At a glance
Powered by AI
The document discusses SENER, an engineering company, and their work in developing Floating Storage Regasification Units (FSRUs) as an alternative for LNG import terminals. SENER operates across various industries including aerospace, energy, and construction.

SENER is a private engineering group that operates across industries like aerospace, energy and construction. It has various business units and affiliates around the world focused on areas such as gas turbines, aerospace components, energy processes and more.

FSRUs provide an alternative to traditional onshore LNG import terminals that have longer permitting processes. They allow for additional worldwide regasification capacity and are not as restricted by site limitations as onshore facilities. The use of FSRUs is changing the LNG production chain upstream, midstream and downstream.

FLOATING STORAGE REGASIFICATION UNITS

June 2012

CONTENTS
SENER OVERVIEW SENER FSRU DESIGN REASONS FSRU DEVELOPMENTS

SENER, Ingeniera y Sistemas, S.A.

CONTENTS
SENER OVERVIEW SENER FSRU DESIGN REASONS FSRU DEVELOPMENTS

SENER, Ingeniera y Sistemas, S.A.

SENER OVERVIEW
GRUPO DE INGENIERA
Aeronautical Industry y
GAS TURBINES

g g & Construction Engineering


SENER INGENIERA Y SISTEMAS O O

Energy gy & Environment


MUNICIPAL WASTE TO ENERGY

ITP (53,1%)

BUSINESS UNITS
- Aerospace - Civil & Architecture - Energy & Processes - Marine

ZABALGARBI (30%)
FARM WASTE TREATMENT

- Design, development and technology - Manufacturing of components and module integration - In service support

TRACJUSA (42%)
LOCATIONS
- Bilbao - Buenos Aires - Madrid - Algiers - Barcelona - Warsaw - Seville - Abu Dhabi V l i Ok - Valencia - Okayama - Lisbon - San Francisco - Mxico DF - So Paulo

O O O

MARKETS
- Large civil aircraft - Defence - Industrial turbines - Small civil aircraft - Helicopters

VALPUREN COMATUR (95%) VALPUREN BAUELO (93%)


C.S.P.

AFFILIATES & PARTICIPATIONS


- ITP ENGINES UK (100%) - TURBORREACTORES (100%) - AEROMARITIME GROUP (100%) - ITA (100%) - PRECICAST BILBAO (60%) KEY: O Operating C Construction

TORRESOL ENERGY (60%)


AFFILIATES & PARTICIPATIONS
- III (100%) - ENGIVIA (100%) - NTE-SENER (100%) - HISDESAT (5%) GEMASOLAR (100%) ARCOSOL (Valle 1) (100%) TERMESOL (Valle 2) (100%) O C C

SENER, Ingeniera y Sistemas, S.A.

SENER OVERVIEW SENER FACTS AND FIGURES


OWNERSHIP
Year 2011
Turnover Employees p y

S.G.I.
1,160 M 5, 165

S.I.S.
653 M 2,243

100% Private DISTINCTIVE VALUES Innovation

NON SPANISH SALES

57 %

Quality Independence

SENER, Ingeniera y Sistemas, S.A.

Up

CONTENTS
SENER OVERVIEW SENER FSRU DESIGN REASONS FSRU DEVELOPMENTS

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DESIGN REASONS

Considering C id i the h situation i i of f Nuclear N l P Power N Natural lG Gas i is not the h "source " of f energy of transition" Natural Gas is the Source of Energy for the next 30 years Actually there is a need for additional world wide regasification capacity .

In these circumstances, there are cases where FRSU is an alternative Such facilities are not subject to so long process for obtaining permits as required by the onshore regasification plants

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DESIGN REASONS


Offshore regasification is changing the philosophy of the LNG production chain Upstream Midstream Downstream

Traditional
Gas Field Liquefaction Facility LNG Storage Tank LNG Tanker LNG Storage Tank Vaporizers To Pipeline System

Storage -Regasification Offshore

Today
Gas Field Liquefaction Facility LNG Storage Tank To Pipeline System

Future

Liquefaction, Storage and Regasification Offshore


To Pipeline System

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DESIGN REASONS


The sum of SENER's capabilities on Naval Design LNG Regasification Terminal Combined Cycle

SENER FSRU DESIGN

SENER, Ingeniera y Sistemas, S.A.

COMBINED CYCLES EXPERIENCE

SENER, Ingeniera y Sistemas, S.A.

