Common SR 2014-15 PDF
Common SR 2014-15 PDF
Common SR 2014-15 PDF
1.0
2.0
After the formation o f ESCOMs separate ESCOM wise SRs were being prepared
and issued.
3.0
4.0
The
: Chairman
: Member
: Member
: Member
: Member
: Member
: Member
: Member
: Member
Convener
The Committee met on 18.09.2014 and issued guide lines to be followed for
revising material prices and labour charges. The committee directed to include
new materials in the proposed Common SR 2014-15 and also to get rates from
neighboring states such as Andhra Pradesh, Maharashtra, Kerala & Tamil Nadu.
The Committee further directed that the draft Common SR shall be
prepared in accordance with the guide lines issued and be circulated among all
the members to obtain the comments and suggestions before the second meeting.
Page 1 of 8
5.0
6.0
The committee deliberated and discussed on the draft proposal placed in the
meeting and accorded concurrence to adopt the draft proposal. The committee
issued further guide lines to include Galvanized Line Structural Materials, Cable
Entry Type Transformers, New Type Underground LT Feeder Pillar Box, Safety
Materials and to delete LT Wiring Kit. The committee also directed to include
Testing, Pre Commissioning Charges for 11KV CTs & PTs, LT CTs, Meters RMUs,
LBS and HT/LT UG Cable and Transformers Repair Charges for m ajor repairs.
7.0
The above suggestions were incorporated and the modified draft proposal was
placed before Chairman SR Committee in the meetings held on 04.11.2014 and
12.11.2014, in the meeting it was directed to include transformer repair charges
for minor repairs also with 20% increase over the prevailing repair charges
which are applicable in BESCOM.
8.0
In accordance with the directions issued, the material and labour charges have
been revised.
9.0
Weighted Average
materials
procured
& 5%
by
on weighted
ESCOMs
have
average
been
on procurement cost of
considered.
Eg.:
Poles
&
Transformers.
>
For some material, prevailing SR rates have been updated using IEEMA price
variation formulae. Eg. HT/LT UG Cables & Insulators.
Average o f IEEMA
indices for June, July & August-2014 have been consider or updating the prices.
>
For some material, prorate prices o f similar materials have been adopted, for
which rates are not available, in any o f the above process. Eg.: RMUs & some
Line Materials.
>
For some materials, rates have been worked out considering the raw material
8s conversion cost. Eg: Line Materials and Conductors.
>
Market Rates have been considered for some o f the materials. Eg:
AB Cable,
KPWD Electrical SR Rates for some materials like - have been adopted.
>
>
In respect o f 33 KV system works, the material rates have been work out
based on the weighted average o f procurement rates o f all ESCOMs and
IEEMA updated o f rates.
Page 2 of 8
>
Existing rates have been continued for some o f the materials. Eg: Epoxy
Termination Kits, Conventional RMU.
>
>
NOTE:
1. The prevailing excise duties and taxes as applicable for materials have
been
>
>
>
>
for MESCOM,
GESCOM,
HESOM
and
CESC.
Existing Special
Break Down Works: For attending to the BREAK DOWN works for speedy
restoration o f Power Supply, payment o f 25% additional Labour charges
specified is continued.
NOTE:
specific
approval for the Executive Engineer by way o f O.M and shall not be paid merely
because it is provisioned in the estim ate.
Page 3 of 8
Purchase o f Small Items: The LECs carrying out works on labour contract
basis is authorized to purchase small items other than poles. Conductors,
Transformers, Lighting Arrestors, H.T. Insulators, Meters and GOS at SR Rates
wherever the execution o f the work is held up due to non availability o f such
materials provided the cost o f such purchase is limited to 10% o f the total
estimate cost and after the specific approval o f the Executive Engineer by the
way o f an OM.
General Guidelines:
a. The Squirrel ACSR conductor shall not be used for any new works (B.O. No.
B 19/6723/95-96/21.06.2000 of KEB.
b. The Average span for new 11 KV lines in Urban areas shall be 40 Mtrs. In Rural
areas the average span length shall be 50 Mtrs. However the average span will
be 60 Mtrs. in respect o f lines drawn to IP Sets.
Minimum size o f the conductor to be used:
(a) 1 lk V lines:
Minimum size o f the conductor to be used for all new 11 KV lines shall be
Rabbit ACSR only.
(b) LT lines:
a) Urban areas: Minimum size o f conductor to be used for phases and
neutral shall be Rabbit ACSR conductor.
b) Rural areas: The minimum size o f conductor to be used shall be Weasel
for phases and neutral.
c) Only Weasel Conductor shall be used for Street Light Control,
Gangakalyana and water works.
Page 4 of 8
Only RCC poles shall be used for dead ends, DP structures, Transformer
Centers and Anchor Points.
equipments shall be
In all Self Execution works provision shall be made for BEE 3 Star or
Higher Rated Transformers only upto 100KVA.
Material code number for all materials have been provided in the SR and
the same has to be used while preparation o f the estimate and in the
indents.
All the field officers and inspecting officers should ensure that the
materials used shall confirm to the relevant IS specifications and the
works
executed
are
in accordance
with
the
approved
drawings
stipulated norms. The UG cable/PVC wires used for the work shall carry
ISI markings.
Guy set includes Anchor Rod, Turn buckle, Guy wire, Strain Insulator,
Guy clamp with Bolts, Nuts and Washers.
As
per
Government
Electrical
Inspectorate
order
No.
CEG/
Page 5 of 8
b. While
working
out
the
cost
data
sheet,
provision
has
been
In case
c. All the necessary materials required for execution o f work are included in the
cost data sheet.
Hence
contingencies
at 2%
on the
estim ate
cost is
provisioned only to take care o f unforeseen materials and labour and shall be
paid as per actual if incurred, with the specific approval o f the Executive
Engineer, by way o f issue o f O.M.
14. Provision for inspectorate charge shall be made as a separate item in the estim ate
as per the applicable rates. The current applicable rate o f inspectorate charges is
provided in the Common SR.
15. For short lines less than 1 KM, the estimates shall be prepared as per actual
requirement o f the materials.
16. Concreting:
a. Concreting o f poles shall be taken up depending on soil conditions. Separate
provision has to be made in the estimate, at the rates provided in the SR.
b. 1:4:8 Cement Concrete has to be provided for base concreting.
c. 1:2:4
cement
concrete
has
to
be
provided
for
pole
concreting
coping etc,.
17.
All transformers above and inclusive o f 25 KVA capacities are to be provided with
GOS and HG fuse units.
18.
19.
Cost data sheets for works o f providing HT< Over Head Lines, Aerial Bunched
Cables, Distribution Transformers Centers for 25/63/100 KVA on single 9 Mtr.
RCC poles o f Square
Section
KVA
Page 6 of 8
NOTE:
1. As per the CEA guidelines, Transformers o f capacity more than 25kVA have to
be erected on DP structures/Plinth only.
2. Correspondence has been made with CEA regarding erection o f Transformers on
11 Mtrs. Spun Poles and till such time the final directions are received the
prevailing instructions in force in respective ESCOM s shall be followed.
3. If the depreciated value o f the cable proposed to be released is less than the sum
o f estim ated labour for such release, road cutting charges payable to BMP and
other civic bodies, then the releasing of the cable need not be resorted to.
4. Labour charges for releasing o f materials shall be at 90% o f the cost o f erection.
(Please see Corporate Office circular No. BESCOM/BC-35/07-08/CYS-86/DT:
23.10.07)
5. While executing the re-conductoring work the released conductor shall be
returned to stores as credit in accordance with circular No. BESCOM/GM (T)/
BC-20/F-664/05-06/CYS-174, Dt: 10.01.06. (See page No_____ )
6. The following additional components have to be included while preparing
estimates for Distribution works which are executed on turnkey / partial
turnkey basis:
a. Service ta x@ 12.36% on labour cost.
b. Works contract tax. (if applicable)
c. Transportation cost from Stores to site @ 2% on materials cost.
d. Watch and ward cost @ 1% on material cost.
e. Insurance charges @ 1% on material cost against theft 8s accidents.
f. Performance guarantee and loss of interest on margin money for Bank
Guarantee (BG) @ 2.5% of the value of BG.
g. Statutory charges as per actual (For Inspectorate, Civic body etc.,)
h. Compensation cost as per approved norms for tree cutting, crop insurance etc.
7. In
estimates
to
be
executed
on
labour
contract
basis,
provision
for
Provident Fund charges at 13.61% and ESI at 4.75% (or as applicable) on Total
Labour Charges shall be made in the estim ate.
20.
Important Points
> Materials:
The rates in respect o f items both material & labour, which are not found in this
schedule o f rates, but need to be provided in estim ate may be obtained from the
office o f Quality, Standard 8a Safety, Corporate Office, BESCOM or from the
concerned Corporate office o f ESCOMs.
Page 7 of 8
The schedule o f rates for materials is "FORD" inclusive o f all applicable duties,
taxes and freight 85 insurance charges.
>
Labour charges:
Component o f labour charges: The labour charge does not include any
additional components.
The additional labour charges towards special locality allowance break down
charges and works in hazardous installations shall be included in the estimates
as applicable.
The special locality allowance is allowable only on basic labour charges and not
on additional labour charges for works at hazardous installation and break
down charges.
(G. SHBBLA)
CONVENOR SR COMMITTEE 8s
GENERAL MANAGER (ELE.), Q, S&S,
BESCOM.
Page 8 of 8
Sl.
No.
Particulars
Materials Cost
Labour Charges
10.
11
12
13
Note:1) All the materials required for execution o f works are included in the cost data sheet. The
contingency at 2% provisioned is only to take care o f unforeseen material and labour and
when applicable shall be paid after the specific approval o f the Executive Engineer by way of
issue o f an O.M.
2) **This is to cover the admissible transportation charges, Labour for loading and unloading
and for carrying the materials by head load, which shall be paid as per actuals.
4) It shall not be construed that all the above amounts mentioned in the estimates has to
be paid to the contractor. The payment shall be arranged as per actuals.
5) The LECs carrying out works on labour contract basis are authorized to purchase small items
other than poles, Conductors, Transformers, Lightning Arrestors H.T. Insulators, Meters and
GOS at SR rates wherever the execution o f the work is held up due to non availability o f such
materials provided the cost of such purchase is limited to 10% o f the total estimate cost and
after the specific approval o f the Executive Engineer by the way o f an OM.
Sl.
No.
Particulars
Materials cost
Labour charges
10
11
12
Amount in Rs.
Note:1) While preparing the estimate provision has to be made specifically for the
conductor accessories such as Wedge/ PG clamps, Alkathene Tube, etc., duly
assessing the quantity.
2) The contingency at 2% provisioned is only to take care of unforeseen material and
labour. This has to be paid only for any additional work carried out and as per
actual.
3) The materials to be procured by the agency shall conform to ESCOM s
specifications and got inspected before execution o f work. The material shall be
procured by the agencies from the approved vendors.
Sl.
No
Particulars
Materials cost
a. ESCOM s portion
b. Agency portion______________
Labour charges
10
11
12
Amount in Rs.
1 ) While preparing the estimate provision has to be made specifically for the
conductor accessories such as Wedge/ PG clamps, Alkathene Tube, etc., duly
assessing the quantity.
2 ) The contingency at 2% provisioned is only to take care o f unforeseen material
and labour and is not payable to the contractor at 2% but payable at actuals.
3) The materials to be procured by the agency shall conform to ESCOM s
specifications and got inspected before execution o f work. The material shall be
procured by the agencies from the approved vendors.
Particulars
Materials Cost
Labour Charges
10
11
12
Note:
1) The estim ate is only provisional.
2) The final cost o f the work shall be worked out after completion o f the work
and difference amount has to be collected from the applicant before
commissioning.
Particulars
Materials Cost
Labour Charges
9.
o e:
1) All the materials required for execution o f works have to be arranged by the agencies.
2) No material shall be supplied by ESCOMs.
3) The materials shall conform to ESCOMs specifications and shall be got inspected before
execution o f work. The material shall be procured by the agencies from the BESCOM
approved vendors. Bills and Test Certificate in respect o f the materials procured shall be
furnished to BESCOM (Please see circular No. BESCOM/BC-20/F-1111/2008-09/Dated
24.06.2010).
Sl.
No.
Particulars
Materials cost
Labour charges
Civil Engineering Charges
Locality Allowance @ ....% on Labour Charges + 30% of
Civil
Engineering
Charges
(Applicable
for
areas
mentioned in Page No............Part-6)
Total Material Cost = Material cost + 70% o f civil
Engineering Charges.
Total Labour Charges = Labour charges + 30% Civil
Engineering charges + locality allowance.
Employees cost at 20% o f the labour charges.
1
2
3
4
5
6
9
10
11
12
13
14
15
16
17
18
19
Amount in Rs.
Note:1) While preparing the estimate provision has to be made specifically for the
conductor accessories such as Wedge/ PG clamps, Alkathene Tube, etc., duly
assessing the quantity.
2) The contingency at 2% provisioned is only to take care of unforeseen material and
labour. This has to be paid only for any additional work carried out and as per
actual.
3) The materials to be procured by the agency shall conform to ESCOMs
specifications and got inspected before execution of work. The material shall be
procured by the agencies from the approved vendors.
Cost
Data
Sheet No.
1
2
3
4
PARTICULARS
Total cost
o f Estim ate
(In Rs.)
M aterial + Labour
(Both casual
and Regular)
Labour Charges
only casual
(In Rs.)
Km
304439
40639
Km
273522
34729
Km
246544
31065
Km
513125
47804
Unit
on 9 m tr
on 9 m tr
on 8 m tr
on 9 m tr
Labour
Km
466124
60975
Km
555933
63975
Km
184786
25676
Km
277643
34507
Km
308845
39232
Km
367363
44406
Km
308138
34751
Km
192233
28392
Km
389288
48932
Km
330921
45509
Per unit
Per unit
Per unit
47724
51114
43299
4725
4855
6783
Nos
6992
700
Km
1617740
1743990
862809
974165
1100415
183547
2113255
2354315
862897
1471687
1712747
185307
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Km
Km
Km
22
23
24
25
26
24 a
25 a
26 a
27
27 a
28
29
30
31
32
a
b
c
d
33
a
b
c
d
34
a
b
c
d
35
a
b
c
d
Km
Km
2711524
3094244
862985
2071961
2454681
187066
Per
Per
Per
Per
unit
unit
unit
unit
130632
179813
235218
221822
9312
9523
9993
9952
Per
Per
Per
Per
unit
unit
unit
unit
134455
183816
238898
225502
9803
10014
10365
10324
Per unit
332490
9833
Per unit
336079
10129
Per unit
119240
7036
Per unit
168422
7247
Per unit
Per unit
223479
210082
7427
7386
Per unit
401262
11833
Schenider Make
ABB Make
Seimens Make
MEI
Providing Com pact RMU 11kV class VCB/SF6 Type (1
Incomer+1Breakers+1 Outgoing)
Per
Per
Per
Per
unit
unit
unit
unit
1075936
1078975
1076285
1075752
10222
10510
10411
10847
Schenider Make
ABB Make
Seimens Make
MEI
Providing Com pact RMU 11kV class VCB/SF6 Type
Per
Per
Per
Per
unit
unit
unit
unit
759135
762141
760278
759766
7632
7883
7812
8143
Per
Per
Per
Per
unit
unit
unit
unit
276582
276581
275788
275767
2590
2627
2599
2703
Per
Per
Per
Per
unit
unit
unit
unit
321429
321428
320635
320614
2590
2627
2599
2703
(1 OD)
Schenider Make
ABB Make
Seimens Make
MEI
Providing Com pact RMU 11kV class VCB/SF6 Type
(1VL)
Schenider Make
ABB Make
Seimens Make
MEI
36
Km
1017179
71989
37
Km
641515
64559
38
39
40
41
42
a)
b)
c)
d)
e)
43
Per unit
53459
2466
Per unit
57959
2466
Per unit
65559
2466
1132904
1491923
1579163
1824000
2280000
1182768
1611596
1997538
2507446
2908949
10580
9390
6390
8907
5907
8568
5568
8745
5745
8895
5895
1014
456
1014
456
1014
456
1014
456
1014
456
1063
1469
2331
3423
5569
338
338
398
465
486
Per
Per
Per
Per
Per
Per
Per
Per
Per
Per
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
Per unit
Per unit
Per unit
Per unit
Per unit
Per
Per
Per
Per
Per
unit
unit
unit
unit
unit
44
Per W ork
7813
45
Per W ork
12344
46
Per W ork
Per W ork
5000
Per W ork
6250
Per W ork
7500
47
Per W ork
Material cost
as per site
requirem ent
3750
SL.
No
Particulars
Unit
Labour Cct
Qty
Rate
Amt
Rate
Amt
Nos
5941
5941
937
937
Nos
23
3278
75394
937
21551
Set
449
449
88
88
Set
23
443
10189
88
2024
Set
16671
16671
2877
2877
Nos
72
103
7416
45 kN Disc Insulators
Nos
300
1800
Sets
855
5130
314
1884
Kms
3.045
36810
112086
230-8
7028
10
Nos
89
534
11
Nos
26
238
6188
49
1274
12
Set of 2
Nos
24
424
10176
88
2112
13
Nos
140
840
14
Nos
120
960
43
344
15
Nos
26
73
1898
20
520
Total
16
255672
Labour charges
a) Casual
40639
b) Regular
8128
Total Cost/Km in Rs.
Note:
40639
304439
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labour Cost
Qty
Rate
Amt
Rate
Amt
Nos
5941
5941
937
937
Nos
18
3278
59004
937
16866
Set
449
449
88
88
Set
18
443
7974
88
1584
Set
16671
16671
2877
2877
Nos
57
103
5871
Nos
300
1800
Sets
855
5130
314
1884
Kms
3.045
36810
112086
2308
7028
10
Nos
89
534
11
Nos
21
238
4998
49
1029
12
Set o f 2
Nos
19
424
8056
88
1672
13
Nos
140
840
14
Nos
120
960
43
344
15
Kg
21
73
1533
20
420
Total
16
231847
34729
Labour charges
a) Casual
34729
b) Regular
6946
Total Cost/Km in Rs.
273522
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labo ur Cost
Qty
Rate
Amt
Rate
Amt
Nos
4324
4324
751
751
Nos
18
2297
41346
751
13518
Set
449
449
88
88
Sets
18
439
7902
88
1584
Set
13437
13437
2747
2747
Nos
57
103
5871
Nos
300
1800
Sets
855
5130
314
1884
Kms
3.045
36810
112086
2308
7028
10
Nos
89
534
11
Nos
21
238
4998
49
1029
12
Set o f 2
Nos
19
424
8056
88
1672
13
Nos
140
840
14
Nos
120
960
43
344
15
Kgs
21
73
1533
20
420
Total
16
209266
31065
Labour charges
a) Casual
31065
b) Regular
6213
Total Cost/Km in Rs.
246544
Note: 1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labour Cost
Qty
Rate
Amt
Rate
Amt
Nos
5941
5941
937
937
Nos
22
3278
72116
937
20614
Set
449
449
88
88
Sets
22
443
9746
88
1936
Sets
16671
33342
2877
5754
Nos
69
103
7107
Nos
12
506
6072
Nos
12
546
6552
Sets
855
5130
314
1884
10
Kms
3.C-45
93860
28580-4
4031
12274
11
Nos
12
276
3312
12
Nos
27
238
6426
49
1323
13
Set o f 2
Nos
23
424
9752
88
2024
14
Nos
140
840
15
Nos
10
120
1200
43
430
16
Kgs
27
73
1971
20
540
Total
17
455760
Labour charges
a) Casual
47804
b) Regular
9561
Total Cost/Km in Rs.
Note:
47804
513125
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
Sl
No
Particulars
Unit
Labour Cost
Qty
Rate
Amt
Rate
Amt
Nos
5941
5941
937
937
Nos
18
3278
59004
937
16866
Set
449
449
88
88
Sets
18
443
7974
88
1584
Set
318
318
85
85
Sets
19
312
5928
85
1615
Set
16671
16671
2877
2877
Nos
57
95
5415
Nos
76
41
3116
10
Nos
300
1800
11
Nos
14
112
12
Sets
855
6840
314
2512
13
Kms
3.045
36810
112086
2308
7028
14
Kms
4.06
21900
88914
1693
6874
15
Nos
21
238
4998
49
1029
16
Span
20
3150
63000
938
18760
Sets
20
318
6360
17
Nos
89
534
18
Nos
140
1120
19
Nos
120
840
43
301
20
Kgs
21
73
1533
20
420
Total
21
392953
Labour charges
a) casual
60975
b) Regular *
12195
Total Cost/Km in Rs
Note:
60975
466124
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labour Cost
Qty
Rate
Amt
Rate
Amt
Nos
5941
5941
937
937
No's
23
3278
75394
937
21551
Set
449
449
88
88
Sets
23
443
10189
88
2024
Set
318
318
85
85
Sets
24
312
7488
85
2040
Set
16671
16671
2877
2877
Nos
72
95
6840
Nos
96
41
3936
10
Nos
300
1800
11
Nos
14
112
12
Sets
855
6840
314
2512
13
Kms
7.105
36810
261535
2308
16398
14
Nos
89
534
15
Nos
26
238
6188
49
1274
16
Span
25
2520
63000
533
13325
Sets
25
318
7950
17
Nos
140
1120
18
Nos
120
960
43
344
19
Kgs
26
73
1898
20
520
Total
20
479163
Labour charges
a) Casual
63975
b) Regular
12795
Total Cost/Km in Rs.
Note:
63975
555933
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labour Coet
Qty
Rate
Amt
Rate
Amt
Nos
4324
4324
751
751
Nos
17
2297
39049
751
12767
Set
318
318
85
85
Sets
17
308
5236
85
1445
Nos
64
41
2624
Nos
14
112
Sets
835
6680
314
2512
Kms
4.06
21900
88914
1693
6874
Nos
18
238
4284
49
882
10
Nos
140
1120
11
Kgs
18
73
1314
20
360
Total
12
153975
Labour charges
a) Casual
25676
b) Regular
5135
Total Cost/Km in Rs.
No te:
25676
184786
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labour Cost
Qty
Rate
Amt
Rate
Amt
Nos
4324
4324
751
751
Nos
24
2297
55128
751
18024
Set
318
318
85
85
Sets
24
308
7392
85
2040
Nos
96
41
3936
Nos
14
112
Sets
835
6680
314
2512
Kms
4.06
36810
149449
2308
9370
Nos
25
238
5950
49
1225
10
Nos
140
1120
11
Kgs
25
73
1825
20
500
Total
12
236234
Labour charges
a) Casual
34507
b) Regular
6901
Total Cost/Km in Rs.
No te:
34507
277643
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labour Coet
Qty
Rate
Amt
Rate
Amt
Nos
5941
5941
937
937
Nos
24
3278
78672
937
22488
Set
449
449
88
88
Sets
24
318
7632
88
2112
Nos
96
41
3936
Nos
14
112
Sets
835
6680
314
2512
Kms
4.06
36810
149449
2308
9370
Nos
25
238
5950
49
1225
10
Nos
140
1120
11
Kgs
25
73
1825
20
500
Total
12
261766
Labour charges
a) Casual
39232
b) Regular
7846
39232
308845
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labour Coet
Qty
Rate
Amt
Rate
Amt
Nos
5941
35646
931
5586
Nos
19
3278
62282
931
17689
Sets
449
3143
88
616
Sets
22
318
6996
88
1936
Sets
200
140-0
85
595
Sets
18
194
3492
85
1530
Nos
95
41
3895
Nos
50
14
700
Sets
10
835
8350
314
3140
10
Kms
4.06
36810
149449
2308
9370
11
Kms
1.C15
21900
22229
1693
1718
12
Nos
25
238
5950
49
1225
13
No's
140
1120
14
No's
6500
65C-C
500
500
15
Mtrs
50
300
16
Mtrs
25
32
800
17
Kgs
25
73
1825
20
500
Total
18
314076
Labour charges
a) Casual
44406
b) Regular
8881
Total Cost/Km in Rs.
Note:
44406
367363
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labour Cost
Qty
Rate
Amt
Rate
Amt
Nos
4324
21620
751
3755
Nos
15
2297
34455
751
11265
Set
318
318
85
85
Sets
24
308
7392
85
2040
Set
200
200
85
85
Sets
24
190
4560
85
2040
Nos
95
41
3895
Nos
50
14
700
Sets
835
6680
314
2512
1C
Kms
4.0-6
36810
149449
2308
9370
11
Kms
1.015
21900
22229
1693
1718
12
Nos
20
238
4760
49
980
13
Nos
140
1120
C-
14
Nos
650-0
650-0'
500
500
15
Mtrs
50
300
16
Mtrs
25
32
800
17
Kgs
20
73
1460
20
400
Total
266437
34751
Note: The no. o f RCC poles and PCC poles have to be used as per field conditions and hence estimates have to be prepared
accordingly.
18
Labour charges
a) Casual
34751
b) Regular
6950
Total Cost/Km in Rs.
308138
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
Note:
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labour Cost
Qty
Rate
Amt
Rate
Amt
Nos
4324
21620
751
3755
Nos
15
2297
34455
751
11265
Set
318
318
85
85
Sets
24
308
7392
85
2040
Set
2 CO
2CC
85
85
Sets
19
190
3610
85
1615
Nos
48
41
1968
Nos
21
14
294
Sets
835
6680
314
2512
1C
Kms
3.045
21900
66686
1693
5155
11
Nos
20
238
4760
49
980
12
Nos
140
1120
13
Nos
6500
6500
500
500
14
Mtrs
50
300
15
Mtrs
25
32
800
16
Kgs
20-
73
1460
2C-
400
Total
17
158163
Labour charges
a) Casual
28392
b) Regular
5678
Total Cost/Km in Rs.
No te:
28392
192233
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labour Coet
Qty
Rate
Amt
Rate
Amt
Nos
5941
35646
931
5586
Nos
19
3278
62282
931
17689
Sets
30
720
21600
254
7612.5
Nos
ICO
41
4100
Nos
50
14
700
Sets
12
835
10020
251
3012
Kms
4.C6
36810
149449
2308
9370
Kms
1.015
21900
22229
1693
1718
Kms
1.015
(103 kgs)
62.8
6417
1693
1718
1C
Kgs
26
62.8
1633
11
Nos
25
238
5950
49
1225
12
Nos
140
1120
13
Nos
65CO
65CO
500
500
14
Mtrs
50
300
15
Mtrs
25
32
800
16
Kgs
25
73
1825
20
500
Total
17
330570
Labour charges
a) Casual
48932
b) Regular
9786
Total Cost/Km in Rs.
