Sener Fsru English
Sener Fsru English
Sener Fsru English
June 2012
CONTENTS
SENER OVERVIEW SENER FSRU DESIGN REASONS FSRU DEVELOPMENTS
CONTENTS
SENER OVERVIEW SENER FSRU DESIGN REASONS FSRU DEVELOPMENTS
SENER OVERVIEW
GRUPO DE INGENIERA
Aeronautical Industry y
GAS TURBINES
ITP (53,1%)
BUSINESS UNITS
- Aerospace - Civil & Architecture - Energy & Processes - Marine
ZABALGARBI (30%)
FARM WASTE TREATMENT
- Design, development and technology - Manufacturing of components and module integration - In service support
TRACJUSA (42%)
LOCATIONS
- Bilbao - Buenos Aires - Madrid - Algiers - Barcelona - Warsaw - Seville - Abu Dhabi V l i Ok - Valencia - Okayama - Lisbon - San Francisco - Mxico DF - So Paulo
O O O
MARKETS
- Large civil aircraft - Defence - Industrial turbines - Small civil aircraft - Helicopters
S.G.I.
1,160 M 5, 165
S.I.S.
653 M 2,243
57 %
Quality Independence
Up
CONTENTS
SENER OVERVIEW SENER FSRU DESIGN REASONS FSRU DEVELOPMENTS
Considering C id i the h situation i i of f Nuclear N l P Power N Natural lG Gas i is not the h "source " of f energy of transition" Natural Gas is the Source of Energy for the next 30 years Actually there is a need for additional world wide regasification capacity .
In these circumstances, there are cases where FRSU is an alternative Such facilities are not subject to so long process for obtaining permits as required by the onshore regasification plants
Traditional
Gas Field Liquefaction Facility LNG Storage Tank LNG Tanker LNG Storage Tank Vaporizers To Pipeline System
Today
Gas Field Liquefaction Facility LNG Storage Tank To Pipeline System
Future
Up
Project LNG Regasification Plant. Sagunto (Spain) LNG Regasification Plant. Barcelona (Spain) LNG Regasification Plant. Huelva (Spain) LNG Regasification Plant. Bilbao (Spain) Plant (Netherlands) LNG GATE Regasification Plant. LNG Dunkerque Regasification Plant (France)
Up
NAVAL EXPERIENCE
System:
Global leader in ship building with 3D CAD/CAE/CAM. Currently used in 150 shipyards and design offices located in 30 countries
SENER, Ingeniera y Sistemas, S.A.
Up
CONTENTS
SENER OVERVIEW SENER FSRU DESIGN REASONS FSRU DEVELOPMENTS
The niche market of this FSRU is in broad outline: Offshore Off h terminals t i l project j t "Low "L capacity it of f send d out t < 5 BCMA" Permanent LNG facilities. FSRU new construction specific for each client. Perfect integration with combined cycles onshore Far away of facilities which only renting the send out capacity temporarily
ON SHORE JETTY
Up
FSRU is permanently moored to a dual berth jetty A subsea pipeline conducts the NG to an onshore ORF
Main Particulars are as follows: Length over all (LOA) Length between Perpendiculars (LBP) Breadth ( (Moulded) ) Depth to Trunk Deck Deadweight at design draught LNG Storage Capacity 245.70 m 245.70 m 47.00 m 32.44 m 74.800 T 163,000 m3
Main Particulars are as follows: Operating pressure range: Operating temperature range: Design gas send-out pressure: Maximum gas send-out flow: Gas send-out temperature (min.): 40 bar g (start up) / 80 bar g (max) 0 C 38 C 95 bar g 2,5 MTPA = 365300 Ncm/h = (3,2 bcma) 6 C
Onshore Receiving Facilities (ORF) Gas is treated at the Pipeline Filters and measured at the Metering skids the heating value and Wobbe index from the gas chromatograph. skids, chromatograph Block valves are incorporated to allow isolation Operating pressure range is 40 bar g (start up) / 80 bar g (max) and operating temperature range: 0 C C 38 C C.
Up
FSRU is permanently moored to a dual berth jetty An access platform conducts the NG to an onshore ORF The LNG carriers will be moored to the other side of the jetty
SENER, Ingeniera y Sistemas, S.A.
Main Particulars are as follows: Length over all (LOA) Length between Perpendiculars (LBP) Breadth (Moulded) Depth to Trunk Deck Deadweight at design draught LNG Storage Capacity
SENER, Ingeniera y Sistemas, S.A.
Main Particulars are as follows: Operating pressure range: Operating temperature range: Design gas send-out pressure: Maximum gas send-out flow: Gas send-out temperature (min.): 40 bar g (start up) / 80 bar g (max) 0 C 38 C 95 bar g 2,5 MTPA = 365300 Ncm/h = (3,2 bcma) 6 C
Onshore Receiving Facilities (ORF) Gas is treated at the Pipeline Filters and measured at the Metering skids the heating value and Wobbe index from the gas chromatograph. skids, chromatograph Block valves are incorporated to allow isolation Operating pressure range is 40 bar g (start up) / 80 bar g (max) and operating temperature range: 0 C C 38 C C.
Up
THANK YOU