated wire size in
Sq.mm
2.5 4.0 6.0 10.0 16.0 25.0 50.0
1 Single Phase
i) 2 Single Core
ii) Twin core wire
55
65
60
60
60
60

65
65
**
**
**
**
**
**
2 3 Phase
4 Single Cre Wire
70 75 85 90 110 130 165

b) Under Ground Cable
Sl.
No
UG Cable Size in Sq. mm 10.0 16.0 25.0 35.0 50.0 70.0 95.0
1 Single Phase 75 90 ** ** ** ** **
2 Three Phase 90 110 120 140 160 190 210

Scale of Inspection Fees of Electrical
Inspectorate Schedule
Part-6

PART - 6
Scale of Inspection Fees of
Electrical Inspectorate Schedule

Scale of Inspection Fees of Electrical Inspectorate Schedule
1. Fees for Initial Inspections
SCALE A
For inspection examination or test of any generating station receiving station or other place in which
energy is generated received or distributed at a voltage of 100 Volts or more
Capacity Fees
i) Domestic lighting sets in residential premises
with 10 KW and below 50-00
ii) For cases other than mentioned in item(i) above
a) Upto and including 10 KVA 150-00
b) Exceeding 10 KVA but not exceeding 100 KVA 375-00
c) Exceeding 100 KVA but not exceeding 500 KVA 825-00
d) Exceeding 500 KVA but not exceeding 5000 KVA 1500-00
e) 1000 KVA and above 2000-00
Rs.100/- per 1000 KVA or part there above 1000 KVA.
Notes : (1) In the case of generation station or other place in which energy is generated the fee shall be
paid by the Supplier or the person generating energy. In the case of receiving station, the fee shall be
paid by the Owner.
2) The fee shall be levied separately for total capacity of each type or equipment at one place.
SCALE B
For an inspection examination or test made in pursuance of rule 50 to 70 of the Indian Electricity
Rules 1956 where energy is or is about to be supplied or used at high and medium voltage except in
these cases to which scales A to H of this Schedule specifically refer.
Capacity Fees (Rs)
i) Upto and including 5 KW 50-00
ii) Exceeding 5 KW but not exceeding 50 KW 150-00
iii) Exceeding 50 KW but not exceeding 100 KW 200-00
iv) Exceeding 100 KW but not exceeding 500 KW 250-00
v) Exceeding 500 KW but not exceeding 5000 KW 600-00
vi) 5000 KW and above 1200-00
Note : 1) The fee shall be paid by the owner to whom energy is or is about to be supplied.
2) The fee shall be levied separately for total capacity of each type of equipment
at one place.
For inspection of Multistoreyed Building and issue of safely certificate under rule 50A of the Indian
Electricity Rules 1956.
Capacity Fees (Rs)
i) For Multistoried Building upto six floors
including basement and ground floor 500-00
ii) For Multistoried Building having more than
six floors including basement and ground floor 1000-00
Note : The fee is exclusive of the fees for inspection of substation and stand by generators in the
multistoryed Building. But it is inclusive of switchgear and cables.
SCALE C
For an inspection examination or test of any electrical installation appliances or apparatus (other than a
generating Station or a receiving station for which a separate fee will be charged under scale A in a
factory within the meaning of the factories Act (XXIII) of 1948 to which energy is supplied by the
Electricity Board or Licences or in which energy is generated.
Capacity Fees
i) For power Fees as per scale B be applied
ii) For lighting or for purposes other than power Rs.40 per K.W. or part thereof
(Provided no fees under this item shall be subject to maximum of Rs.400
charged in respect of an electric installation
appliances or apparatus in any factory where
not more than twenty workers are employed)
Note : 1) If any factory of which energy is supplied by a licensee or in which energy is
generated both for lighting and for power, separate fee under Clause (i) and (ii) should
be charged.
2) The fee shall be paid by the owner.
SCHEDULE D
For an inspection or of examination in pursuance of Rules 29 to 31 and 92 of the Indian Electricity Rules
1956.
Capacity Fees
a) Of a low or medium voltage service line 50-00
b) Of a High or extra high voltage service line 150-00
Note : The fee shall be paid by the licensee or the supplier.
SCALE E
Fee for inspection of Neon sign and X-Ray installations.
Capacity Fees
a) Neon Sign Installations Rs.25/- per KVA subject to a minimum of Rs.100/-
b) X-Ray Installations Rs.15/- per KVA subject to a minimum of Rs.200/-
Note : The fee shall be paid by the owner.

