Space Programming Architecture
Space Programming Architecture
July 2004
July 2004
Foreword
The EPA Facilities Manual is comprised of four distinct, yet complementary resources for planning and managing Environmental Protection Agency (EPA) facilities. These four volumes are meant to be used simultaneously to determine design intent, requirements, and the ongoing evaluation of all EPA facilities. The use of one volume without reference to the other three would result in an incomplete understanding of the requirements for EPA facilities. Volume 1: The Space Acquisition and Planning Guidelines contain information on space planning, space estimation, environment, materials, furniture, process, and maintenance. EPAs Office of Administration and Resources Management developed this document to help EPA facilities managers, space managers, and line personnel plan and use their space. Volume 2: The Architecture and Engineering Guidelines (referred to as the A&E Guidelines) provide guidance for facilities management, engineering, planning, and architecture professionals in the design and construction of new EPA facilities and the evaluation of existing facilities. Volume 3: The Safety, Health, and Environmental Management Manual: Safety and Health Requirements outlines safety and health considerations for owned or leased EPA facilities. The Manuals goal is to maintain a safe and healthful workplace that protects against injury, illness, and loss of life. Volume 4: The Safety, Health, and Environmental Management Manual: Environmental Management Guidelines, establishes environmental specifications to be addressed by designers and managers of EPA facilities and related building systems.
July 2004
2 4 5 5 5
45 48 49 50
3. 3.1 3.2
11 12 12 12 12 14 20 23 23
4. 4.1 4.2
Technical Aspects of Space Planning General . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Overview of Technical Considerations . . . 27 4.2.1 Code Compliance . . . . . . . . . . . . . 27 4.2.2 Handica ppe d Ac cessibility . . . . . . 28 4.2.3 GSA Facilities Standards PBS-P100 . . . . . . . . . . . . . . . . . . . 28 4.2.4 Building Systems . . . . . . . . . . . . . . 28 Overview of Environmental Considerations 29 Principles of Space Planning Professional Design and Planning Assistance . . . . . . . . . . . . . . . . . . . . . . . . . Area Measurement; Efficiency . . . . . . . . . 5.2.1 General . . . . . . . . . . . . . . . . . . . . . 5.2.2 Area Definitions . . . . . . . . . . . . . . Plan Organization . . . . . . . . . . . . . . . . . . . Blocking and Stacking . . . . . . . . . . . . . . . 5.4.1 Block D esignations . . . . . . . . . . . . 5.4.2 Stacking . . . . . . . . . . . . . . . . . . . . . Circulation and Egress . . . . . . . . . . . . . . . Circulation Factor . . . . . . . . . . . . . . . . . . .
5.3 5.4
5.5 5.6
31 32 32 32 33 38 38 38 40 40
iii
July 2004
Chapter 1 - Introduction
1.1 Statement of Purpose
The EPA Facilities Manual, in four volumes, is intended to set forth and codify the agencys various recommended standards for its nation-wide office and laboratory facilities. Since its inception in 1970, the EPA has acquired office space and laboratories of various kinds in support of its mission to monitor and to advance the nations environmental well-being. As the agencys mission has grown, so has its staff and the requirement for office space, and as scientific knowledge has expanded, the need for improved laboratory facilities has increased. To keep pace with growth and change, implement throughout the agency the lessons learned through experience and practice, promote an equitable allocation of space for all employees, and ensure continuing safe and healthy operations of its facilities, the agency has developed this four-part manual for use by EPA administrators, laboratory directors, facilities managers, design professionals, and anyone involved with the acquisition, design, operations, and maintenance of EPA facilities.
1.2
Background
Over the course of its over 30 years of operation, the EPA has developed standards and guidelines for the acquisition, design, and operations of its office space and its laboratory facilities. These standards had been previously published by the agency as three separate manuals: Space Guidelines (Volumes 1 & 2), directed primarily at the acquisition and planning of office space; Architecture, Engineering and Planning Guidelines; and the Facility Safety, Health, and Environmental Management Manual. The revised, integrated EPA Facilities Manual updates and reorganizes these documents as explained below.
1.3
July 2004
effective design and operation in its facilities, and, whenever possible, provide an example to the public and private sectors. Volume 3, Safety, Health, and Environmental Manual: Safety and Health Requirements sets forth EPAs standards and recommendations for the operations of its facilities, both owned and leased. These standards relate primarily to the safety and health of building occupants, and address concerns such as fire and life safety, indoor air quality, and the safe handling of chemicals and hazardous material in the laboratory environment. Volume 4, Safety, Health, and Environmental Manual: Environmental Management Guidelines, provides a detailed program of the environmental factors to be considered in the operations and maintenance of EPA space. This volume also considers some environmental factors as they affect building design and, therefore, many items are cross-referenced in Volumes 2 and 3.
Although each volume of the manual is focused on a specific aspect of facilities planning, facilities management, or both, some material has applicability to all aspects, and cross-references from one volume to another are included where appropriate. For example, the discussion of egress is relevant to both the space planning of the facility and the technical code requirements addressed in Volumes 2 and 3. Similarly, the selection of environmentally appropriate materials is a topic germane to both Volumes 2 and 4. Where appropriate, and to avoid unnecessary duplication of material, cross-references have been provided between volumes.
July 2004
July 2004
In some circumstances, such as a laboratory procurement, the EPA is granted the authority to conduct its own procurement process.
2.2
The POR accompanies the SFO and is intended to describe the agencys specific needs and to provide the basis for the development of tenant space layouts. The POR tailors the generic space described by the SFO to make the space more suited to the agencys specific needs. Its preparation typically requires the assistance of outside professional services. Chapter 3 discusses preparation of the POR in greater detail. Topics addressed in the POR include: Enumeration of the amount and type of space required to house the agency: offices, workstations, laboratories, and support spaces Listing of the required special spaces: conference/training space, hazardous materials storage, food service, and fitness center Descriptions of building systems as they relate to the interior fit-out: lighting, power and telecommunications requirements, heating, ventilation and air-conditioning (HVAC) requirements, and acoustics For special spaces such as laboratories, all of the technical requirements for the facility including detailed room data sheets for each laboratory room Requirements for facility security systems
4
July 2004
Interior finishes and details, including above standard finishes Proposed furniture: systems furniture, loose furniture, and laboratory casework.
2.3
Budgeting
2.3.1 GENERAL The cost of space is clearly a prime consideration in the development of the SFO and the POR. The GSA PBS has documented its policies for computing rents and for determining tenant improvement costs in its Pricing Desk Guide. The Guide explains in detail the PBS policies with respect to types of space, key pricing elements, forced moves, customer agency rights and options, and similar factors that determine the rents and fees that will be charged to the agency. In addition to the rent, the agency must also consider items such as costs of swing space, move costs, furniture and equipment costs, security costs, and telecommunications costs. In the initial stages of project planning, cost estimating is necessarily somewhat rough, and first estimates are order-of-magnitude based on experience with similar types of space. It is helpful to seek outside assistance in arriving at budget numbers for construction costs. Such help can be provided by a local architecture and engineering (A-E) firm with experience in the type of project contemplated, or by a contractor who has recently worked on projects similar in size and scope to the proposed facility. Also, estimating aids such as the R.H. Means Building Construction Cost Data, which is updated annually, can offer useful information. Some factors to consider in the early planning stages: Before detailed drawings and specifications have been prepared, estimates are typically developed on a square foot basis. As the project proceeds and more information becomes available, estimating can also become more detailed and accurate. Because of the extent and complexity of mechanical and electrical services required in laboratories, as well as the costs of case work and fume hoods, the square foot costs of such laboratories will be substantially higher than that of standard office space. If the project is a renovation of an existing structure, costs are greater than for new construction. If the building is considered to be of historic interest, and subject to requirements that historic elements are to be preserved and/or restored, costs are significantly higher, and the construction schedule is considerably lengthened. If the project includes a need to remediate hazardous materials, such as existing asbestoscontaining materials or contaminated earth at the site, the cost for such remediation, as well as its impact on the time schedule, must be considered. In developing the project estimate, an escalation factor to account for inflation should be included. A tentative construction schedule should be prepared, and costs escalated to the mid-point of the construction period.