MAIN COMBINED CYCLES EXPERIENCE


Project CCC NORTE (Mxico) CCC PILAR (Argentina) CCC MANUEL BELGRANO (A (Argentina) ti ) CCC San Martn (Argentina) CCC SAN LORENZO (Mxico) CCC TERMOZULIA II (Venezuela) CCC EL VENT (Spain) CCC BIZKAIA ENERGA (Spain) CCC ARCOS III (Spain) CCC ESCOMBRERAS (IV) (Spain) CCC ACECA (Spain) CCC VALLADOLID (Mxico) CCC TERMOZULIA III (Venezuela) CCC AGUA PRIETA II (Mxico) Power MW 450 500 800 800 116 490 400 800 800 800 400 600 500 400

SENER, Ingeniera y Sistemas, S.A.

Up

LNG TERMINAL EXPERIENCE

SENER, Ingeniera y Sistemas, S.A.

MAIN LNG TERMINAL EXPERIENCE

Project LNG Regasification Plant. Sagunto (Spain) LNG Regasification Plant. Barcelona (Spain) LNG Regasification Plant. Huelva (Spain) LNG Regasification Plant. Bilbao (Spain) Plant (Netherlands) LNG GATE Regasification Plant. LNG Dunkerque Regasification Plant (France)

SENER, Ingeniera y Sistemas, S.A.

Up

NAVAL EXPERIENCE

System:

Global leader in ship building with 3D CAD/CAE/CAM. Currently used in 150 shipyards and design offices located in 30 countries
SENER, Ingeniera y Sistemas, S.A.

MAIN NAVAL EXPERIENCE


Project Sea Cloud II Hussar MARTN I SOLER 4000 DWT BARGE Ro-Pax M/S Viking ADCC Ro Ro - Acciona Ro-Ro Sierra Laurel Chemical vessels for Huelva Rescue Tugs for UNV SWATH Aliswath 3000 DWT BARGE City Cat 40 TAIPAN Texaco captain FPSO (*) Petro jarl IV FPSO Uisge Grom FPSO Alba FPSO GM 4000 Semisub Drilling Rig (*) ( ) floating gp production, , storage g and offloading g Length (m) 135,70 152 50 152,50 75,13 138,79 209 43 209,43 117,27 140,00 35,46 64,00 63,99 39,70 140,40 214,70 220,00 228 50 228,50 237,20 N.A. FO ORAN So oftware to ool develo oped by S Sener

SENER, Ingeniera y Sistemas, S.A.

Up

CONTENTS
SENER OVERVIEW SENER FSRU DESIGN REASONS FSRU DEVELOPMENTS

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS

The niche market of this FSRU is in broad outline: Offshore Off h terminals t i l project j t "Low "L capacity it of f send d out t < 5 BCMA" Permanent LNG facilities. FSRU new construction specific for each client. Perfect integration with combined cycles onshore Far away of facilities which only renting the send out capacity temporarily

Our design ranges covers the following performances


Sendout (bcma) 0,2 5,0 Storage capacity (m3) 20.000 - 200.000 Sendout pressure (bar) 25 - 100 Berthing Jetty Turret Island Jetty

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS


SENER has developed some specific project shown in the following slides

OFF SHORE FSRU TURRET MOORED

ON SHORE JETTY

OFF SHORE ISLAND JETTY

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS OFF SHORE FSRU TURRET MOORED

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS OFF SHORE FSRU TURRET MOORED


- FLOATING STORAGE AND REGASIFICATION PLANT FOCUSED TO A 160 MW GT CONSUMER - STORAGE CAPACITY 60.000 M3 - AVERAGE REGASIFICATION SEND-OUT 0,5 BCMA AT 50 BAR - BUFFER LNG AUTONOMY FOR 30 DAYS WHEN OPERATING AT THE DESIGN SEND-OUT - LNG CARRIERS ROTATION EVERY 15 DAYS - DOUBLE-HULLED STEEL VESSEL WITH FOUR LNG TANKS USING MEMBRANE CONTAINMENT SYSTEM - BOIL-OFF RATE 0,15% VOL. / DAY - GAS SENT TO SHORE VIA EXPORT RISERS THROUGH TURRET LOCATED AT BOW - OPERATION WHILE PERMANENTLY MOORED AT A FIELD LOCATION - LARGE PROCESS FACILITIES AREA, LIVING QUARTERS AND HELIDECK - LNG TRANSFER IN SIDE-BY-SIDE CONFIGURATION USING CONVENTIONAL LOADING ARMS

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS OFF SHORE FSRU TURRET MOORED

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS OFF SHORE FSRU TURRET MOORED


- LENGTH Between Perpendiculars.: 161,00 m - BREADTH: 34,80 m - DEPTH: 20,60 m - SCANTLING DRAUGH 9,00 m

SENER, Ingeniera y Sistemas, S.A.