SCALE F
Capacity Fees (Rs)
For an inspection, examination of every : new aerial 50-00
line including a service line crossing either above or
below a telegraph, telephone or other aerial line at
one or more spans, places or points in pursuance or
Rule 87 of the Indian Electricity Rules, 1956.
Provided that where more than one crossing are situated
within distance of half a mile each, of each Other and are
inspected at the same time, the fee shall be as follows :
For inspection of First Crossing 50-00
For Inspection of every additional crossing 25-00
Note : 1) The fees shall be paid by the person whose line was last erected.
2) The fee lieviable under this shall not be charged when, the inspection has been
carried out in connection with an inspection for which fees is leived under Scale D or
E.
SCALE G
The fee for any inspection or examination of an aerial line or underground cable in pursuance of Rule
39,66,77 to 81 and 85 etc., of I.E. Rules 1956.
a) For an inspection or examination of an extra Rs.50 per K.M. or part there
high Voltage line or cable. of subject to a minimum
of Rs.400-00
b) For an inspection or examination of an extra Rs.20 per K.M. or part there
high Voltage line or cable. of subject to a minimum
of Rs.200-00
Note : 1) The fee shall be paid by the supplier or owner.
2) In case of power line cable run for rural
electrification the fee shall be 50% of the above.
b) For an inpsection or examination of medium Rs.25 per K.M. or part there
or low voltage aerial distribution main or cable. of subject to a minimum
Minimum of Rs.50. of Rs.50-00
SCALE H
Fee for the inspection or examination of Switchgear
a) For low or medium Voltage 150-00
b) For high or extra high voltage 450-00
c) For E.H.T. Switch gear 1000-00
Note : The fee shall be paid by the supplier or owner

II. FEE for Peridocial Inspections
SCALE I
Fee for inspection examination or test of any generating station, receiving station or other place in
which is Generated received or distributed at a voltage of 100 volts or more.
Capacity Fees (Rs)
i) Domestic lighting set in residential premises upto
and including 10 K.W. 50-00
ii) For case other than mentioned in (i) above
a) Upto and including 10 KVA 100-00
b) Exceeding 10 KVA but not exceeding 500 KVA 150-00
c) Exceeding 100 KVA but not exceeding 500 KVA 300-00
d) Exceeding 500 KVA but not exceeding 5000 KVA 750-00
e) 5000 KVA and above 1500-00
Note : 1) In the case of generating station or other place in which energy is generated the fee
shall be paid by the licensee or other person generating energy. In the case of a
receiving Station the owner or consumer shall pay the fee.
2) The fee shall be levied separately for total capacity of each type of equipment at one
place.
SCALE J
a) For an inspection, examination or test or installation, made when energy is used at
high and medium voltage.
Capacity Fees (Rs.)
a) Upto and including 5 KW 50-00
b) Exceeding 5 KW but not exceeding 50 KW 75-00
c) Exceeding 50 KW but not exceeding 100 KW 100-00
d) Exceeding 100 KW but not exceeding 500 KW 150-00
e) Exceeding 500 KW but not exceeding 5000 KW 400-00
f) 5000 KW and above 750-00
b) For inspection of multistroyed Building and issue of safety certificate under Rule 50A
of the I.E. Rules 1956.
Capacity Fees (Rs.)
i) For Multistoryed Building upto six floors including
basement and ground Floor 300-00
ii) For Multistoryed Building having more than
six floors including basement and ground floor 750-00
Note : The fee is exclusive of the fees for inspection of substation and stand by generators in the
multistoryed Building. But it is inclusive of swtichgear and cables.
SCALE K
Capacity Fees (Rs.)
a) Neon Sign Installations Rs.15/- per KVA subject to a minimum of Rs.60/-
b) X-Ray Installations Rs.10/- per KVA subject to a minimum of Rs.100/-
Note :
1) The fee shall be paid by the owner.
2) The fee shall be paid be levied separately for the total capacity of each type of equipment at
one place.
SCALE L
For an inspection examination or test of any electrical installation appliances or apparatus (other than a
generating station or a receiving station for which a separate fee will be charged under scale A in a
factory within the meaning of the factories Act (XXIII) of 1948 to which energy is supplied by the
Electricity Board or Licensee or in which energy is generated.
Capacity Fees
i) For power Fees as per scale J be applied
ii) For lighting or for purposes other than power
(provided no fees under this item shall be charged in
respect of an electric installation appliances or
apparatus in any factory where not more than twenty
workers are employed)
Note :
1) In any factory to which energy is supplied by a licensee or in which energy is generated both
for lighting and for power, separate fee under Clause (i) and (ii) should be charged.
2) The fee shall be paid by the owner or the consumer.
SCALE M
Fee for the inspection or examination of Switchgear
a) Of low medium voltae service line 50-00
b) Of a high or extra high voltage service line 100-00
Note : The fee shall be paid by the Licensee or the supplier.
SCALE N
The fee for any inspection or examination of an aerial line or underground cable.
a) For an inspection or examination of an extra high
Voltage line or cable.
b) For an inspection or examination of a medium or low
voltage aerial distribution line or cable
c) For an inspection or examination of high Voltage line
or UG Cable.
Note : 1) The fee shall be paid by the supplier or owner or consumer.
SCALE O
Fee for the inspection or examination of Switchgear
a) Low or medium voltage 50-00
b) High or extra high voltage 100-00
Note : The fee shall be paid by the supplier or owner.