July 2004
Construction costs can vary considerably from one city to another. Comparative cost indexes are available that provide factors to adjust construction costs for various urban locations. Budget estimates need to include fees for professional services: A-E design fees, project supervision, and specialized consultants (if any). If the program requires that the organization relocate temporarily to swing space while the permanent quarters are undergoing renovation, it may be necessary to consult local real estate brokers to determine the availability and cost of the temporary space. It may also be possible to undertake the renovation project in stages such that part of the building can serve as swing space as construction proceeds in the unoccupied portion. The use of swing space can greatly increase the overall cost of the program and cannot be overlooked because such costs, when added to the other costs of construction, furniture and equipment, may make the entire project economically unfeasible. The cost of swing space may include, in addition to lease costs of the space (at short-term rates), two moves of personnel, possible minimal rehabilitation of the swing space, and the possible need to lease or make other provision for furniture in the swing space. To the other budget costs noted above (e.g., construction, professional fees, escalation for inflation) must be added costs for furniture, equipment, move costs, security systems and monitoring, and telecommunications. These are usually estimated on a per person or per workstation basis. Depending on the funds available, it may be decided that leasing of the furniture may be preferable to outright purchase. The pre-construction cost estimate is only an approximation, until such time as contractors submit firm bids for the build-out of the leased space. It is therefore customary to include a contingency factor to cover the unanticipated costs that may potentially appear during construction. This factor may range from 10% to 20%, depending on the level of information on which the preliminary cost estimate is based. Where construction is to be renovation of an existing structure, as opposed to new construction, a higher contingency factor should be applied, as conditions requiring additional expense may not appear until demolition of existing finishes takes place.
2.3.2 TENANT IMPROVEMENTS (TI) GSA provides guidance to client agencies in its Pricing Desk Guide. This document sets forth GSAs policies for determining what construction items are to be considered as base building (and therefore the responsibility of the landlord) and what portions of the build-out of building interiors are to be included in the tenant improvement (TI) allowance. The following summarizes GSAs Key Pricing Elements from the Pricing Desk Guide. When an agency procures space through GSA, it is provided with an allowance to finance the build-out of the interiors. While this allowance is prorated into the rent, the process makes funds available up front to facilitate occupancy. The allowance has two components: the general component and the customization component.
July 2004
The general component is a dollar amount per square foot to cover the cost of partitions, doors, carpeting, and such standard work-letter items. The allowance is intended to take the space from a building shell to a vanilla office space. This allowance is set nationally, adjusted annually, and indexed to local construction costs. The customization component is also a dollar amount per square foot but is tailored to individual agencies and bureaus. This component is intended to cover special items and finishes that are not typical to all office space but are necessary to customize the space for a particular agency. Examples include millwork, laboratory countertops and fume hoods, private restrooms, raised access flooring, slab-to-slab walls, and built-in equipment. Customization tiers, each equal to a tenth of the value of the general allowance, have been created. Based on historical data, each agency or bureau has been assigned a tier. At present (2003), EPA has been placed in Tier 3, meaning that a 30% customization allowance is provided for build-out in addition to the general component dollars. Collectively, the general and customization components constitute the TI allowance. In any instance, should build-out costs exceed the TI allowance, the tenant agency (EPA) is responsible for the excess amount. GSA has also clearly identified the interior elements that are to be covered by the TI allowance. Funds for the base building (even when residual funds exist) are not transferable for TI use. Budgets for the base building and TI are separate and are not to be commingled. The only exception would be the use of TI funds for base-building in a prospectus level project where a cost overrun has occurred in the purchase of the site or on construction of the shell, and then only with the tenant agencys consent. In the tables that follow, Table 2.3.3 identifies the items for base-building and tenant areas that constitute the building shell, and Table 2.3.4 lists the elements that typically constitute the TI.
July 2004
Table 2.3.3. Ba se B uilding and Te nant Are a Item s Inc lud ed in the Building Shell
Base Building
Base structure and building enclo sure co mpo nents (windows with exterior finishes) are complete.
Tenant Areas
Broom clean concrete floor slab, with level floor not varying more than 1/4 inch (6 mm) over ten (10) foot (3,048 m m) ho rizontal run in ac cord ance with American Concrete Institute (ACI) Standards. Gypsum wallboard, spackled and prime painted, on exterior perimeter walls and interior core walls are installed. Fully installed 2 X 2 foot (610 x 610 mm) suspended acoustical ceiling with 2 X 2 parabolic fluorescent (or other building standard such as 2'.0" X 4'.0" (610 x 1,220 mm) fixtures) installed in the ceiling grid for an open office plan at the rate of one fixture per 80 BO MA usable square feet (7.43 sm) or 100 rentab le square feet (9.29 sm).
Base building electrical an d me chanical system s (e.g., central fire alarm, chiller plant, cooling tower) are com plete and functional. All common areas, such as lobbies, elevators, fire egress corridors and stairwells, garages, and service areas are complete. Circulation corridors are provided as part of the base building only on multi-tenanted floors where the corridor is common to mo re than one tenant. On single tenant floors, on ly the fire egress corridor necessary to meet code is provided as part of the shell. Building common restrooms are com plete and ope rationa l.
Common corridor stud walls, without gypsum board on demised tenants' premise side and without suite entry door, are installed. Central heating, ventilation and air conditioning systems are installed and operational, including, as appro priate, main and branch lines, V AV boxes, dampers, flex ducts and diffusers, for open office layout. Conditioned air through medium pressure d uc tw ork a t a ra te of 0 .7 5c fm /sq ua re fo ot o f B O M A usable area is provided.
Building cores on each floor with leaseable space contain the following: Tapp able domestic water riser, service sanitary drain, sanitary vent, ready for extension to tenant demised area(s). Electrical po wer distribution pane ls and circuit breakers av ailable in an elec trical closet, with capacity at 277/480 volt and 120 /208 volt, 3 phases, 4 wiring providing 7 watts per BOM A usable (5 watts per rentab le) square foot. Designated connection point to the central fire alarm system for extension to tenant d emised area(s). Distribution backboard within a wire closet for connection to tena nt's telephone lines. V ertical co nduit (empty sleeve) through building core, available for tenant wiring/cabling.
Sprinkler mains and distribution piping in a protection layout (open plan) with heads turned down, concealed with an escutcheon or trim plate, are installed.
Space Acquisition and Planning Guidelines Chapter 2 - How Space is Acquired Table 2.3.4 Typica l Tena nt Imp rovem ents
July 2004
Electrical and telephone outlets and wiring from the tenant demised premises to the building core Carpeting or other floor covering; raised access flooring Plumbing fixtures within the demised premises and connection to the building core Partitioning and wall finishes Doors (including suite entry), sidelights and frames, and hardware Millwork Fire alarm wiring from building core to tenant space and within tenant space; pull stations; strobes; annunciators; and exit signage within the demised premises Thermostats Window treatments Supplemental power, cooling or heating (above the open office plan layout capacities provided in base building) higher rates of air exchanges (if it entails additional or upgraded air handling equipment); pathogen control systems; and all other special HVAC components required by specific tenant needs Adjustment or repositioning of sprinkler heads so as not to conflict with tenant's particular office partition layout; additional sprinklers required by local code to meet tenant's layout, or ceiling grid adjustments and consequent repositioning of sprinkler heads to the center of ceiling tiles Tenant signage in the common corridor and within the tenant's demised area. (An overall tenant directory in the building lobby is part of building shell.) Changes (moves) or additions to the open plan lighting pattern, or to the open plan HVAC distribution network (e.g., additional ductwork and ceiling diffusers to accommodate individual office layout) Upgrades or changes to building standard items, such as plaster or vaulted ceilings, specialty lighting, and upgraded ceiling tile Structural enhancements to base building to support non-conventional floor loads, such as a library. (The cost for structurally changed space is no longer borne by the tenant through a continuing premium rent charge.) Private bathrooms, private elevators, or staircases within tenant space Laboratory casework Security systems and features within tenant space are part of tenant improvements; specialty security systems and features for the entire building requested by tenants (usually through the building security committee) are neither building shell nor tenant improvements. They are a separate capital investment in the property and charged to agencies as part of the building specific security charge.
