Single Project Execution with CCPM+
By
Larry Leach
Draft 3.1, 4/13/09
oe ee GPa avis ee
E Se as
a
{s——| sweat — oo
ie Soo
tani tare
f suoerea er
tam east toe
(ay eae ne
ie | Sones er
i ies SFT
a
a
(ea
oe ine | ene tae
[ ae ar
i oon SaSingle Project Execution With CCPM+
Contents
Introduction 4
Summary of Overall Process. 5
Process Flow Chart 5
Step Listing 5
1 Policies and Master Resource Pool 6
Project Roles 6
Conventional Network Requirements. 7
Planning Defaults 7
Task Type (fixed duration) 8
Effort-driven 8
Task Splitting 8
Resource Loading for Resource Leveling 9
Resource Leveling Options 9
MS Project Options to Avoid 10
Guidelines 4
Unique Requirements to Prepare for Multiproject CCPM 16
Single Resource List 16
2 Create the CCPM Plan. 17
Mean Task Duration Estimates 17
Resource load 18
Resource level 19
Project and Feeding Buffer Options 20
Optimize the Plans 20
3 Execute! 23
Relay Racer Task Perfarmance. 23
Status 23
Dispatch Tasks 25
Manage Buffers 27
Control Changes 31
Advanced Projects, Inc. 2008 Page 2Single Project Execution With CCPM+
4 Lessons Leamed For Continuaus Impravement 32
Advanced Projects, Inc. 2008 Page 3