Up

SENER FSRU DEVELOPMENTS OFF SHORE - JETTY

FSRU is permanently moored to a dual berth jetty A subsea pipeline conducts the NG to an onshore ORF

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS OFF SHORE - JETTY


FSRU D bl hull Double h ll non self lf propelled ll d vessel l Insulation of tanks is provided by means of a membrane technology Center line C li longitudinal l i di l bulkhead b lkh d creates two rows of f tanks k i in order d to avoid sloshing Accommodation is provided for 45 people, including Re-gasification Pl Plant operators and d Shi Ship crew

Main Particulars are as follows: Length over all (LOA) Length between Perpendiculars (LBP) Breadth ( (Moulded) ) Depth to Trunk Deck Deadweight at design draught LNG Storage Capacity 245.70 m 245.70 m 47.00 m 32.44 m 74.800 T 163,000 m3

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS OFF SHORE - JETTY


Re-gasification Process Main i re-gasification ifi i facilities f ili i are LNG loading/unloading systems located in the Jetty LNG handling h dli system Re-gasification section BOG (Boil-off (B il ff gas) ) handling h dli systems NG handling systems which send the NG to the subsea pipeline

Main Particulars are as follows: Operating pressure range: Operating temperature range: Design gas send-out pressure: Maximum gas send-out flow: Gas send-out temperature (min.): 40 bar g (start up) / 80 bar g (max) 0 C 38 C 95 bar g 2,5 MTPA = 365300 Ncm/h = (3,2 bcma) 6 C

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS OFF SHORE - JETTY


Jetty D bl berth Double b h pilled ill d jetty j Able to receive a LNG carriers ranging from 240 to 315 m LOA (up to 217,000 m3 capacity and 12 m of draft) and the FSRU vessel Supported by 1.800 mm diameter piles Total Surface 3.400 m2

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS OFF SHORE - JETTY


Subsea Gas Pipeline C Connects the h Jetty with i h the h OR ORF (O (Onshore h receiving i i f facilities) ili i ) Nominal diameter of 20 Two fiber-optic T fib i cables bl are i installed ll d with i h the h same routing i as the h gas pipeline

Onshore Receiving Facilities (ORF) Gas is treated at the Pipeline Filters and measured at the Metering skids the heating value and Wobbe index from the gas chromatograph. skids, chromatograph Block valves are incorporated to allow isolation Operating pressure range is 40 bar g (start up) / 80 bar g (max) and operating temperature range: 0 C C 38 C C.

SENER, Ingeniera y Sistemas, S.A.

Up

SENER FSRU DEVELOPMENTS ON SHORE

FSRU is permanently moored to a dual berth jetty An access platform conducts the NG to an onshore ORF The LNG carriers will be moored to the other side of the jetty
SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS ON SHORE


FSRU Double hull non self propelled vessel Insulation of tanks is provided by means of a membrane technology Does not include a center line longitudinal bulkhead There is no sloshing problems thanks to this location in sheltered waters, so the FSRU structure can be lightened Four LNG tanks with a total LNG storage capacity of 182.000 182 000 m3

Main Particulars are as follows: Length over all (LOA) Length between Perpendiculars (LBP) Breadth (Moulded) Depth to Trunk Deck Deadweight at design draught LNG Storage Capacity
SENER, Ingeniera y Sistemas, S.A.

245.70 m 245.70 m 47.00 m 32.44 m 82.700 T 182,000 m3

SENER FSRU DEVELOPMENTS ON SHORE


Re-gasification Process Main i re-gasification ifi i facilities f ili i are LNG loading/unloading systems located in the Jetty LNG handling h dli system Re-gasification section BOG (Boil-off (B il ff gas) ) handling h dli systems NG handling systems which send the NG to the pipeline

Main Particulars are as follows: Operating pressure range: Operating temperature range: Design gas send-out pressure: Maximum gas send-out flow: Gas send-out temperature (min.): 40 bar g (start up) / 80 bar g (max) 0 C 38 C 95 bar g 2,5 MTPA = 365300 Ncm/h = (3,2 bcma) 6 C

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS ON SHORE


Jetty D bl berth Double b h pilled ill d jetty j Able to receive a LNG carriers ranging from 240 to 315 m LOA (up to 217,000 m3 capacity and 12 m of draft) and the FSRU vessel Supported by 1.200 mm diameter piles Total Surface 9.400 m2

SENER, Ingeniera y Sistemas, S.A.

SENER FSRU DEVELOPMENTS ON SHORE


Access Platform Includes l d the h pipe i rack k 12m width earth embankment which starts at the shore and finishes at the end of the jetty (mooring dolphins)

Onshore Receiving Facilities (ORF) Gas is treated at the Pipeline Filters and measured at the Metering skids the heating value and Wobbe index from the gas chromatograph. skids, chromatograph Block valves are incorporated to allow isolation Operating pressure range is 40 bar g (start up) / 80 bar g (max) and operating temperature range: 0 C C 38 C C.

SENER, Ingeniera y Sistemas, S.A.

Up

THANK YOU