July 2004
11
July 2004
3.2
3.2.1 GENERAL Defining the Goals: In order to develop a comprehensive and workable program, it is helpful to first define what is intended to be accomplished by the proposed new facility. Depending on the specific purposes of the project, some objectives might include: To consolidate existing fragmented organizational components To respond to increased or newly assigned mission responsibilities, or to provide for increased staff To improve operational efficiencies and to reduce operation and maintenance costs To correct or to mitigate existing code and/or accessibility deficiencies To enhance employees safety and environmental conditions To replace existing facilities that are outdated or deteriorated, or that are no longer available to the agency because of lease expiration or similar cause
A clearly defined statement of objectives, and the criteria to be observed in achieving them, is the first step in creating a well-organized program of requirements. 3.2.2 SECURITY Security of occupants in government occupied facilities, both owned and leased, is of great concern in light of terrorist events and threats in recent years. Some guidelines for making federal facilities more secure have been developed while others are in the process. These documents address the placement of new buildings on a site, access control, design and construction, and monitoring. Key reference documents include: US Department of Justice, Recommended Minimum Standards and Applications to Security Level of Federal Facilities. General Services Administration, PBS P-100 Facilities Standards for the Public Buildings Service, Chapter 8 - Security. Department of Health and Human Services, Guidance for Protecting Building Environments from Airborne Chemical, Biological, or Radiological Attacks The latest edition of these documents should be consulted. Other guidance documents may also be available in the future. 3.2.3 SITE SELECTION The general location of the proposed new facility will be defined in the SFO, which typically establishes an area (perhaps within a given radius from some relevant point, such as an existing related EPA facility) within which the facility is expected to be built. In some instances, the site location may be predetermined, as when the proposed project is the construction of an addition to an existing facility, or when an existing building is to be renovated and altered to accommodate the program requirements. Or, GSA may have space available in an existing building that is suitably located and of a size that will accommodate the agencys program.
12
July 2004
In the event the agencys planning team has a participatory role in site selection, selection criteria will include some of the following points. It will be important to have professional assistance, particularly with respect to engineering aspects of the project. Minimum required site area, based on the size of building, along with associated site support requirements such as parking. Site zoning appropriate to the intended use and density. Community acceptance of the proposed facility. In some instances, it may be desirable to invite community participation in the site selection process. It may also be necessary to demonstrate to the community that there will be no negative environmental effects on the neighborhood, such as increased traffic or the possibility of objectionable noise or undesirable emissions. Historic or archaeological aspects of the site that may impose constraints on new construction. Site area sufficient to support future expansion of the facility, if such expansion is anticipated. Presence of adverse environmental conditions that may affect the use of site, such as site contaminants requiring remediation; also, presence of wetlands, potential for flooding. A location that provides desired amenities; for example, convenience to public transportation and to neighborhood retail shops and eating places. Site capability to include ancillary support structures if required, such as a separate storage building for hazardous waste, or a child care facility separate from the offices and/or laboratories. A separate hazardous waste building may require setbacks from nearby buildings and property lines (refer to Volume 2). Technical characteristics of the site: foundation conditions, possible seismic activity, available utilities, accessibility for service vehicles and automobiles. Requirements for open space to provide setbacks for security (if required) or to allow landscaping that will enhance the facilitys appearance and image.
It is EPAs policy, and also a requirement of law and executive orders, to lend its support to community efforts to maintain and restore buildings of historic worth, and to promote urban redevelopment where appropriate. In the selection of a site or of an existing building for a proposed facility, the agencys planning team should consider the feasibility of adapting an existing historic structure to the proposed uses. Where no existing building is available suitable to the proposed use, consideration should be given to developing a building that will fit into the fabric of an urban redevelopment area. Factors to be addressed include: If an existing historic structure is to be altered and rehabilitated, GSA typically provides guidance in the form of a Building Preservation Plan, which identifies areas of architectural significance and defines the standards to be employed in the construction. For some buildings, a Historic Structures Report may be available. The Secretary of the Interiors Standards for Rehabilitation and Guidelines for Rehabilitating Historic Buildings offers additional guidance for preservation projects. The design of an alteration and rehabilitation project will require review and approval by historic preservation authorities; typically a State Historic Preservation Office (SHPO) as
13
July 2004
well as GSA preservation specialists. The design approach will depend on the specific building being restored and on the desired program to be achieved, so that each project will be different. Where alterations and/or additions are extensive, it is often more desirable to separate visually the new construction from the existing work, rather than trying to replicate the original construction. Because older structures will typically include antiquated mechanical, electrical, and plumbing systems, the alteration and rehabilitation will require care and ingenuity on the part of the A-E to integrate modern building systems into the structure in a manner sympathetic to the historic spaces and finishes. Similarly, older structures will also include many conditions that violate current codes and accessibility standards, and bringing them into compliance with current codes may necessitate in some instances design solutions that provide performance meeting the intent of the codes rather than literal and complete compliance. As previously noted, rehabilitation of an historic structure is an expensive undertaking and one which requires an extended time frame for both design and construction.
The programmatic needs for the proposed facility will include one or more of several types of space: office space (along with support), laboratory space (and lab support), special spaces such as food service, child care, data processing, conference/training, fitness/wellness, and storage. A discussion of these types of space follows. 3.2.4 OFFICE AND OFFICE SUPPORT SPACE 3.2.4.1 OFFICES AND WORKSTATIONS Having determined the number of persons to be accommodated in the space, their job functions, and their organizational hierarchy, the next step is to establish how much space will be required to house them. The goal is to create offices and workstations that provide a pleasant and efficient working environment for their occupants, but without waste of space. Based on past experience and practice, the EPA has developed planning guidelines that suggest appropriate ranges of size for various categories of agency personnel. A thoughtful application of these guidelines, which are listed in Table 3.2.3 will result in an equitable facility, consistent with similar facilities in the agency, and one that falls within GSAs general space limits. In developing the POR, the planning team must be aware of the need for flexibility since organizational needs will inevitably change, and a program that provides adaptability to change will age well. The use of one or two universally-sized workstations (rather than rigid adherence to a hierarchy of workstation sizes), suited to most employees except for senior management, will permit future changes with little need for reconfiguration of workstations. The universal workstation (mentioned above in 3.1), which is typically from 75 to 80 net square feet (6.97 to 7.43 sm), is found to be workable for the majority of professionals and senior clerical staff and permit the future reassignment of personnel with minimal disruption to the existing layout. Exhibits 1A and 1B, which follow, illustrate
14
July 2004
typical office and workstation layouts that can be adapted to suit the specific requirements of the particular facility. Care should be taken to limit the height of workstation panels to typically no more than 65" to maximize penetration of natural light to the interior zones. Selective use of translucent glass panels will further help with distribution of light and create a bright and pleasing ambiance.
Table 3.2.4.2: Office and W orkstation Area Guidelines TYPE DESIGNATION A KEY SPACE SIZE ATTRIBUTES (App rox.) Enclosed O ffice w ith 350 to 375 Sq .Ft. several visitor chairs & (32.5 to 34.8 sq. m .) conference table (6-8) Furniture: standard or systems type Deputy Regional Enclosed office, with 275 to 300 Adm inistrator several visitor chairs & (25.5 to 27.9) conference table (4-6) Furniture: standard or systems type Assoc . Reg. Enclosed office, with 225 to 250 Adm inistrator either conf. table (4) or (20.9 to 23.2) Division Director informal seating, plus General Counsel pull-up chairs Furniture: standard or systems type Deputy Division Enclosed office, with 170 to 180 Director small table or pull-up (15.8 to 16.7) Branch Chief chairs for conference (3 to 4) Furniture: standard or systems type Section Chief Enclosed office or 100 to 120 Senior Legal semi-enclosed work(9.3 to 11.1) station. 2 visitor chairs Furniture: systems type Universal Workstation Semi-enclosed work75 to 80 station with 0-2 visitor (7.0 to 7.4) chairs. V ariations in equipment and storage needs. Furniture: systems type TITLE OR ASSIGNMENT Regional Adm inistrator
15
July 2004
16
July 2004
17
July 2004
3.2.4.2
OFFICE SUPPORT SPACE Office support space includes those ancillary functions typically associated with office use, for example, meeting rooms, filing space, copying, printing and faxing, and storage of office supplies. For most organizational units, such as Sections or Branches, there will also be a need for a reception area with guest seating, as well as a small employee coffee/beverage station. In order for the planning team to allow adequate floor area for such support functions, the agency, based on experience, has developed support space guidelines to be applied on a per employee basis. These rules-of-thumb areas are useful for estimating and may be modified as needed where the organization has an unusual and atypical missionspecific requirement, for example, when filing needs are greater than usual, or where there is a proven requirement for additional space for group meetings. Guidelines for estimating office support space areas are given in Table 3.2.3.3: Office Support Space Area Guidelines.