Note:
48932
389288
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Particulars
Unit
Labour Cost
Qty
Rate
Amt
Rate
Amt
Nos
5941
5941
931
931
Nos
23
3278
75394
931
21413
Set
16671
16671
2877
2877
Sets
23
1290
29670
280
6440
Nos
69
103
7107
C-
Nos
300
1800
Sets
855
7695
314
2826
Kms
3.C-45
36810
112086
2308
7028
Nos
26
238
6188
49
1274
10
Set o f 2 No's
25
424
10600
88
2200
11
Nos
140
1260
12
Kgs
26
73
1898
20
520
Total
13
276310
Labour charges
a) Casual
4550-9
b) Regular
9102
Total Cost/Km in Rs.
Note:
45509
330921
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
Paritculars
Unit
Part-A: LINES
1
WL
Material cost
Qty
Labour Cost
Rate
Amt
Rate
Amt
Set
16671
16671
2877
2877
Set
13437
13437
2747
2747
Nos
300
1800
Sets
855
1710
314
628
Nos
238
476
49
98
Nos
140
280
No
120
120
43
43
Kgs
73
146
20
40
WL
Total Part A
Using 8 Mtrs RCC Pole
17969
3556
21203
3686
Set
16467
16467
625
625
11
No
3330
3330
169
169
12
Set/3 Nos
4288
4288
375
375
13
Total Part B
24085
42054
1169
Labour Charges
14
a) Casual
4725
b) Regular
945
45288
Labour Charges
15
Note:
a) Casual
4855
b) Regular
971
47724
5670
51114
5826
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Paritculars
Unit
Material cost
Qty
Part-A: LINES
Labour Cost
Rate
Amt
Rate
Amt
Set
28892
28892
5548
5548
Nos
238
714
49
147
Sets
855
2565
314
942
Nos
300
1800
Nos
103
309
Nos
140
420
Nos
120
240
43
86
Kgs
73
219
20
60
Labour Charges
a) Casual
6783
b) Regular
1357
Total Cost/Unit in Rs.
Note:
43299
1) RCC Poles shall be used for dead ends, DP structure and PSC poles for intermediate supports
2) Other charges such as service tax, ESI, PF and other applicable charges shall be loaded as per typical cost data sheet
SL.
No
Material cost
Paritculars
Unit
Qty
Rate
Amt
Nos
3000
3000
Nos
2100
2100
Set
368
368
Mtrs
50
200
Set
474
474
LS
LS
150
LS
LS
700
T o ta l
6992
SL.
No
Particulars
Unit
Qty
Rate
Amt
Material Cost
1
Km
548860
548860
Km
675110
675110
Nos
5375
16125
Per Kit
2990
5980
Nos
300
900
Nos
80
160
Mtrs
1143
9144
Nos
10
120
1200
582369
708619
Labour charges
Mtrs
50
31679
1584
i) Without HD PE Pipe
Rmtr
50
625
31250
Rmtr
900
913
821700
Nos
1500
4500
Nos
1375
2750
Nos
35
105
f) Laying o f GI Pipe
Mtrs
40
320
Nos
10
60
600
10
Note:
862809
a) Casual
862809
b) Regular
172562
Total Cost/Km in Rs. (Flat Armoured)
1617740
1743990
1)
While preparing estimates for turnkey/total tunkey projects please refer to Sl. No........... of General
Guidelines vide a to .... in Page No.............
2)
When multiples cables have to be laid in the common trench the following excavation is to be followed:
a) 0.75 Mtrs x 1 Mtrs for 2 cables, b) 1 Mtr x 1 Mtr for 3 cables, c) 1.25 Mtr x 1 Mtr for 4 nos. o f cables
and so on (As per Ltr No. BESCOM/BC-14/F-45
3)
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open
trench excavation. Hence provision shall be made for both in the estimate and the bills shall be paid as
per actual inventory taken.
Particulars
Unit
Material cost
Qty
Rate
Amt
Material Cost
1
Km
548860
548860
Km
675110
675110
Nos
5375
16125
Per Kit
2990
5980
Nos
4000/
8000
10/5
40000
Sand
Cmt
60
2000
120000
Nos
30
300
9000
Nos
30
80
2400
Mtrs
1143
9144
10
Nos
20
120
2400
11
753909
880159
Labour charges
a) Cable trench excavation, 1000x0.6x1=600, Ordinary
soil
Cmt
600
181
108600
km
31679
31679
Cmt
550
40
22000
No
1500
4500
No
1375
2750
km
2304
2304
km
8094
8094
mtr
60
35
2100
i) Laying of GI Pipe
mtr
40
320
No
20
60
1200
12
183547
a) Casual
183547
b) Regular
36709
Total Cost/Km in Rs. (Flat Armoured)
974165
1100415
NOTE
1)
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No...........of General
Guidelines vide a to .... in Page No.............
2)
When multiples cables have to be laid in the common trench the following excavation is to be followed:
a) 0.75 Mtrs x 1 Mtrs for 2 cables, b) 1 Mtr x 1 Mtr for 3 cables, c) 1.25 Mtr x 1 Mtr for 4 nos. of cables
and so on (As per Ltr No. BESCOM/BC-14/F-45
3)
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open
trench excavation. Hence provision shall be made for both in the estimate and the bills shall be paid as
per actual inventory taken.
Particulars
Unit
Qty
Rate
Amt
Material Cost
1
2
Km
1038890
1038890
Km
1279950
1279950
Nos
6555
19665
Per Kit
3910
7820
Nos
300
900
Nos
80
160
Mtrs
1143
9144
Nos
10
120
1200
1077779
1318839
Labour charges
Mtrs
50
33439
1672
i) Without HD PE Pipe
Rmtr
50
625
31250
Rmtr
900
913
821700
Nos
1500
4500
Nos
1375
2750
Nos
35
105
f) Laying o f GI Pipe
Mtrs
40
320
Nos
10
60
600
862897
10
a) Casual
862897
b) Regular
172579
Total Cost/Km in Rs. (Flat Armoured)
2113255
2354315
NOTE
1)
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No........... of General
Guidelines vide a to .... in Page No.............
2)
When multiples cables have to be laid in the common trench the following excavation is to be followed:
a) 0.75 Mtrs x 1 Mtrs for 2 cables, b) 1 Mtr x 1 Mtr for 3 cables, c) 1.25 Mtr x 1 Mtr for 4 nos. o f cables
and so on (As per Ltr No. BESCOM/BC-14/F-45
3)
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open
trench excavation. Hence provision shall be made for both in the estimate and the bills shall be paid as
per actual inventory taken.
SL.
No
1
2
2
Particulars
Unit
Qty
Rate
Amt
Km
1038890
1038890
Km
1279950
1279950
Nos
6555
19665
Per Kit
3910
7820
Nos
4000/
8000
10/5
40000
Sand
Cmt
60
2000
120000
Nos
30
300
9000
Nos
30
80
2400
Mtrs
1143
9144
Nos
20
120
2400
10
1249319
1490379
Labour charges
a) Cable trench excavation, 1000x0.6x1=600, Ordinary
soil
Cmt
600
181
108600
Km
33439
33439
Cmt
550
40
22000
Nos
1500
4500
Nos
1375
2750
Km
2304
2304
Km
8094
8094
Mtr
60
35
2100
i) Laying o f GI Pipe
Mtr
40
320
Nos
20
60
1200
11
a) Casual
185307
b) Regular
37061
Total Cost/Km in Rs. (Flat Armoured)
1471687
1712747
NOTE
1)
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No........... of General
Guidelines vide a to .... in Page No.............
2)
When multiples cables have to be laid in the common trench the following excavation is to be followed:
a) 0.75 Mtrs x 1 Mtrs for 2 cables, b) 1 Mtr x 1 Mtr for 3 cables, c) 1.25 Mtr x 1 Mtr for 4 nos. o f cables
and so on (As per Ltr No. BESCOM/BC-14/F-45
3)
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open
trench excavation. Hence provisionshall be made for both in the estimate and the bills shall be paid as
per actual inventory taken.
SL.
No
Particulars
Unit
Qty
Rate
Amt
Material Cost
Km
1632500
1632500
Km
2015220
2015220
Nos
8050
24150
Per Kit
3940
7880
Nos
300
900
Nos
80
160
Mtrs
1144
9152
Nos
10
120
1200
10
1675942
2058662
Labour charges
Mtrs
50
35198
1760
i) Without HD PE Pipe
Rmtr
50
625
31250
Rmtr
900
913
821700
Nos
1500
4500
Nos
1375
2750
Nos
35
105
f) Laying o f GI Pipe
Mtr
40
320
Nos
10
60
600
11
862985
a) Casual
862985
b) Regular
172597
Total Cost/Km in Rs. (Flat Armoured)
2711524
3094244
NOTE
1)
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No........... of General
Guidelines vide a to .... in Page No.............
2)
When multiples cables have to be laid in the common trench the following excavation is to be followed:
a) 0.75 Mtrs x 1 Mtrs for 2 cables, b) 1 Mtr x 1 Mtr for 3 cables, c) 1.25 Mtr x 1 Mtr for 4 nos. o f cables
and so on (As per Ltr No. BESCOM/BC-14/F-45
3)
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open
trench excavation. Hence provisionshall be made for both in the estimate and the bills shall be paid as
per actual inventory taken.
SL.
No
1
2
2
Particulars
Unit
Qty
Rate
Amt
Km
1632500
1632500
Km
2015220
2015220
Nos
8050
24150
Per Kit
3940
7880
Nos
4000 /
8000
10/5
40000
Sand
Cmt
60
2000
120000
Nos
30
300
9000
Nos
30
80
2400
Mtrs
1144
9152
Nos
20
120
2400
10
1847482
2230202
Labour charges
a) Cable trench excavation, 1000x0.6x1=600, Ordinary
soil
Cmt
600
181
108600
Km
35198
35198
Cmt
550
40
22000
Nos
1500
4500
Nos
1375
2750
Km
2304
2304
Km
8094
8094
Mtrs
60
35
2100
i) Laying o f GI Pipe
Mtrs
40
320
Nos
20
60
1200
11
a) Casual
187066
b) Regular
37413
Total Cost/Km in Rs. (Flat Armoured)
2071961
2454681
NOTE
1)
While preparing estimates for turnkey / total tunkey projects please refer to Sl. No........... of General
Guidelines vide a to .... in Page No.............
2)
When multiples cables have to be laid in the common trench the following excavation is to be followed:
a) 0.75 Mtrs x 1 Mtrs for 2 cables, b) 1 Mtr x 1 Mtr for 3 cables, c) 1.25 Mtr x 1 Mtr for 4 nos. o f cables
and so on (As per Ltr No. BESCOM/BC-14/F-45
3)
Where cables are laid using trenchless technology, there may be a necessity to lay the cable in open
trench excavation. Hence provisionshall be made for both in the estimate and the bills shall be paid as
per actual inventory taken.
Particulars
Unit
Qty
M aterial Cost
Labour Cost
Rate
Am t
Rate
Am t
Part-A: TRANSFORM ER
a) 9 Mtr RCC DP Transform er Structure (Using 9
Mtr RCC Poles)
No
24132
24132
3641
3641
No
20898
20898
3150
3150
1 lk V Pin Insulators
Sets
103
309
Sets
300
900
Nos
855
3420
314
1256
No
64455
64455
603
603
Single
Electrode
with
accessories
1355
4065
507
1521
No
120
120
43
43
Kgs
73
146
20
40
Nos
140
560
10
GI W ire 8 SWG
Kgs
62.8
314
11
Kgs
10
66.72
667
12
99088
7104
95854
6613
Labour Charges
i) u sing 9 m tr Poles
a) Casual
7104
b) Regular
1421
13
a) Casual
6613
b) Regular
1323
107613
103790
Part-B:
14
15
Labour Charges
16
Set of 3 Nos
2283
2283
63
63
a) Casual
63
b) Regular
13
2359
17
1679
1679
25
44
1100
Nos
34
136
Nos
64
256
Nos
24
192
Nos
188
376
No
6390
No
No
No
Mtrs
181
181
503
503
6390
456
456
3000
3000
558
558
18
Set/3 Nos
871
871
375
375
19
No
7320
7320
563
563
21320
Labour Charges
a) Casual
2636
b) Regular
527
21
22
Total (A+B+C)
1) U sing 9 m tr Poles
24483
134455
Labour Charges:
a) Casual
9803
b) Regular
1961
2) U sing 8 m tr Poles
130632
Labour Charges:
a) Casual
9312
b) Regular
1862
Note: Provision for actual quantity of additional m aterials viz 45kN Disc Insulator, 1 lk V Pin Insulators ACSR/AAA
Conductor, Transparent Alkathine Tube, PG Clamps and Term inal Connectors etc. W henever required m ay be made in the
estim ate separately for
erection 01 s rnase, h k v / m j v ,
, ,-
00 0
Sl
No
Particulars
Unit
Qty
M aterial Cost
Labour Cost
Rate
Am t
Rate
Am t
Part-A: TRANSFORM ER
a) 9 Mtr RCC DP Transform er Structure (Using 9
Mtr RCC Poles)
No
24312
24312
3641
3641
No
20898
20898
3150
3150
1 lk V Pin Insulators
Sets
103
309
Sets
300
900
Nos
855
3420
314
1256
No
109635
109635
603
603
Single
Electrode
with
accessories
1355
4065
507
1521
No
120
120
43
43
Kgs
73
146
20
40
Nos
140
560
10
GI W ire 8 SWG
Kgs
62.8
314
11
Kgs
10
66.72
667
12
144448
7104
141034
6613
Labour Charges
i) using 9 m tr Poles
a) Casual
7104
b) Regular
1421
13
a) Casual
6613
b) Regular
1323
152973
148970
Part-B:
14
15
Labour Charges
16
Set of 3 Nos
2283
2283
63
63
a) Casual
63
b) Regular
13
2359
17
1679
3358
40
81
3240
Nos
79
316
Nos
122
488
Nos
24
192
Nos
188
376
No
5907
No
Nos
No
Mtrs
181
362
503
503
5907
456
456
3000
3000
588
588
18
Set/ 3 nos
871
871
375
375
19
No
7320
7320
563
563
25068
Labour Charges
a) Casual
2847
b) Regular
569
21
22
Total (A+B+C)
1) Using 9 m tr Poles
28484
183816
Labour Charges:
a) Casual
10014
b) Regular
2003
2) Using 8 m tr Poles
179813
Labour Charges:
a) Casual
9523
b) Regular
1905
Note: Provision for actual quantity of additional m aterials viz 45kN Disc Insulator, 1 lk V Pin Insulators ACSR/AAA
Conductor, Transparent Alkathine Tube, PG Clamps and Term inal Connectors etc. W henever required m ay be made in the
estim ate separately for
Particulars
Unit
Qty
M aterial cost
Labour Cost
Rate
Am t
Rate
Am t
Part-A: TRANSFORM ER
a) 9 Mtr RCC DP Transform er Structure (Using 9
Mtr RCC Poles)
No
26482
26482
3749
3749
No
23248
23248
3377
3377
1 lk V Pin Insulators
Sets
103
309
Sets
300
900
Nos
855
3420
314
1256
No
146408
146408
805
805
Single
Electrode
with
accessories
1355
4065
507
1521
No
120
120
43
43
Kgs
73
146
20
40
Nos
140
560
10
GI W ire 8 SWG
Kgs
62.8
314
11
Kgs
10
66.72
667
12
183391
7414
180157
7042
Labour Charges
I) using 9 m tr Poles
a) Casual
7414
b) Regular
1483
13
a) Casual
7042
b) Regular
1408
192288
188608
Part-B:
14
15
Labour Charges
16
Set of 3 Nos
2283
2283
63
63
a) Casual
63
b) Regular
13
2359
17
a) LT Protection Kit
Nos
1679
3358
181
362
No
16705
16705
403
403
No
Mtrs
45
106
4770
Nos
12
86
1032
Nos
238
952
503
503
Nos
24
192
Nos
188
376
No
5568
5568
456
456
Nos
3000
3000
588
588
18
Set/3 Nos
871
871
375
375
19
No
7320
7320
563
563
W ith LT Protection
kit
27439
40786
a) Casual
2847
2888
b) Regular
569
578
30855
44252
225502
238898
a) Casual
10324
10365
b) Regular
2065
2073
221822
235218
a) Casual
9952
9993
b) Regular
1990
1999
Labour Charges
21
22
Total (A+B+C)
1) Using 9 m tr Poles
Labour Charges:
2) Using 8 m tr Poles
Labour Charges:
Note: Provision for actual quantity of additional materials viz 45kN Disc Insulator, 1 lk V Pin Insulators ACSR/AAA Conductor,
Transparent Alkathine Tube, PG Clamps and Term inal Connectors etc. W henever required may be m ade in the estimate
separately for
Particulars
Unit
Qty
M aterial cost
Labour Cost
Rate
Am t
Rate
Am t
Part-A: TRANSFORM ER
a) 9 Mtr RCC DP Transform er Structure (Using 9
Mtr RCC Poles)
No
26482
26482
3749
2999
No
26482
26482
3377
2703
11 kV Pin Insulators
Sets
103
309
Sets
300
900
Nos
855
3420
314
1256
No
237696
237696
1208
1208
Single
Electrode
with
accessories
1355
4065
507
1521
No
120
120
43
43
Kgs
73
146
20
40
Nos
140
560
10
GI W ire 8 SWG
Kgs
62.8
314
11
Kgs
10
66.72
667
12
274679
7067
274679
6771
Labour Charges
i) using 9 m tr Poles
a) Casual
7067
b) Regular
1413
13
a) Casual
6771
b) Regular
1354
283160
282804
Part-B:
14
15
Labour Charges
16
Set o f 3 Nos
2283
2283
63
63
a) Casual
63
b) Regular
13
2359
17
No
16705
16705
No
Mtrs
45
194
8730
Nos
12
207
2484
Nos
357
1428
Nos
24
192
Nos
188
376
No
5895
Nos.
403
403
644
644
5895
456
456
3000
3000
558
558
18
Set/ 3 nos
832
832
375
375
19
No
7320
7320
563
563
46962
Labour Charges
a) Casual
2999
b) Regular
600
21
22
Total (A+B+C)
1) U sing 9 m tr Poles
50561
336079
Labour Charges:
a) Casual
10129
b) Regular
2026
2) U sing 8 m tr Poles
335724
Labour Charges:
a) Casual
9833
b) Regular
1967
Note: Provision for actual quantity o f additional m aterials viz 45kN Disc Insulator, 11 kV Pin Insulators ACSR/AAA
Conductor, Transparent Alkathine Tube, PG Clamps and Term inal Connectors etc. W henever required may be m ade in the
estim ate separately for
W hile preparing estimates for turnkey / total tunkey projects please refer to Sl. No.
a to .... in Page N o.............
CO ST D ATA SH EET - 28
Erection o f 3 Phase, llk V / 4 3 3 V , 25kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre on
9 M trs RCC Pole (Square Section
Material cost
Sl.
No
1
Materials
Unit
Labour Cost
Qty
Rate
Amt
Rate
Amt
No
7210
7210
937
937
Nos
103
309
Nos
300
900
Set
855
855
314
314
Set
4703
4703
899
899
No
64455
64455
603
603
Single
Electrode with
accessories
1355
4065
507
1521
Each
252
252
Each
2 731
2731
Each
403
403
No
140
140
10
GI Wire 8 SWG
Kgs
62.8
314
11
Kgs
10
66.7
667
12
Set/3 Nos
2283
2283
63
63
No
1679
1679
181
181
No
Mtrs
25
44
1100
Nos
34
136
Nos
64
256
503
503
Nos
24
192
Nos
188
376
No
6390
6390
456
456
No
3000
3000
558
558
CIRCUIT
13
14
Set/3 Nos
871
871
375
375
15
Nos
7320
7320
563
563
16
No
120
120
43
43
17
Kg
70
70
20
20
18
110797
Labour Charges
a) Casual
7036
b) Regular
1407
119240
CO ST D ATA SH EET - 29
Erection o f 3 Phase, llk V / 4 3 3 V , 63kVA BEE 3 Star Rated Single Pole Mounted Transformer Centre
on 9 M trs R C C Pole (Square Section)
Material cost
Sl.
No
1
Materials
Unit
Labour Cost
Qty
Rate
Amt
Rate
Amt
No
7210
7210
937
937
Nos
103
309
Nos
300
900
Set
855
855
314
314
Set
4703
4703
899
899
No
109635
109635
603
603
Single
Electrode
with
accessories
1355
4065
507
1521
Each
252
252
Each
2731
2731
Each
403
403
140
140
No
10
GI Wire 8 SWG
Kgs
62.8
314
11
Kgs
10
66.7
667
12
Set/3 Nos
2283
2283
63
63
Nos
1679
3358
181
362
No
Mtrs
40
81
3240
Nos
79
316
Nos
122
488
503
503
Nos
24
192
Nos
188
376
No
5907
5907
456
456
No
3000
3000
588
588
CIRCUIT
13
14
Set/3 Nos
871
871
375
375
15
Nos
7320
7320
563
563
16
No
120
120
43
43
17
Kg
70
70
20
20
18
19
Labour Charges
159725
a) Casual
7247
b) Regular
1449
168422
Sl.
No
M aterials
U nit
Labour C ost
Qty
Rate
Am t
Rate
Am t
7210
7210
937
937
No
Nos
103
309
Nos
300
900
Set
855
855
251
251
Set
7050
7050
899
899
No
146408
146408
805
805
Nos
1355
4065
507
1521
Each
252
252
Each
2731
2731
Each
403
403
No
140
140
10
GI Wire 8 SWG
Kgs
62.8
314
11
Kgs
10
66.7
667
12
Set/3 Nos
2283
2283
63
63
a) LT Protection Kit
No
1679
3358
181
362
No
16705
16705
403
403
No
Mtrs
45
106
4770
Nos
12
86
1032
Nos
238
952
503
503
Nos
24
192
Nos
188
376
No
5568
5568
456
456
No
3000
3000
588
588
13
14
Set/3 Nos
871
871
375
375
15
Nos
7320
7320
563
563
16
No
120
120
43
43
17
Kg
73
73
20
20
18
214566
Labour Charges
201219
for LT D istribution Box
for LT Protection K it
a) Casual
7427
7386
b) Regular
1485
1477
Total
T otal C ost for Erection o f a Single Pole M ounted lO O kVA Transform er w ith L T
D istribution B o x in Rs
223479
T otal C ost for Erection o f a Single Pole M ounted lO O kVA Transform er w ith L T
Protection K IT in Rs
210082
Materials
Unit
Qty
Labour Cost
Rate
Amt
Rate
Amt
No
15800
15800
2084
2084
Set
26496
26496
1799
1799
Sets
98
882
56
504
Nos
103
927
Mtrs
50
36.81
1841
Coils
500
1000
Each
596
596
Each
9668
9668
Each
906
906
GI Wire 10 SWG
Kgs
62.8
314
Kgs
10
66.72
667
10
Mtrs
10
1143
11430
11
Mtrs
20
291
5820
12
Nos
200
1600
13
Mtrs
40
27
1080
14
No
237696
237696
1208
1208
15
Set/3 Nos
871
871
375
375
16
Nos
7320
21960
563
1689
17
Single
Electrode
with
accessories
1355
4065
507
1521
No
16705
16705
403
403
No
Mtrs
45
194
8730
644
644
18
Nos
12
207
2484
Nos
357
1428
Nos
24
192
Nos
188
376
No
5895
5895
456
456
No
3000
3000
558
558
Set/3 Nos
2283
2283
63
63
RoU
10
30
19
20
21
nos
381
1524
72
288
22
MS Fish plate
Nos
59
531
18
158
23
No
120
120
43
43
24
Kg
73
146
20
40
387063
Labour Charges
11833
a) Casual
2367
b) Regular
Total Cost in Rs
401262
SI.
No
M aterials
U n it
ABB M ake
MEI
Rate
Q ty
Am t
Q ty
Am t
Q ty
Amt
Q ty
Am t
R M U (3 W ay), O ne Incom er + Tw o
1
No
1050370
1050370
1050370
1050370
1050370
Cmt
4425
0.15
663.75
0.37
1637.25
0.53
23 45 .25
0.64
2832
Cmt
4425
0.65
2876.25
1.44
6372
0.56
2478
Kgs
68.3
40
2732
14
956.2
23
1570.9
Cmt
4425
0.08
354
Cmt
3776
0.57
2152.32
Kgs
50
50
2500
50
2500
50
2500
50
2500
No
2000
4000
4000
4000
4000
No
528
528
528
528
528
3 5 0 M VA, 630A m ps
2
1066363
1063670
1063792
1062736.3
cm t
141
1.29
181.89
3.33
469.53
2.63
370.83
5.72
806.52
No
2510
10040
10040
10040
10040
b) R egular
T o ta l cost
10222
10510
10411
10847
10222
10510
10411
10847
2044
2102
2082
2169
1075936
1078975
1076285
1075752
T he m easu rem en ts for E arth work and con cretin g w ork s have been p rovision as per the dim ension s of the equ ip m en ts of m akes w h ich are in use at
p resent in BE SC O M . D etail for the m easurem en t are furn ish ed in the data sh eet furn ish ed in P age N o ..............
W hile preparin g e stim ates for turnkey / to tal turnkey p rojects p lease refere to Sl. N o ...........T o gen eral g u id elin es vid e a to page N o........... T o
Sl.
No
Materials
Unit
ABB Make
Siemens Make
MEI
Rate
Qty
Amt
Qty
Amt
Qty
Amt
Qty
Amt
No
739453
739453
739453
739453
739453
Cmt
4425
0.08
354
0.28
1239
0.43
1902.75
0.48
2124
Cmt
4425
0.36
1593
1.08
4779
0.42
1858.5
Kgs
68.3
30
2049
10
683
17
1161.1
Cmt
4425
0.06
265.5
Cmt
3776
0.43
1623.68
Kgs
50
40
2000
40
2000
40
2000
40
2000
No
2000
4000
4000
4000
4000
No
528
528
528
528
528
749977
750903
752682
749994.2
cmt
141
0.72
101.52
2.5
352.5
282
4.35
613.35
No.
2510
7530
7530
7530
7530
Labour Charges
a) Casual
b) Regular
Total cost
7631.5
7882.5
7812
8143.35
7632
7883
7812
8143
1526
1577
1562
1629
759135
762141
760278
759766
The measurements for Earth work and concreting works have been provision as per the dimensions o f the equipments o f makes which
are in use at present in BESCOM. Detail for the measurement are furnished in the data sheet furnished in Page No.............
