01 - Rig Selection
01 - Rig Selection
01 - Rig Selection
Rig Selection
Learning Objectives
Rig sizing
Rig Selection
Rig Selection
Rig selection involves effort of many groups in the up stream sector.
Rig Selection
Rig Selection
Water depth, seabed soil condition, near seabed seismic results Drilling engineer selects the rig Drilling rig owner (Contractor) defines the rig
Rig Selection
Rig Selection Process
Rig Selection
Rig Selection Process
Rig Selection
Rig Selection Process
Rig Selection
Rig Types
land
Cable Tool Rigs no longer in operation are used for drilling
Rig Selection
Marine Rigs
Rig Selection
Rig Selection Process
Swamp Barge Land Rig Jack-up Tender Assisted Semisubmersable Drillship 10000 ft max
10 ~ 30 ft
7500 ft max
11
Rig Selection
Rig Selection Process ~ Land and Shallow Waters
Jack-up Land Rig Tender Assisted
Swamp Barge
12
Rig Selection
Rig Selection Process ~ Deep Water
Semisubmersable
Drillship
13
Rig Selection
Rig Selection Process ~ Deep Water Installations
14
Rig Selection
Marine Rig Sizing and Selection
Major Rig selection criteria are as follows; Water Depth rating Rig capacity, bulk capacity, liquid and mud mixing
capacity
Derrick, sub structure, drilling envelope Physical rig size and weight Stability in rough water Duration of drilling program Type of drilling i.e Exploration or Development Availability and cost
15
Rig Selection
Marine Rig Sizing and Selection
Water Depth rating Primary consideration for Rig selection Selection based on Bottom Supported Units and Floating Rigs Size of rig with respect to Drilling Equipment Set (DES)
Commonly is never an issue of selection. Marine Rigs
Rig Selection
Marine Rig Sizing and Selection
Bottom Supported Units consists of
Jack Up rigs
Limited to 400 feet water depth. Typical water depth from minimum 25 feet to maximum 300ft Most widely used marine rig for both stand alone drilling of exploratory wells and multi-wells development drilling from jackets Common used independent legs cantilever jack-ups which can cover 9 15 wells on a jacket or small platform depends upon the drilling envelop. The derrick and substructure is skidded out on cantilever. Individual legs penetrate into below sea bed Popular designs are Baker Marine 300C, Marathon Le Tourneau 116C and Friede Goldman L780 mod II
17
Rig Selection
Marine Rig Sizing and Selection
Bottom Supported Units consists of (continued) Jack Up rigs
Mat type Jack up the drilling hull is supported by legs from large
mat/pontoon that rest on sea floor. Its used for very soft sea floor soil condition
Slot type jack up rig where drilling of wells done through the slot in the hull of the rig
18
Rig Selection
Marine Rig Sizing and Selection ~ Jack-up
19
Rig Selection
Marine Rig Sizing and Selection
Bottom Supported Unit consist of Jack Up rigs Jack up rigs are self contained and most are for drilling depths of 25,000 feet
20
21
Rig Selection
Jack-up Positioning
22
Rig Selection
Jack-up Positioning
23
Rig Selection
Jack-up Risks
Punch Through
Rig Selection
Jack-up Risks
25
Rig Selection
Jack-up Risks ~ Old Foot Prints
26
Rig Selection
Rig Specifications
27
Rig Selection
Marine Rig Sizing and Selection
Bottom Supported Units consist of
Platform rigs
Long term development drilling projects from sufficiently large
platform
Cost effective and limited only by water depth limitation of the platform
28
Rig Selection
Marine Rig Sizing and Selection
29
Rig Selection
Tender Assisted Rig
30
Rig Selection
Marine Rig Sizing and Selection
Floating rigs (Floaters)
Water depth capability slowly increased to 7000 feet Floating rigs do not rest on the sea floor
31
Rig Selection
Marine Rig Sizing and Selection
32
Rig Selection
Marine Rig Sizing and Selection
Semi Submersible
33
Rig Selection
Marine Rig Sizing and Selection
Drill Ship
34
Rig Selection
Marine Rig Sizing and Selection Floating rigs
1. Deepwater capability using dynamic positioning system (DPS). Anchoring systems are not required
35
Rig Selection
Marine Rig Sizing and Selection
36
Rig Selection
Other Considerations