Table 3.2.4.3: Office Support Space Area Guidelines SUPPORT SPACES Reception Area M ain DESCRIPTION APPROXIMATE SIZE net square feet 300 sf minimum (27,87 sm) FREQUENCY GUIDE
Central reception & security point for visitors Desk/counter area; display; seating for 6 Ad jac ent to e ntry lobby; near Public Inform ation a nd D ock ets Reception/waiting for senior administrators, e.g., R.A., D.D. Seating for 2-4 Public education center Information/display area Library Sm all video theater W orkstations & su pport Reference & research area W ork areas Storage of do ck ets Standard room for meetings of 6-20 people (also see Special Spaces: Conference Room) Re ference area for em ployee s, typically for a specific Division Shelving a nd s eats
1 pe r facility
Departmental
1 pe r facility
Public Information
Varies
1 pe r facility
Varies
1 pe r facility
Meeting Room
150 sf to 400 sf (13,93-37,16 sm) 200 sf (18,58 sm) maxim um; see Special Space: Library
Varies
Library/ Reference
Varies
18
Space Acquisition and Planning Guidelines Chapter 3 - Determining Space Needs SUPPORT SPACES DESCRIPTION APPROXIMATE SIZE net square feet 100-200 sf per facility (9,29 - 18,58 sm)
July 2004
FREQUENCY GUIDE
Central Evidence
Secure evidence storage room May contain sec urity files, safe If increased floor loading is required, this is Special Space
Copy Center Main/Satellite See Special Space table for Main and Satellite copy areas Distributed networked copy/printer for a clus ter of w ork station s an d offices. Can be locate d in an open easily accessible space Filling cabinets distributed in open plan office area 40 sf (3,71 sm) One per 12 - 20 employees
Convenience
Filling - General
Varies
Equipment Station
Shared station for com pute r, microfiche reader, typewriter, or other equipment Sp ace fo r work s urface and chair Closets or hanging pace for em ployee s' and visitors ' coats Am enity within office area Counter with sink a nd s torag e (proxim ate to wet stack) Coordinated system of collection for recyclable materials. Plan for 7 m aterials (wh ite pap er, ne wsprint, other paper, glass, aluminum, plastic, trash) Usual method has convenience bins distributed locally, satellite collection room each floor, and central building collection/storage Career, retirement, personal counseling Discreet access Office space devoted to these employee amenities
As needed
Close ts
0.5 sf (0,05 sm) per employee 30-35 sf (2,79-3,25 sm) Co ordinate w ith building's method
Distributed
Coffee Station
Recycling
120 sf per room (11.15 sm) 120 sf per office (11,15 sm)
19
July 2004
APPROXIMATE SIZE net square feet Oth er desirable area s that fall unde r GSA "O ffice" space lim its Child Care Center Fitness Center
SUPPORT SPACES
DESCRIPTION
FREQUENCY GUIDE
Th ese area s are des irable b ut considered office -type spac e by the GS A. Becau se it is difficult for a Region to includ e them and still ma intain 152.5 sf/pe rson (O ffic e), the best o ptio n is to share them with other agencies if possible.
3.2.5
LABORATORIES The design of laboratories is a special area of expertise that requires the extensive input of the scientists and technicians that will use them, as well as the assistance of qualified design professionals experienced in this field. This volume is not intended to replace such design expertise, but instead to provide an overview of the general requirements that will lead to a reasonably accurate estimate of the amount of space that will be needed. Volume 2 discusses in greater detail many of the aspects of laboratory design, while Volume 3, Safety, Health, and Environmental Management Manual: Safety and Health Requirements addresses the health and safety aspects of laboratory operations. Because of the specialized nature of laboratory operations, and because of their typically heavy demands on a facilitys mechanical and electrical systems, laboratories are most often constructed to meet requirements unique to that operation, and it would be unusual to find a building that is readily adaptable to the specialized program. With respect to space acquisition and space planning, the following points should be noted: The EPA recommends that laboratories be constructed to a standardized module that can be repeated and which because of its modularity can be adapted to changing mission assignments. EPA prefers a module that is at least 11' (3,353 mm) wide (center to center of demising partitions), and from 26' to 33' (7,925 to 10,058 mm) deep, and finds that a module of that size accommodates the laboratory casework on both sides, leaving aisle space between the countertops of at least 5' (1,524 mm). Depending on the number of people that are expected to work in that laboratory, and the extent of equipment and casework that they require, the room may be designed to occupy two or three lab modules, rather than a single module. It is important that the modular scheme be maintained, as this will allow the flexibility to convert labs of two or more modules to single labs, or to combine single-module labs into larger labs as program needs change. In some instances, where the flow of work is such that two laboratories need to be located side-by-side (for example, where materials to be tested require laboratory preparation work prior to analysis in a second laboratory) the two labs can be connected by a swinging or sliding door to avoid the need to move the samples or chemicals through the primary corridor. Each lab module must have direct access to shared utilities such as gases and compressed air. The space containing the facilities must be easily and fully accessible to service personnel without disturbing persons working in the labs. This separation of traffic can be achieved by providing a utility corridor behind the lab modules, or an interstitial space above the modules. All valves and dampers in service lines should be located over either the service or access corridor to allow access by service personnel.
20
July 2004
Laboratories are usually designed for a specific purpose that is defined by the program. However, most laboratories fall into one or the other of two categories: wet, that is, utilizing chemicals and processes that require plumbing and piping, as well as fume hoods; and dry, which are typically electronic. Laboratories may also be categorized as research laboratories or testing laboratories: the former intended to investigate new processes and materials, and the latter designed to test samples brought from the field to determine composition, toxicity and other properties. Research laboratories are specific to the targeted investigation and could take many forms depending on the equipment employed, while test laboratories are likely to be somewhat more standardized in layout since testing procedures (in most instances) are likely to be repetitions of previously established routines. Specialized laboratory space may be required for certain types of testing and research. Such specialized spaces may require other than standardized modular spaces. Examples include laboratories that work with animals, or with fish, or with flora. In such cases, the scientists and technicians will determine the details of the lab spaces appropriate to their specialized needs. The space planning team will need to determine the flow of work through the laboratory facility. An example of such a work flow (not necessarily the same for all lab facilities) might be: collection of samples in the field, delivery of samples to the lab building, holding of samples (perhaps in a refrigerated holding room) prior to testing, preliminary preparation of the samples in a preparation laboratory, carting of prepared samples to final testing laboratory (or laboratories), and finally removal of tested material to a hazardous waste storage facility for final disposal. Circulation throughout the laboratory facility must be carefully considered. Because of the hazardous nature of most laboratory chemicals and gases, access to the laboratory areas should be limited to authorized persons, and code-mandated fire separations must be strictly observed. Personnel corridors serving the entrances to the lab modules should be a minimum of 6' (1829 mm) wide, and the planners should be aware of the fact that these corridors are used for carting of samples and chemicals. The delivery of piped gases and chemicals to the individual laboratories is best accomplished through the use of a service passageway, access to which is restricted to technical employees, or through an overhead (interstitial) service space. Because the EPA prefers that its laboratory facilities be placed in one-story structures, vertical circulation (stairs and elevators) should not, in most cases, be necessary. Exhibit 2 provides a diagram of typical laboratory-type modules. Note, however, that some very specialized laboratories may vary because of the nature of the mission and the equipment required, and the laboratory installation must be tailored to the specific agency needs.
Because of the specialized nature of laboratories, the POR should include extensive information about the requirements of each laboratory, including the engineering details. The information is conveyed through the use of Room Data Sheets, which are to be provided for each laboratory. The Room Data Sheet should indicate location, size, and type of fume hoods, laboratory
21
July 2004
casework and countertops, room finishes, plumbing requirements (e.g., sinks, emergency showers, eyewash stations), power and signal connections, locations of required laboratory gas connections, and similar details. Appendix C of Volume 2 shows examples of Room Data Sheets for laboratories of various modular sizes. Exhibit 2 Generic Laboratory Layouts, which follows, illustrates laboratories of one, two, and three modules.
22
July 2004
23
July 2004
3.2.6
LABORATORY SUPPORT SPACES Laboratory support space includes those rooms and spaces required to support the laboratories themselves, and will vary according to the specific mission of the facility. Typically, such support spaces might include: Technical library Storage for chemicals Storage for hazardous waste Glass washing facilities Support spaces for specialized labs, such as for animal or fish research.
