Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

9project Report Format

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 13

SAMPLE SHEET (OUTER COVER PAGE)

DESIGN OF SUB MODULES OF A MICRO PROCESSOR USING LOW POWER DESIGN TECHNIQUES
(24pt., 1.5 line spacing, Centre Aligned, Bold)

A MINI/MAJOR MCA Semester (III/V/VI) PROJECT REPORT


(12pt, Bold) SUBMITTE I! "A#TIA$ %U$%I$$ME!T &% T'E #E(UI#EME!TS %&# T'E A)A# &% T'E E*#EE &% (12pt, Centre Aligned)

MASTE# &% C&M"UTE# A""$ICATI&!S (14pt, Bold) (!a+e o, Instit-tion) (14pt)


SUBMITTED TO (12pt, Bold)

!SV "#$#% !ADI SARVA VISHWAVID&ALA&A ('()t* B#"+) SUBMITTED B& (12pt, Bold) !a+e o, St-dent(s) (14pt) 1aran 1-+ar #a5es6 S6ar+a Tar.inder Sing6 Uni.ersit/ E0a+ !o(s). (14pt) 23142241 23142242 23142244

N,me #- t.e C#m),/0 (B#"+'()t)


(i, pro5ect is allocated 7/ co+pan/)

Cit/ (12pts) !o.e+7er 2812 (12pt) (Mont6 9 :ear o, S-7+ission)

SAMPLE SHEET (INNER COVER PAGE)

DESIGN OF SUB MODULES OF A MICRO PROCESSOR USING LOW POWER DESIGN TECHNIQUES
(24pt., 1.5 line spacing, Centre Aligned, Bold)

A MINI/MAOR MCA Semester V PROJECT REPORT


(12pt, Bold) SUBMITTE I! "A#TIA$ %U$%I$$ME!T &% T'E #E(UI#EME!TS %&# T'E A)A# &% T'E E*#EE &% (12pt, Centre Aligned)

MASTE# &% C&M"UTE# A""$ICATI&!S (14pt, Bold) (!a+e o, Instit-tion) (14pt)


SUBMITTED TO (12pt, Bold)

!SV "#$#% !ADI SARVA VISHWAVID&ALA&A ('()t* B#"+) SUBMITTED B& (12pt, Bold) !a+e o, St-dent(s) (14pt) 1aran 1-+ar #a5es6 S6ar+a Tar.inder Sing6
SUPERVISED B& (12pt,Bold) !AME &% SU"E#;IS&#(S)<Internal (12pt) !a+e o, Instit-te (12pt)

Uni.ersit/ E0a+ !o(s). (14pt) 23142241 23142242 23142244


SUPERVISED B& (12pt,Bold) !AME &% SU"E#;IS&#(S) (12pt) !a+e o, t6e Co+pan/ (12pt)

!o.e+7er 2812 (12pt) (Mont6 9 :ear o, S-7+ission)

SAMPLE SHEET

AC!NOWLEDGEMENT

S1$/,t2re(s) #- St2+e/ts 1aran 1-+ar (23142241), #a5es6 S6ar+a (23142242), Tar.inder Sing6 (23142244)

Sarva Vidyalaya Kelavani Mandal Sanchalit

SAMPLE SHEET

S. K. PATEL INSTITUTE
OF MANAGEMENT & COMPUTE STU!IES A constit-ent o, 1A I SA#;A ;IS')A;I :A$A:A
Sector<24, *'<=, *and6inagar.

Certificate from DIRECTOR


This is to certify that the project documentation entitled '<title of the project>' is bonafide project work done by Mr./Ms. <name of student><,exam no>, in partial fulfillment of the re uirement for the award of de!ree of Master of "omputer #pplication at <institute> $ a constituent colle!e of %#&' (#)*# *'(+,#*'&-#.#-#. ' further certify that in project work done by him/her is ori!inal work carried out at the company <name of the company> under their super/isor and !uidance.

&ate0111111111

&irector

(. %. 2#T5. '6(T'T7T5
Sector<24, *'<=, *and6inagar.