Other Considerations for Offshore Location Are Check for subsea pipelines, marine cables, telephone lines, shipwreck Usually sea bed features e.g slumping, steep inclines, unusual debris at sea floor Very soft sea bed soil condition, low anchorholding capability Shallow gas
37
Rig Selection
Marine Rig Sizing and Selection
If problems cannot be resolved, alternate rig site should be selected site survey studies proposed for Jack up leg investigation are as follows; Side scan sonar for sea bed features, debris, boulder and pipeline High resolution shallow seismic for shallow gas. Correlation with
Rig Selection
Common Foundation Problems
Some common foundation problems are; Punch through during preload Inadequate leg length
39
Rig Selection
Rig Sizing
Most offshore rigs are rated /sized to drill well depth of 25000 ft. One rig can be used to drill various type of well and well depths Functionally, Offshore rigs becomes over specified and rig sizing is not an issue Rig sizing are more pertinent to land drilling. Specifications are tailored to suit drilling well depths and well condition
40
Rig Selection
Land Rigs
Conventional (unitised) rigs Trailer mounted rigs Helicopter transportable rigs (heli-rigs) Desert rigs
41
Rig Selection
Land Rig ~ Trailer Mounted Rig
Generally uses telescopic mast Restricted to light work and medium depth drilling to 10,000 feet Generally mounted on a truck or large trailer. Available in drive-in or back in unit Low rig down, move and rig up time increase
Rig Selection
Conventional Land rigs
Largest land rigs are available with derricks or big jack knife mast Rated for drilling 10,000 to 35,000 feet well depths Rig components are torn down and moved individually
capacity
Most rigs have 142 feet derrick or mast and able to pull (3) joint stands of drill string
43
Rig Selection
Rig Site Preparation
After well site located, rig site preparation depends upon; Onshore : Marsh,terrain/topography
Offshore
44
Rig Selection
Rig Site Preparation
Onshore Rig site Preparation Well location usually vertical on sub-surface target location
barge in
Filling up or small platform to take rig
45
Rig Selection
Rig Power Requirements Main power requirements of a drilling rig are
the drawworks, rotating system, rig mud pumps and power for rig ancilliaries
46
Rig Selection
Rig Site Preparation
Rig ancilliaries consist of centrifugal mud pumps to run mud
47
Rig Selection
Marine Rig Sizing and Selection
Mechanical Drive System Commonly used for trailer-mounted rigs of medium
Rig Selection
Marine Rig Sizing and Selection
A TYPICAL AC-SCR-DC SYSTEM As shown in schematically below :
AC generator
SCR system
49
Rig Selection
Marine Rig Sizing and Selection
Total Rig power required at the Prime Mover can be presented by ;
HP rig = HP H + 2 x HP P + HP RT where HP rig HP H HP P HP RT = = = = Total rig power required at the SCR power outlet Power required by the hoisting system at the input of the drawworks Power required by each pump at the input Power required by the rotary table or top drive system input
Assuming the SCR and electrical transmission system efficiency at 0.90 (range 0.85 - 0.90) HP RT
HP engine =
______
= 1.11 HP RT
where
Rig Selection
Hoisting Power Requirements
Hoisting system provides the means for the vertical movement of the pipe in the well It consists of the drawworks, crown and travelling blocks, wireline and ancilliary equipment such as hooks, bails and elevators The horse power required at the Travelling Blocks can be computed by HPTB = LxV 33,000
Where
B
L = heaviest hook load (lbs) V = hoisting rate (ft/min) normally assumed 93ft/min B=friction factor of the block and tackle system
51
Rig Selection
Marine Rig Sizing and Selection
As with all mechanical system, the block/tackle system is not friction less i.e B < 1.0 Friction factor
B
No of lines
6 8 10 12
52
Rig Selection
Marine Rig Sizing and Selection
Drawworks reels in wireline as the pipe is lifted and thus is made up of drum to spool the wireline, shafts and chain driving the drum A typical drawworks consists of four shafts and five chains and efficiency is given by