Room Data Sheets, similar to those provided for the laboratories themselves, should also be included in the POR to delineate the support space requirements. 3.2.7 SPECIAL SPACES Special spaces are defined as those that require modifications to the base building architectural and/or mechanical systems in order to accommodate the space uses proposed. Examples include spaces requiring reinforced floor loading capacity (libraries, high density file rooms), augmented HVAC systems (large meeting/training rooms with high occupancy rates), spaces with special electrical service requirements (computer rooms), and spaces with additional plumbing systems such as food service facilities. Table 3.2.8: Special Space Area Guidelines, which follows, describes the approximate size and frequency of Special Spaces that are typically found in EPA facilities.
TABLE 3.2.8: Table of Special Space Area Guidelines SPE CIAL SPACES Com mon Special Spaces Conference Room Meeting room with audio-visual capabilities Specialized lighting, power, HVAC Varies 400 to 800 sf (37,16 - 74,32 sm ) Minimum 1 per fac ility, preferably 1 per floor or 1 per 150 employees 1 pe r facility DESCRIPTION APPROXIMATE SIZE net square feet FREQUENCY GUIDE
Shared facility for large volume copying, collating & binding Service counter, reproduction equipment, tables, storage, recycling bins Specialized HVAC, power, acoustics
24
Space Acquisition and Planning Guidelines Chapter 3 - Determining Space Needs SPE CIAL SPACES Satellite DESCRIPTION APPROXIMATE SIZE net square feet 225 sf (20,90 sm)
July 2004
Centralized room for routine office copying 1-2 copiers, table, storage, recycling bins Specialized HVAC, power, acoustics
Com mon Special Spaces Pu blic Information Enclosed space for laser printers serving PCs, LANs Counter, paper storage For IAQ, recomm ended over providing printers in open work areas; special exhaust Specialized room for mainframe or LAN equipment and related workstations Specialized HVAC , power, telecomm unications Equipment support for networked computer services Specialized roo m for vo ice an d da ta comm unications equipment. Includes racks, table/counter for monitor and file servers Locate centrally; stack floors Requires HV AC and uninterruptib le powe r supply. Prim ary telec om m unications wiring to run from pro vider point of en try to this space for distribution to the floor. Locate such that cable run to the furthest PC on the floor does not exc eed 295 feet. Provide fo r a vertical bank of co ndu its (or sleeves thru floors), including spares for future use, to connect each vertically stacked room with the primary service. Building design should also consider the use of raised floor throughout the occupied space to facilitate cable and/or air distribution. 70 sf for 1-3 printer (6,5 sm) W alking distance maxim um 75'
Computer Room
L AN R oo m / T ele co m Ro om
Reference area for EPA employees and public Re ading are a, stack s, ca talogu ing, storage Specialized floor loading, hum idity control, lighting 25
July 2004
Space Acquisition and Planning Guidelines Chapter 3 - Determining Space Needs SPE CIAL SPACES DESCRIPTION APPROXIMATE SIZE net square feet Varies FREQUENCY GUIDE As needed
Filing: S ecu re
Enclosed a rea o r spe cial file cabinets for confidential material Specialized floor loading, fireproofing Com pact storage for files or other media, using mechanized equipment Specialized floor loading
1 H .D. unit per floor if needed & structure allows 1 pe r facility Sa tellite if split location
Receiving, storage and dispensing of office supplies; d istribution of m ail W ork area and storage Locate with easy access to service elevator Specialized floor loading Strategically located break room Tables & chairs, peak occ. 15 Pantry with sink, refrigerator, storage, m icrowave Specialized HVAC, plumbing On-site storage for records Shelving, min. interior finishes Specialized floor loading, climate control
Varies
Employee Lounge
250 sf (may be smaller if fewer employees) (23,22 sm) 500-600 sf (46,45-55,74 sm)
1 pe r facility
Desirable areas if budget permits Sophisticated, flexible multipurpose facility, A.V. c apa bility Training/ Moveable partitions, storage for Conference materials and equipment, tables, Center chairs Specialized HVAC, acoustics, lighting, audio-visual installation Video Conferencing Facility to allow multi-party meeting at 2 or more locations, using visual, voice and data comm unications Specific d esign of e quipm ent & furniture available Specialized HVAC , power, telecomm unications, lighting, acoustics
Minimum 750 sf for 1 room (24 person at tab les or 4 0 in rows) (69,68 sm)
1 pe r facility
26
Space Acquisition and Planning Guidelines Chapter 4 - Technical Aspects of Space Planning
July 2004
4.2
4.2.1
Foremost among the concerns addressed by the codes are the life safety provisions. These include measures intended to prevent the spread of fire and to make certain that, should fire break out, occupants can exit the building quickly and safely. Egress Requirements: The need to provide simple and direct means, of sufficient capacity to handle all occupants to exit space in the event of fire or other calamity is a criterion that is
27
July 2004
Space Acquisition and Planning Guidelines Chapter 4 - Technical Aspects of Space Planning
paramount in the development of space layouts. The applicable codes give design guidance with respect to building population, travel distance to exits, exit capacities, fire stair criteria, and dead end conditions. Typically, codes require that for most populations, there should be two means of egress (enclosed fire stairs and/or passages that lead to the outside). Also, occupied spaces, such as offices, workstations, laboratories and meeting rooms cannot be located in a dead end area, that is, an area more than a given distance (20' [6,100 mm] in most codes) beyond an exit corridor. Other code provisions that will affect the space layouts include the need to provide systems to alert occupants and to suppress fire: a fire alarm system, sprinkler system, fire stand pipes and hose cabinets, and fire extinguishers. 4.2.2 HANDICAPPED ACCESSIBILITY Volume 2 discusses in greater detail the requirements for meeting the accessibility requirements mandated by the Uniform Federal Accessibility Standards (UFAS), and the Americans with Disabilities Act Accessibility Guidelines (ADAAG). These two documents are equivalent in most respects but in those areas where they differ the more stringent requirements should be applied. In developing the space layouts, the designers need to provide aisle widths and maneuvering space adequate for persons in wheelchairs, and to allow proper clearances at door openings so that such openings can be easily negotiated by the handicapped. Changes in floor level will require ramps to permit the wheelchair-bound to move freely from one level to another, unless the difference in level is sufficient to justify a wheelchair lift. Those areas of an EPA facility that are open to the public must be designed to be fully accessible. Those areas not normally open to the public, such as laboratories, must be accessible or must be easily adaptable to accommodate any employee who is or may become handicapped. Refer to Volume 2 for additional requirements for the handicapped. 4.2.3 GSA FACILITIES STANDARDS PBS-P100 GSA, as the landlord for most governmental organizations, has set forth its requirements and recommendations for federal facilities in a comprehensive document titled Facilities Standards for the Public Buildings Service. This document is intended to establish general design standards and criteria for new construction and for alterations (including alterations to historic structures) and is applicable to leased space as well as to facilities owned by the government. PBS-P100 covers many of the same concerns that are addressed in this four-volume EPA Facilities Manual and should be used in conjunction with the Manual. The Standards are general criteria only and must be tailored to suit the detailed requirements of a specific project. PBSP100 is not meant to substitute for the services of a qualified design or construction professional. 4.2.4 BUILDING SYSTEMS The design of the various building systems, including HVAC systems, electrical systems (power and lighting), security systems, telecommunications systems (telephone and data), and fire alarm systems, is properly the responsibility of the A-E design team because of the technical expertise involved. Recommended standards and practices for the design of such systems are given in the Architecture and Engineering Guidelines (Volume 2) and in the GSA Facilities Standards for the
28
Space Acquisition and Planning Guidelines Chapter 4 - Technical Aspects of Space Planning
July 2004
Public Buildings Service PBS-P100 (November 2000). These documents provide general design criteria that are to be applied by competent design and construction professionals. The EPA space planning team, in the development of estimates of space required, must allow for space adequate to support the necessary mechanical, electrical and telecommunications equipment that will serve the occupiable space. Of particular concern in the design of HVAC systems is the air quality of the spaces to be occupied by EPA employees and contract employees, and the need to minimize energy use.