While preparing estimates for turnkey / total turnkey projects please refere to Sl. No..........To general guidelines vide a to .... page No.
.......T o .........
S c h e n id er M ak e
Sl.
M aterials
No
U n it
(l O D )
A B B M ak e
S ie m e n s M ake
M EI
R ate
Q ty
Am t
Q ty
Am t
Q ty
Am t
Q ty
Am t
No
266070
^66070
^66070
^66070
26 6 0 7 0
Cmt
4 42 5
0.07
309.75
0.09
398.^5
0.1
44^.5
0.16
708
Cmt
4 42 5
0.^9
1^83.3
0.36
1593
0.14
619.5
Kgs
68.3
10
683
3.5
^39.05
409.8
Cmt
4 42 5
0.02
88.5
Cmt
3 77 6
0.14
5128.64
Kgs
50
12
600
12
600
12
600
12
600
No
2000
4000
4000
4000
4000
No
5 28
5^8
5^8
5^8
528
273474
T o t a l c o st o f m a terial.
273428
272670
272523
L ab o u r C h a rg e s
cmt
141
0.57
80.37
0.83
117.03
0.63
88.83
1.37
193.17
No.
2510
^510
^510
2510
2510
L ab o u r C h a rg e s
a) Casual
b) Regular
T o t a l cost
2 5 9 0 .4
2627
2 5 9 8 .8 3
2 7 0 3 .1 7
^590
^6^7
^599
2703
518
5^5
5^0
541
276582
276581
275788
275767
N o ...............
W h ile p re p a rin g e stim a te s for tu r n k e y / to ta l tu rn k e y p ro je cts p lease re fe re to Sl. N o ........... T o g e n e r a l g u id e lin e s v id e a to .... p age No.
....... T o ..........
CO ST D ATA SHEET-35
Providing Com pact RMU 1 lk V Class SF6/VCB Type ( 1VL|
Schenider Make
Sl.
No
Materials
Unit
ABB Make
MEI
Rate
Qty
Amt
Qty
Amt
Qty
Amt
Qty
Amt
No
310917
310917
310917
310917
310917
Cmt
4425
0.07
309.75
0.09
398.25
0.1
442.5
0.16
708
Cmt
4425
0.29
1283.25
0.36
1593
0.14
619.5
Kgs
68.3
10
683
3.5
239.05
409.8
Cmt
4425
0.02
88.5
Cmt
3776
0.14
528.64
Kgs
50
12
600
12
600
12
600
12
600
No
2000
4000
4000
4000
4000
No
528
528
528
528
528
317517
317370
cmt
141
0.57
80.37
0.83
117.03
0.63
88.83
1.37
193.17
No.
2510
2510
2510
2510
2510
2590.37
2627
2598.83
2703.17
a) Casual
2590
2627
2599
2703
b) Regular
518
525
520
541
321429
321428
320635
320614
Total cost
318275
318321
The m easurem ents for Earth work and concreting works have been provision as per the dim ensions of the equipm ents of makes
which are in use at present in BESCOM. Detail for the measurem ent are furnished in the data sheet furnished in Page No.
W hile preparing estim ates for turnkey / total turnkey projects please refere to Sl. N o.......... To general guidelines vide a to ....
page N o......... T o .........
M aterial cost
SL.
No
Unit
Particulars
Labour Cost
Qty
Rate
Am t
Rate
Am t
Nos
10
5941
59410
937
9370
Nos
24
3278
78672
937
22488
Note:
RCC Poles shall be used for dead ends, D P structure and PSC poles for interm ediate supports and hence the
quantity o f RCC and PSC poles m ay be revised as p er field condition.
Kms
1.015
700820
711332
18076
18347
Nos
2963
17778
733
4396
T-Jointing Kits
Nos
3757
22542
916
5494
Nos
1879
11274
620
3718
Sets
30
289
8670
102
3060
Sets
12
145
1740
136
1632
End Caps
Nos
10
19
190
40
10
2283
4566
63
126
11
Sets
855
5130
314
1884
12
Sets
140
840
13
Nos
117
468
23
92
14
Nos
22
88
16
15
Nos
34
238
8092
39
1326
Set (3Nos)
16
17
930792
Labour Charges
a) Casual
71989.1
b) Regular
14397.8
1017179
W hile preparing estim ates for turnkey / total turnkey projects please refere to Sl. No.......... To general
guidelines vide a t o __ page N o...........T o .........
SL.
No
Unit
Particulars
Labour Cost
Qty
Rate
Am t
Rate
Am t
Nos
10
5941
59410
937
9370
Nos
15
3278
49170
937
14055
Note: RCC Poles shall be used for dead ends, DP structure and PSC poles for interm ediate supports and hence the
quantity o f RCC and PSC poles m ay be revised as per field condition.
3
kms
1.015
345902
351091
13441
13643
Nos
20
1987
39740
476
9520
Nos
60
217
13020
68
4080
Nos
25
152
3800
48
1200
Sets
20
289
5780
102
2040
Sets
16
145
2320
136
2176
Nos
16
289
4624
102
1632
10
T-connector KZ3 95
Nos
372
2976
115
920
11
Sets
310
1550
170
850
12
Nos
372
2976
142
1136
13
Nos
50
19
950
200
14
Sets
855
6840
314
2512
15
Sets
140
1120
16
Mtrs
400
31.82
12728
17
Nos
25
238
5950
49
1225
564045
Labour Charges
a) Casual
64559
b) Regular
12912
Total Cost/Km in Rs.
641515
W hile preparing estim ates for turnkey / total turnkey projects please refere to Sl. No.......... T o general
guidelines vide a t o __ page No...........T o ..........
Unit
Particulars
Qty
Rate
Am t
No
10752
10752
No
19339
19339
GSM Modem
No
7642
7642
No
1485
1485
MCB 6 amps
No
210
210
No
2010
4020
No
615
1845
No
3000
3000
Kit
2060
2060
10
Miscellaneous m aterials
LS
LS
147
147
50500
Labour Charges
a) Casual
2466
b) Regular
493
Total Cost
53459
Note:
(1) For 15 /25 kVA Transform er feeding to individual IP sets, use only one contactor & without MCCB .
1)
W hile preparing estim ates for turnkey / total tunkey projects please refer to Sl. N o............o f General
Guidelines vide a t o __ in Page No................
Unit
Particulars
Qty
Rate
Am t
No
10752
10752
No
19339
19339
GSM Modem
No
7642
7642
No
1500
1500
MCB 6 amps
No
210
210
No
3280
6560
No
454
1362
No
3000
3000
Kit
4612
4612
10
Miscellaneous m aterials
LS
LS
23
23
55000
Labour Charges
a) Casual
2466
b) Regular
493
Total Cost
1)
57959
W hile preparing estim ates for turnkey/total tunkey projects please refer to Sl. N o............o f General
Guidelines vide a t o __ in Page No................
Particulars
Unit
Qty
M aterial cost
Rate
Am t
No
10752
10752
No
19339
19339
GSM Modem
No
7642
7642
No
1700
1700
MCB 6 amps
No
210
210
No
5775
11550
No
341
1023
No
3000
3000
Kit
7322
7322
10
Miscellaneous m aterials
LS
LS
62
62
12
1)
62600
Labour Charges
a) Casual
2466
b) Regular
493
Total Cost
65559
W hile preparing estim ates for turnkey / total tunkey projects please refer to Sl. N o............o f General
Guidelines vide a t o __ in Page No................
Particulars
Unit
Total Cost
Set
1132904
Set
1491923
Set
1579163
Set
1824000
Set
2280000
Set
1182768
Set
1611596
Set
1997538
Set
2507446
Set
2908949
Installing & fixing the compact pre-fabricated packaged sub-station 100/250/500/750/ 990
kVA transform er on the existing concrete plinth. (This does not include the cost o f plinth, cable
duct,laying & term ination o f cable etc. provision for the sam e shall be m ade
W hile preparing estim ates for turnkey/total turnkey projects please refere to Sl. No.........
vide a t o __ page N o...........T o .........
8467
To general guidelines
Materials
LT CT's Class - 1 Accuracy Ring Type Ratio 50/5
for 15/25kVA DTC
LT CT's Class - 0.5 Accuracy Ring Type Ratio
100/5 for 50/63kVA DTC
LT CT's Class - 0.5 Accuracy Ring Type Ratio
150/5 for lOOkVA DTC
LT CT's Class - 0.5 Accuracy Ring Type Ratio
400/5 for 250kVA DTC
Unit
Qty
M aterial cost
Labour Cost
Rate
Am t
Rate
Am t
Nos
615
1845
56
168
Nos
454
1362
56
168
Nos
341
1023
56
168
Nos
400
1200
56
168
Nos
450
1350
56
168
No
3000
3000
558
558
No
4545
4545
288
288
W ith Meter
W ithout Meter
a) 15/25kVA DTC
9390
1014
6390
456
b) 63kVA DTC
8907
1014
5907
456
c) lOOkVA DTC
8568
1014
5568
456
d) 250kVA DTC
8745
1014
5745
456
e) 500kVA DTC
8895
1014
5895
456
W hile preparing estim ates for turnkey/total turnkey projects please refere to Sl. No.......... T o general
guidelines vide a t o __ page N o...........T o .........
COST DATA S H E E T - 43
For providing LT Capacitor to the Distribution Transformer
M aterial cost
Sl.
No
Materials
Set
Unit
Labour Cost
Qty
Rate
Am t
Rate
Am t
525
525
338
338
Set
931
931
338
338
Set
1733
1733
398
398
Set
2758
2758
465
465
Set
4883
4883
486
486
Set
200
200
M aterial +
Labour
M aterial
Labour
1063
725
338
1469
1131
338
2331
1933
398
3423
7641
465
5569
5083
486
Total
W hile preparing estim ates for turnkey / total turnkey projects please refere to Sl. No.......... To general guidelines
vid e a t o __ page No...........T o .........
SL.
No
Paritculars
Unit
Qty
Consolidated
Amount in Rs.
Nos
7813
PART-A (Materials)
1
The labour charges includes all works such as digging o f pits, Erection o f
Poles, Fixing o f Cross Arms, insulators, Strining o f wire, providing guy sets.
Estimates coverig more than 2 pole works shall not split to bring them into
this catageory.
SL.
No
Paritculars
Unit
Qty
Consolidated
Amount in Rs.
Nos
12344
PART-A (Materials)
Note:^
The labour charges includes all works such as digging o f pits, Errection o f
Poles, Fixing o f Cross Arms, insulators, Strining o f wire, providing guy sets.
Estimates coverig more than 3 pole works shall not split to bring them into
this catageory.
SL.
No
Paritculars
Unit
Qty
Consolidated
Amount in Rs.
Nos
3750
Nos
5000
Nos
6250
Nos
7500
5 &
Above
as per Com m on
SR 2012-13
PART-A (Materials)
PART-B (Labour)
Note:1
The labour charges includes all works such as digging of pits, Erection of Poles, Fixing of
Cross Arms, Strining of conductor, fixing of Conductore accessories, insulators, Fixing guy
sets, Anti climbing device, spiral earth electrode and danger board etc complete
No other labour charges or any other charges towards special locality allowance LC
Charges, additional labour charges, transportation charges etc., are payable.
Certificate has to be furnished by the section officer who prepares the estimate that the
estimates are not split to claim the above labour charges
Material
Unit
Rate/Unit
(in Rs)
194
Mtrs
2
3
Nos
207
Nos
357
Nos
24
Nos
399
Nos
188
Mtrs
Rate/Unit
(in Rs)
106
Nos
86
Nos
238
Nos
24
Nos
399
Nos
188
Sl No
Material
Unit
Material
Unit
Rate/Unit
(in Rs)
81
Mtrs
Nos
79
Nos
Nos
122
24
Nos
399
Nos
188
Mtrs
Rate/Unit
(in Rs)
44
2
3
Nos
33
Nos
32
Nos
24
Nos
399
Sl No
Material
Unit
Nos
188
The size o f the lead wire provisioned are as per Standard requirement depending on the
Ampere rating of the transformer.
The Size of the cable mabe modified to suite field requirement where ever necessary.
Item
No
1.1
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
Material
Code
UoM
200105
No
5941
5941
1.2
200106
No
7210
7210
1.3
200103
No
4438
4324
1.4
200003
No
2613
2297
1.5
200004
No
3077
2814
1.6
200006
No
3607
3278
1.7
200007
No
New Item
3558
1.8
200120
No
14989
15800
1.9
200107
No
7675
7675
10
1.10
11Mtrs Long PSC pole o f w orkin g Load 365 K g for interm ediate
poles only
200010
No
7924
7924
11
1.11
200514
No
2310
2310
12
1.12
200621
No
17510
18009
13
1.13
200610
No
11980
12321
14
2.1
279020
No
15
2.2
16
2.3
17
2.4
18
2.5
LT 4 Pin X A rm s - MS
19
2.6
LT 4 Pin X A rm s - GI
279013
279014
20
2.7
LT 2 Pin X A rm s - MS
21
2.8
LT 2 Pin X A rm s - GI
22
2.9
2 Pin Cross A rm w ith pole clam p, bolt & nuts & w ashers for
RCC Pole - MS
23
2.10
2 Pin Cross A rm w ith pole clam p, bolt & nuts & w ashers for
RCC Pole - GI
24
2.11
2 Pin Cross A rm w ith pole clam p, bolt & nuts & w ashers for
PSC Pole - MS
25
2.12
2 Pin Cross A rm w ith pole clam p, bolt & nuts & w ashers for
PSC Pole - GI
26
2.13
4 Pin Cross A rm w ith pole clam p, bolt & nuts & w ashers for
RCC Pole - MS
27
2.14
4 Pin Cross A rm w ith pole clam p, bolt & nuts & w ashers for
RCC Pole - GI
28
2.15
4 Pin Cross A rm w ith pole clam p, bolt & nuts & w ashers for
PSC Pole - MS
29
2.16
4 Pin Cross A rm w ith pole clam p, bolt & nuts & w ashers for
PSC Pole - GI
30
2.17
31
2.18
32
2.19
33
2.20
34
2.21
Special 3 Pin Cross A rm , clam p and Bolt & Nuts for RCC Poles MS
35
2.22
Special 3 Pin Cross A rm , clam p and Bolt & Nuts for RCC Poles GI
36
2.23
37
2.24
38
2.25
39
2.26
40
2.27
41
2.28
42
2.29
43
2.30
44
2.31
45
2.32
46
2.33
279130
47
2.34
281683
3
48
3.1
279012
No
No
No
No
No
No
No
No
No
No
279091
No
279092
279082
279083
279017
No
No
No
No
300
281
New Item
359
710
664
New Item
848
233
218
New Item
278
107
100
New Item
127
187
200
New Item
248
180
194
New Item
240
313
318
New Item
399
306
312
New Item
391
475
449
New Item
567
468
443
New Item
559
774
764
New Item
969
53
50
New Item
64
73
68
New Item
87
230
215
New Item
269
320
299
New Item
374
770
720
New Item
901
No
206
212
No
228
238
750
750
279090
1 o f 17______
Sl
No
Item
No
49
4.1
50
4.2
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
278910
No
145
151
278911
Each
70
73
279523
No
Material
Code
51
5.1
52
5.2
53
5.3
54
5.4
55
5.5
56
5.6
57
5.7
58
5.8
59
5.9
PCC Pole clam p type A for X arm upto 1M from pole top - MS
60
5.10
PCC Pole clam p type A for X arm upto 1M from pole top - GI
61
5.11
279550
279650
279503
279510
279502
279522
No
No
No
64
60
New Item
76
53
50
New Item
63
57
54
New Item
68
56
53
New Item
66
56
53
New Item
66
No
65
61
No
63
No
62
5.12
Guy clam p - MS
63
5.13
Guy clam p - GI
64
5.14
Tu rn bu ckle (GI)
279146
No
176
183
65
5.15
279140
No
204
191
66
5.16
67
5.17
279524
No
65
68
5.18
MS Fish Plate
279800
No
57
59
69
5.19
GI Fish Plate
New Item
67
70
5.20
518
546
59
75
244
285076
No
61
Insulators
71
6.1
283005
No
40
49
72
6.2
283055
No
55
54
73
6.3
283003
No
12
15
74
6.4
283053
No
25
26
75
6.5
283007
No
173
169
76
6.6
283158
No
12
14
77
6.7
283166
No
30
34
78
6.8
283040
No
400
300
79
6.9
283017
No
450
506
80
6.10
283018
No
450
506
81
6.11
283021
No
450
506
82
6.12
283315
No
140
157
83
6.13
283101
No
330
371
84
6.14
283320
No
177
170
85
6.15
283045
No
287
287
86
7.1
279030
No
78
80
87
7.2
285058
No
180
190
88
7.3
285066
No
390
411
21900
Conductor
89
8.1
W easel ACSR
284105
Km
23000
90
8.2
R abbit ACSR
284108
Km
38500
36810
91
8.3
C oyote ACSR
284116
Km
96000
93860
92
8.4
Lynx ACSR
284120
Km
147000
139000
93
9.1
7/10 SW G G u y W ire
281110
MT
64000
64630
94
9.2
8 SW G GI W ire
281008
MT
62300
62800
95
9.3
10 SW G GI W ire
281010
MT
65600
66256
96
9.4
GI B arbed W ire 12 SW G
281205
MT
77200
77972
10
PG Clam ps
97
10.1
285518
No
288
304
98
10.2
C oyote to Coyote
285515
No
262
276
99
10.3
R abbit to Rabbit
285508
No
84
89
100
10.4
W easel to Rabbit
285549
No
73
77
101
10.5
W easel to W easel
285509
No
57
60
102
10.6
Squirrel to W easel
285548
No
53
56
11
103
11.1
95 Sqm m
285555
No
116
122
104
11.2
120 Sqm m
285557
No
226
238
105
11.3
150 Sqm m
285559
No
266
280
106
11.4
185 Sqm m
285562
No
292
308
107
11.5
240 Sqm m
285565
No
339
357
108
11.6
285600
Set
262
276
109
11.7
285605
Set
347
366
Sl
No
Item
No
110
11.8
Material
Code
285610
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
363
383
111
11.9
285068
No
538
567
112
11.10
285079
No
758
799
113
11.11
282723
No
416
439
114
11.12
282726
No
575
606
115
11.13
282720
No
516
544
116
11.14
285661
No
391
412
117
11.15
285662
No
1624
1712
118
11.16
285663
No
1865
1966
119
11.17
285654
No
2467
2600
120
11.18
285665
No
2707
2853
12
121
12.1
285670
No
135
142
122
12.2
285671
No
702
740
123
12.3
285673
No
702
740
124
12.4
285676
No
702
740
125
12.5
285694
No
702
740
126
12.6
285695
No
702
740
127
12.7
285678
No
1238
1305
128
12.8
285680
No
1238
1305
129
12.9
285691
No
74
78
130
12.10
285692
No
94
99
13
A
131
13.1
321301
No
50000
53003
132
13.2
321304
No
50330
58794
133
13.3
321433
No
72640
64455
134
13.4
63kVA, A lu m inu m W dg
321306
No
78100
84780
135
13.5
321434
No
114660
109635
136
13.6
100kVA, A lu m inu m W dg
321310
No
97400
105730
137
13.7
321435
No
178480
146408
138
13.8
250kVA, A lu m inu m W dg
321325
No
233000
237696
139
13.9
321436
No
292467
292467
140
13.10
500kVA, A lu m inu m W dg
321350
No
470800
376532
141
13.11
321400
No
157555
171030
142
13.11
New Item
71455
143
13.12
New Item
117635
144
13.13
New Item
156408
145
13.14
250kVA, A lu m inu m W dg
New Item
249696
146
13.15
500kVA, A lu m inu m W dg
New Item
391532
14
A
147
14.1
321376
No
102414
62536
148
14.2
321377
No
157121
105071
149
14.3
321380
No
157121
136410
150
14.4
New Item
251888
151
14.5
New Item
751584
152
14.6
New Item
69536
153
14.7
New Item
113071
154
14.8
New Item
146410
155
14.9
New Item
263888
156
14.10
New Item
766584
15
157
15.1
100 kVA
321365
No
127430
121059
158
15.2
250 kVA
321370
No
253882
241188
159
16.1
321302
No
66200
62890
160
16.2
321303
No
76600
72770
161
16.3
321300
No
46860
44517
162
17.1
25KVA
321483
No
226641
221400
163
17.2
63KVA
321484
No
317917
274420
164
17.3
100KVA
321485
No
417380
360150
16
17
3o
Sl
No
Item
No
165
17.4
166
17.5
18
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
No
742750
614200
No
1110409
891540
77820
Material
Code
UoM
250K VA
321486
500KVA
321487
Transform er Oil
167
18.1
601400
kLtr
74000
168
18.2
Reclaim ed oil
601410
kLtr
40700
42801
169
18.3
601420
kLtr
26640
28015
19
LT Protection
170
19.1
LT Protection kit
301107
No
2360
1679
20
LT Distribution Box
171
20.1
301230
No
15625
16705
172
20.2
301060
No
23742
24715
173
21.1
301151
Set
1478
D eleted
174
21.2
301207
Set
3841
D eleted
175
21.3
301152
Set
7681
D eleted
6041
D eleted
12082
D eleted
21
22
176
22.1
301163
177
22.2
301153
Set
178
22.3
301154
Set
11279
D eleted
179
22.4
3001154
Set
22558
D eleted
180
22.5
301155
Set
2839
D eleted
181
22.6
301156
Set
1139
D eleted
182
23.1
303200
No
653
761
183
23.2
303205
No
1164
1164
302122
Set/3 Nos
832
871
279110
Set
23
24
Lightning Aresters
H G Fuse Unit
184
24.1
185
25.1
186
25.2
187
25.3
188
25.4
189
25.5
190
25.6
25
279111
279120
set
Set
9040
8500
New Item
10780
13035
12250
New Item
15545
15565
14600
New Item
18562
26
191
26.1
New Item
19534
192
26.2
New Item
24799
193
26.3
25050
26496
194
26.4
New Item
33669
195
26.5
New Item
10106
196
26.6
New Item
12809
197
26.7
New Item
16204
198
26.8
New Item
20594
5000
4703
New Item
5967
7505
7050
New Item
8954
27
Set
SPMT M aterials
199
27.1
200
27.2
201
27.3
202
27.4
28
279128
279115
279125
GOS
4 o f 17-------
Set
Set
Sl
No
Item
No
203
28.1
204
28.2
205
28.3
206
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
Material
Code
UoM
304212
Set
7580
7320
304213
Set
10157
10632
304224
Set
15732
16467
28.4
279149
Set
3600
3330
207
28.5
New Item
4220
208
28.6
M ale and Fem ale contacts w ith B&N for 11kV 200A GOS (3
M ale & 3 Fem ale contacts each)
503000
Set
2518
2518
209
28.7
304204
Set
12050
12613
210
28.8
503211
No
342
342
29
DOLO Cutouts
211
29.1
302011
Set/3 Nos
4446
4288
212
29.2
302021
Set/3 Nos
3176
3396
213
30.1
DP Sets - MS
279100
Set
214
30.2
DP Sets - GI
215
31.1
216
31.2
217
32.1
285570
set
371
391
218
32.2
285575
set
919
969
219
32.3
285571
set
926
976
30
31
32
33
4475
New Item
5669
Set
11420
10755
New Item
13617
H - Clam ps
220
33.1
285585
No
76
80
221
33.2
285587
No
378
398
222
33.3
285586
No
357
377
223
33.4
285590
No
295
311
224
33.5
285594
No
96
101
34
225
34.1
300308
No
37880
40000
226
34.2
300312
No
44025
48000
227
34.3
No
New Item
228
34.4
No
New Item
146025
35
LT Spacers
229
35.1
230
35.2
231
35.3
36
284502
No
41
41
New Item
25
24
284503
No
24
232
36.1
6 Sqm m , 2 Core
287054
Km
39094
43057
233
36.2
10 Sqm m , 2 Core
287055
Km
49244
54334
234
36.3
10 Sqm m , 4 Core
287205
Km
64585
71551
235
36.4
16 Sqm m , 2 Core
287056
Km
50994
56956
236
36.5
16 Sqm m , 4 Core
287206
Km
81465
90529
237
36.6
25 Sqm m , 2 Core
287057
Km
74075
81930
238
36.7
25 Sqm m , 4 Core
287207
Km
97300
109778
239
36.8
50 Sqm m , 4 Core
287209
Km
130262
144591
240
36.9
287210
Km
218430
241512
241
36.10
287211
Km
309456
339689
242
36.11
287212
Km
343060
378559
243
36.12
287213
Km
387670
430906
244
36.13
287214
Km
494188
546711
245
36.14
287216
Km
683665
751939
246
36.15
287218
Km
941077
1040069
37
247
37.1
10 Sqm m
288605
No
248
37.2
16 Sqm m
288606
No
249
37.3
25 Sqm m
288607
No
250
37.4
35 Sqm m
288608
No
251
37.5
50 Sqm m
288609
No
252
37.6
70 Sqm m
288610
No
10
10
253
37.7
95 Sqm m
288611
No
11
11
254
37.8
120 Sqm m
288612
No
16
16
255
37.9
150 Sqm m
288613
No
23
24
256
37.10
185 Sqm m
288614
No
28
29
257
37.11
240 Sqm m
288616
No
46
48
258
37.12
400 Sqm m
288617
No
95
100
5 r287170
Set
553
553
38
259
38.1
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
Item
No
260
38.2
10 Sqm m , 4 Core
288174
Set
553
553
261
38.3
16 Sqm m , 2 Core
288171
Set
553
553
Material
Code
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Sl
No
UoM
262
38.4
16 Sqm m , 4 Core
288175
Set
553
553
263
38.5
25 Sqm m , 2 Core
288172
Set
553
553
264
38.6
25 Sqm m , 4 Core
288176
Set
595
595
265
38.7
50 Sqm m , 4 Core
288178
Set
678
678
266
38.8
288179
Set
836
836
267
38.9
288180
Set
836
836
268
38.10
288181
Set
1319
1319
269
38.11
288183
Set
1362
1362
270
38.12
288185
Set
1737
1737
271
38.13
288187
Set
2573
2573
500
HS Type
272
38.14
up to 6 Sqm m
Kit
New Item
273
38.15
10 to 16 Sqm m
Kit
New Item
500
274
38.16
25 to 35 Sqm m
Kit
New Item
650
275
38.17
50 to 95 Sqm m
Kit
New Item
1000
276
38.18
Kit
New Item
1200
277
38.19
Kit
New Item
1400
278
38.20
400 Sqm m
Kit
New Item
2000
39
279
39.1
U p to 4C x 50 Sqm m
288150
Set
307
307
280
39.2
288159
Set
362
362
281
39.3
288163
Set
455
455
282
39.4
288165
Set
557
557
283
39.5
288166
Set
678
678
40
284
40.1
2.5 to 25 Sqm m
288168
Set
186
186
285
40.2
35 to 95 Sqm m
288169
Set
289
289
41
286
41.1
95 Sqm m
287340
Km
494000
548860
287
41.2
120 Sqm m
287342
Km
775500
843170
288
41.3
240 Sqm m
287345
Km
945000
1038890
289
41.4
400 Sqm m
287350
Km
1500000
1632500
42
290
42.1
95 Sqm m
287400
Km
617500
675110
291
42.2
120 Sqm m
287402
Km
969375
1040920
292
42.3
240 Sqm m
287405
Km
1181250
1279950
293
42.4
400 Sqm m
287410
Km
1876250
2015220
294
42.5
No
4222800
4222800
43
295
43.1
3.5C x 25 Sqm m
287257
Km
96140
138000
296
43.2
3.5C x 95 Sqm m
287261
Km
238057
371000
297
43.3
New Item
548000
298
43.4
New Item
680000
299
43.5
New Item
849000
44
300
44.1
302510
Set
918356
918356
301
44.2
312550
Set
677499
677499
302
44.3
312551
Set
12945
12945
303
44.4
312552
Set
35303
35303
304
44.5
312553
Set
14121
14121
305
44.6
312554
Set
7825
7825
306
44.7
312555
Each
1569
1569
302480
Set
1255150
1341910
302481
Set