SAMPLE SHEET

OF MANAGEMENT & COMPUTE STU!IES A constit-ent o, 1A I SA#;A ;IS')A;I :A$A:A

Certificate from INTERNAL SUPERVISOR

This is to certify that the project report compiled by

Mr. /Ms.

111111111111111111111111111111, student of semester$1111 from M"# department, (. %. 2atel 'nstitute of Mana!ement 3 "omputer (tudies, a constituent colle!e of %adi (ar/a *ishwa/idyalaya, 4andhina!ar, is done under my !uidance. To the best of my knowled!e, this work is satisfactorily completed. &urin! the tenure, he/she was found to be /ery hard workin! and sincere. +e/(he completed all the tasks assi!ned and su!!ested to him/her. C"##ent$%
1 2 3

&ate0111111111

I/ter/," S2)er31s#r

Sarva Vidyalaya Kelavani Mandal Sanchalit

SAMPLE SHEET

S. K. PATEL INSTITUTE
OF MANAGEMENT & COMPUTE STU!IES A constit-ent o, 1A I SA#;A ;IS')A;I :A$A:A
Sector<24, *'<=, *and6inagar.

DECLARATION

' hereby declare that the project entitled 81111111111111111111 1111111111111111111111119 submitted for the M.".#. &e!ree is my ori!inal work and the project has not formed the basis for the award of any de!ree or any other similar titles in any other 7ni/eristy. (i!nature of the (tudent0 : ; <

2lace0 &ate

SAMPLE SHEET

Project Report Sequence


1. Certi,icate o, S-ccess,-l Co+pletion %ro+ co+pan/ %ro+ director %ro+ internal s-per.isor Candidate>s sel, declaration 2. Ac?no@ledge+ent 4. "ro7le+ A7stract 4. Inde0A B(Ta7le o, Content) 5. $ist o, A77re.iations =. $ist o, Ta7les (@it6 page nos.) C. $ist o, %ig-resB*rap6sBC6arts (@it6 page nos.) 3. C6apters (as +entioned in t6e Inde0) 2. #e,erences 18. Bi7liograp6/ 11. Appendi0 A. "ro5ect $og S6eets (as per t6e sc6ed-led +eetings) B. ata 9 S6eets ((-estionnairesB Inter.ie@s, i, an/) C. %or+-lation etails (i, an/) . #e,erred "apersB E0isting S/ste+s (i, an/)) N#te4 T.e He,+er ,/+ F##ter m2st st,rt -r#m F1rst C.,)ter ,/+ e/+ ,t B15"1#$r,).0/ Re-ere/6es P,$e7 T.e m,81m2m P,$e "1m1t -#r t.e re)#rt 1s 9: (#r (::: ;#r+s* ;.16.e3er 1s m1/1m2m) e86"2+1/$ A6</#;"e+$eme/t* Cert1-16,te* I/+e8* L1st #- A55re31,t1#/s* F1$2res* T,5"es ,/+ A))e/+187 O/e s#-t0 6#)0/H,r+ 6#)0 ;1t. S)1r,"=B1/+1/$ -#r Pre=S25m1ss1#/ ,/+ T;# 6#)1es ;1t. S)1r,"=B1/+1/$ /H,r+=B1/+1/$ (1/6"2+1/$ ,tt,6.e+ CDs) -#r t.e F1/," S25m1ss1#/7 Re)#rt F#rm,t4 %ont T/peD Ti+es !e@ #o+an %ont SiEeD !or+al Te0t (12), 'eadings (14, Bold), S-7<'eadings (12, Bold Italic) $ine %or+atD Spacing (1.5), Align+ent (F-sti,ied) MarginsD $e,t<1.5, #ig6t<1.8, Top<1.25, Botto+<1.8 'eaderD GG"ro5ect TitleHH, $e,t<Aligned, SiEe<18 %ooterD $e,t< Instit-te !a+e, #ig6t< "age !o., SiEe<18 F#r Re-ere/6es* B15"1#$r,).0 > A))e/+184 %ont T/peD Ti+es !e@ #o+an %ont SiEeD 18 $ine %or+atD Spacing (1.8), Align+ent (F-sti,ied) MarginsD $e,t<1.5, #ig6t<1.8, Top<1.25, Botto+<1.8