4.3
These goals can be achieved through thoughtful design and selection of building materials and building systems. Refer to Volumes 2 and 4 of the EPA Facilities Manual for a more detailed discussion. In order to promote sound environmental design practices, and to measure effectively the degree of success in attaining satisfactory environmental performance, the U.S. Green Building Council has developed a rating system called Leadership in Energy and Environmental Design (LEED) Green Building Rating System. More detailed information on the green building certification program may be found at http://www.usgbc.org/programs/leed.htm. All EPA buildings should be designed to achieve the highest level of LEED certification attainable. The EPA space planning team, as it develops its program for the proposed facility (whether a new building or the renovation and alteration of an existing structure), should emphasize the environmental aspects of the project. For example, the team can: Seek a site that minimizes adverse environmental conditions, such as proximity of heavy traffic or discharge of pollutants from neighboring occupancies. The site should also be chosen so as to minimize the impact that the new EPA facility will have on the environment. Require use of building materials and furnishings that are low in volatile organic compounds (VOCs) Encourage the use of building materials and products made from recycled materials and post-consumer waste, where such use is economically feasible Shun the use of toxic or hazardous materials, as well as those that deplete the ozone layer Avoid the use of materials and products from non-renewable sources Select energy-efficient building systems and require the use of automated control systems that support energy conservation
29
July 2004
Space Acquisition and Planning Guidelines Chapter 4 - Technical Aspects of Space Planning
Utilize energy-efficient lighting systems, and provide switching controlled by occupancy sensors and/or daylight sensors Encourage space planning layouts that maximize use of natural light, as an energy conservation measure as well as a means to contribute to the well-being of the employees.
30
July 2004
In the event that EPA acquires its own A-E services, it is nevertheless likely that the lessors A-E team would develop the construction documents from the DIDs provided by EPAs consultants,
31
July 2004
because the lessors A-E has a detailed knowledge of the building, local code requirements, and similar aspects of the project not necessarily available to the agencys team.
5.2
5.2.1
5.2.2
32
July 2004
Rentable Area: This is the area that consists of the sum of the Gross Measured Areas of each floor less the vertical penetrations such as stairs, elevator shafts, and mechanical shafts, and is the area for which the building owner expects to receive rent. It is also equal to the sum of the Usable Area plus the Common Area. In a building with multiple tenants, the distributed portions of Common Area allotted to each tenant plus their usable areas should equal the total rentable area.
Given the above definitions, it can be seen that because the tenant is expected to pay rent on space that he cannot physically occupy (his distributed share of the common area), it is to his advantage to lease space where the ratio of usable area to rentable area is maximized. This is a measure of the efficiency of the building and is called the R/U ratio: Rentable Area divided by Usable Area. In a typical multi-story office building, a calculation of the Floor R/U Ratio, that is, the Floor Rentable Area divided by the Floor Usable Area, a ratio that approaches 1.0 indicates a floor plate that has been designed to achieve maximum efficiency: floor R/U ratios typically range from 1.25 (less efficient) to 1.1 (more efficient). A similar calculation for the Building R/U Ratio, which incorporates the building common area (rather than only the floor common area), will generate a ratio necessarily higher than that for the typical office floor.
5.3
Plan Organization
The development of a well-organized plan design is the key first step in achieving a successful space plan. It assumes that the space planner is working from a program that lists the required number and approximate sizes of offices and workstations, as well as the support spaces associated with them. The program will also include special spaces specific to the project, such as laboratories (if required), conference and training facilities, food service, child care centers, and fitness and health facilities. If the building to be occupied is known, the planner will develop the space layouts according to the buildings characteristics. These will include: Size of floor plate. For occupancies requiring multiple floors, a floor of at least 20,000 usable square feet (1858 usable sm) minimum is preferred by EPA, although buildings offering smaller floor areas have been used in some instances. A simple plan of circulation that repeats on each floor provides for an efficient use of the space and makes occupant orientation easier. It also helps if groups of workstations are provided with a service center containing elements used by all, such as printer, fax, paper storage, and beverage station. Such service centers can be used to break up large clusters of workstations, while providing necessary support functions shared by a group of employees. Floor shape. Irregular floor configurations tend to generate less efficient space plans because they often lead to awkward circulation patterns and to corners that are difficult to use; for this reason, a simple floor plan is preferable Bay size. The spacing of columns produces the typical bay size (such as 20' by 20' or 30' x 30' [6,096 x 6,096 mm or 9,144 x 9,144 mm]) and influences the spacing of workstations and circulation aisles. A larger bay size will lead to a more efficient space
33
July 2004
layout because it will allow greater flexibility in the location of workstations. However, many older office buildings can be found where 20' x 20' (6,096 x 6,096 mm) bay sizes were used. Core to window depth. A buildings core is the central grouping of service elements, and includes elevators, fire stairs, toilet rooms, and utility closets. Because natural light is desired by the building occupants, a core-to-window depth of from 40' to 50' (12,192 to 15,240 mm) is recommended. This will permit locating the primary circulation at the core, and whatever enclosed rooms are required by the program at the interior space; in this way, maximum daylight is available to the floor occupants. Floor live load capacity. The allowable load on a floor that the structure permits is called the live load capacity. Such loads include the weight of furniture, partitions, and people. Most codes require that office floors be capable of carrying 100 lbs/sq.ft. or 1,600 kg/sm (allowing for 80 psf (1,280 kg/sm) for people and furniture, plus 20 psf (320 kg/sm) for the weight of partitions. This capacity is not sufficient to accommodate unusually heavy loads, such as high-density files or library book stacks. Where such loads are anticipated, a live load capacity of 150 to 175 psf (2,400 to 2,800 kg/sm) should be provided, preferably near the core, as spaces requiring additional capacity do not ordinarily require access to natural light. EPA typically asks that 10 to 15% of the occupiable floor space be reinforced to carry additional loads. Although the initial program may not envision full use of the requested reinforced floor area, the flexibility to be able to meet possible future needs justifies providing an adequate area for increased live load.
A key consideration in the development of a good space layout is to build in the flexibility that will allow the layout to remain workable several years into the future with a minimal need for change. To this end, as previously mentioned, the use of a limited number of office and workstation sizes is strongly encouraged. Another way in which the space layout can provide the desired flexibility is to create service nodes that provide small areas of service space (for example, print-fax-copy machines, perhaps combined with a beverage station and paper/supplies storage). Such nodes can be placed to break up long expanses of aisle and can also serve as a landmark to identify an organizational unit. As noted before, small team meeting rooms of appropriate size that can be interchangeable with typical offices will add to the desired flexibility. Such team rooms, if provided, should anticipate the possibility of changed use in the future and should, therefore, allow for such change by providing blocking in the walls as needed to carry future furniture workstations or wall-mounted equipment. Exhibit 3 shows a typical office floor of an EPA facility illustrating the circulation, use of service nodes, and reinforced areas to receive increased live loads. The planning team will need to take into consideration the functional relationships or adjacencies that should exist between organizational components. In many cases, the work flow does not require a circulation connection from one organizational group to another, and whatever need for communication between groups can be efficiently handled by in-house networks. In other
34
July 2004
situations, the optimal work pattern will suggest the need for one group to be located close to another (or perhaps close to several other groups). Such adjacencies are best determined by those persons in senior management who are most familiar with organizations operations and procedures, and these functional relationships should be described in the POR. A bubble diagram showing the desired relationships is a useful way to communicate graphically the appropriate adjacencies. An example of such a bubble diagram is given in Exhibit 4.
35
July 2004
36
July 2004
37
July 2004
5.4
5.4.1
BLOCK DESIGNATIONS For its facilities housing both laboratories and administrative functions, the EPA has adopted a convention of assigning block designations for the major components of the facility. This practice provides a readily identifiable way to organize the various functions and more easily see the functional relationships among the different space uses. Block designations for such facilities include: Block A: General Office Space Block B: Administrative Support Space Block C: Laboratory Space Block D: Laboratory Support Space Block E: General Support Space
Because of the different uses of the space, the need to provide separate and usually more complex mechanical systems to serve the laboratories, and the possibility of additional hazards present in the laboratory areas, it is often necessary (i.e., required by code) or at least desirable to separate the laboratory and lab support blocks from the other blocks with fire-rated construction. Where the proposed facility consists only of office and office support space, the use of block designations is less useful and is therefore omitted. 5.4.2 STACKING For facilities of more than one story, the stacking aspect of the diagram refers to the placement of organizations by floor. For example, if the facility under consideration has spaces and functions that serve the public, such as libraries and training rooms, the blocking and stacking diagram would, in all likelihood, locate such spaces on the ground floor, while spaces seldom visited by many employees or by the public might best be placed on upper floors. The disposition of the vertical circulation elementspassenger elevators and lobbies, service elevators, stairs and escalatorsbecomes an important part of the stacking diagram. It is readily apparent that, depending on the size of the organization to be housed, a blocking and stacking diagram can become rather complex because many varying factors must be considered: building size, number of floors, bay sizes, organization sizes, functional relationships, locations of entry points and service delivery points. A program of such complexity would clearly benefit from the services of an experienced professional space planner. Exhibit 5 is a stacking diagram of part of EPAs Headquarters facility, illustrating the placement of various organizational components within the office building structures.