III. FEES for other servi ces of the electrical inspector
SCALE P
1. For an inspection and for issue of a certificate under
Rule 82 of I.E. Rules 1956. 100-00
Note : The fee shall be paid by the person who proposes either to erect a new building or structure or to
make any temporary addition or alteration in or upon any building or structure.

SCALE Q
(In pursuance of Rule 99 to 107 both inclusive)
For an inspection or examination of any electric traction system, Rs.500 per day or part thereof including
trolly wires and over head equipments and Test of bending and leaking currents.
Note : The fee shall be paid by the Licensee or the owner of the electric traction system as the case may
be.

SCALE R
Fee for testing energy meters. Fees (Rs)
a) For testing a single meter of any description in the laboratory
i) Upto a capacity of 50 Amps 50-00
ii) Of capacity exceeding 50 Amps 100-00
b) If meter is to be tested on the consumers premises the above fees shall be
increased by Rs.10/- meter.
Note : The fee shall be paid by the person or agency or firm or any other body at whose request the test
is conducted or by the owner.

SCALE S
Fee for an inspection of examination or test of voltage within the consumer premises at the request of the
consumer or the licensee and issue of a certificate.

Fees (Rs.)
a) Low voltage and medium Voltage 50-00
b) High Voltage 100-00
Note : 1) For inspection and examination or test of voltage and reading voltage for a duration of
24 hours as above Rs.50/- in addition to the amount charged for each item above.
2) The consumer shall pay the fee in the first instance but the Electrical Inspector shall
decide as to who should pay the fee when reported as dispute between the consumer
and the supplier.

SCALE T Fee (Rs)
Fee for an inspection examination or test of any main Rs.100 for the first hour and
service line for the existence of leakage therein which may there after Rs.30/hr.
result in electrolysis to other pipe or to any appliance
connected with.
Note : 1) If any leakage is discovered in any street main, distributing main or service line, the
fee shall be paid by the Licenses or the owner of the main of service line as the case
may be.
2) If a leakage is discovered the fee shall be paid by the owner of the water gas or other
pipe or of all appliance connected therewith.
SCALE U
Fee for testing an Installation for the existence of leakage to earth 50-00
Note : The fee shall be paid by the party making application.

SCALE V Fee (Rs.)
For localizing of the leakage to earth in any installation Rs.50 for the hour or part
thereof and thereafter.
Note : The fee shall be paid by the party making application.

SCALE W Fees (Rs.)
Fee for deciding any case of difference or dispute under
Section 24(1), 25(6) or clause VI (3) of the Schedule
to the I.E.ct, 1910 referred to the E.I. 100-00
Note : In the case of difference or dispute referred to the E.I. for being decided under Section 26(6) of the
said. Act. An addition fee for the testing of meter in accordance with Scale (R) shall be recoverable.

SCALE X Fees (Rs)
Fee for testing of Earth Electrode
For Low voltage installation
For Medium Voltage installation
For High Extra high voltage installation 30-00 per
For lighting Conductor earth electrode
Note : The fee shall be paid by the party making appliances.

SCALE Y
Fee for an inspection or an examination of any electrical installation at the request of any supplier or
consumer not falling within the purview of the above scales : actual expenditure incurred in addition to the
charges as noted below :
Fee (Rs)
i) For Low voltage installations 50-00
ii) For medium voltage installations 75-00
iii) For High voltage installations 100-00
Note : The fee shall be paid by the party making the application.