D
= (0.98)n
D
Therefore
Rig Selection
Marine Rig Sizing and Selection
The hook load L is normally taken as the heaviest casing load in mud. Usually 9-5/8 casing represents the heaviest string. Therefore ;
L = buoyant unit weight of casing in mud x length of casing Mud Buoyancy factor is calculated by
B
F
=1-
m/
65.50
B
F
where
L = B F x W C x H where
54
Rig Selection
Power Requirements for Rotary System
Rotating system impacts rotating action to the drillstring and bit Rotary system consists of the kelly, rotary table and drive bushing Top Drive system consists of the top drive (DC motor and gear box), drill string and bit Rotating horse power requirements depend on speed of rotation, hole friction, angle, depth straightness. Basically it can be given by HP RT = T x N 5250
where HP RT = rotating system HP (BHP)
T = rotary torque required (ft-lbs) N = rotary speed (rpm)
55
Rig Selection
Power Requirements for Top Drive System
Power Requirements for Top Drive System
For modern day rigs drilling complex wells with top drive system. The horse power required can be calculated based on extreme condition HP RT = T x N 5250
= 35,000 x 120 5250 = 800 BHP
where
torque rating of a 5-1/2 drillpipe with 35,000 ft-lbs N = RPM. Assume at 120 rpm
56
Rig Selection
Power Requirements for Pumps
The mud pumps is the heart of a rig circulating system Mud pumps are designed for pressure output, flowrate and horsepower requirements Power required by rig pump can be calculated by
Where
HHP = pump output at fluid end in BHP P = total pressure drop in the system (psi) Q = pumping rate (GPM)
57
Rig Selection
Derrick or Mast and Substructure
Derrick or a mast provides the vertical height necessary for the hoisting system to raise and lower the pipe API standards 4A provides specs for derrick and API standard 4D provides specs for mast type structure Derrick or Mast must be able to handle /support all loads, including drilling load and weight of pipe set in the derrick Derrick must be able to withstand wind loads acting horizontally on the pipe racked in it Selection for a derrick based on whether rig usage i.e drilling activities or workover and servicing
58
Rig Selection
Derrick or Mast and Substructure
Drilling requires pipe to be handled in stands (3 joint of connected pipe is about 90 feet in length)
Height of derrick is roughly ascertained by [pipe length 90 feet + 25 feet for travelling block, hook, and bails + 3 feet stick up above rotary table + 5 feet for buffer below crown block] These will total at about 123 feet
59
Rig Selection
Derrick or Mast
The schematic below shows API 4A Derrick size classification
60
Rig Selection
Derrick or Mast
Table 1 provides the General Dimension of Derrick size
61
Rig Selection
Derrick or Mast
62
Rig Selection
Derrick or Mast Derrick or Mast for workover or well servicing activities
handle tubings which are limber and tend to bend due to its own weight. Pipe are handled in
Rig Selection
Substructure
Sub structure provides the height for the blowout preventer stack required
work safely
On offshore rigs, especially for drilling from platform must have sufficient longitudinal and traverse width to allow the drilling unit to skid from one well to another over entire drilling envelope of wells
64
Rig Selection
Derrick and Substructure Loading
Derrick load is defined by the heaviest hook load that can be handled with proper safety factor Effective derrick load can be evaluated by
F DE = 4L (N + 4) 4N Where F DE N = Effective Derrick load, lbs = number of lines string up over the block = Heaviest hook load, lbs
The heaviest hook load L is usually taken as the heaviest casing load in mud as given in earlier section Wind load is created by wind acting horizontally on the pipe set back in the derrick and is calculated by
65
Rig Selection
Derrick and Sub structure loading
Wind load is created by wind acting horizontally on the pipe set back in the derrick and is calculated by Lw = 0.004 V2 A
Where L w = wind load, lbs V = wind velocity, mph A = area of pipe set back
66