1642550
1756090
45
307
45.1
308
45.2
4 Way
6 of 17
Sl
No
Item
No
309
45.3
310
45.4
311
45.5
312
45.6
313
45.7
314
45.8
315
45.9
316
46.1
317
46.2
46
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
302482
Set
2029960
2170280
302483
Set
2417360
2584460
302484
Set
340660
364210
302310
Set
1544045
1638232
302311
Set
1482283
1584750
302312
Set
1231830
1316970
302313
Set
580000
620090
Conventional RMUs OD
One B reaker (VL) Panel w ith Cu Busbar
One B reaker (VL) Panel w ith Al Busbar
3 Way RM U, 2OD + 1VL (One Incom er + One B reakers
O utgoing), 350MVA, 800A m ps w ith Cu Busbar
302315
No
312215
333789
302316
No
299727
320445
302320
Set
919615
983160
302321
Set
882830
943860
302325
Set
849761
908480
Material
Code
5 Way
6 Way RM U,
5 Way
5 Way
4 Way
3 Way
+ One
318
46.3
319
46.4
320
46.5
321
46.6
302326
Set
819658
876297
322
46.7
302470
No
160497
171590
47
323
3 Way
3 Way
47.1
506505
No
1095
1095
324
47.2
506520
No
18755
18755
325
47.3
506525
No
18755
18755
326
47.4
506530
No
4247
4247
327
47.5
506535
No
4247
4247
328
47.6
506540
No
448
448
329
47.7
506545
No
757
757
330
47.8
C losing Coil
506550
No
757
757
331
47.9
506555
No
1579
1579
332
47.10
506560
No
750
750
333
47.11
506565
No
2837
2837
334
47.12
Insulated Housing
506510
No
27386
27386
335
47.13
506515
No
5963
5963
336
47.14
506570
No
23958
23958
337
47.15
Flow er C ontact
506580
No
1065
1065
48
338
48.1
T rip p in g Coil
506445
No
9345
9345
339
48.2
V IP Relay
506481
No
51398
51398
340
48.3
440615
No
3894
3894
341
48.4
302580
No
14810
14810
302340
Unit
542587
739453
302345
Unit
918076
1050370
302350
Unit
1269282
1355749
302355
Unit
1559825
1661128
49
342
49.1
343
49.2
344
49.3
345
49.4
346
49.5
1OD for RM U
302335
Unit
152109
266070
347
49.6
302358
Unit
306898
310917
50
4 Way
5 Way
6 Way RM U,
348
50.1
506491
Unit
38549
41210
349
50.2
506492
Unit
84017
89830
350
50.3
506493
Unit
271820
290610
51
351
51.1
284791
Km
639788
700820
352
51.2
284792
Km
756250
811368
284819
Km
292270
345902
52
353
52.1
7 of 17
Sl
No
Item
No
354
52.2
355
52.3
356
53.1
53
54
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
284811
Km
299735
356375
284812
Km
300992
365685
Km
New Item
Material
Code
3x95+1 x70 +1x25 Sqm m Street light (Insu lated m essen ger cum
Neutral)
3x95+1 x70 +1x35 Sqm m Street light (Insu lated m essen ger cum
Neutral)
Covered Conducor
C overed C onductor
357
54.1
284853
No's
2963
2963
358
54.2
284863
No's
3757
3757
359
54.3
284873
No's
1879
1879
360
54.4
Surge A rester
303100
No
692
803
361
54.5
284880
No
117
122
362
54.6
284885
No
22
23
363
54.7
284820
No
1806
1806
364
54.8
284821
No
1987
1987
365
54.9
284818
No
2065
2065
366
54.10
284815
No
2065
2065
367
54.11
284822
No
217
228
368
54.12
Piercing C onnector Suitable for 16 Sqm m - 95 Sqm m A B Cable Street Light Connections
284223
No
152
160
369
54.13
Piercing C onnector Suitable for 25 Sqm m - 95 Sqm m A B Cable M ain to M ain Connections
284855
No
253
267
370
54.14
284865
No
253
267
371
54.15
284284
No
289
305
372
54.16
284825
No
145
152
373
54.17
284826
No
289
305
374
54.18
284836
No
423
446
375
54.19
284837
No
372
392
376
54.20
284827
No
325
343
377
54.21
284828
No
289
305
378
54.22
284834
No
271
286
379
54.23
284835
No
134
141
380
54.24
284829
No
372
392
381
54.25
284832
No
310
310
382
54.26
284830
No
289
289
383
54.27
284831
No
271
271
384
54.28
284840
No
181
181
385
54.29
284833
No
19
19
55
55.1
386
55.1.1
3x95 Sqm m
288312
Set
7666
8815
387
55.1.2
3x240 Sqm m
288314
Set
9473
10894
388
55.1.3
3x400 Sqm m
288315
Set
9648
11095
2753
55.2
389
55.2.1
3x95 Sqm m
288332
Set
2394
390
55.2.2
3x240 Sqm m
288334
Set
3000
3450
391
55.2.3
3x400 Sqm m
288336
Set
3078
3540
2990
55.3
392
55.3.1
3x95 Sqm m
288302
Set
2600
393
55.3.2
3x240 Sqm m
288304
Set
3400
3910
394
55.3.3
3x400 Sqm m
288305
Set
3426
3940
55.4
395
55.4.1
3x95 Sqm m
288462
Set
2006
2307
396
55.4.2
3x240 Sqm m
288464
Set
2155
2478
397
55.4.3
3x400 Sqm m
288465
Set
2200
2530
55.5
398
55.5.1
3x95 Sqm m
288456
Set
2543
2924
399
55.5.2
3x240 Sqm m
288458
Set
3191
3669
400
55.5.3
3x400 Sqm m
288460
Set
3204
3685
8 of 17
Sl
No
Item
No
55.6
Material
Code
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
401
55.6.1
3x95 Sqm m
288322
Set
4674
5375
402
55.6.2
3x240 Sqm m
288324
Set
5700
6555
403
55.6.3
3x400 Sqm m
288329
Set
7000
8050
55.7
404
55.7.1
3x95 Sqm m
288450
Set
4986
5734
405
55.7.2
3x240 Sqm m
288452
Set
5634
6479
406
55.7.3
3x400 Sqm m
288453
Set
6806
7827
No
1022
1022
56
407
56.1
612614
408
56.2
612615
No
730
730
409
56.3
612617
No
952
952
410
56.4
612618
No
1077
1077
411
56.5
612616
No
1180
1180
57
LT Service Connector
412
57.1
For W easel
288502
No
31
33
413
57.2
For Rabbit
288503
No
31
33
58
A
PVC Pipes
Pipes
414
58.1
778020
M tr
15
21
415
58.2
778025
M tr
22
27
416
58.3
778032
M tr
30
45
417
58.4
778040
M tr
36
50
418
58.5
778050
M tr
45
56
419
58.6
778063
M tr
59
74
420
58.7
778075
M tr
70
88
421
58.8
778080
M tr
98
123
422
58.9
778100
M tr
112
140
423
58.10
778105
M tr
233
291
424
58.11
778110
M tr
352
440
Bends
425
58.12
New Item
426
58.13
New Item
10
427
58.14
New Item
22
428
58.15
New Item
35
429
58.16
New Item
54
430
58.17
New Item
65
431
58.18
New Item
71
432
58.19
New Item
100
433
58.20
New Item
151
434
58.21
New Item
200
435
58.22
New Item
254
59
GI Pipes B - Class
436
59.1
GI Pipe - 20 m m Dia
768040
M tr
105
110
437
59.2
GI Pipe - 25 m m Dia
768042
M tr
148
155
438
59.3
GI Pipe - 32 m m Dia
768043
M tr
200
209
439
59.4
GI Pipe - 40 m m Dia
768044
M tr
211
220
440
59.5
GI Pipe - 50 m m Dia
768046
M tr
275
286
441
59.6
GI Pipe - 63 m m Dia
768047
M tr
298
310
442
59.7
GI Pipe - 65 m m Dia
768048
M tr
393
409
443
59.8
768052
M tr
1097
1143
444
59.9
768058
M tr
1098
1144
60
445
60.1
289022
100 M tr
710
863
446
60.2
289023
100 M tr
860
1045
447
60.3
289024
100 M tr
1058
1264
448
60.4
289025
100 M tr
1467
1713
61
449
61.1
289026
100 M tr
1987
2306
450
61.2
289027
100 M tr
2775
3182
451
61.3
289028
100 M tr
3082
3552
452
61.4
289029
100 M tr
3809
4364
453
61.5
289030
100 M tr
5851
6548
454
61.6
289031
100 M tr
7191
8059
455
61.7
289032
100 M tr
9489
10558
456
61.8
289033
457
61.9
o o f1 7 334
100 M tr
11716
12981
100 M tr
13472
14978
Sl
No
Item
No
458
61.10
62
Material
Code
289036
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
Coil
17543
19424
Fuse wires
459
62.1
625020
Kg
773
780
460
62.2
625230
Kg
773
780
461
62.3
625250
Kg
773
780
462
62.4
625075
Kg
773
780
38
63
463
63.1
15A
300003
No
38
464
63.2
30A
300005
No
53
53
465
63.3
60A
300007
No
158
158
466
63.4
100A
300010
No
283
283
467
63.5
200A
300020
No
450
450
468
63.6
300A
300030
No
825
825
64
64.1
469
64.1.1
GI G rou nding pipe, B - Class, 40m m dia, 2.5m trs long, 2.9m m
thick w ith bolts nuts,GI Strips and w ashers com plete
281674
No
599
605
470
64.1.2
600095
No
400
450
471
64.1.3
607054
Bag
300
300
281685
No
2000
2000
607220
50 kg Bag
400
400
821900
Coil
500
500
357001
No
836
D eleted
64.2
Rod Earthing
472
64.2.1
473
64.2.2
474
65.1
65
66
Alkathine tube
T ra n sp aren t Alkathin e tube 19m m dia, 2 m m thick in coils o f
30 m trs
475
66.1
476
66.2
357021
No
3933
D eleted
477
66.3
357511
No
4245
D eleted
478
66.4
New Item
3000
479
66.5
357512
No
6891
3463
480
66.6
357500
No
15750
15750
481
66.7
357003
No
1190
D eleted
482
66.8
483
66.9
357205
No
484
66.10
485
66.11
357201
No
486
66.12
487
66.13
357200
488
66.14
489
66.15
490
New Item
905
3820
D eleted
New Item
2499
4275
D eleted
New Item
3000
No
4075
D eleted
357206
No
4275
D eleted
357122
No
1200
D eleted
66.16
LT, S.Ph, 5-30 A Static E nergy M eter o f A ccu racy Class in retail
out lets o f BESCOM
357015
No
4075
D eleted
491
66.17
357580
No
4100
10733
492
66.18
357585
No
12750
13532
493
66.19
357514
No
14745
14745
494
66.20
New Item
19135
495
66.21
No
New Item
10126
67
67.1
No
6720
6720
496
358040
1U of 17
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
358023
No
6240
6240
358030
No
5952
5952
67.4
LT M etering Box for hou sing the ETV M eters w ithou t CT's
bu sb ar w irin g etc;
358050
No
4000
4000
500
67.5
612655
No
322
322
501
67.6
358005
No
317
480
502
67.7
358076
No
4545
4545
503
67.8
No
New Item
6500
Sl
No
Item
No
Material
Code
497
67.2
498
67.3
499
504
67.9
626234
No
10
505
67.10
626500
Kg
160
167
506
67.11
357590
No
507
67.12
626233
No
68
508
68.1
336005
No
613
619
509
68.2
336006
No
613
619
510
68.3
336010
No
609
615
511
68.4
336015
No
507
512
512
68.5
336020
No
449
454
513
68.6
336025
No
337
341
514
68.7
336030
No
337
400
515
68.8
336035
No
337
400
516
68.9
336040
No
337
400
517
68.10
336046
No
337
450
518
68.11
336050
No
337
450
69
69.1
519
69.1.1
335230
No
7658
8631
520
69.1.2
335220
No
21393
24110
69.2
11KV CTs
521
69.2.1
336292
No
3510
4000
522
69.2.2
336294
No
3510
4000
523
69.2.3
336296
No
3510
4000
524
69.2.4
336302
No
3510
4000
525
69.2.5
336303
No
3510
4000
526
69.2.6
336304
No
3510
4000
527
69.2.7
336306
No
3510
4250
528
69.2.8
336308
No
3510
4250
529
69.2.9
336310
No
3510
4250
530
69.2.10
336341
No
3510
4250
531
69.2.11
336309
No
3510
4250
532
69.2.12
336342
No
3510
4250
533
69.2.13
336315
No
3510
4500
534
69.2.14
336321
No
3510
4500
535
69.2.15
336375
No
3510
4500
536
69.2.16
336325
No
3510
4500
537
69.2.17
336335
No
3510
4750
70
70.1
538
70.1.1
358350
No
63840
63840
539
70.1.2
358320
No
124500
124500
540
70.2
New Item
135585
541
70.3
0.2 S Class ETV M eter w ith A B T Feature & DLM S Protocal w ith
ToD for above
New Item
20000
542
71.1
1KVA
344901
Set
24821
24821
543
71.2
5KVA
344905
Set
91050
91050
288507
No
22
22
71
72
544
72.1
UPS on Line
11 of 17
Sl
No
Item
No
Material
Code
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
545
72.2
288508
No
23
23
546
72.3
288509
No
34
34
547
72.4
288510
No
54
55
548
72.5
288511
No
79
79
549
72.6
288512
No
85
86
550
72.7
288513
No
112
114
551
72.8
288514
No
157
159
552
72.9
288515
No
202
204
553
72.10
288516
No
204
207
554
72.11
288517
No
295
298
555
72.12
288518
No
496
501
73
556
73.1
288527
No
22
22
557
73.2
288528
No
34
30
558
73.3
288529
No
53
45
559
73.4
288530
No
81
70
560
73.5
288531
No
123
100
561
73.6
288532
No
169
110
562
73.7
288533
No
213
145
563
73.8
288534
No
305
215
564
73.9
288535
No
425
275
565
73.10
288536
No
448
280
566
73.11
288537
No
496
405
567
73.12
288538
No
1009
680
568
74.1
10 Sqm m
288630
No
569
74.2
16 Sqm m
288631
No
570
74.3
25 Sqm m
288632
No
571
74.4
32 Sqm m
288633
No
572
74.5
50 Sqm m
288634
No
573
74.6
70 Sqm m
288635
No
12
13
574
74.7
95 Sqm m
288636
No
16
17
575
74.8
120 Sqm m
288637
No
21
22
74
576
74.9
150 Sqm m
288638
No
25
26
577
74.10
185 Sqm m
288639
No
38
40
578
74.11
225 Sqm m
288640
No
42
44
579
74.12
240 Sqm m
288641
No
62
65
580
74.13
300 Sqm m
288642
No
73
77
581
74.14
400 Sqm m
288643
No
95
100
582
75.1
429810
No
100
100
583
75.2
359215
No
900
900
584
75.3
359210
No
1619
1619
585
75.4
427252
Pair
985
985
586
75.5
430395
No
231
231
587
75.6
410020
No
2150
2150
588
75.7
M egger 500 V
359400
No
2250
2250
589
75.8
359450
No
4500
4500
590
75.9
Silica Gel
607056
Kg
170
170
591
75.10
427210
Set
1710
1710
592
75.11
427215
Nos
1254
1254
593
75.12
611972
No
12
12
594
75.13
Ring Spanners
424000
Set
1577
1577
595
75.14
Tu be Spanners
424150
Set
600
600
596
75.15
424410
No
788
788
597
75.16
424408
No
300
300
598
75.17
424300
Set
283
283
75
599
75.18
418170
No
100
100
600
75.19
427405
No
120
120
601
75.20
427403
No
60
60
602
75.21
427408
No
681
681
603
75.22
427435
No
1898135
1898135
604
75.23
425040
No
200
200
605
75.24
425041
No
152
152
606
75.25
440000
No
70
70
607
75.26
LT Line Tester
440005
No
38
38
608
75.27
440008
No
15863
15863
609
75.28
425522
No
80
80
610
75.29
425521
No
69
69
611
75.30
425518
No
72
72
612
75.31
H am m er 8 Lbs
418141
No
200
200
613
75.32
H am m er 2 Lbs
418100
No
150
150
614
75.33
A llen Keys
424260
No
192
192
615
75.34
424264
No
142
142
12 of 17
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
Item
No
616
75.35
424365
No
227
227
617
75.36
Box Spanners
424120
Set
2000
2000
618
75.37
440060
No
63000
63000
619
75.38
440830
No
31539
31539
620
75.39
359180
No
450
450
621
75.40
422811
No
150
150
622
75.41
620172
No
150
150
623
75.42
430311
No
100
100
624
75.43
359481
No
5400
5400
625
75.44
Ru bber Appron
427341
No
185
185
626
75.45
Pippette
430140
No
350
350
627
75.46
Protective Goggle
427330
No
350
350
628
75.47
429814
No
375
375
629
75.48
427300
No
439
439
630
75.49
427360
No
504
504
Material
Code
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Sl
No
UoM
631
75.50
Glass Funnel
430200
No
105
105
632
75.51
H ickery Rods
427120
No
957
957
633
75.52
M anilla Rope 1
406226
M tr (100)
2200
2200
634
75.53
M anilla Rope 3 / 4
406220
M tr (100)
1800
1800
635
75.54
406351
Kg
211
211
636
75.55
Files o f sizes
426000
Set
250
250
637
75.56
Safety Belts
427320
No
610
610
638
75.57
427310
No
112
112
639
75.58
427311
811
811
640
75.59
425320
No
7870
7870
641
75.60
358361
No
25925
25925
642
75.61
No
357000
357000
643
75.62
H ydraulic C rim p ing Tool w ith suitable Dies for crim pin g lugs o f
size upto 400Sqm m
Set
9500
9500
644
75.63
No
New Item
672
645
75.64
No
New Item
2939
646
75.65
Protective Eye W ear for S afety w ith integral hands free LED
Lighting
No
New Item
847
647
75.66
Leather Shoes
Pair
New Item
933
648
75.67
Socks
Pair
New Item
90
649
75.68
No
New Item
469
650
75.69
C hain saw, extrem ely robust and long lasting chain saw. H ighly
suitably for cu tting firewood, thinning shrubs and bushes and
sh aping trees.
Set
New Item
24793
425360
651
75.70
Set
New Item
652
75.71
No
New Item
653
75.72
No
New Item
654
75.73
M tr
New Item
655
75.75
No
New Item
656
75.75
Insulated Crowbars
No
New Item
657
75.76
No
New Item
658
75.77
No
New Item
659
75.78
Head Torch
No
New Item
660
75.78
No
New Item
1900
661
76.1
801035
Per 1000
10000
10000
662
76.2
801034
Per 1000
5000
5000
663
76.3
820672
No
300
300
664
76.4
820673
No
380
380
665
76.5
820703
No
80
80
666
76.6
820704
No
100
100
667
76.7
765050
M tr
937
937
668
76.8
802005
No
669
76.9
802006
No
10
10
76
M iscellaneous Materials
670
76.10
No
26
26
671
76.11
R iver Sand
800650
Cm t
1640
2000
672
76.12
800651
Cm t
950
950
673
76.13
C em en t in 50kg bags
800030
Bag
330
330
674
76.14
Cm t
3450
3450
675
76.15
Cm t
3850
3850
676
76.16
Cm t
50
50
677
76.17
Stone Spalls
Cm t
130
130
678
76.18
Stone Boulders
679
76.19
76.20
680
Cm t
200
200
802460
No
115
120
622675
Roll
120
120
13 of 17
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
622620
Roll
110
110
622720
Roll
10
10
A C B Paint
632030
Ltr
120
120
632013
Ltr
180
180
632050
Ltr
250
250
76.26
632020
Ltr
90
90
76.27
622124
Roll
35
35
688
76.28
Cotton W aste
627520
Kg
50
50
689
76.29
418185
No
690
76.30
612621
No
230
230
691
76.31
612623
No
110
110
692
76.32
M onoplast
506559
100 Gms
55
55
693
76.33
B itum en C om pound
604060
Kg
65
65
694
77.1
289352
Km
41180
42486
695
77.2
289354
Km
73260
74211
696
77.3
289360
Km
161220
161561
697
77.4
289364
Km
234490
234500
698
77.5
289369
Km
314530
313615
699
77.6
2 Core, 6 Sqm m
289452
Km
91950
92508
700
77.7
2 Core, 10 Sqm m
289472
Km
117730
117438
701
77.8
4 Core, 4 Sqm m
289404
Km
151830
152675
702
77.9
4 Core, 6 Sqm m
289454
Km
154910
153608
703
77.10
4 Core, 10 Sqm m
289474
Km
252240
248481
704
77.11
4 Core, 16 Sqm m
289484
Km
375150
367781
705
77.12
446024
No
255
255
706
77.13
F lurocent tube
611530
No
40
40
707
77.14
446039
No
440
440
708
77.15
446040
No
102
102
709
77.16
446037
No
425
425
710
77.17
446038
No
90
90
711
77.18
611730
No
650
650
712
77.19
612645
No
1850
1850
713
77.20
446044
No
300
300
714
77.21
612240
No
225
225
278832/27
8811
No
108
120
Sl
No
Item
No
Material
Code
681
76.21
682
683
76.22
76.23
684
76.24
685
76.25
686
687
77
715
77.22
716
77.23
613050
No
11
11
717
77.24
612660
No
1913
1913
718
77.25
358012
No
1400
1400
78
719
78.1
5 W atts
611545
No
100
100
720
78.2
8 W atts
611548
No
104
104
721
78.3
11 W atts
611551
No
120
120
722
78.4
14 W atts
611554
No
116
116
723
78.5
18 W atts
611558
No
148
148
724
78.6
23 W atts
611563
No
168
168
79
79.1
725
79.1.1
733612
MT
75500
74102
726
79.1.2
733613
MT
75500
74102
727
79.1.3
733616
MT
75500
74102
728
79.1.4
733618
MT
75500
74102
729
79.1.5
733620
MT
75500
74102
730
79.1.6
733623
MT
75500
74102
731
79.1.7
733625
MT
75500
74102
732
79.1.8
733628
MT
75500
74102
733
79.1.9
733630
MT
75500
74102
734
79.1.10
733633
MT
75500
74102
735
79.1.11
733634
MT
75500
74102
79.2
GI
736
79.2.1
MT
New Item
90102
737
79.2.2
MT
New Item
90102
738
79.2.3
MT
New Item
90102
739
79.2.4
MT
New Item
90102
740
79.2.5
MT
New Item
90102
741
79.2.6
MT
New Item
90102
742
79.2.7
MT
New Item
90102
743
79.2.8
MT
New Item
90102
14 of 17
Sl
No
Item
No
Material
Code
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
744
79.2.9
MT
New Item
90102
745
79.2.10
MT
New Item
90102
746
79.2.11
MT
New Item
90102
80
747
80.1
250 kVA
542180
No
748
822
748
80.2
500 kVA
542185
No
748
822
81
749
81.1
25 m m
542190
No
62
62
750
81.2
3 2m m
542192
No
75
75
751
81.3
40m m
542194
No
117
117
752
81.4
45m m
542196
No
156
156
525
82
753
82.1
3 kVAr
333103
Set
525
754
82.2
9 kVAr
333109
Set
931
931
755
82.3
18 kVAr
333118
Set
1733
1733
756
82.4
27 kVAr
333127
Set
2758
2758
757
82.5
54 kVAr
333154
Set
4883
4883
83
758
83.1
358055
Set
5827
5845
759
83.2
358060
Set
5347
5362
760
83.3
358065
Set
5011
5023
761
83.4
358070
Set
5011
5200
762
83.5
358075
Set
5011
5350
763
83.6
Set
New Item
6390
764
83.7
Set
New Item
5907
765
83.8
Set
New Item
5568
766
83.9
Set
New Item
5745
767
83.10
Set
New Item
5895
84
768
84.1
358086
No
10752
10752
769
84.2
358098
Set
19339
19339
770
84.3
GSM M odem
447662
No
7642
7642
1485
85
MCCB
771
85.1
358088
No
1485
772
85.2
358090
No
1500
1500
773
85.3
358092
No
1700
1700
774
85.4
358093
No
5486
5486
775
85.5
358095
No
9752
9752
776
85.6
358096
No
16450
16450
777
85.7
M CB 6 Am ps
358094
No
210
210
86
Contactors
778
86.1
For 25 kVA, 40 Am ps
352440
No
2010
2010
779
86.2
352460
No
3280
3280
780
86.3
352480
No
5775
5775
781
86.4
352485
No
11390
11390
87
15 of 17
Sl
No
Item
No
Material
Code
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
1132904
87.1
276530
No
1500000
783
87.2
276540
No
1650000
1491923
784
87.3
276550
No
1579163
2009325
785
87.4
276575
No
1824000
2415622
786
87.5
276590
No
2280000
2821919
787
87.6
276531
No
1650000
1182768
788
87.7
276541
No
1800000
1611596
789
87.8
276560
No
1997538
2212473
790
87.9
276585
No
2507446
2711112
791
87.10
276599
No
2908949
3191280
805743
88
88.1
Breakup prices
Copper wound Oil Cooled Distribution Transformer
792
88.1.1
500 kVA
321450
No
760099
793
88.1.2
750 kVA
321475
No
941028
997537
794
88.1.3
990 kVA
321490
No
1255765
1331175
795
88.1.4
LT A C B 2000A
310520
No
115716
115716
796
88.1.5
MCCB 400A
358097
No
14100
14100
89
797
SCRAP MATERIALS
Note: The rates are indicative and the respective zones are
authorized to fix the floor price suitabaly as approved in
the Common SR 2012-13 meeting held on 09.11.2012 and
confirmed vide proceedings CEE/T&P/KPTCL - 6998 7013 Dt: 15.11.2012
89.1
C opp er W ire
791210
Kg
421
512
798
89.2
731211
Kg
158
192
799
89.3
C opp er C onductor
791200
Kg
421
512
800
89.4
C opp er Ingots
791205
Kg
294
358
801
89.5
Kg
216
248
802
89.6
A lum iniu m
791010
Kg
120
124
803
89.7
791100
Kg
83
85
89.8
791175
Kg
81
100
804
805
89.9
806
89.10
807
89.11
90
A C SR C onductor
791101
Kg
87
89
791531
Kg
105
103
791530
Kg
86
88
Iron Item s
808
90.1
790100
Kg
28
20
809
90.2
790101
Kg
26
20
810
90.3
790104
Kg
26
20
811
90.4
790104
Kg
26
20
812
90.5
790102
Kg
20
20
813
90.6
790300
No
1704
D eleted
814
90.7
790300
Kg
18
18
815
90.8
790401
Kg
25
25
816
90.9
Kg
26
26
817
90.10
Brass
791300
Kg
176
176
818
90.11
Baliga Poles
793510
Rm tr
72
72
819
90.12
Kg
16
16
820
90.13
442120
No
452
440
821
90.14
795030
No
300
292
822
90.15
Lead
791400
Kg
85
80
823
90.16
795240
Kg
22
20
824
90.17
825
90.18
Kg
826
90.19
Kg
827
90.20
91
795910/20
795500
Kg
Kg
46
77
46
51
478
67
4754
828
91.1
15 kVA
Each
9000
829
91.2
25 kVA
795104
Each
10503
5857
830
91.3
63 kVA
795106
Each
16600
8570
831
91.4
100 kVA
795110
Each
22880
12052
832
91.5
200 kVA
795120
Each
50000
27500
833
91.6
250 kVA
795125
Each
52000
28600
834
91.7
300 kVA
795130
Each
55000
30250
835
91.8
500 kVA
795150
Each
66500
36575
16 of 17
Sl
No
Item
No
92
Material
Code
UoM
Common SR 2012-13 in
' FORD Rates inclusive
of duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive of duties
taxes & F&I
836
92.1
15 kVA
837
92.2
25 kVA
795160
838
92.3
50 kVA
795165
839
92.4
63 kVA
795166
840
92.5
100 kVA
795170
Each
45402
45402
841
92.6
200 kVA
795180
Each
76004
76004
842
92.7
250 kVA
Each
85000
85000
843
92.8
300 kVA
795190
Each
91767
91767
844
92.9
500 kVA
795195
Each
152393
152393
845
92.10
915000
915000
9736
93
Each
9740
9740
Each
26066
26066
Each
25126
25126
Each
35000
35000
5 MVA
846
93.1
15 kVA
Each
9736
847
93.2
25 kVA
795158
Each
6000
6000
848
93.3
63 kVA
795160
Each
10000
10000
849
94.1
In good condition
850
94.2
94
17 of 17
Kg
14
14
No
77
77
BILL OF MATERIALS-1
For 11 kV DP structure Kit as per Drg No. SIC/DL/WSO 18/29-7-85
Sl
No
Particulars MS Angle/Flat in mm
Clamps made
20 mm
out of
Class 'A'
MS
GI Pipe in 50x6 mm
Flat
Length
Qty
Wt/Mtr in
Kgs
Total
Wt/Set
in kgs
16 mm
Hexogon
al Bolt &
Nut
Qty
5.8
27.14
175 mm
Long
120 mm
2 Nos
50 mm
Long
60 mm
3 Nos
4.5
14.4
65 mm
Long
4.5
25.2
50 mm
long
3.2
3.49
Note :