SAMPLE SHEET

INDE? CONTENTS Certi,icate o, S-ccess,-l Co+pletion


%ro+ co+pan/ %ro+ director %ro+ internal s-per.isor Candidate>s sel, declaration Ac?no@ledge+ent

PAGE NO7 I

II III 1. 2. 4. = = =

"ro7le+ A7stract $ist o, A77re.iations $ist o, Ta7les (@it6 page nos.) $ist o, %ig-resB*rap6sBC6arts (@it6 page nos.) C.,)ter '4 C.,)ter @4 C.,)ter A4 INTRODUCTION > PROBLEM BAC!GROUND

E?ISTING S&STEM STUD& /LITERATURE REVIEW REQUIREMENT ANAL&SIS /SRS > DESIGN (F2/6t1#/,"* N#/= F2/6t1#/,"* Te6./16," ReB21reme/t/UML/ DFD/ FLOW CHARTS/CIRCUIT DIAGRAMS et67)

C.,)ter (4 C.,)ter E4 C.,)ter F4 C.,)ter G4 #e,erences < Bi7liograp6/ < Appendi0

IMPLEMENTATION (W1t. S6ree/ S.#ts CI/)2t/O2t)2t/Re)#rtsD) S&STEM TESTING C(U/1t/ F2/6t1#/,") =Test C,sesD > RESULTS ANAL&SIS OF RESULT AND CONCLUSIONS FUTURE SCOPE > LIMITATIONS = = =

A. "ro5ect $og S6eets (as per t6e sc6ed-led +eetings) < B. ata 9 S6eets ((-estionnairesB Inter.ie@s, i, an/) < C. %or+-lation etails (i, an/) <
D. Referred Papers Review and Existing Systems Study Findings (if any) E. !ding if needed.

SAMPLE SHEET

M1/#r/M,H#r Pr#He6t L#$ S.eet (-#r I/ter/," S2)er31s#r)


D,te4 T1me4

Semester > C",ss4

T1t"e #- Pr#He6t4

P#1/ts t# 5e +1s62sse+ ;1t. S2)er31s#r4

Re6#r+ #- D1s62ss1#/4

P#1/ts t# 6#3er 50 t.e /e8t meet1/$/ 1/ F1/," re)#rt (S2$$este+ M#+1-16,t1#/s)4

Sr. No. '7 @7 A7

Roll No. Sign

Student Name

4.

SAMPLE SHEET

Pr#He6t Dr,-t Pr#)#s," F#rm


R#"" N#4 N,mes4 Semester4 A7 Pr#)#se+ Pr#He6t T1t"e

B7 Pr#5"em B,6<$r#2/+ ,/+ Des6r1)t1#/I CL1m1te+ t# E:: ;#r+s* Use e8tr, S.eet (1- /ee+e+) I
Follow following Project Proposal Template Sr. Number Content 1 2 3 ! " # % ' Introduction Objectives Study nalysis nalysis Finding Proposed System Tec$nical Specification &ffort &stimation Feasibility Study ( 1) 11 Scope Of Project Fact * Finding Tec$ni+ue nticipated &,pectation Sc$edule Feasibility Tec$nical Feasibility &conomical Feasibility Operational Feasibility Page Number

"ppr!ved #y Pr!$e%t &!nit!ring

!mmittee

"ppr!va'()!t "ppr!ve(*i%+) 1 2 !mments (write p!ints)

P&

Signature

SAMPLE SHEET

S.,.Pate' -nstitute !f &anagement . !mputer Studies

M1/#r/M,H#r Pr#He6t L#$ S.eet (-#r st2+e/t)


R#"" N#4 N,mes4 Semester4 Srn! *as+ "''!%ati!n Date !mp'eti!n Date F!''!w/0p Date Status

Student Signature1 ertified #y -nterna'(Externa' Supervis!r

Signatures

You might also like