38
July 2004
EXHIBIT 5
July 2004
5.5
5.6
Circulation Factor
In arriving at a reasonable estimate of the amount of space required to house the offices and laboratories (if any) in the program, an allowance for circulation space must be included. Because the amount of circulation space necessary varies, depending on the floor plate of the building under consideration, as well as the proposed mix of offices and workstations, no one factor is suitable for all conditions. For preliminary planning purposes, a circulation factor (for secondary circulation) of 40% can be applied to the net area of office space to be included in Block A, and the administrative support space, Block B. For large special spaces such as conference/training centers, cafeterias, and warehouses, a smaller allowance for circulation can
40
July 2004
be assumed. No factor is suggested here; the space planning team should examine the net area of the large special space and develop a rough hypothetical arrangement to arrive at a reasonable circulation pattern and an estimate of space required for circulation. Similarly, the Laboratory, Lab Support, and General Storage blocks are comprised of large elements that can be connected by primary corridors the areas of which can usually be estimated if the size of the proposed floor plate can be determined, so a smaller factor (10% to 15%) can be assumed at the outset of the planning process. Note that it will also be necessary to include an allowance for service passageways to serve the laboratories, as discussed above.
5.7
Tab le 5.8: Exam ple of T ypical Sum ma ry of Program Spac e Req uirem ents Key to Block Designations A General Office (and Workstation) Space (with Circulation @ 40%) B Administrative Support Space (with Circulation @ 40%) C Laboratory Space (with Circulation @ 10%) D Laboratory Support Space (with Circulation @ 10%) E General Warehouse and Storage Space (no allowance for Circulation) Unnamed EPA Office/Laboratory Organization Immediate Office Director's Office Deputy Director's Office Assoc. Director's Office Sr. Professional Offices Clerical Workstations Files Copier Equipment Station Beverage Station Director's Conf. Room Totals: PersNo. ons Items C 1 D 1 D F G -----15 1 9 3 10 1 1 1 1 * Area 250 180 170 720 192 90 30 20 20 240 1912 Circ. 100 72 68 288 77 77 12 8 8 96 806 A Block Designations B C D E Totals 350 252 238 1,008 269 167 42 28 28 336 2,718
41
July 2004
Space Acquisition and Planning Guidelines Chapter 5 - Principles of Space Planning PersNo. ons Items D 1 F 6 F G -----30 20 3 1 20 1 1 1 * Area 180 720 1600 192 300 180 30 20 20 3242 Circ. 72 288 640 77 120 72 12 8 8 1297 A 252 1008 2240 269 420 252 42 28 28 4539 B C D E Totals 252 1,008 2,240 269 420 252 42 28 28 4,539
Branch I Branch Chief Office Sr. Professional Offices Professional Offices Clerical Workstations Meeting Room Files Copier Equipment Station Beverage Station Totals: Branch II Branch Chief Office Sr. Professional Offices Professional Offices Clerical Workstations Meeting Room Files Copier Equipment Station Beverage Station Totals: Branch III Branch Chief Office Sr. Professional Offices Professional Offices Clerical Workstations Meeting Room Files Copier Equipment Station Beverage Station Totals:
D F F G ------
1 4 24 5 2 15 1 1 1 34
G F F G ------
1 -10 5 1 12 1 1 1 16
42
July 2004
Laboratory Branch Branch Chief Office Sr. Professional Offices Professional Offices Clerical Workstations Meeting Room Files Copier Equipment Station Beverage Station Laboratories: Organic Preparation Gas Chromatograph Hazardous Waste Prep. Inorg. Prep. Trace Level Inorg, Prep. High Conc. Inorg. Instr. Met. Analysis Inorg. Instr Non-Met. Anal. Inorg. Instr. Radiation Asbestos Testing Dishwashing Laboratory Support Hazardous Receiving Environmental Receiving Solvent Storage Inorg. Standards Stor. Organic Standards Stor. Gas Storage Technical Library Terminal/Meeting Room Totals:
Circ. 72 192
-----------
1 1 2 1 1 2 1 1 1 1
792 264 792 264 528 528 528 264 264 792
79 26 79 26 53 53 53 26 26 79
871 290 871 290 581 581 581 290 290 871
871 290 871 290 581 581 581 290 290 871
------
1 1 1 1 1
106 79 26 26 26
(to be located outside of building; enclosed by fence) -1 528 53 -1 528 53 41 12,593 2421
43
July 2004
Administrative Support Main Reception Area Mail Room Video Conference Room General Training Room Break Room Central Files (high density) Totals: General Warehousing Shipping & Receiving Central Storage Totals:
* ------
Persons
No. Items 1 1 1 1 1 1
1 1
---Circ.
TOTALS:
Perso ns 136
Block Block Block Block Block TOTAL A C D E B 7,345 19,736 2,020 5,516 15,014 4,000 46,286
Ba sed on abo ve sum mary, a facility w ith app roximately 46,500 u sab le sq .ft. (432 0 sq . m.) is required.
Notes: All area s are in squ are feet. Lab orato ry area s ba sed on assu m ed m odu le of 11' x 24 ' = 264 sq.ft. No allowance has been included for toilet rooms or for mechanical equipment rooms, telephone/data closets and electrical closets (including UPS roo m s). In addition to areas summ arized above, most laboratory installations will require a hazardous materials storage facility (HMSF, designated Block F) which should be located in a building sep arate d from the m ain structu re. Size of the H MS F: from 1,200 to 1,800 sq.ft. (1 11 to 167 sq. m .)
44
July 2004
45
July 2004
Acoustics. The use of sound-absorbing materials for systems furniture panels will contribute to a reduction in ambient noise levels within the space. The planning team should make certain that the system chosen is acoustically acceptable and should compare sound-absorbing performance data among the various suppliers. Lighting. Most manufacturers offer lighting units that mount to the underside of overhead cabinets. Such lighting reduces the need for convenience outlets at the desk top for movable task lights. Environmental Adequacy. Because the furnitures materials and fabrics could affect the indoor air quality, the planning team should verify that environmental criteria are met. See Chapter 5 of the Safety and Health Manual (Volume 3 of the EPA Facilities Manual) for discussion of indoor air quality considerations. Environmental Control. In recent years, designers and engineers have developed integrated systems that permit the occupant of a systems-type workstation to control at his desk the delivery of tempered air to his space and the level of lighting. Such integrated systems typically require a raised-access floor as part of the air-delivery scheme. The planning team may want to consider the use of such a system, as it provides the state of the art in environmental control of the workstation. Delivery and Installation. The project schedule establishes dates for occupancy of the facility, and the furniture supplier will have to be ready to ship and to install his product in the time period specified.
The choice of a particular furniture system is also dependent on federal procurement regulations, which require that the procurement process be open and competitive such that all competent manufacturers have the opportunity to submit an offer. For this reason, it is important for the agency (and its design consultants) to prepare detailed specifications providing the performance criteria for the furniture, including (where appropriate) the requirement to test a representative workstation in an environmental chamber to verify that the product will not off-gas an unacceptable level of VOCs. The furniture industry also continues to evolve in response to technological change. Depending upon the size of procurement, it behooves the project managers to undertake comparative evaluation of available systems, components, and case goods, to identify products that best meet their needs for flexibility, systems integration, ergonomics, and durability. The agency should also be aware that most furniture vendors provide substantial discounts from book prices for large volume purchases by federal agencies, and a comparison of final, discounted prices should be made prior to making a final commitment to a particular vendor. A wide variety of systems furniture is available today. There is also much variation in construction, ergonomics, durability, flexibility, and adaptability among the models offered. The sustainable environment characteristics of these systems, of concern to EPAs mission, also varies significantly. In the process of interior build-out and furnishing, careful attention should be given to the above characteristics. Since furniture is a large up-front cost and will be in use for several years, a thorough analysis of the available systems should be undertaken to ensure that the selected model (or combinations) best serve the specific user-group requirements.
46
July 2004
Available furniture systems may be categorized into three primary types: Freestanding and non-panel systems: The former utilizes legs or other base support for work surfaces and stanchions for overhead storage units, and the latter may use wall-mounted tracks for supporting work surfaces and overhead storage. These systems do not require additional reinforcement in the wall. Panel based systems: Consist of stacking panels or tiles in a variety of finishes including glazed tiles. They are optionally available as powered or non-powered systems. Work surfaces and overhead storage are attached to the panels. Spine or service wall based systems: A modified panel system that is self-supporting, stackable, integrates with other systems, allows off-modularity, and has substantial handling capability for data and power cables.