1. All holes are o f 18 mm for 16 mm bolts
2. All Sllotted holes are of 18x35 mm long
3. The weights given are for raw materials as per ISI structural steel hand book
type-CDP-1
2 Nos.
2.16 kg/set
type-CDP-2
2 Nos.
2.56 kg/set
6 mm thick
washer 1No.
BILL OF MATERIALS -2
FOR 100 TO 300 kVA TRANSFORM ER CENTER KIT
SL.
No
Particulars
a) GOS Fram e
b) P in insulator support
c) LA F ixin g X -arm
Qty
MS Angle Wt/Mtr in
Flat in mm
Kgs
1 Set
1 No.
65x65x6
5.8
31.2
20 mm
dia. Class
Qty in
'A' GI Pipe
No
Length in
mm/Qty
175
50x6
2.4
375x3
2.7
50
2,350x2
18.8
75
40x40x5
340x2
2.04
40x40x5
70x4
0.84
40x40x5
60x6
1.08
0
0
50x6
2.4
400x3
2.88
50x50x6
4.5
2,350x1
10.58
45x45x6
70x2
0.56
65x65x6
5.8
1,025x2
11.86
50x6
2.4
436x2
2.15
65
0
0
1 Set
1Set
45x45x6
1,260x2
10.08
50
65x65x6
5.8
2,350x1
13.63
65x65x6
5.8
70x2
0.812
85
65x65x6
5.8
925x2
10.73
0
4
1 Set
1 Set
50x6
2.4
496x2
2.27
65
45x45x6
1,360x2
10.88
50x6
2.4
1 Set
2,700x2
16 mm dia
Hexaganal
Bolt & Nut
Length in
mm
45x45x6
1 Set
1 Set
Length/
total wt/set
piece in
in kgs
mm x Nos
1 Set
1.37
65
2,700x2
21.6
500x2
40
50x6
2.4
493x2
2.44
65
100x50x4.7
9.2
2,700x2
49.69
225
185 m m
65x65x6
5.8
310x2
3.6
3 No
50x6
2.4
523x2
2.44
65
65x65x6
5.8
1,150x1
5.89
50x6
2.47
548x1
1.32
65
45x45x6
50x6
50x6
4
2.4
2.4
1800x1
560x1
320x1
6.11
0
0
65
0
0
0
0
0
Note :
233.962
45x45x6
1 Set
1 Set
2.41
45x45x6
1 Set
463x1
285x2
BILL OF MATERIALS-3
3 Pole Structure for Transformer
Sl
No
Particulars
1
2
G O S F ra m e
Unit
MS Angle
Flat in mm
Wt/Mtr in
Kgs
Length
/Nos in
mm
6
5 0x5 0 x6
4.5
1280x3
17.28
50x6
6 5 x6 5 x6
2.4
5.8
463x2
2000x 2
2.22
23.2
50x6
4 5 x4 5 x6
2.4
4
463x2
23 5 0 x4
2 .0 9
37.6
4 5 x4 5 x6
310x4
4.96
4 5 x4 5 x6
70x8
2 .24
4 5 x4 5 x6
4 5 x4 5 x6
4
4
60x12
1360x4
2.28
21.76
50x6
2 .4
498x2
2.39
50x6
6 5 x6 5 x6
2.4
5.8
285x2
2000x 1
1.37
11.6
50x6
4 5 x4 5 x6
2.4
4
423x2
1000x 2
1.26
8.00
50x6
2 .4
50x1
1.34
50x6
5 0x5 0 x6
2.4
4.5
320x1
2700x2
0.77
24.3
50x6
2.4
493x2
2.31
1 Set
1 Set
2 N os
1 Set
1 No
B ra ce C ross M e m b e r an d C lam p s
1 Set
Wt/Set in
Kgs
7
BILL OF MATERIALS-4
FOR 25 TO 63 kVA TRANSFORMER CENTRE KIT (This BoM is suitable for Conventional Transformer Only, Separate BoM- 6 is furnished for Star Rated
Tranaformer)
Sl.
No
Particulars
Qty
MS Angle/
Flat
Wt/Mtr
in Kgs
Length/
Piece in
m tr x No
Total
W t/Set in
kgs
16 mm dia
Hexgonal
No.Bolt & Nut
Qty
2 0 mm
class 'A' GI
pipe
Qty
Clam p
made
out o f
50x6
m m MS
flat No
Qty
W t/Set
in K gs
1 Set
2 No
65x65x6
5.8
2.7x2
31.32
175
120
1 No
50x50x6
4.5
2.7x2
(0.06x3)
12.96
65
460
2.16
1 Set
4 No
45x45x6
50x50x6
4
4.5
2.7x2
0.5x2
50
65
4
4
0
0
0
0
0
465
2.23
1 Set
4 No
5.8
2.7x2
0.285x2
31.32
3.19
12
50
7
4
0
160
0
3
0
465
0
2
0
2.23
21.6
4.5
120
536
2.6
GI Pipe
20x5
160
H Frame
Set
1 No
62.69
Note :
1. The bill of materials are prepared as per DRG No.SIC/WS/017/date 28.6.85.
2.The weights given are for raw materials as per ISI structural steel Hand book.
3.
BILL OF MATERIALS-5
H.FRAME
Sl.
No
Particulars
Unit
MS Angle
Flat in mm
Wt/Mtr
in Kgs
G O S - H F ram e F ix in g C ross-A rm
No
6 5 x6 5 x6
5.8
1200x 2
13.92
No
50x6
2.4
473x2
2.27
No
4 5 x4 5 x5
3.4
1360x2
9.25
No
50x6
2.4
503x2
2.41
No
50x6
2.4
285x2
1.37
No
4 5 x4 5 x5
3.4
2350x2
15.98
No
4 5 x4 5 x5
3.4
310x2
2.11
No
4 5 x4 5 x5
3.4
70x4
0.95
No
4 5 x4 5 x5
3.4
60x6
1.22
G O S H an d le F ram e F ix in g C ross-a rm
No
6 5 x6 5 x6
5.8
1100x 1
6.38
No
No
50x6
2.4
548x1
1.32
4 5 x4 5 x5
3.4
1000x 1
3.40
No
50x6
2.4
558x1
1.34
No
50x6
16*50
2.4
320x1
0.77
3 N os
16*65
12 N os
16*150
6 N os
Length in Wt/Set in
mm
Kgs
G O S F ram e
K gs
62.69
Note
1 The hole have to be provided at locations as mentioned in the drawings
2 All holes are in mm and slot holes 18*35 ,, to suit 16mm unless otherwise stated.
3 the weight mentioned in the BoM is as per Steel Table
4 The Bolts & Nuts shall confirm ISS
BILL OF MATERIALS - 6
25/63 kVA TC Structure suitable for mounting Star Ratec 25 & 63kVA Transformers
Part No.
No.
1
2
Part No.
T1
T2
M S C leat 50x50x6m m x 70 m m
3
3 Star Rated
W t/ M tr in
r
2 a
H
M
O
C
S
E
B
Sl.
K gs
Q ty/set
5.8
1 No
5.8
1 No
4.5
1 No
12.15
Approx wt in
Kg
31.32
4.5
3 Nos
0.945
D T C -10
2 No
21.6
DTC-9
2 No
4.5
T4
9.2
2 No
49.68
D T C -11
5.8
2 No
3.6
K IT D E T A ILS
7
2.4
2 No
2.16
2.4
4 No
4.46
2.4
2 No
2.6
10
DTC-4
5.8
2 No
11.89
11
DTC-8
3.4
1+1 No
9.248
12
D T C -13
5.8
1 No
6.38
13
D T C -14
3.4
1 No
3.400
2 No Each
18.8
2 No Each
2.04
4 No Each
0.84
6 No Each
1.08
D TC-3
4 0 x40x5m m 340m m
4 0 x40x5m m 70m m
4 0 x40x5m m 60m m
C lam ps
15
2.4
2 No
2.7
16
2.4
2 No
2.39
17
2.4
2 No
2.22
2 No
1.368
b) 320 m m
1 No
0.768
196.139
18
a)
16mm x 175m m
7 No
b)
16mm x 65m m
12 No
c)
16m m x 200m m
7 No
d)
16mm x 50m m
4 No
e)
12m m x 50m m
10 Kgs
4 No
T O T A L b ) B olt and nut
10 Kgs
BILL OF MATERIALS-7
SINGLE POLE MOUNTED TRANSFORMER STRUCTURAL MATERIALS ON 9 MTRS. LONG RCC POLE ( SQ.
SECTION) FOR 25/63 kVA TC SET
Part
No.
MS Angle size in mm
Length in
Quantity Wt / Mtr.
mm
50x50x6
850
4.5
3.825
50x50x6
1150
4.5
10.35
50x50x6
850
7.65
45x45x5
4.5
2
Not Applicable
45x45x5
700
3.4
4.76
45x45x5
1321
8th Plate
3.4
2
Not Applicable
8.98
7
8
65x65x6
485
5.8
Weight in
kg.
2.784
65x65x6
850
5.8
9.86
10
65x65x6
485
5.8
2.784
11
45x45x5
1230
3.4
8.16
12
13
45x45x5
1000
6.8
485
2
1
3.4
5.8
2.9
50x8
550
3.1
3.41
480
3.1
2.976
50x8
Bolts & Nuts
(various sizes)
16x125mm
16x50 mm
16x50 mm
B ILL O F M A T E R IA LS -8
SINGLE POLE MOUNTED TRANSFORMER STRUCTURAL MATERIALS ON 9 MTRS. LONG RCC POLE ( SQ.
SECTION) FOR 100 kVA TC SET.
Part
No.
MS Angle size in mm
Length in
mm
Quantity
Wt/Mtr
50x50x6
850
4.5
11.475
50x50x6
1150
4.5
20.7
50x50x6
850
4.5
7.65
45x45x5
900
3.4
6.12
45x45x5
1500
3.4
10.20
45x45x5
1321
3.4
8.98
8th Plate
65x65x6
485
5.8
5.568
65x65x6
850
5.8
9.86
10
65x65x6
485
5.8
5.568
11
45x45x5
1350
3.4
9.18
12
45x45x5
1000
3.4
6.8
485
5.8
2.9
50x8
550
3.1
3.41
50x8
480
3.1
2.976
13
Weight in
kg-
Not
Applicable
Clam ps
16x125m m
16x50 m m
16x50 m m
BILL OF MATERIALS - 9
For OH line (Having Single H Frame with Transformer seating and seating angle support x-arm) for
11mtr Spun Pole for 25KVA Transformer.
Sl No
TOP Bracket
100x100x8mm MS Angle
Length
(in mm)
Qty
(in Nos)
Kgs/Mtr
Total Wt
850
12.1
30.86
2400
7.14
34.27
45x45x5mm MS Angle
850
3.4
8.67
1040
7.14
14.85
50x50x6mm MS Angle
1000
4.5
50x50x6mm MS Angle
1000
4.5
65x65x6mm MS Angle
1440
5.8
16.7
Transformer Center
8
130x130x12mm Angle
1110
23.4
25.97
1200
9.56
22.94
10
1110
23.4
51.95
11
75x75x6mm MS Angle
1750
6.8
23.8
12
65x65x6mm MS Angle
1260
5.8
14.62
13
1110
7.14
15.85
45x45x5mm MS Angle
15
16
40x40x5mm MS Angle
17
18
1640
3.4
11.15
60
3.4
1.22
335
2.01
1000
3.532
21.19
15kgs
Approx.
15
Total in Kgs
Note
1. The weights mentioned are subject to tolerance as per IS
2. The weights mentioned are before drilling of holes
329.06
BILL OF MATERIALS - 10
For UG Cable network (Having 3 Nos H Frame with Transformer seating and seating angle support xarm) for 11mtr Spun Pole for 25KVA Transformer.
Sl No
Length
(in mm)
Qty (in
Nos)
Kgs/Mtr
Total Wt
850
2400
850
1040
2000
1000
1440
5
4
5
2
2
2
2
12.1
7.14
3.4
7.14
4.5
4.5
5.8
51.43
68.54
14.45
14.85
18
9
16.7
1110
1200
1110
1750
1260
1110
1
2
2
2
2
2
23.4
9.56
23.4
6.8
5.8
7.14
25.97
22.94
51.95
23.8
1640
60
335
6
18
6
3.4
3.4
3
33.46
3.67
6.03
1000
1000
2
8
17kgs
Approx.
5.89
3.53
11.77
28.26
TOP Bracket
1
2
3
4
5
6
7
100x100x8mm MS Angle
75x40x4.8mm MS Channel (MC75/MCP75)
45x45x5mm MS Angle
75x40x4.8mm MS Channel (MC75/MCP75)
50x50x6mm MS Angle
50x50x6mm MS Angle
65x65x6mm MS Angle
Transformer Center
8
9
10
11
14
15
16
130x130x12mm Angle
100x50x5mm MS Channel (MC100/MCP100)
130x130x12mm MS Angle (with side plate)
75x75x6mm MS Angle
65x65x6mm MS Angle
75x40x4.8mm MS Channel (MC75/MCP75)
GOS Mountina Structure (Ladder)
45x45x5mm MS Angle
45x45x5mm MS Angle (Cleat)
40x40x5mm MS Angle
17
18
12
13
17
Total in Kgs
Note
14.62
15.85
448.3
BILL OF MATERIALS - 11
For OH line (Having Single H Frame without Transformer seating and seating angle support x-arm) for
11 mtr Spun Pole for 63/100/250/500 KVA Transformer.
Sl No
8
9
10
TOP Bracket
100x100x8mm MS Angle
75x40x4.8mm MS Channel (MC75/MCP75)
45x45x5mm MS Angle
75x40x4.8mm MS Channel (MC75/MCP75)
50x50x6mm MS Angle
50x50x6mm MS Angle
65x65x6mm MS Angle
GOS Mountina Structure (Ladder)
45x45x5mm MS Angle
45x45x5mm MS Angle (Cleat)
40x40x5mm MS Angle
11
12
1
2
3
4
5
6
7
Length
(in mm)
Qty
(in Nos)
Kgs/Mtr
Total Wt
850
2400
850
1040
1000
1000
1440
3
2
3
2
2
2
2
12.1
7.14
3.4
7.14
4.5
4.5
5.8
30.86
34.27
8.67
14.85
9
9
16.7
1640
60
335
2
6
2
3.4
3.4
3.002
11.15
1.22
2.01
1000
3.532
21.19
10kgs
Approx.
10
Total in Kgs
Note
168.93
BILL OF MATERIALS - 12
For UG Cable network (Having 3 Nos H Frame without Transformer seating and seating angle support xarm) for 11 mtr Spun Pole for 63/100/250/500 KVA Transformer.
Sl No
TOP Bracket
100x100x8mm MS Angle
2
3
Length
Qty
(in mm) (in Nos)
Kgs/Mtr
Total Wt
51.43
68.54
14.45
850
2400
850
4
5
12.1
7.14
3.4
4
5
1040
2000
2
2
7.14
4.5
14.85
18
6
7
50x50x6mm MS Angle
65x65x6mm MS Angle
1000
1440
2
2
4.5
5.8
9
16.7
1640
3.4
33.46
9
10
60
335
18
6
3.4
3
3.67
6.03
1000
3.53
28.26
Total in Kgs
10
274.39
11
10kgs
12
Note
1. The weights mentioned are subject to tolerance as per IS
2. The weights mentioned are before drilling of holes
Approx
Item No
1
1.1
1.1.1
2
3
4
1.1.2
1.1.3
1.1.4
1.2
5
6
7
8
1.2.1
1.2.2
1.2.3
1.2.4
1.3
9
10
11
12
1.3.1
1.3.2
1.3.3
1.3.4
1.4
13
14
15
16
1.4.1
1.4.2
1.4.3
1.4.4
17
18
19
20
1.5.1
1.5.2
1.5.3
1.5.4
21
22
23
24
1.6.1
1.6.2
1.6.3
1.6.4
25
26
27
28
1.7.1
1.5
1.6
1.7
1.7.2
1.7.3
1.7.4
Particulars
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
Digging o f Pits
Digging o f Pits 1.8 mtr depth for errection o f 9 to 10 m tr Long Steel/RCC/PSC
supports as per approved Drawing.
Ordinary Soil
Hard Soil
Hard latterite Soil
Hard Rock (By Chizling and/Or Wedging)
Digging o f Pits 1.5 mtr depth for erection o f 7.5/8 mtr Long Steel/RCC/PSC/PCC
supports as per approved Drawing.
Per
Per
Per
Per
pit
pit
pit
pit
267
916
1016
New item
334
1145
1270
2172
Ordinary Soil
Hard Soil
Hard latterite Soil
Hard Rock
Digging o f Pits 2.0mtr depth for errection o f 9.5mtr Long RCC supports (350Kg
Working load for 33KV) as per approved Drawing.
Ordinary Soil
Hard Soil
Hard latterite Soil
Hard Rock
Digging o f Pits 2.2mtr depth for errection o f 11mtr Long RCC/PSC supports as
per approved Drawing.
Per
Per
Per
Per
pit
pit
pit
pit
216
741
820
New item
269
926
1025
1751
Per
Per
Per
Per
pit
pit
pit
pit
293
927
1103
New item
366
1159
1379
2378
Ordinary Soil
Hard Soil
Hard latterite Soil
Hard Rock
Digging o f Pit 2.5 mtr depth for errection o f 11mtr long tubular spun pole as per
approved Drawing.
Ordinary Soil
Hard Soil
Hard latterite Soil
Hard Rock
Per
Per
Per
Per
pit
pit
pit
pit
328
1243
1243
New item
410
1554
1554
2668
Per
Per
Per
Per
pit
pit
pit
pit
805
1610
1610
New item
1007
2013
2013
6542
Per
Per
Per
Per
pit
pit
pit
pit
323
1268
1406
New item
404
1586
1757
2627
173
441
487
1124
Concrete works
1.8
Providing cem ent conccrete to poles and Guy sets with m aterial and labour
including necessary curing etc., complete (cost does not include excavation)
Each
Each
Each
182
237
603
194
252
596
Each
Each
Each
Each
Each
Each
2079
2262
New item
New Item
New Item
1197
2185
2373
2312
2731
9668
835
Each
112
140
Each
256
403
Each
666
906
Each
794
798
1.8.2
35
1.8.3
37
a) 150mm around poles for a height o f 300mm for RCC, PSC, PCC poles/Ibeam/Rail steel sections
b) 390mm all around the pole for an height o f 300mm for Spun poles
1.8.4
a) Providing cem ent concrete 1:2:4 for Anchor Rod in Marshy/Black Cotton Soil
600x600x450mm
Erection o f Poles
39
2.1
Erection o f steel supports 9.0 to 10.00 mtr long such as 22.68 kg (50 lbs) Rail,
27.22 kg (60 Lbs) Rail I Beam o f sizes 200x100mm, 175x90 mm, 125x100 mm.
Fabricates poles tubular poles in pits o f 1.8 mtr Depth, Aligning, Refilling with soil
and ramming as approved drawing
No
216
269
40
2.2
Same as above but erection o f 7.5 to 8.0 mtr long steel supports (18.75 kgs.,
/41Lbs) Rail, 125x75 mm, I beam in pit o f 1.5 mtr depth.
No
192
240
1 of 12
Sl
No
Item No
41
2.3
42
2.4
43
2.5
44
2.6
45
2.7
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
No
385
482
No
483
603
No
680
850
Erection o f 11 mtr PSC pole with working load o f 365kg in a pit o f 2 mtrs depth.
No
770
963
Erection o f 11mtr long Concrete spun pole in a pit o f 2.5 mtr depth.
No
861
1077
No
No
New I t e m
New I t e m
25
30
Particulars
Same as above but erection o f RCC/PCC/PSC poles o f 7.5 to 8 mtr long in pit of
1.5 mtr depth.
Erection o f RCC/PSC poles 9 to 10 mtr long but in a pit o f 1.8 mtr depth
Erection o f RCC poles 9.5 mtr long 350Kg WL but in a pit o f 2.0 mtr depth for
33KV lines
2.8
2.9
48
2.9
Per
structu
re
1349
1686
49
2.10
Per
structu
re
1767
2209
50
2.11
Same as above using RCC poles 7.5/8 mtr long in pits o f 1.5 mtr depth.
Per
structu
re
1767
2209
51
2.12
No
39
49
52
2.13
No
135
169
53
2.14
Per
structu
re
1772
2216
Per
structu
re
2378
2090
Per
structu
re
2465
2271
Per
structu
re
2724
2440
2973
2612
0
3081
2839
0
3405
3050
1439
1799
providing spiral earth electrode type earthing along with pole (without charcoal,
salt etc.,)
Errection o f H Frame.
Erection o f Double pole transformers structure including fixing o f structural
materials, erection o f poles etc., complete for mounting o f transformers as per
approved drawing using I-Beems or MS Rail 8 mtrs. long.
54
55
56
57
58
59
2.15
2.16
2.16.1
2.16.2
2.17
2.17.1
2.17.2
2.18
2.18.1
2.18.2
60
3.1
for 250 kVA Transformer on the existing 11 mtrs. Spun pole (excluding erection o f
pole)
61
3.2
Per
for 100 kVA on the existing 9 mtrs. RCC pole (Squre Section) (excluding erection of
structu
pole)
re
720
899
62
3.3
for 25/63 kVA on the existing 9 mtrs. RCC pole (Square Section) (excluding
erection o f pole)
Per
structu
re
720
899
63
3.4
3 Pole structure: Erection o f 3 pole structure formed with 3 Nos 9 mtr RCC Pole
with platform for mounting 100 to 500 kVA transformers as per approved Drawing
including fixing structure materials, erection o f poles etc., complete. (excluding
excavation charges)
Per
structu
re
3637
4546
Per
structu
re
3003
3753
Per
structu
re
3439
4299
Per
structu
re
20438
17972
Each
Each
68
68
85
85
3.5
65
3.6
size 200x100 mm 175x90 mm, 225x100 mm size, 9 to 10 mtr long pits for line
deviation with necessary foundation, including fixing o f cross arm, braces,
strain/disc insulators.