SCALE Z
Fee for security an approval detailing method of construction of the following types of installations.
Fee (Rs.)
i) Drawing of generating sets
a) Upto and including 10 KVA 25-00
b) Above 10 KVA upto including 100 KVA 50-00
c) Above 100 KVA upto including 1000 KVA 100-00
d) Above 1000 KVA 200-00

ii) Drawing of transformer centers and HT installations
a) Upto 200 KVA 200-00
b) Above 200 KVA upto 1000 KVA 300-00
c) Above 1000 KVA 500-00

iii) a) M.S.Building upto 6 floors including basement 200-00
and ground floor
b) M.S.Building having more than 6 floors including 300-00
basement and Ground floor

iv) Medium pressure and low voltage, consumer installations 25-00

v) Addition and alternations to existing installations
a) Upto and including 100 KVA 25-00
b) Above 100 KVA 50-00

INSPECTION FEE FOR LIFTS Fees (Rs.)
a) Initial Inspection 250-00
b) Periodical Inspection 100-00


Sketches and Drawings
Part-7
Pages - 1/10
PART - 7
Sketches and Drawings


1) Scope :
This specification covers details of L.T. line composite spacers to overcome the problem of Mid-span
clashing of conductors.
2) Working Conditions :
L.T. line spacers, shall be suitable for tropical climate with a maximum ambient temperature of 50
0
C,
humidity of 100% and wind pressure upto 150 Kgs./m2
3) Materials :
The Composite spacers shall be made of polypropylene and shall be made of single mould except for the
clamping pieces. The fly nuts and studs shall be made of Engineering Grade Nylon. The studs shall be properly
fixed in position at the moulding stage.
4) Shape and Dimensions :
The shape and dimensions of the L.T. composite spacers shall be as per the drawing
enclosed.
a) Overall length - 1200 mm
b) Ph. to Ph - 380 mm
c) Thickness - 12 mm
d) Width - 25 mm



















Pages - 2/10


Pages - 3/10

Pages - 4/10

Pages - 5/10

Pages - 6/10
Pages - 7/10

Pages - 8/10

Pages - 9/10

Pages - 10/10

Annexe 2
Technical Specification for Single Pole Mounted Transformer Structural
Materials (On 11 Mtr. Long Tubular Spun Concrete Pole)

1.0 Scope:
This specification for manufacture and supply of structure materials for
Transformer centre on 11 Mtr. Long tubular spun concrete pole.
2.0 Standards:
This angle and structural material shall conform to commercial quality IS 1977/
ST42/ST32.
3.0 Drawing:
The materials to be supplied shall conform to drawing: Drg. No: KPTCL/TECH/
518, Dt. 27-12-2001 Transformer centres on 11 mtr. Long tubular Spun concrete
pole.
4.0 Painting:
The structural materials shall be treated for corrosion, Derusting, De-scalling and
final 2 coats of Red oxide or it may be galvanized.
5.0 Marking:
The structural parts shall be engraved BESCOM & Part No. Designation No. on
it.
6.0 Packing
The structural parts shall be delivered suitably packed to avoid damage during
transit, in the form of kit, supplied in plastic cover along with bill of materials and
assembly drawings.
7.0 Length & Weight:
The length and weight of the parts shall be as noted in the drawing excluding
Bolts & Nuts.
8.0 Bolts & Nuts:
The tendered shall quote MS Bolts & Nuts as per requirement.
9.0 Specification:
The steel used for fabrication of structural material shall confirm to IS 1977. The
structural material shall be manufactured and supplied as per the bill of materials.
All these structural parts shall be treated for corrosion, de-rusting, de-scaling etc.,
and shall be painted.
BILL OF MATERIALS
SINGLE POLE MOUNTED TRANSFORMER STRUCTURAL MATERIALS ON 11 MTRS. LONG
SPUN POLE 250 kVA TC SET.
Size of Steel Section in mm
Length in
mm
Quantity
Top Bract
100x100x6 M.S. Angle 850 5
75x40x5 M.S. Channel 2400 4
45x45x5 M.S. Angle 850 5
75x40x5 M.S. Channel 1040 2
50x50x5 M.S. Angle 2000 2
50x50x5 M.S. Angle 1000 2
65x65x6 M.S. Angle 1440 2
Transformer Centre
130x130x12 M.S. Angle 1110 1
100x50x6 M.S. Channel 1200 2
130x130x12 M.S. Angle (with side plate) 1110 2
75x75x6 M.S. Angle 1750 2
65x65x6 M.S. Angle 1260 2
75x40x5 M.S.Channel 1110 2
GOS Mounting Structure (Ladder)
45x45x5 M.S. Angle 1640 6
45x45x5 M.S. Angle (cleat) 60 6
40x40x5 M.S. Angle 335 6
Round Clamps of different sizes made out of flats suitable for fixing
the above structural materials to the pole

a) 75x10 M.S. Flat 1000 2
a) 75x6 M.S. Flat 1000 8
MS Hexagonal bolts, nuts, washers of different sizes in sufficient
quantity for fixing clamps
17 kgs Approx.