Programmatic requirements of the user-groups will be instrumental in identifying criteria for comparative analysis of available systems. The selection team may, in addition, visit existing installations of the systems being considered and obtain feed-back from managers of those facilities. Among others, criteria may include: Panels: Stacking capability Thickness Width options Acoustic ratings (NRC and STC) Desk-Mounted Screens: Stacking capability Thickness Acoustic ratings (NRC and STC) Off-Modularity: - of panel connection - of overhead storage unit location Interchangeability: - of work surfaces between various systems with change of brackets - of overhead storage units between various systems Power / Data: Provision of outlets at desk height Access to wall outlets in private offices Concealed wire management and adequate cable carrying capacity Adequate separation between power and data cables Number of circuits accommodated Length of base feed Fiber-optic capability Furniture Components: One-touch counterbalanced overhead storage unit User-adjustable work surface height Stackable lateral file units Adequate variety of work surface shapes and sizes
47
July 2004
Variety and quality of work surface finishes Miscellaneous: Sliding panels for privacy or securing the workstation
From an operations perspective, it is beneficial to select systems furniture with components that are interchangeable for optional configurations or between various applications (for example, enclosed offices and workstations). This allows for optimal inventory size and relative ease of modification for different user types.
6.2
48
July 2004
6.3
Telecommunications
The planning of office and laboratory space for the EPA requires that close attention be given to provisions for telecommunications and for networking of computer systems. Such provisions should include adequate outlets to serve the voice and data needs for each office and workstation. These considerations are discussed in substantial technical detail in Section 16 of Volume 2 Architecture and Engineering Guidelines and will not be repeated here. The space planning team needs to address the following points as it develops the program for the proposed facility: What provision must be made to bring telephone service to the building, and what space will be require to house the service entrance equipment. Where security is a prime consideration, and the need to maintain operations in the event of a disaster is very important, provision for redundant service may be considered as a requirement. Vertical distribution of telephone and data cabling is typically accomplished through vertical conduit serving stacked closets on each floor. Empty sleeves for future conduit allows for future expansion. Where EPA shares space in a multi-tenant building, care should be taken to isolate EPAs distribution system from that of the other tenants for security reasons. How will telephone service be distributed to the various offices and workstations? Typically, closets at each floor of the building are provided, from which horizontal cables will distribute service to each outlet. The size of such closets is determined by standards established by the Electronics Industries Association (EIA) and by the requirements of the EPA Structured Wiring/Telecommunications Guidelines. Closets shall also be sized to allow for an increase of capacity of up to 25%. Horizontal distribution at each floor can be accomplished in several ways. The use of raised access flooring for both power and electrical cabling provides the greatest flexibility, as it permits the ready relocation of outlets. Raised access flooring is recommended by GSA for new structures. In existing structures without such flooring, or where its use is precluded because of cost, horizontal distribution by means of cable trays located above a suspended ceiling or by conduit beneath the floor slab feeding poke-through floor fittings is suggested. EPA recommends that the use of power poles be avoided, as they are considered unsightly. The space planning team must also consider its requirements for computer networking. In larger facilities, one or more central computer rooms may be required, serving LAN closets adjacent to, or sharing space with, the telecommunications closets. Distribution of cabling from the LAN closets utilizes the same system as the telephone system: raised flooring, cable tray, or poke-throughs. Consideration must also be given by the planning team to other possible communications needs. Will the EPA facility need rooftop antennae for satellite reception? Will videoteleconferencing be part of the program? What about closed-circuit television for security monitoring? Should there be outlets for broadcast and/or cable TV?
49
July 2004
Note that EPA typically designs and provides its own telecommunications system, and that the building landlord is expected to furnish only the infrastructure ready to receive the cable distribution system that will be installed by EPA and its contractor. However, it is important that the space planning team and its professional designers make complete provision for this work. The number of telephone outlets and computer outlets to be provided in offices, workstations and laboratories is given in Section 16.12 of Volume 2, Communication Systems, on a per unit basis. Quantities thus determined are useful for preliminary planning purposes, and can be refined when design drawings are developed.
6.4
Note that many EPA facilities require the support of emergency power, beyond that provided for base building life safety systems (e.g., emergency lighting, fire pumps): for example, computer systems where mission-critical, and laboratory equipment that must remain functional in the event of a power outage. A UPS system that provides continuity of service until stand-by power kicks in will serve to prevent loss of important computer data. The design of such electrical systems is the province of the buildings A-E design team, but the agencys planning team will be responsible for providing the design criteria (that is, which items of equipment require back-up power and/or UPS support) to the A-E team.
50
July 2004
Index
Aisle Space . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 Acoustics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 Base B uilding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Blocking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 Bubble Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Budgeting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5, 6 Building Codes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27 Building Shell . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6, 7 Building Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 Central Evidence Spaces . . . . . . . . . . . . . . . . . . . . . . 18 Child Care Spaces . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Circulation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40 Common Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 Constructio n Do cuments . . . . . . . . . . . . . . . . . . . . . . 31 Cubicles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 Customization Allowance . . . . . . . . . . . . . . . . . . . . 6, 7 Design Intent D rawings (DIDs) . . . . . . . . . . . . . . . . . 31 Dry Laboratories . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 Egress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27, 40 Energy Conservation . . . . . . . . . . . . . . . . . . . . . . . . . 29 Environmental Considerations . . . . . . . . . . . . . . . 13, 29 Fume Hoods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 Furniture . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 General Allowance . . . . . . . . . . . . . . . . . . . . . . . . . 6, 7 General Use Classification . . . . . . . . . . . . . . . . . . . . 11 Gross Measured Area . . . . . . . . . . . . . . . . . . . . . . . . 32 GSA Facilities Standards PBS-P100 . . . . . . . . . . . . . 28 Handica ppe d Ac cessibility . . . . . . . . . . . . . . . . . . . . 28 Historic Structures . . . . . . . . . . . . . . . . . . . . . . . . 13, 14 Laboratories . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 Laboratory Casework . . . . . . . . . . . . . . . . . . . . . . . . 48 Laboratory Modules . . . . . . . . . . . . . . . . . . . . . . . . . 23 Laboratory Support Spaces . . . . . . . . . . . . . . . . . . . . 24 51 LEED Building Rating System . . . . . . . . . . . . . . . . 29 Library . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Lighting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 Live Load Cap acity . . . . . . . . . . . . . . . . . . . . . . . . . 34 Loose Furniture . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45 Meeting Rooms . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Metric Design Guide . . . . . . . . . . . . . . . . . . . . . . . . 32 Office Support Space . . . . . . . . . . . . . . . . . . . . . 18, 19 Pan els . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47 Pollution Prevention . . . . . . . . . . . . . . . . . . . . . . . . 29 Pricing Desk Guide . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Program of Requirements (POR) . . . . . . . . . . . . . . . . 4 Pub lic Do ckets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Public Information Spaces . . . . . . . . . . . . . . . . . . . . 18 Reception Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 Rentable Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Req uest for P roposals . . . . . . . . . . . . . . . . . . . . . . . 31 Research Laboratories . . . . . . . . . . . . . . . . . . . . . . . 21 Resource Conservation . . . . . . . . . . . . . . . . . . . . . . 29 Room D ata Sheets . . . . . . . . . . . . . . . . . . . . . . . 22, 48 R/U Ratio . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33 Security . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Site Selection . . . . . . . . . . . . . . . . . . . . . . . . . . . 12, 13 Solicitation for Offers (SFO) . . . . . . . . . . . . . . . . . . . 4 Space Acquisition . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 Space Allocation . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 Special Spaces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 Stacking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38 Systems Furniture . . . . . . . . . . . . . . . . . . . . . . . . . . 45 Telecomm unications . . . . . . . . . . . . . . . . . . . . . . . . 48 Tenant Areas . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 Tenant Im provements . . . . . . . . . . . . . . . . . . . . 6, 7, 9 Testing Laboratories . . . . . . . . . . . . . . . . . . . . . . . . 21
July 2004
Uninterrupted Power Supply (UPS) . . . . . . . . . . . . . 50 Universal Workstation . . . . . . . . . . . . . . . . . . . . . 15, 17 Usable Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32 W et Laboratories . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
52