Erection o f 4 Pole structure as in item, 11, with platform for mounting o f
Transformer. (excluding excavation charges)
Construction o f platform with size stone, cem ent concert for erection o f 500
66
67
68
4.1
4.2
Sl
No
Item No
69
4.3
Particulars
70
4.4
71
72
4.5
4.6
Fixing o f V-Shape/Horizontal cross arm including single top support Braces and
Insulators fixing
Fixing o f V-Shape/Horizontal cross arm for DC Line including Braces and
Insulators fixing. (Without Single Top Support)
Fixing o f 4 Pin double cross arm including braces and insulators.
Fixing o f HT/LT single top support .
73
4.7
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
Each
70
88
Each
58
72
set
Each
Set o f 2
nos
119
45
148
56
70
88
74
5.1
Spike Type
per set
16
20
75
5.2
18
23
113
141
76
5.3
77
per set
126
158
Fixing guarding including fixing o f necessary cross arms for existing HT and LT
line at Road Crossing, Telephone Line Crossings up to span o f 60 mtrs.
per set
427
533
78
5.4
79
5.5
Fixing guarding including fixing o f necessary cross arms between HT and LT line
up to a span o f 40 mtrs
per set
427
533
80
5.6
per set
750
938
81
5.7
per
km/wir
e
1354
1693
82
5.8
per
km/wir
e
1846
2308
83
5.9
per
km/wir
e
3225
4031
84
85
86
87
6.1
6.2
6.3
6.4
Each
Each
Each
Each
483
644
966
1288
603
805
1208
1610
per set
o f 1 no.
of
electro
de
82
103
Per
TFR
3500
4025
No
4200
4830
4200
4830
Erection o f Transform er
a) Erection o f 25 to 63 kVA Transformer on Transformer structure.
-do- 100 kVA Transformer
-do- 200-250 kVA Transformer
-do- 300-500 kVA Transformer
88
6.5
89
6.6
90
6.7
Hiring o f crane for releasing existing Transformer and erection o f NEW 250 to
500kVA Transformers. (applicable for maintenance works only and in case o f non availability o f departmental crane)
91
6.8
Hiring o f crane for releasing existing Transformer and erection o f NEW 250 to
500kVA Transformers. In case o f failure and agumentation, (applicable for
maintenance works only and in case o f non -availability o f departmental crane)
7
92
7.1
93
7.2
94
95
7.2.1
7.2.2
NOTE:- W hen the awards are issued for erection o f New Transformers under labour awards, Hire charges are not
HT M etering
Erection o f HT metering Cubicle on Platform.
No
966
upto 8 ways
above 8 ways
8.1
Additional cost for m aking term ination using H/W edge Clam ps
97
98
99
9.1
9.2
9.3
100
9.4
Rabbit to Rabbit
Coyote to Coyote
Rabbit to Coyote
Additional cost for making termination using H- Clamps along with 2 hole
Paddle/In-Line Connector/Micro wedge connector.
10
10.1
No
No
700
757
875
946
Per box
322
403
No
No
No
51
68
68
64
85
85
set
140
175
96
101
1208
Erection o f LT Feeder piller box including necessary civil works like soil excavation
& concreting etc. complete
Fixing M etering Box for housing the E T V M eter 3-ph 4 w ire along w ith CT's, Meter & w iring for DTC's
25/63 kVA TC
per set
3 of 12
811
1014
Sl
No
Item No
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
102
10.2
100 kVA TC
per set
811
1014
103
10.3
250 kVA TC
per set
811
1014
104
10.4
300/500 kVA TC
per set
811
1014
11
105
11.1
106
11.2
107
11.3
108
11.4
109
11.5
12
Particulars
Fixing 3-phase LT Capacitor housed in a enclosure w ith n ecessary Fuses, wiring, m ounting arrangem ent for
15/25 kVA DTC, 3 kVAr
63 kVA DTC, 9 kVAr
100 kVA DTC, 18 kVAr
250 kVA DTC, 27 kVAr
500 kVA DTC, 54 kVAr
per set
270
338
per set
270
338
per set
318
398
per set
372
465
per set
389
486
Erection & Com m m issioning o f 11kV Auto reclosures and Sectionalizers w ith rem ote com m unication capability
110
12.1
Erection o f fabricated steel structure for Seating Auto reclosures and Sectionalizers per set
280
350
111
12.2
Erection o f 11kV Auto reclosures with control box GSM modem, connecting cable,
control transformer, wiring testing and commissioning including parameterisation
per set
1960
2450
112
12.3
Erection o f 11kV sectionalizers with control box GSM modem, connecting cable,
PTs wiring testing and commissioning including parameterisation
per set
1680
2100
13
113
13.1
for 25 kVA
per set
2466
3083
114
13.2
for 63 kVA
per set
2466
3083
115
13.3
per set
2466
3083
116
13.4
Fixing DOLO cutouts/Horn Gap Fuses including fixing o f cross arms and wiring
Each
100
125
117
118
119
119
a
13.5
13.6
13.7
set
450
500
New Item
563
625
1250
New Item
1979
50
63
61
76
set
93
116
13.7a
120
13.8
121
13.9
Modofication o f GOS Operating System for making Foot path free for pedestrian
Fixing o f 3 Nos lightning arrestors including wiring.
Fixing Pole Fuse Board
122
13.10
Fixing PVC pipe for taking the leads form the conductor to the pole fuse board
(including taking the lead wire inside the PVC pipe & giving connection to the
overhead line & pole fuse box/Aerial fuse Board).
123
13.11
Per
GOS
set/3
No's
No
No
29
36
13.12
Releasing & Refixing o f over head service mains (single phase/three phase) for
consumer installation and street lighting and similar work (While executing
reconductoring work)
Per
connec
tion/
installa
tion
28
35
13.13
Per
Releasing & Refixing o f over head service mains (single phase/three phase) for
connec
consumer installation and street lighting and similar work (While replacing existing tion/
pole)
installa
tion
42
53
13.14
126
13.15
Supplying heavy guage PVC pipe 25mm dia 2mm thick confirming to IS 2509 with
suitable size bends, junction box, adhesive paste etc and fixing using inverted
wood plug in case RCC ceiling & RCC Wall stone structure are rawal plugs in case
o f brick walls and cement plastering damaged portion using heavy gaauge saddles
at an intervel o f 700mm using NF Screws (2/1)
Mtr
New Item
68
127
13.16
Wiring for lighting/power circuit using one o f PVC insulated 1100v grade stranded
Aluminum unsheathed wire 4 Sq mm single core/multi core cable in open or
cocealed system o f wiring (10/521)
Mtr
New Item
12
128
13.17
Wiring for lighting/power circuit using one o f PVC insulated 1100v grade stranded
Copper unsheathed wire 4 Sq mm single core/multi core cable in open or cocealed
system o f wiring (10/521)
Mtr
New Item
39
129
13.18
Supplying and fixing o f porcelain fuse channel with cut out 16 Amps on existing
wooden/panel using necessary nuts, bolts, and washers etc complee (32/3)
No
New Item
69
124
125
4 of 12
Sl
No
Item No
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
130
13.19
Fixing and Wiring o f Single/Three Meter phase m eter on the existing meter board
Per
connec
tion
New Item
90
131
13.20
Per
connec
tion
New Item
60
132
13.21
set
267
334
133
13.22
Fixing and Wiring o f FTL with suitable clamps bracket bolts and nuts using
departmental material and departmental ladder vehicle under supervision o f
departmental Staff.
set
267
334
134
13.23
Fixing and Wiring as SV/M.V light Fittins with suitable clamps Brackets, lamps,
Bolts and nuts using departmental Materials and departmental Lader vehicle
under supervision o f departmental Staff.
set
428
535
135
13.24
set
314
393
136
13.25
Per Kit
145
181
137
13.26
(a) W iring o f One circuit o f LT Wiring for for 25/63/100 KVA DTC to the existing LT
protection Kit/Distribution Box via metering box. (includes fixing o f necessary
supports like 2 Pin X-arms, Spacers etc)
Set
402
503
138
13.27
(b) W iring o f Two circuits o f LT W iring for for 25/63/100 KVA DTC to the existing
LT protection Kit/Distribution Box via metering box.(includes fixing o f necessary
supports like 2 Pin X-arms, Spacers etc)
Set
644
805
139
13.28
Fixing One Circuit o f LT Wiring for 250/500 KVA Transformers via metering box.
(includes fixing o f necessary supports like 2 Pin X-arms, Spacers etc)
Per
Circuit
515
644
140
13.29
141
142
143
144
146
Km
400
500
13.30
13.31
Surveying for construction o f HT and LT Lines duly furnishing single line diagram
indicating pole locations
Numbering and Scheduling o f poles
Magpying (Excluding Cost o f paint etc.,)
Km
Km
303
120
13.32
No
379
150
90% of the pole
erection
charges.
No
13.33
14
145
Particulars
14.1
14.2
85% of the 8
Mtrs. RCC Pole
erection
charges.
Releasing & R estringing o f loose spans, binding, straightening o f inclined pole etc.
Tightening o f loose spans
a) Weasel/Squirrel
b) Rabbit
c) Coyote
Km
90% of the
corresponding
strining charges.
90% of the
corresponding
stringing
charges.
No
75% of the
corresponding
erection charges.
75% of the
corresponding
erection
charges.
14.3
14.4
Km
Km
531
856
149
14.5
No
90% of the
corresponding
erection charges.
15
15.1
2172
2715
Km
766
958
Km
Km
3884
2321
4855
2901
Sqmt
Sqmt
3
3
4
4
150
15.1.1
151
15.1.2
15.2
152
153
15.2.1
15.2.2
15.3
15.3.1
15.3.2
16
664
1070
90% of the
corresponding
erection
charges.
Note: Locality allowance noted under Sl. No. 67 is not applicable to item No.
61 & 62
Transportation Rates:
Transporation by Head Load (applicable only in case w here the m aterials have to be carried/transported from
the road side to the interiors using physical/M anual labour)
5 of 12
Sl
No
Item No
154
16.1
155
16.2
156
16.3
157
16.4
158
16.5
17
Particulars
Poles: for Transporting one pole (Not payable for distance less than 25 Mtrs)
Conductor: For Transporting 1 km Length Conductor (Not payable for distance
less than 25 Mtrs)
Transformer: For Transportation 100 kVA Transformer (Not payable for distance
less than 25 Mtrs).
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
No
98
123
per km
42
53
No
210
263
No
350
438
No
350
438
Hire Charges (These charges have to be specifically approved b y the Corporate O ffice in respect o f repair to
transform ers w hen applicable)
159
17.1
Km
160
17.2
Km
161
17.3
Loading o f any type o f m aterial not covered specifically (cost includes crane
charges i f any).
MT
834
1043
162
17.4
UnLoading o f any type o f m aterial not covered specifically (cost includes crane
charges i f any).
MT
834
1043
163
17.5
Loading o f Power Transformer and other similar materials like switchgear cable
drums, Drake /Lynx, conductors etc., (cost includes crane charges if any).
MT
926
1158
164
17.6
Unloading o f Power Transformer and other similar materials like switchgear cable
drums, Drake/Lynx conductors etc., (cost includes crane charges if any).
MT
926
1158
18
165
166
167
18.1
18.2
18.3
168
169
170
171
172
19.1
19.2
19.3
19.4
19.5
173
174
175
176
177
20.1
20.2
20.3
20.4
20.5
19
20
21
a) Loading and unloading o f poles (loading o f poles to vehicles at stores and unloading at workspot) NOTE:Consolidated am ount for both loading and unloading.
8 m tr RCC/PSC poles
No
45
56
9 m tr RCC/PSC poles
No
60
75
8 m tr PCC pole
No
37
47
a) Loading o f Transform er(when m aintaince m en for loading and unloading are not available in store)
25 kVA
No
115
144
63 kVA
No
115
144
100 kVA
No
173
216
250/300 kVA
No
288
360
500 kVA
No
575
719
b ) U n loading o f Transform er
25 kVA
No
115
144
63 kVA
No
115
144
100 kVA
No
173
216
250/300 kVA
No
288
360
500 kVA
No
575
719
Fixing o f energy m eter to non-m etered IP sets 10HP and below: Including cost o f all the m aterials like Meter
Board, Channel cutouts and necessary wires required for the work.
178
21.1
Fixing Single phase Energy m eter to IP Sets fixed inside Pump House
179
21.2
180
21.3
22
22.1
181
182
183
184
185
22.1.1
22.1.2
22.1.3
22.1.4
22.1.5
186
22.2
Note:
Per IP
Set
Per IP
Set
554
693
766
958
Per IP
Set
2561
3201
Cmt
Cmt
Cmt
Cmt
Cmt
145
217
193
317
781
181
271
241
396
976
UG Cable Works
Earth work excavation for cable trench o f 0.5 to 0.75 mtr. Width and Depth upto 1
mtr. including trial pits, depositing on bank upto a lead o f 50 mtrs, Supplying and
Displaying necessary Danger Boards and Lighting, Using sight Rails and Sign
Boards at every 100mtrs wherever necessary as directed.
In Ordinary Soil
In Hard Soil
In Ordinary Rock without Blasting
In Ordinary Rock with Blasting
Hard Rock/Latterite Rock latterite Soil
6 of 12
Sl
No
Item No
Particulars
Refillingthecabletrencheswithselectedavailableearthfromtrenchexcavation
187 22.3 includingwatering, consolidationinlayersof 15cm.Thicknessincluding
depositingofthesurplusearthwithaleadof200Mtrs.
188
189
190
191
192
193
194
195
196
197
198
199
200
CuttingofRoadsurfaceforcabletrenchesanddisposingoftheexcavatedearth, as
22.4 d
irectedincludingBarricading, DangerLightingthenRefillingtheCableTrenches.
22.4.1 MacadamRoad
22.4.2 TarRoad
22.4.3 CementConcreteRoad
RemovingtheExistingStoneSlabspavementandstockingthematerialsfor
22.5 excavatingthetrenchwithaleadof50mtrRefixingthestoneslabafterrefilling
thetrenchesasinitem2
L
yingandJointingthepipes(100-150mm), diaincludingloweringinPosition:
22.6 Fa
ixingCollarsetc., Joiningwithmudmortorcomplete
22.7 RCCPipe
22.8 StoneWarePipe
LayingtheGI Pipe80mmto150mmdiaat DrainageWaterSupplyCrossing
22.9 includingfixingcollarselbows, bends, TeesandotherfittingwithCutsand
Threadswherevernecessarycomplete.
RemovingandRefixingstoneMasonarywithnecessarypatchupandcementing
22.10 d
rainworksforCluvert, WaterValveCrossingetc., includingcostofmaterials.
22.11 CoveringcablewithTiles
Spreadingandformingwithsandall roundthecabletoadepthof75mmand
22.12 w
idthof500mm. (Doesnotincludecostofsand).
R
e
movingthekerbStonesandRefixingat theoriginal placewithnecessary
22.13 earth
work
22.14 FixingofRouteJointindicatingSlabs
TransportingHTcablefromStoretoworkspotincludingloadingandunloading
22.15
(includingCraneandotherequipmentchargesifany)
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
Cmt
32
40
182
300
603
228
375
754
81
101
Mtr
Mtr
28
22
35
28
Mtr
32
40
Cmt
420
525
1843
2304
6475
8094
48
60
Cmt
Cmt
Cmt
Sqmt
Km
Km
Rmtr
No
Km
(Cable)
8096
10120
Km
(Cable)
9716
12145
Km
(Cable)
9716
12145
Km
(Cable)
11334
14168
205
Km
(Cable)
Km
(Cable)
500
625
Km
(Cable)
1000
1250
Km
(Cable)
1100
1375
23
23.1
Laying o f cable in E xisting trench/GI pipe/Stone W are/RCC Hum e pipe using W ooden/Alum inum Rollers as
directed b y the departm ental staff.
HT Cable
Cable
km
Cable
km
Cable
km
Cable
km
LT Cable
25343
31679
26751
33439
26751
33439
28158
35198
Cable
km
Cable
km
Cable
km
9043
11304
13234
16543
13514
16893
No
700
875
of
12
Sl
No
Item No
217
218
23.3.3
23.3.4
219
220
221
23.4.1
23.4.2
23.4.3
23.4
24
24.1
222
223
224
24.1.1
225
226
227
24.2.1
24.2.2
24.2.3
228
24.2.4
229
24.2.5
Common SR
2014-15 in '
875
875
No
No
No
1200
1200
1200
1500
1500
1500
No
No
No
700
700
700
875
875
875
No
No
No
1100
1100
1100
1375
1375
1375
Km
25342
31678
24.2
25.1
25.2
25.3
25.4
25.5
No
No
Common SR
2012-13 in '
700
700
Unit
24.1.2
24.1.3
25
230
231
232
233
234
Particulars
Km
8707
10884
Earth E xcavation for R.M.U. Foundation Depositing o f earth on Bank up to a lead o f 50 m tr and w ith a lift up to
1.5 m tr
Ordinary Soil
Cmt
134
141
In hard soil
Cmt
201
211
In ordinary Rock without Blasting
Cmt
216
270
In ordinary Rock with Blasting
Cmt
231
289
Hard Rock/Lattirite Rock/Lattirite Soft (Chistling & Wedging)
Cmt
628
941
235
236
25.6
Refilling the RMU foundation with the approved new earth with initial lead o f 50
mtr including watering and tamping layers o f 15 cm thick etc., complete.
Cmt
42
56
237
25.7
Cmt
165
206
25.8
KSRB 4-1.3: Providing and Laying in position plain cement cocrente o f m ix M7.5
(1:4:8) with OPC Cement @ 180 Kgs, with 40mm and down size graded granite
metal coarse aggregates @ 0.85 cum and fine aggregtes @ 0.57 cum machine
mixed, machine mixed, concrete laid in layers not exceeding 15 cms. thick well
compacted, in foundation and plinth, including cost o f all materials, labour, HOM
o f machinery, curing complete as per specifications. SPECIFICATION No. KBS 4.1,
4.2
Cmt
3799
3973
25.9
KSRB 4-1.6: Providing and Laying in position plain cement cocrente o f m ix M15
(1:2:4) with Cement @ 240 Kgs, with 20mm and down size graded granite metal
coarse aggregates @ 0.878 cum and fine aggregtes @ 0.459 cum machine mixed
concrete laid in layers not exceeding 15 cms. thick well compacted, in foundation
and plinth and cills, including cost o f all materials, labour, HOM o f machinery,
curing complete as per specifications. SPECIFICATION No. KBS 4.1, 4.2
Cmt
4276
4425
Quintal
6383
6830
238
239
240
25.10
KSRB 4.9.1: Providing mild steel reinforcement for RCC work including
straightening, cutting, bending, hooking, placing in position, lapping and /or
welding wherever required, and Laying with binding wire and anchoring to the
adjoining members wherever necessary complete as per design (laps, hooks and
wastage shall not be measured and paid)cost o f materials labour, HOM o f
machinery complete as per specifications. SPECIFICATION No. KBS 4.6.3
241
25.11
Cmt
3116
3776
242
25.12
Cmt
2773
3287
243
25.13
KSRB 5-8.5: Providing quoin dressing to stone masonry and stone slabs, two line 5
Cms wide on each face as per specifications. (measurement including mortar
joints) KSB 5.1.13
Mtr
70
68
244
25.14
Sqmt
160
188
245
25.15
Providing and constructing Burnt Brick Masonary with approved quality o f Nonmodular bricks o f standard size o f class designation 50 (table moulded) with
cem ent mortar 1:8 for basement and superstructure including cost o f materials,
labour charges, scaffolding, curing complete as per specifications. Specification No.
KBS 6.2
Cmt
4000
5189
246
25.16
1. Transporting RMU (Coventional) unit from store to work spot including loading,
unloading. (No separate crane charges)
247
25.16.1
No
9070
11338
5 panels
8 of 12
Sl
No
Item No
1 panel
1. Transporting RMU (Compact) unit from store to work spot including loading,
unloading. (No separate crane charges)
No
Common SR
2012-13 in '
1814
248
25.16.2
249
5 panels
No
New Item
6000
250
3 panel
No
New Item
4000
No
No
10042
2008
12553
2510
per
panel
422
528
No
No
668
668
835
835
No
No
646
120
808
150
Km
14461
18076
25.16
Particulars
Unit
2. Fixing foundation frame o f channels and angle iron welding fixing in concrete
aligning the RM U on foundation bed, assembly o f units, connecting Bus Bars from
panel to panel initial filling o f oil etc., complete.
251
252
25.16.1
25.16.2
253
25.17
Lettering the RM U with enam el paint and also writing single line diagram o f each
panel, caution Board, Danger Board etc., including cost o f Paint, Brush etc.,
254
255
25.18
25.19
25.20
256
257
25.20.1
25.20.2
26
Common SR
2014-15 in '
2268
5 panels
1 panel
PILC
XLPE
258
26.1
Stringing o f 11kV grade aerial bunched 3 core cable o f XLPE insulation & black
LDPE sheathing having a standard aluminum conductor, standard around a
weather resistant black XLPE insulated AAA messenger wire 11kV size 3x95
sq.mm+1x70 sq.mm with bare m essenger
259
26.2
Stringing o f 11kV grade aerial bunched 3 core cable o f XLPE insulation & black
LDPE sheathing having a standard aluminum conductor, standard around a
weather resistant black XLPE insulated AAA messenger wire 11kV size 3x120
sq.mm+1x95 sq.mm with bare m essenger
Km
14461
18076
26.3
Stringing o f 1.1kV grade aerial bunched 3 core cable o f XLPE insulation standard
aluminum conductor, standard around a weather resistant black XLPE insulated
AAA messenger wire (3x95) (for Phase conductor) + (1x70) (insulated messenger
neutral) + (1x16) street light control.
Km
10753
13441
261
26.4
Stringing o f 1.1kV grade aerial bunched 3 core cable o f XLPE insulation standard
aluminum conductor, standard around a weather resistant black XLPE insulated
AAA messenger wire (3x95) (for Phase conductor) + (1x70) (insulated messenger
neutral) + (1x25) for street light control.
Km
10753
13441
262
26.5
Stringing o f 1.1kV grade aerial bunched 3 core cable o f XLPE insulation standard
aluminum conductor, standard around a weather resistant black XLPE insulated
AAA messenger wire (3x95) (for Phase conductor) + (1x70) (insulated messenger
neutral) + (1x35) for street light control.
Km
10753
13441
263
26.6
No
102
102
264
26.7
No
102
102
265
26.8
No
136
136
266
26.9
No
136
136
267
26.10
No
102
102
268
26.11
Pole Clamp-145mm x 95
No
170
170
269
26.12
No
48
48
270
26.13
No
68
68
271
26.14
No
68
68
272
26.15
No
68
68
273
26.16
No
136
136
274
26.17
No
136
136
275
26.18
No
136
136
276
26.19
No
136
136
260
9 of 12
Sl
No
Item No
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
277
26.20
No
170
170
278
26.21
No
136
136
279
26.22
No
136
136
280
26.23
No
136
136
281
26.24
No
136
136
282
26.25
No
142
142
283
26.26
No
176
176
284
26.27
No
340
340
285
26.28
No
476
476
286
26.29
T-connector KZ3 95
No
115
115
287
26.30
No
288
26.31
No's
2747
916
289
26.32
No's
2198
733
290
26.33
No's
1859
620
291
26.34
No
95
95
292
26.35
No
23
23
293
26.36
No
27
27.1
294
295
296
297
298
299
27.1.1
27.1.2
27.1.3
27.1.4
27.1.5
27.1.6
300
301
302
303
304
305
27.2.1
27.2.2
27.2.3
27.2.4
27.2.5
27.2.6
27.2
Particulars
Laying o f UG Cables b y trenchless technology b y adopting horizontal boring & D raw ing o f cable including
preparation at site
Without HDPE Pipe
i) Normal soil 5'' bore size
Rmtr
500
625
ii) Rock soil 5'' bore size
Rmtr
870
1088
iii) Normal soil 6 bore size
Rmtr
500
625
iv) Rock soil 6 bore size
Rmtr
870
1088
v) Normal soil 8'' bore size
Rmtr
N.A
To be deleted
vi) Rock soil 8'' bore size
Rmtr
N.A
To be deleted
With HDPE Pipe
i) Normal soil 5'' bore size
Rmtr
600
750
ii) Rock soil 5'' bore size
Rmtr
970
1213
iii) Normal soil 6'' bore size
Rmtr
730
913
iv) Rock soil 6'' bore size
Rmtr
1140
1425
v) Normal soil 8'' bore size
Rmtr
N.A
To be Deleted
vi) Rock soil 8'' bore size
Rmtr
N.A
To be Deleted
306
27.3
Providing chain link fencing 50mm size o f 8 guage properly stretched between
rectangular poles and fixed with suitable bolts & nuts, the free ends shall be
welded to the pole and block pipe at top and bottom as required including cost of
all materials, labour, lead and lifts, cutting, bending wherever necessary, wastage
and lapping etc., complete as per the direction o f the engineer incharge for work
including two coats o f approved quality paint over one coat o f prim er paint.
307
27.4
LTFP box Painting (including scrubbing o f old paint, supplying and applying
prim er and two coats o f aluminium /enamel paint including m inor repair to box)
LS
1035
1294
308
27.5
Spun Pole Painting (supplying and applying two coats o f enam el paints to 11Mtrs
spun pole) and painting all the metal parts o f the structure with two coats o f
aluminium paint over primer
Pole
4830
5555
309
27.6
Spun Pole Painting (supplying & applying two coats o f enam el paints to 11Mtrs
spun pole) and painting
Pole
2070
2381
310
27.7
Repairing the broken damaged door o f RMU with necessary hinges, welding etc.,
with necessary paint touch up including supply o f paint for touch up.
per door
457
571
311
27.8
Repairing the broken damaged door o f LT feeder box with necessary hinges,
welding etc.with necessary paint touch up including supply o f paint for touch up.
per box
305
381
312
27.9
Repairing the broken damaged door o f LT distribution box fixed to DTC with
necessary hinges, welding etc. with necessary paint touch up including supply o f
paint for touch up.
per box
229
286
28
Sqmt
676
780
Sl
No
Item No
Particulars
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
313
28.1
set
8467
8467
314
28.2
er Panel
1471
1224
1839
1530
488
488
610
610
55802
11160
5580
13098
8529
69753
13950
6975
16373
10661
29
Labour Charges towards Station Works (As per Prevailing KPTCL SR with
effect from 01.09.06)
11KV SWITCHGEAR
Erection, alignm ent and fixing to the foundation, indoor/outdoor 11KV switchgear
panel/unit including m ovement from the point o f unloading to thr point o f erction.
315
29.1
316
317
318
319
320
29.1.1
29.1.2
29.1.2.1
30
321
30.1
322
323
324
325
326
30.2
30.3
30.4
30.5
30.6
31
Per Set
Each
Each
Each
Each
Special labour charges for Ganga Kalyna and Water Works, Drinking Water Works and SC & E&I
Works:
Note:(1) These labour charges are applicable for 1 to 2 pole and 3 to 5 poles in respect of Ganga Kalyana and Water Works (316,
327)
(2) These rates are applicable only when 1 to 2 pole and 3 to 5 poles are involved and no other associated works. (316, 317)
(3) These rates are applicable only when 1 to 4 pole works for Service Main and E&I Works (328 to 332)
The Labour charges are all inclusive i.e., digging of pits, erretion of poles, fixing of cross arms, insulators, stringing of
wires, providing of guy sets, fixing of spiral earthrodes, Etc.,
No other labour charges or any other charges towards special locality allowance, LC charges, additional labour charges,
Transportation charges, etc., are payable.
(4) Certificate has to be furnished by the section officer who prepares the estimate that the estimates are not split to claim
the above labour charges.
Labour Charges for one to two pole and three to five pole works in respect of all types of works wherein other works such
as DTC erection etc., and other works are not involved.
327
31.1
The Consolidated labour chrges for 1 to 2 poles works for Ganga kalyana & Water
works. This am ount includes all charges including Transportation charges, loading
and un-loading charges, etc.,
set
New Item
7813
328
31.2
The Consolidated labour chrges for 3 to 5 poles works for all types o f works. This
amounts includes all charges including Transportation charges, loading and un
loading charges, etc.,
set
New Item
12344
329
31.3
The Consolidated labour chrges for 1 to 4 poles works for Service connection and
E&I works. This amount includes all charges including Transportation charges,
loading and un-loading charges, etc.,
330
31.3.1
set
New Item
3750
331
31.3.2
set
New Item
5000
332
31.3.3
set
New Item
6250
333
31.3.4
set
New Item
7500
334
31.3.5
set
New Item
Estimates are to
be prepared as
per SR
NOTE:
1
2
3
4
The loading and unloading charges shall be included at the following rates in all estimates for the works which are proposed to be
taken up on labour contract.
For Poles - As per the rates provided for Loading and unloading of poles in the SR
For all other materials excluding transformers and conductors - 10% of the rates provisioned for Loading and unloading of
poles in the estimate.
For Transformers and Conductor - As per the rates provided in the S.R.
11 of 12
Sl
No
Item No
Particulars
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
The Labour charges for erection o f Poles, Guy Sets, DP Structures etc., involving excavation o f soil provided in the cost sheet for
general works is for ordinary soil only. Wherever other type o f soil is encountered, the difference in rates for excavation in such soil
provided in the Schedule o f labour shall be worked out and adopted.
12 of 12
Item
No
Material
Code
UoM
Common SR 2012-13 in
' FORD Rates inclusive
o f duties taxes & F&I
Common SR 2014-15
in ' FORD Rates
inclusive o f duties
taxes & F&I
1.1
5 MVA
322205
No
4129300
45 5 7 5 7 0
1.2
10 MVA
322210
No
9235300
10267860
2.1
311601
No
326940
349540
2
3
Circuit Breakers
33 kV Circuit Breaker SF6 type 800A, 25kA
3.1
11kV 500MVA (1600A, for two incomer & two capacitor bank and 1250A for
eight feeders) indoor type switchgear comprising 2IC+10F+1BC+2AP VCB's all
of 25KA repturing capacity as per technical specification
Set
7123629
76 1 6 0 4 5
3.2
11kV 500MVA (1600A, for one incomer & one capacitor bank and 1250A for
four feeders) indoor type switchgear comprising 1IC+5F+1BC+1AP VCB's all
of 25KA repturing capacity as per technical specification
Set
3760685
40 2 0 6 4 0
3.3
11kV, 500 MVA, (1600A, for incomer & 1250 A for feeder) outdoor Switch
gear, comprising of 2IC+1BC+12F + 1 AP3 VCBs
309204
Set
7918842
84 6 6 2 2 6
3.4
11kV, 500 MVA, (1600A, for incomer & 1250 A for feedder) outdoor Switch
gear, comprising of 2IC+1BC+10F+1 AP3 VCBs
309202
Set
6894963
73 7 1 5 7 2
3.5
11 KV, 500 MVA, 1250 A, (I/C) and 800 A (feeder), outdoor Switch Gear,
comprising of 2IC+1BC+8F+1AP3 VCBs
309200
Set
5803156
62 0 4 2 9 5
3.6
309206
Set
3174149
33 9 3 5 6 0
10
3.7
309208
No
528802
565355
11
3.8
309210
Set
3227925
34 5 1 0 5 3
309214
Set
2012000
2 1 51 078
309218
No
297000
317530
No
269490
29 81 47
11kV Kiosk
12
4.1
11kV 350 MVA, 800A Outdoor Type, kiosk comprising of 1IC+4F+1 AP3
PCVCB
13
4.2
5
5.1
Instrument Transformers
Current Transformers
14
5.1.1
220kV CT's
15
5.1.2
110 kV 0.2 class accuracy CT with all accessiories for metering purpose
16
a. CT ratio 100-75-1A
No
102917
113861
17
b. CT ratio 100-50-75-5A
No
103590
114606
18
c. CT ratio 100-5A
No
102920
113864
19
5.1.3
33 kV class CT With 0.2 accuracy class 400 - 200/ 1-1A for lines
336470
No
25960
28 72 1
20
5.1.4
336473
No
25960
28 72 1
21
5.1.5
336400
No
16230
17 9 5 6
22
5.1.6
No
New Item
35 13 6
23
5.1.7
No
New Item
35 13 6
24
5.1.8
No
New Item
29 70 4
25
5.1.9
No
New Item
26 73 4
26
5.1.10
No
New Item
27848
27
5.1.11
No
New Item
23392
28
5.1.12
330210
No
16230
17 9 5 6
29
5.1.13
330220
No
16230
17 9 5 6
Potential Transformers
30
6.1
220kV PTs
No
607520
607520
31
6.2
110kV 0.2 class accuracy PT with all accessiories for metering purpose
Nos
137000
151568
32
6.3
No
34650
38 33 5
No
New Item
33
335512
34
6.4
35
6.5
335220
No
7780
No
New Item
8607
Lightning Arester
36
7.1
303510
No
11050
37
7.2
303512
No
7940
87 84
38
7.3
303520
No
10030
11096
39
8.1
Isolators 33kV 800A, 25kA Upright with Earth Switch complete metallic
portion with insulator
304536
Set
73300
78 36 7
40
8.2
Isolators 33kV 800A, 25kA Upright without Earth Switch complete metallic
portion with insulator (live point height 3750mm)
304524
Set
68260
72 97 8
41
8.3
Isolators 33kV 800A, 25kA Upright without Earth Switch complete metallic
portion with insulator (live point height 4750mm)
304525
Set
73320
78 38 8
42
9.1
344007
Set
75600
75 60 0
43
9.2
344011
Set
165600
165600
44
9.3
344107
Set
38400
38 40 0
12 2 2 5
Isolators
1 of 3
Sl
No
Item
No
45
9.4
46
9.5
47
9.6
Battery Charger 110V, 100Ah (with float cum boost charger working on 230V
1ph AC supply along with integral DCDB consisting 4 nos. O/G feeders as
per specifications)
48
9.7
Capacitor Bank with 0.2% Series reactor & NCT 12.1kV 2.5 MVAr star
connected Capacitor Bank
10
Panel
UoM
Common SR 2012-13 in
' FORD Rates inclusive
o f duties taxes & F&I
344111
Set
82800
Common SR 2014-15
in ' FORD Rates
inclusive o f duties
taxes & F&I
82 80 0
344416
Set
39700
42 13 5
344426
Set
74200
78 75 0
333424
Set
403200
403200
Material
Code
49
10.1
339500
No
402800
402800
50
10.2
339530
No
584000
584000
51
10.3
339540
No
321900
321900
201050
MT
98450
102614
11
52
Towers
11.1
53
11.2
201055
MT
83664
87 20 3
54
11.3
736002
MT
98450
102614
55
11.4
210080
MT
98450
102614
12
56
12.1
358046
No
13973
14371
57
12.2
358044
No
8541
87 84
58
12.3
358043
No
5979
6149
13
Insulators
59
13.4
283125
No
2894
3253
60
13.2
283006
No
388
437
61
13.3
283056
No
155
162
62
13.4
283433
No
647
728
14
14.1
63
285080
No
963
1015
64
285079
No
866
913
65
285078
No
662
698
14.2
66
285050
No
758
799
67
258046
No
686
723
68
285038
No
541
571
281410
No
686
723
69
14.3
14.4
70
285699
No
566
596
71
285697
No
517
545
72
285696
No
481
507
14.5
73
285610
No
325
343
74
285605
No
301
317
14.6
75
282620
No
511
539
76
282616
No
439
463
15
STATION STRUCTURES
77
15.1
78
15.2
79
15.3
80
15.4
81
15.5
82
15.6
16
276110
MT
136208
143591
MT
123931
130648
279103
Set
5515
5672
279016
No
823
846
279093
No
343
353
279526
No
93
96
83
16.1
287451
Km
2102240
2 2 86 860
84
16.2
287453
Km
2470100
2 6 89 630
85
16.3
287456
Km
2720400
2 9 73 570
86
16.4
287457
Km
3621840
3938710
87
16.5
287458
Km
4185000
4553100
23100
17
17.1
88
288050
No
23100
89
288052
No
23100
23100
90
288054
No
34060
34 06 0
91
288055
No
34060
34 06 0
92
288056
No
39500
39 50 0
17.2
93
288060
No
5840
5840
94
288062
No
5840
5840
95
288064
No
7990
7990
96
288065
No
7990
7990
97
288066
No
8740
8740
17.3
98
288070
No
7255
7255
99
288072
No
7255
7255
100
288074
No
9030
9030
101
288075
No
9030
9030
2 of 3
Material
Code
UoM
Common SR 2012-13 in
' FORD Rates inclusive
o f duties taxes & F&I
288076
No
10730
Common SR 2014-15
in ' FORD Rates
inclusive o f duties
taxes & F&I
10 7 3 0
288080
No
18920
18 9 2 0
288082
No
18920
18920
288084
No
25320
25320
288085
No
25320
25320
288086
No
30160
30 16 0
Sl
No
Item
No
102
103
104
105
106
107
3 of 3
Item
Description
No
1
Detailed Surveying on Turn-Key:
i)
1
2
a)
b)
ii)
3
4
a)
b)
iii)
iv)
v)
vi)
8
9
a)
b)
10
vii)
11
Unit
ReconnaissanceSurvey-cum-walkover Surveyalong
withDepartmental Stafftodeterminethefeasibleroute
oftheline ontoposheet. Analternaterouteif available
shouldbeindicated. Therouteofthelineistobe
indicatedandgot approvedbythecompetent authority
(Ratesincludethecost ofToposheet and
Transportation)
Hillyterrain
km
Plainterrain
km
DetailedSurvey, fixinganchor pointsandtakinglevels
at 20 mtrsintervels drawingrouteprofileonGraph
paper indicatinggeographical featureslikeNalas,
Rivers, Gardens, P&TLines, Railway-crossingsetc., and
enroutevillages.
Hillyterrain
km
Plainterrain
km
Fixingmarkingstoneswithapprovedmarksincluding
paintingabovethegroundlevel andYellowLettering
andmarkingthedirectionofincomingline andout
goinglines aretobeclearlymarkedonthetopwithred Per
colour. If the distancebetweentwoanchor pointsis
Stone
morethanI km, onemoredirectional stoneistobe
fixed. Soalsofor theroadcrossing, railwaycrossing
,River crossing, HTcrossingandnalacrossingfor all on
boththesides.
Burgiedetailsfor identificationfor all Anchor towers
Per
withexistingpermanent markslikepoles, telephone
Anchor
lines, buildings, etc.,
Tower
v) Conductingsoil resistivitytests
PerTest
Clearingofbushes, treebranchesoftrees cropsand
shrubswherever encounteredfor detailedsurveyto
enroutethe corridorwidthof3mtrs (includingviewing
forfixinganchor towersetc.,)
Hillyterrain
KM
Plainterrain
KM
a) Submissionofreportsintheformofgoodbinding
including thepreparationofsketchesfor burgiedetails
for eachanchor points, schedulingofline details, S.R. Perset
values, soil classificationreports, tower schedule,
abstract oftowersetc., complete.
b) Drawingtherouteprofileongraphsheet, including
geographicfeaturelikeNalas, rivers, gardens, P&Tlines
railwaycrossingetc, inclusiveofall stationaries.
(Normal requirement is5 Sets)
Preparing the Schedules: PTCCProposal : Containing
PTCCquestionaire, toposheet extractswithmarking of Set
theproposedline, SRReport, tower sketch, station
singlelinediagrametc., (30Copies/Sets)
RailwayCrossingproposal withdrawing areinclusiveof Per
graphsheetsand other stationerymaterials, labour
crossing
etc., (10Sets)
Tree ScheduleContainingthedetailslikenameoftree,
Per
girthsizeoftree, distancefromcentral line ofthe
H
e
alignment, approximateheight ofthetreeetc., complete ctare
12
Viii)
a)
13
b)
14
c)
15
Inclusiveofall workslikefixingof
stonesat every20 mtrsinthecentrelineandbothends
ofthecorridor, paintingofeachtreeafter chipping,
w
gthenumbers onthetree, takinggirthsizeofall
d) thritin
etrees cominginthe corridor at 1mtr heightfrom
GL, approximateheight ofthetreeandforest clearance
proposals etc., complete(10 Sets).
Note: This appliestoforest area only.
Common SR
2012-13 in '
Common SR
2014-15 in '
636
618
795
773
3147
2101
3934
2626
313
391
283
354
542
678
939
627
1174
784
191
239
191
239
757
946
757
946
542
678
3529
4411
Forest proposals:
Page 1 of 14
Km
Sl
No
Item
Description
No
Check Survey by using their own Equipment
2
a) Hillyterrain
b) PlainTerrain
16
17
3
18
19
20
21
22
23
Common SR
2012-13 in '
Common SR
2014-15 in '
KM
KM
1627
1089
2034
1361
1047
1309
1047
1309
23
29
10464
13080
3139
3924
8370
10463
RunningPeripheral Theodolitetraversealongperiphery
andcoordinatingandheighteningofall corners/turning
points, establishingpermanent co-ordinateaxis
formationofgridsat 50mintervalsfor northingand
Acre
a) eastingwithreferencetoalreadyestablishedpermanent
co-ordinateaxislevelsat 50mgridintersectionfor
preparingplot planoftheentireareawithcontours.
Includingexistingstructurelocation.
Establishingdatumlevel andbenchmarksat every
100m/50mintervalsbothlongitudinal andlaterallyand
all
ers/turningpointswithstonepillars ofsizenot
No
b) lesscorn
than0.2mx2mx1.0mburiedonthegroundand
exposedtopengravedfor paintingRL, andcoordinates
ofthat point.
Takinglevel at 5Msuitablegridinterval inthesub
No
c) stationareafor plottingblocklevels, contour map.
PreparationofCADdrawings, generatingthecontours
u
ingappropriatesoftwareandsubmissionof6setsof
Per
d) bs
lueprintsandonetracingsheet (original) andonesoft Project
copyetc. Complete.
Furnishingcuttingandfillingquantities using
Per
e) appropriatesoftwarefor earthworkcalculation.
Project
Super imposingGAdrawingsoncontour mapsinCo
Per
f) ordinationwith departmental engineersandsupplyof Project
12setsofblueprint drawingsetc., complete.
4
24
Unit
b)
25
26
27
28
29
30
31
32
33
34
35
36
37
i)
ii)
iii)
iv)
v)
iv)
vii)
viii)
ix)
x)
xi)
xii)
xiii)
38
C)
Conductingvariouslaboratorytestsonsoil samplesat
approvedlaboratoryincluding preparationofsoil
samplesfor determinationofsoil, Propartiesetc.,
Completeasper specification.
Note: Laboratory identifiedshall beapprovedby
ESCOMEngineersnot belowtherank ofEE(Civil).
Bulkdensityandmoisturecontent
Sieveanalysis
HydrometerAnalysis
Liquidlimit andplasticlimit
Shrinkagelimits
Specificgravity
Standardproctor densitytest
Swell pressure
Freeswell index
UncombinedCompressivestrength
Triaxial shear test
Onedimensional consolidationtest
Californiabearingratio
Submittingfinal report in6 copiesincludingall field
recordsandlaboratorytest results, graphsand
recommendationsetc., completeasper specifications.
Mtrs
1566
1958
0
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
Each
627
627
627
627
733
733
733
840
840
840
840
840
840
784
784
784
784
916
916
916
1050
1050
1050
1050
1050
1050
PerJob
12558
15698
Sl
No
Item
No
Description
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
1) Corresponding
ratesin KPWDSRas
mentionedagainst
eachclassification
belowshall be
adopted.
2) Areaweightages
applicablefor the
respectiveareas as
per latest KPWDSR
shall beallowedto
arriveat Final Rate.
3) Extrafor excavation
under water
conditionsand/or foul
conditionsincluding
bailing/pumpingout,
rempvingslushadd
20%oftherateofthe
respectiverate on
account ofslow
progressofwork
under these
conditions. (Theextra
percentageindicated
hereshall beas
indicatedinthe
relevant KPWDSR)
Normal Soil
Cmt
As per KPWD SR
applicable to
respective area
Latest KPWDSR
Ratesfor hardsoil
39
i)
40
Cmt
Latest KPWDSR
Ratesfor Ordinarysoil
41
Cmt
Latest KPWDSR
Ratesfor Ordinarysoil
42
iv) Fullysubmergedsoil
Cmt
Latest KPWDSR
Ratesfor Ordinarysoil
43
v) Wet blackcottonsoil
Cmt
Ratefor ordinaryrock
(Without blasting) of
latest KPWDSR
44
iv) Dryfissured/Ordinaryrock
Cmt
Latest KPWDSR
Ratesfor Ordinarysoil
45
vii) Latteritesoil
Cmt
46
viii) Hardrockwithblasting/Hardlatterite
Cmt
Ratefor ordinaryrock
(Without blasting) of
latest KPWDSR
Ratefor ordinaryrock
(Withblasting) of
latest KPWDSR
6
47
48
49
i) Normal Soil
ii) B.C. Soil
iii) Partially Submergedsoil
Cmt
Cmt
Cmt
Page 3 of 14
Sl
No
50
51
52
53
54
Item
No
iv)
v)
vi)
vii)
viii)
7
Description
Unit
Fullysubmergedsoil
Wet blackcottonsoil
Dryfissured/Ordinaryrock
Latteritesoil
Hardrockwithblasting/Hardlatterite
Cmt
Cmt
Cmt
Cmt
Cmt
Common SR
2012-13 in '
Common SR
2014-15 in '
Back Filling :
55
Backfillingwithexcavatedearthavailablenear the
i) tower andconsolidationlayer bylayer of 150mmdepth
withadequatequantityofwater.
56
Cmt
Cmt
Rates as per
KPWD SR
applicable to
respective area
+10% extra
Rates as per
KPWD SR
applicable to
repective area
+10% extra
Concreting&curingasper specificationsincludingthe
cost ofmaterials,T&Pmaterials andlabour chargeswith
a) all leadandlift, for latticetypestationstructures,Tr.
Plinth, control panels, mountingstructuresfor
Breakers, CT'sPT'sIsolators, LA's, etc.,
57
i)
1:4:8concrete(M7.5)
Cmt
58
ii)
1:3:6 concrete(M-10)
Cmt
59
iii) 1:2:4concrete(M-15)
Cmt
60
Cmt
61
Concretingandcuringasper specificationsincluding
b) thecost ofmaterials, T&Pmaterialsandlabour charges
withall leadandlift, forTr. linetowers.
As per KPWD SR
applicable to
respective area
1) Corresponding
ratesinlatest KPWD
SRasmentioned
against each
classification shall be
adopted.
2) For theabovebasic
rateaddapplicable
areaweightageasper
latest KPWDSR.
Ratesunder plain
concretefor
foundationoflatest
KPWDSR
Ratesunder basement
oflatest KPWDSR
Ratesunder raft
foundationoflatest
KPWDSR
Ratesunder raft
foundationoflatest
KPWDSR
Cmt
MT
245
306
Note :
Towers
a) Sortingoftower partsmadeoffabricatedangleiron
Page 4 of 14
Sl
No
63
64
65
66
Item
No
Description
Common SR
2012-13 in '
Common SR
2014-15 in '
318
398
1779
2224
10
1741
2176
Rmtr
33
41
Nos
Nos
Set (3
Nos)
Nos
34
43
43
125
43
Unit
Settingupofstubstemplates andfromonelocationto
Per
b) a
nother location
Location
Assemblinganderrectionoftowersincludingtightening
c) ofboltsandnutsincludingloading,unloadingat store
MT
andsite(IncludingtheWt. ofstubs)
Rivettingoftower bolt endsbyheatingusingdryAcetylenegasandhammeringtodestroythreadssoas
makethetower memberstheft - prrof (Boltsat nodal
d) to
pointsonlytobeselectedandrivetteduptohieght of PerBolt
bottomcrossarm, asper the directionsofthefield
engineer)
e) Weldingofboltsandnuts
PerBolt
Note: For tower errectionsrequiringshutdown25%
aboveS.R. for item5cto5eonlyaretobeadopted.
10
67
68
b) Supplyingandfixingbarbedwireasper specification
69
70
71
72
11
Fixing of Boards
a)
b)
c)
d)
FixingDanger Board
FixingNumber Plate
FixingPhaseplate
FixingCircuit Plates
12
34
100
34
74
ii
75
76
ii
77
78
For hillytarrian
KM
New Item
For plainTarrian
KM
New Item
StringingofGroundConductor asabove
For hillytarrian
For plainTarrian
KM
KM
New Item
New Item
Note:
79
80
81
Page 5 of 14
New Item
9088 WithCoyote
ACSR
9088 withRabbit on
towers
6662WithCoyote
ACSR
3330withRabitt on
towers
4447
3331
50%moreabovethe
ratesspecifiedfor
normal worksis
admissiblefor
shutdownworks of33
kVandabovelines,
CTs DT T---- 1
New Item
100% extra
New Item
75% extra
Sl
No
Item
No
Description
Unit
82
13
Common SR
2012-13 in '
Common SR
2014-15 in '
New Item
50% extra
4102
5128WithCoyote
2511 WithRabitt
6358With Coyote
3037 WithRabitt
7456With Coyote
3588 WithRabitt
Stringingofconductorsinspecial conditionswhere
normal 5spansbetweenanchor toanchor arenot
encountered, whereasanchorsareprovidedat single/
two/ threespanswithaveragespanintervals of
267/320 Mtrs, (ratefor spansofsingleconductor)
A)
83
84
b)
85
86
87
1Span
2009
2 Spans
5086
2429
3 Spans
88
5966
2871
89
90
91
92
93
1Span
3077
1482
2 Spans
3941
1818
3 Spans
94
4415
2132
14
3847With Coyote
1853 WithRabitt
4926With Coyote
2272 WithRabitt
5519With Coyote
2665 WithRabitt
Stringingofconductorsinspecial conditionswhere
normal 5spansbetweenanchor toanchor arenot
encountered, whereasanchorsareprovidedat single/
two/ threespanswithaveragespanintervals of
275/320 Mtrs (Ratefor spansof SingleConductor)
A)
95
96
97
98
99
tangent towersonly
1Span
611
299
2 Spans
1016
490
3 Spans
100
1490
718
101
102
103
104
105
tangent towersonly
1Span
459
223
2 Spans
748
106
15
Grounding of Towers/Equipments
Groundingoftowersincludingcost of40mmdia2.5
mmthick, class'C' G.I. Pipeof3Mtrslengthasper
specifications, with50X6 mmGI Flats 3Mtr long, salt
charcoal, includingexcavationcharges.
Page6of14
557
573WithCoyote
278WithRabbit
935WithCoyote
458WithRabbit
1383With Coyote
697 WithRabbit
2777
3471
367
3 Spans
764WithCoyote
374WithRabbit
1270WithCoyote
612 WithRabbit
1862With Coyote
898WithRabbit
1107
Material
+Labour
a)
107
Set
Sl
No
Item
No
Description
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
Set
1336
1670
Set
1867
2334
Per Loc
3668
4585
MT
1679
2099
MT
1565
1956
Per MT/
Mtr
33
41
MT
750
938
108
c) Groundingofequipmentsbyprovidingcast ironpipe
109
110
16
17
111
112
18
Erection of Transformers
113
114
115
116
117
19
118
i)
5MVAto6.3/8 MVATr.
LS
3451
4314
LS
693
866
Per Set
(3Nos)
806
1008
8370
8370
119
20
120
21
22
Identificationofwires, Ferrulingcrimping
andterminationofwires. WiringofProtectiveDevices,
Coolingfans, Oil flowPumps, OLTC, RTCC
a) Wiring:
121
Page 7 of 14
Sl
No
Item
No
Description
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
Each
3348 1
33481
Per Set
4880
4966
Each
976
995
Set
41848
41848
1224
1530
368
460
Set
(3Nos)
13947
13947
Set
(3Nos)
13947
13947
Set
354
443
Set
45
56
Set
736
920
Set
75
94
b) Testing:
1. RatioTest
2. SCtest
3. Excitationtest
4. MagneticBalancetest
5. Vectorgrouptest.
6. inducedhighvoltagetest.
7. OLTCoperation.
8. Protectivedevicesoperationchecks.
9. stability checks:- for differential andREFR
protection
122
23
a)
123
124
terminationofwiresinBreaker &Wiringuptocontrol
panel / Relaypanels.
125
126
24
127
128
129
rectionofCTsandPTsandwiringincludingmovement Set
a) E
fromthepoint ofunloadingtothepoint oferection.
(3Nos)
b) AssistinginTestingandCommissioning
Set
c) Testing & Commissioning
i)
Current transformers:
Wiring: Indentification ofwires
FerrulingCrimpingof
lugsConnectionsuptomarshallingboxand Control
panel. Current transformers:
Tests: Insulation, Polarity, Ratio, Excitation
Potential Transformers:
Wiring: Indentification ofwires
130
Set
Ferruling
ii) Crimpingoflugs Connectionsuptomarshallingbox.
Potential Transformers:
rectionofNCTswithgroundincludingmovement from
a) E
thepoint ofunloadingtothepoint oferection
b) AssistinginTestingandCommissioning
26
133
134
Erection of NCTs
Erection of Isolators
Page 8 of 14
Sl
No
Item
No
Description
Unit
Common SR
2012-13 in '
Common SR
2014-15 in '
Set
184
230
Per
Stack
61
76
Each
15064
18830
Cmt
As per KPWD SR
applicable to
respective area
Rmtr
As per KPWD SR
applicable to
respective area
As per KPWD SR
applicable to
respective area
As per KPWD SR
applicable to
respective area
Rmtr
429
537
Rmtr
306
383
Rmtr
Per
Panel
2444
3055
Per
Panel
3819
4774
Note :
1) Assisting in testing and commissioning for item No.
13 to 18 means contractors should provide labourers for
testing and commissioning by RT/MT/Firm engineers.
2) Testing & Commissioning in item 13 & 18 means the
testing will be carried out bythe firms themselves using
their own testing equipments and staff in presence of
the MRT staff who will witness the tests.
27
135
136
28
137
29
30
138
a)
139
140
b)
141
i)
Mtr
142
143
144
145
146
147
148
ii)
ii)
iv)
v)
vi)
vii)
vii)
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
d)
149
i)
150
ii)
151
e)
31
152
a)
153
b)
Page 9 of 14
Sl
No
Item
No
Description
Test & Commissioning:
i) C& R Panels Wiring & Testing:
Wiring:Identification, Ferruling, Crimping, termination
154
C) ofwiresin C&Rpanels.
Testing:Testingfor insulationlevel, Testingofrelays,
control operationsfor closingtrippingetc., interlocks
Alarm, AnnunciationandIndicationChecks.
32
155
ii) 11kVKiosk
b
Common SR
2012-13 in '
Common SR
2014-15 in '
Each
41848
41848
1471
1839
1224
1530
488
610
488
610
55802
8529
69753
13950
6975
10661
2369
2961
4512
5640
180
225
24
25
11 kV Switchgear
156
Unit
157
158
ii) 11kVKiosk
Per
Panel
Per
Panel
Per
Panel
Per
Panel
159
160
161
162
Per Set
Nos
Nos
Nos
11160
5580
Note:Assistingintesting&Commissioningfor item
33
163
164
165
Busbar Formation
Groundmat
166
a)
167
SupplyingandlayingofMSflats, ofvarioussizes,
b) weldingandapplyingACBpaint toweldedportionand
coveringwithsodiumbentoniteclay, asper the
drawing/standardspecificationsandconsolidation.
Rmtr
168
Rmtr
Page 10 of 14
50x6mm 50x8mm 75x6mm 75x8mm 75x12mm 50x6mm 50x8mm 75x6mm 75x8mm 75x12mm-
233
249
432
457
484
115
130
314
338
367
50x6mm - 262
50x8mm - 280
75x6mm - 486
75x8mm - 514
75x12mm - 545
50x6mm - 129
50x8mm - 146
75x6mm - 353
75x8mm - 380
75x12mm - 413
Sl
No
Common SR
2012-13 in '
Common SR
2014-15 in '
50x6mm - 193
50x8mm - 215
75x6mm - 462
75x8mm - 488
75x12mm - 528
50x6mm - 217
50x8mm - 242
75x6mm - 520
75x8mm - 549
75x12mm - 594
191
239
Each
551
689
Rmtr
Rmtr
Kgs
Perjoint
438
346
11
420
547
432
14
525
Cmt
925
1156
Per Set
As per Latest
KPWD electrical
SR applicable to
respective areas.
As per Latest
KPWD electrical
SR applicable to
respective areas.
As per Latest
KPWD electrical
SR applicable to
respective areas.
Furnished in 11kV
Works
Material+Labour
Furnishedin 11kV
Works
SqMtr
49
62
SqMtr
85
106
SqMtr
44
55
SqMtr
97
121
Item
No
Description
Unit
169
170
171
f)
36
172
a)
173
174
175
37
176
38
Spreading of Jelly
Supplyingandspreading 100mmthickwith20/25mm
jellywithall leadandlifts.
i) 20/25 mmJelly
Note : Only20/25mmjellyshall beused.
Station Yard Lightning
Supplyinganderectionoffabricatedsupporting
structuresincludingfoundation.
a)
177
b)
178
c)
179
ErectionofRCCpoleswithstringingof O.H.
conductor/Laying ofcableforyardlights.
d)
180
39
181
182
183
184
Rmtr
Painting of structures
a) Supplyingandpaintingoftwocoatsofgoodquality
Material+Labour
Sl
No
Item
No
Description
Common SR
2012-13 in '
Common SR
2014-15 in '
49
62
Set
Set
6111
7639
3059
Set
Set
976
976
1220
1220
Per Set
21300
21300
As per KPWD SR
applicable to
respective area
As per KPWD SR
applicable to
respective area
4347
4347
1634
486
1634
486
As per KPWD SR
applicable to
respective area
As per KPWD SR
applicable to
respective area
171
244
Unit
Supplyingandpaintingtwocoatsof Syntheticenamel
paint after cleaningandscrapingthesurfacewithout SqMtr
aplyingredoxideprimer.
e)
185
40
190
i) 110Volts
ii) 48/24 Volts
b) ErectionofBattery Charger andwiring
i) 110Volts
ii) 48/24 Volts
c)
2447
i)ACSupplycableupto2sources
ii) Loadcables, connectionat charger endupto 10load
points
Testing:
i) ACsupplyVoltagePhaseSequence.
ii) TestingofOutput DCVoltagesin
Boost/Float/Trickle/Variations asper the
order/requirement .
iii) Testingfor RippleFactor.
Commissioning:
191
192
i)
41
i) FixingofBoost Voltagelevel
ii) FixingofFloat Voltagelevel
iii) FixingofTrickleVolagelevel
iv) Testingofalarm, indicationandloadckts, Auto
/Manual changeoversetc.
v) Full loadtest inBoost &Tricklemodes.
110VDC: (1set for 33kVStations)
Fencing :
Colony and Station yard Boundary fencing including
erection of supports
a) Securityfencingusing8SWGchainlink/50mmMesh
193
b) Barbedwirefencing
194
42
195
a)
196
197
b)
c)
43
PLCC Equipments
Erectionofmountingstructuresfor couplingcapacitors
ErectionofCouplingcapacitors/wavetraps/LMU.
Wiring, testingandcommissioning
Yard Levelling
YardLevellingandfillingupofsoil andconsolidation.
198
44
201
45
Set
Set
Set
Cmt
Transportation
Using 10 MT Lorry
199
i)
1to50 KMs
200
ii)
51 to 100KMs
201
iii)
202
b)
Sl
No
Item
No
Description
203
i)
1to50 KMs
204
ii)
51 to 100KMs
205
iii)
206
c)
Unit
i)
1to50 KMs
208
ii)
51 to 100KMs
209
iii)
210
215
216
217
47
48
219
220
221
Prevailing Board
approved Rates
Prevailing Board
approved Rates
MT
1291
1614
MT
1291
1614
MT
229
286
MT
229
286
Cmt
As per KPWD SR
applicable to
respective area
Nos
973
1216
Set
2301
2876
Set
68
85
218
214
26
46
21
c)
213
MobilisationchargesofIDLETransportation applicable
for placeswhereheavydutytrucks arenot available, is
admissibleinadditionto: (a) asfar aspossiblefull
loadshall betransported.
b) Transportationofother materials
212
Common SR
2014-15 in '
207
211
Common SR
2012-13 in '
Sl Item
Description
No
No
d) Fixingofspiral earthelectrodes
222
e) Road/P&TGuarding
223
f) StringingRabbit conductor, fixingdiscinsulator to
224
crossarms etc.,
g) StringingCoyoteconductor, fixingdiscinsulator to
crossarms etc.,
h) SupplyingandfixingofACdevicesasper
specification
225
226
49
Unit
Nos
Set
KM
KM
Rmtr
Common SR
2012-13 in '
25
672
Common SR
2014-15 in '
1846
31
840
2308
3225
4031
As provisioned in As provisioned in 11
11 kV works
kV works
Dismantling
Same rate as that
Same rate as that of
of erection of
erection of Power
Power
Transformer
Transformer
227
i) DismantlingofPowerTransformer
228
229
230
Page 14 of 14
Cmt
Cmt
276
707
345
75% of erection
charges in general
75% of erection
charges in general
566
Name o f
ESCOM
BESCOM
MESCOM
HESCOM
CESCO
GESCOM
Area
Percentage over
& above SR
20
Tumkur District:
15
Pavagada Taluk.
30
20
45
35
Shimoga District:
Hosanagara,Thirthalli,Sagara,Soraba,Shikaripura Taluk
35
25
Dharwad District:
a) Kalghatagi
b)Dharwad Taluk
Haveri District:
a)Hanagal,Herikerur
b)Byadagi,Shiggon,Savanur Taluks
Belgaum District:
Khanapura Taluk Hukkeri, Belgaum,Bailahongala Soundathi
Taluks
Uttar Kannad District:
Karwar, Joida, Haliyal, Sirsi, Mundagod, Yellapur, Bhatakal,
Sidapur, Honnavar, Kumta and Ankola.
45
30
20
30
20
20
40
40
30
30
40
15
Note: In case o f civil works where KPWD SR rates are adopted, the locality allowance as
applicable in KPWD SR shall be followed.
Common SR - 2014-15
PART- 7
Technical Specification for Overhead and
Underground Service Connection works for
the Year 2012-13
Common SR - 2014-15
PVC insulated PVC sheathed Aluminium wires of 650/1100 V Class shall confirm to IS
604 and bear the ISI certification mark.
2.
PVC insulated PVC sheathed Aluminium conductor underground cables with steel
rope/steel wire armouring of 1100 V class shall confirm to IS 1544 and shall bear the ISI
certification mark.
3.
IS 1653
4.
IS 2509
5.
6.
Stoneware pipe
IS 300
7.
ACC pipe
IS 1626
8.
G.I. Wire
IS 1280
9.
IS 6639
IS 6610
IS 2016
12.
IS 1239
Other materials shall confirm to the relevant Indian standard specification wherever
applicable.
A)
1.
Short poles
(Where clearance between messenger wire and ground is Inadequate)
a)
Supplying and fixing 40 mm 2.90 thick G.I. Pipe 1.8 mm long complete with atleast
2 nos of through bolts 12 mm dia with M.S.back plate 100x100x6 mm with eye bolt
fixed at the top for dead ending messenger wire with masonry patch work complete as
per approved drawing (for single phase installations).
Common SR - 2014-15
2.
3.
Eye bolt :
(If building height is sufficient to string service main from pole)
Supplying and fixing M.S.EYE BOLT 16mm dia of sufficient length to cover the thickness
of the wall but not less than 375 mm long with one M.S.back plate of 150x150x60 mm
and M.S. washer of 3 mm thick in front, inclusive of masonry patch work etc. complete as
per approved drawing.
4.
5.
Supplying and stringing PVC insulated and PVC sheathed 650/1100 V class
aluminium conductor of sizes supported by 3.14 mm (10 SWG) G.I. messenger wire with two
break insulator one at each end of the span and with suspenders at intervals of 0.75 mtr. Each
suspender shall be porcelain reel insulator of suitable bore through which insulated wire shall
pass (single core or twin core as the case may be) and this reel insulator shall be fixed to the
messenger wire using 2 mm. (No.14 SWG) G.I. wire suitably bent and twisted. Separate reel
insulators shall be provided for each wire. The messenger wire shall be dead-ended on the
clamp provided to the departmental pole vide item No.4 above.
Size of Insulated wire in
Sq. mm
Single phase - use 2
nos. single core W ire/
one no. 2 core
Three phase - use 4 nos.
single core W ire/ Two
no. Twin core
6.
2.50
4.00
6.00
10.00
16.00
25.00
50.00
a)
16 SWG braized conduit pipe finished with black stove enamelling both inside and
outside.
b)
c)
d)
Common SR - 2014-15
(single core or twin core as the case may be) with necessary length of loose wire not less
than 1 meter long to be terminated inside the meter board without joints and connected to the
main side of the energy meter, using bi-metallic connectors, accessories, sleeves etc.,
inclusive of masonry patch work. The conduit shall be connected to the earth electrode by
means of G.I. wire not less than 4 mm (8 SWG) and tinned copper clamp of width 25 mm and
24 gauge with GI bolt nut and washers.
a)
2.5
4.0
6.0
10.0
16.0
25.0
50.0
19
19
19
25
40
40
40
In Braized
Conduit pipe
In PVC Conduit
pipe
b)
2.5
4.0
6.0
10.0
16.0
25.0
50.0
19
19
19
32
40
40
50
In Braized
Conduit pipe
In PVC Conduit
pipe
In G.I. Pipe
7.
Meter Board
1.
Single phase
a)
Supplying, fixing and wiring, T.W .Meter board 300x300x65 mm made out of 15 mm thick
plank for the front and 12 mm thick plank for the pack with 40x20 mm batten alround
using well seasoned teak wood, fixing them with screws, and smooth finishing with 2
coats of high grade varnish. The back of meter board shall be fixed to the wall by means
of screws on atleast 2 Nos of wooden plugs of 40x25x100 mm long well fixed in the wall
with necessary masonry patch work etc., complete. The planks for both front and back of
the meter board shall be made out of not more than two pieces.
b)
2.
do - 500 x 500 x 65 mm T.W. meter board as in item 7(a) butusing atleast 4 Nos.
of plugs. The planks for both front and back of the meter boardshall be made out
of not more than three pieces.
8.
Earthing :
a)
Supplying, fixing and wiring earth electrodes for grounding conduits, IC cut outs and
other equipments on the meter board using 40 mm dia, 2.90 mm thick G.I.pipe 2.5 mtr
long burred in a pit. The pit should be filled in with equal proportion of salt and charcoal
150 mm allround the pipe to complete depth. The connection from the pipe to the conduit
etc. is to be established through G.I. wire of size as per clause. 7.33 of S 732 using 12
mm dia bolts, nuts washers and checks nuts etc. The pipe shall have 16 through holes of
12 mm dia as per our drawing.
Common SR - 2014-15
b)
- do - using 40mm dia 2.90 mm G.I.Pipe 5.5 mtr long burried horizontally where rock is
encountered at a depth less than 2 mtr depth burial shall be not less than 0.75 mtr.
c)
-do- using 2 Nos. of 40 mm dia 2.90 thick G.I.Pipe 1.25 mtr long burried in pits, 2.5 mtr
apart and connected in parallel.
Note : W herever the specified ground resistance (as per IS 3043 or its latest version thereof)
is not obtained by the groundings, extra grounds are to be provided until the specified
resistance value is obtained, in all such cases concerned. Assistant Executive Engineer must
himself inspect and pass order as to where the additional earthing is to be provided.
B)
1.
Supplying and laying PVC insulated sheathed steel wire/steel tape armoured UG
cable with PVC outer sheathing 1.1 KV Class. The work shall include digging of trench 0.5 mtr
wide 0.6 mtr deep laying the cable in trench refilling and consolidating the soil.
Size of Cable
in Sq. mm
In trench
(New or
Existing)
2.
16
25
35
50
95
120
150
185
225
240
3.
4.
a)
5.
mm thick G.I. pipe with necessary clamps, bolts nuts & washers
on the pole and drain crossing only (40 mm dia pipe for 6, 10 and
and 50 mm dia pipe for 25.35 and 50 Sq mm 65 mm dia pipe for
size cables and 80 mm dia pipe for 185, 225 & 240 Sq. mm size
Supplying and fixing LT cast iron pot-heads suitable for 1.1 KV class UG cable filled
with necessary bitumen/insulating compound complete with terminals, clamps, bolts and nuts
& washers etc.,
Size of Cable
in Sq. mm
No. of Cores
10
16
25
35
50
70
95
120
150
185
225
240
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
3.5
Common SR - 2014-15
c)
Sealable Cutouts
15
30
60
100
200
300
Average rate of Over Head Service main wire and UG Cable per meter
a)
Sl.
No
1
2
2.5
4.0
6.0
10.0
16.0
25.0
50.0
Single Phase
i) 2 Single Core
ii) Twin core wire
3 Phase
4 Single Core Wire
b)
UG Cable Size in
Sq. mm
Single Phase
Three Phase
10 .0
16.0
25.0
35.0
50.0
70.0
95.0
PART - 7
For an inspection or test of any generating station, receiving station or other places in which
energy is generated, transmitted, received or distributed at a rate exceeding 250 Watts and a
voltage of 100 Volts.
Sl. No.
Capacity
i)
ii)
Fees in Rs.
100/-
a)
600/-
b)
800/-
c)
1200/-
d)
2400/-
e)
5000/-
An additional fee of
Rs.500/- per 1000 kVA
shall be levied in excess
of e(i) above.
Notes:
In the case of generating station or other place in which energy is generated the fee shall
be paid by the Supplier or the person generating energy. In the case of receiving
station, the fee shall be paid by the Owner.
The fee shall be levied separately for individual equipment.
The equipment means capacitor bank in outdoor sub-station, generators, power/
distribution / furnace / unit ratio transformer (excluding welding and instrument
transformers).
SCAL EB
medium voltage except in these cases to which scales A and C to H of this Schedule
specifically refer.
Sl. No.
Capacity
Fees in Rs.
Up to and including 5 kW
200/-
300/-
1000/-
1500/-
2000/-
5000/-
For inspection of multistoried building (more than 15 meters in height from ground level to roof
level) in pursuance of rule 50A of IE rules 1956 or under any applicable rules and
regulations made under electricity act 2003
Sl. No.
Capacity
Fees in Rs.
3500/-
4750/-
3000/-
1. The fee shall be paid by the owner to whom energy is or is about to be supplied.
2.
Separate fee shall be levied for inspection of X-rays, neon signs, lifts, sub-station and
standby generators according to the respective scale of fees.
For HV motor load, fee should be levied separately for individual equipment.
For MV load (i.e. Motor, welding transformer etc.), fees shall be levied on the total
connected load on each MCC of every transformer or generator.
SC AL E" C
be charged under scale A in a factory within the meaning of the factories Act (XXIII) of 1948
to which energy is supplied by the ESCOMs or Licensee or in which energy is generated.
Sl. No.
Capacity
Fees in Rs.
For power
Note:
Capacity
Fees in Rs.
1.
240/-
2.
600/-
SCALE E
Fee for inspection of Neon sign and X-Ray installations in pursuance of rule 71 & 73 of IE
rules 1956 or any applicable rules & regulations made under Electricity Act 2003.
Sl. No.
Particulars
Fees in Rs.
Neon Sign
Note:
The fee shall be paid by the owner to whom energy is or about to be supplied.
Separate fee shall be levied for Lifts, sub-station and standby generators according to the
respective scale of fees.
The fee is inclusive of connected switch gear and cables.
SCALE F
For an inspection of one aerial line crossing the other aerial line in pursuance of Rule 87 of
the Indian Electricity Rules, 1956 or under any applicable rules & regulations made under
Electricity Act 2003.
Sl. No.
Particulars
Fees in Rs.
For an inspection, examination of every new aerial line including a service line crossing either
above or below a telegraph, telephone or other aerial line.
For inspection of First Crossing
240/-
100/-
Note:
1.
The fees shall be paid by the person whose line was last erected.
S CA LE" G
The fee for any inspection or examination of an aerial line or underground cable in pursuance
of Rule 39,66,77 to 81 and 85 etc., of I.E. Rules 1956 or under any applicable rules &
regulations made under EA 2003.
Sl. No.
Particulars
Fees in Rs.
1.
2.
3.
Note:
SCALE"H
Particulars
Fees in Rs.
200/-
600/-
1200/-
Note:
1.
2.
3.
If more than one switchgear of the same class of voltage is connected either to
primary or secondary side of a transformer or to a generator, all the switchgears at
each side shall be considered as single for the purpose of calculation of fees.
SCALE I
For an inspection or test of any generating station, receiving station or other places in which
energy is generated, received or distributed at a rate exceeding 250 Watts and a voltage of
100 Volts.
Sl. No.
Capacity
Fees in Rs.
100/-
200/-
300/-
700/-
1800/-
5000/-
An additional fee of
Rs.500/- per 1000 kVA
shall be levied in excess
of e above.
Note:
1.
In the case of generating station or other place in which energy is generated the fee
shall be paid by the Supplier or the person generating energy. In the case of receiving
station, the fee shall be paid by the Owner.
a)
Sl. No.
b)
Capacity
Fees in Rs.
Up to and including 5 kW
200/-
300/-
1000/-
1500/-
2000/-
5000/-
For inspection of multi storied Building (more than 15 meters in height from ground
level to roof level)
Sl. No.
Capacity
Fees in Rs.
1.
700/-
2.
3000/-
1. The fee shall be paid by the owner to whom energy is or is about to be supplied.
2.
Separate fee shall be levied for inspection of X-rays, neon signs, lifts, sub-station and
standby generators according to the respective scale of fees.
For HV motor load, fee should be levied separately for individual equipment.
5.
For MV load (i.e. Motor, welding transformer etc.), fees shall be levied on the total
connected load on each MCC of every transformer or generator.
S CAL EK
Fee for inspection of Neon sign and X-Ray installations in pursuance of rule 71 & 73 of IE
rules 1956 or any applicable rules & regulations made under Electricity Act 2003.
Sl. No.
Particulars
Fees in Rs.
Neon Sign
Note:
The fee shall be paid by the owner to whom energy is or about to be supplied.
Separate fee shall be levied for Lifts, sub-station and standby generators according to the
respective scale of fees.
The fee is inclusive of connected switch gear and cables.
SCALE " L
1.
2.
Capacity
Fees in Rs.
For power
Note:
Capacity
Fees in Rs.
1.
100/-
2.
600/-
Note:
SCAL EN
Particulars
Fees in Rs.
Note:
SCAL EO
Particulars
Fees in Rs.
1.
200/-
2.
High voltage
600/-
3.
1200/-
Note:
III.
SCALE P
Sl. No.
Capacity
1.
Fees in Rs.
350/-
Note:
The fee shall be paid by the person who proposes either to erect a new building or structure
or to make any temporary addition or alteration in or upon any building or structure.
S CAL EQ
Sl. No.
1.
Capacity
Fees in Rs.
Note:
The fee shall be paid by the Licensee or the owner of the electric traction system as the case
may be.
SCAL ER
Particulars
Fees in Rs.
Without CT & PT
125/-
With CT & PT
250/-
a)
Without CT & PT
1000/-
b)
With CT & PT
5000/-
Note:
The fee shall be paid by the person or agency or firm or any other body at whose request the
test is conducted.
SCALE S
Fee for an inspection or examination or test of voltage within the consumer premises at the
request of the consumer of the licensee and issue of a certificate.
Sl. No.
Note:
Particulars
Fees in Rs.
120/-
High voltage
240/-
1.
For inspection and examination or test of voltage and reading voltage for a duration of 24
hours as above Rs.50/- in addition to the amount charged for each item above.
2. The consumer shall pay the fee in the first instance but the Electrical
Inspector shall decide as to who should pay the fee when reported
as dispute between the consumer and the supplier.
SCALE T
Sl. No.
Particulars
Fees in Rs.
Note:
1.
If any leakage is discovered in any street main, distributing main or service line, the
fee shall be paid by the Licensee or the owner of the main or service line as the case
may be.
2. If a leakage is discovered the fee shall be paid by the owner of the water gas or other
pipe or of all appliances connected therewith.
S CAL EU
Sl. No.
Particulars
Fees in Rs.
Rs.240/-
Note:
SCALE V
Sl. No.
Particulars
Fees in Rs.
Note:
SCALEW
Fee for witnessing testing of single energy meter along with connected CT and PT.
Sl. No.
Capacity
300/-
500/-
HV installation
1000/-
EHV installation
3000/-
Note:
1.
Fees in Rs.
SCALE X
1.
Particulars
Fees in Rs.
Note:
SCALE Y
INSPECTION OF TEMPORARY INSTALLATIONS
For inspection and to issue electrical fitness certificate to amusements, circus, jatra,
yakshagana, fair etc.
Sl. No.
Capacity
Fees in Rs.
1.
Up to and including 5 kW
300/-
2.
500/-
3.
600/-
4.
1200/-
5.
2400/-
6.
3000/-
7.
Note:
1. The fee shall be paid by the owner to whom energy is or about to be supplied.
2.
Separate fee shall be levied for Lifts, sub-station and standby generators according
to the respective scale of fees.
SCALE Z
Fee for security an approval of drawings detailing method of construction of the following
types of installations.
Sl. No.
Capacity
Fees in Rs.
a)
250/-
b)
600/-
c)
2000/-
d)
2500/-
a)
500/-
b)
1000/-
c)
2000/-
d)
3000/-
2000/-
3000/-
3.
4.
5.
200/-
a)
500/-
b)
1000/-
c)
1500/-
d)
Above 5000 kW
2000/-
6.
1000/-
7.
Lifts/escalators etc
500/-
8.
1000/-
SCALE ZA
Issue of Electrical Certificate of any installation at the request of any supplier or consumer not
falling within the purview of the above scales and certification of testing equipment of testing
Agencies:
Sl. No.
Capacity
Fees in Rs.
240/-
350/-
700/-
1000/-
Note:
SCALE ZB
Capacity
Fees in Rs.
1.
2000/-
2.
1000/-
3.
2500/-
SCALE ZC
Inspection Fee for Cinemas and Videos (both initial and Periodical)
Sl. No.
Capacity
Fees in Rs.
2000/-
1500/-
Touring/Temporary cinemas/video
500/-
SCALE ZD
Periodical Inspection Fee for the Govt. owned Electricity supply companies (ESCOMS),
KPTCL, KPCL & Hukkeri co-operative society installations.
Transformers and Generators:
Sl. No.
Capacity
Fees in Rs.
1.
Up to 100 kVA
450/-
2.
1000/-
3.
1800/-
4.
Note:
Switchgears:
Sl. No.
Capacity
Fees in Rs.
180/-
550/-
1200/-
Note:
Sl. No.
Fees in Rs.
1.
2.
3.
4To M ^n
TY P IC A L C O N S T R U C T IO N A L DETAILS O F IIK V
FUSE C U T -O U T
PLAN
ENLARGED VIEW OF
TOP CONTACT AND CLAMP
AGM (Q&S)
11 KV 100 AMPS.
BESCOM
Approved:
D.O.L.O CUTOUT
PGM (Q&S)
SCALE: N.T.S
General Manager,(Elec.
Quality Sc Safety
DRG.NO.BESCQM/GM/Q&S/
DATED: