SL - No. Particulars Quantity Unit Rate Amount (RS.)

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 7

Date:

Sl.No. Particulars Quantity Unit Rate Amount (Rs.)


1 Earth work excavation for foundation Cmtr.
in ordinary soil including lead and lift
charges etc., complete (for columns and
S.S. masonry foundation in between
columns).
2 Providing and laying P.C.C. 1:4:8 Cmtr.
bed concrete for foundation. (for
columns and S.S. masonry foundation
in between Columns).
3 Providing and casting R.C.C. 1:2:4 Cmtr.
Column footings excluding cost of
Steel and fabrication charges.
4 Providing and laying S.S. Masonry Cmtr.
foundation in cement mortar 1:6
below plinth beam.
5 Providing and casting R.C.C. 1:2:4 Cmtr.
plinth beam excluding cost of
steel and fabrication charges.
6 Providing and casting R.C.C. 1:2:4
Columns excluding cost of
steel and fabrication charges.
a) Ground Floor Cmtr.
b) First Floor Cmtr.
7 Providing and constructing 9 thk.
B.B.M. brick wall in C.M. 1:6
with necessary scaffolding,
PROPOSED ESTIMATE FOR THE CONSTRUCTION OF RESIDENTIAL BUILDING
ON SITE NO., N.G.E.F. LAYOUT, MALLATHAHALLI VILLAGE,
YESHWANTHPUR HOBLI, BANGALORE NORTH TALUK
Owner: Mr/Mrs
curing etc., complete.
a) Ground Floor Cmtr.
b) First Floor Cmtr.
c) Terrace Floor Cmtr.
8 Providing and constructing 4 thk.
B.B.M. brick wall in C.M. 1:6
with necessary scaffolding,
curing etc., complete.
a) Ground Floor Smtr.
b) First Floor Smtr.
c) Terrace Floor Smtr.
9 Providing and fixing Saal-wood
Frames and Honne Shutters
excluding cost of fittings.
a) Ground Floor Smtr.
b) First Floor Smtr.
c) Terrace Floor Smtr.
10 Providing and fixing Saal-wood
windows and ventilators excluding
cost of fittings.
a) Ground Floor Smtr.
b) First Floor Smtr.
11 Providing and casting R.C.C.1:2:4
lintels excluding cost of steel and
fabrication charges.
a) Ground Floor Cmtr.
b) First Floor Cmtr.

12 Providing and casting R.C.C.1:2:4
loft and chejjas excluding cost of
steel and fabrication charges.
a) Ground Floor Smtr.
b) First Floor Smtr.
13 Providing and casting R.C.C.1:2:4
staircase excluding cost of steel
and fabrication charges.
a) Ground Floor to First Floor Nos.
b) First Floor to Terrace Floor Nos.
14 Providing and casting R.C.C.1:2:4
roof beams excluding cost of steel and
fabrication charges.
a) Ground Floor Cmtr.
b) First Floor Cmtr.
15 Providing and casting R.C.C.1:2:4
roof excluding cost of steel and
fabrication charges.
a) Ground Floor Cmtr.
b) First Floor Cmtr.
c) Terrace Floor Cmtr.
16 Providing and plastering to R.C.C.
works in C.M. 1:3 with lime rendering.
a) Ground Floor Smtr.
b) First Floor Smtr.
c) Terrace Floor Smtr.
17 Providing and plastering to internal
surface of walls in C.M. 1:6 with
lime rendering.
a) Ground Floor Smtr.
b) First Floor Smtr.
c) Terrace Floor Smtr.
18 Providing and plastering to external
surface of walls in C.M. 1:6 with
sponge finish.
a) Ground Floor Smtr.
b) First Floor Smtr.
c) Terrace Floor Smtr.
19 Providing and laying Vitrified
flooring with necessary base mortar.
a) Ground Floor Smtr.
b) First Floor Smtr.
20 Providing and laying Vitrified
skirting.
a) Ground Floor Rmtr.
b) First Floor Rmtr.
21 Providing and dadooing ceramic
tiles for walls in kitchen and toilet.
a) Ground Floor Smtr.
b) First Floor Smtr.
22 Providing and laying ceramic tiled
flooring for toilet.
a) First Floor Smtr.
23 Providing and fixing M.S. railings
for staircase.
a) Ground Floor to First Floor Smtr.
b) First Floor to Terrace Floor Smtr.
24 Providing and fixing black granite
cooking platform with Sink in kitchen
with necessary support.
a) Slab Smtr.
b) Sink Smtr.
25 Providing and painting to R.C.C.
works and internal surface of
walls with one coat of primer,
two coats of patti and two coats
of emulsion paint.
a) Ground Floor Smtr.
b) First Floor Smtr.
c) Terrace Floor Smtr.
26 Providing and painting to external
surface of walls with one coat of
primer and two coats of apex paint.
a) Ground Floor Smtr.
b) First Floor Smtr.
c) Terrace Floor Smtr.
27 Providing and painting to doors,
Windows, ventilators and M.S.
railings and gate with one coat of
primer, two coats of patti & two
coats of enamel paint.
a) Ground Floor Smtr.
b) First Floor Smtr.
c) Terrace Floor Smtr.
28 Providing and constructing 9 thk. Cmtr.
B.B.M. parapet wall in
C.M. 1:6 with necessary scaffolding,
curing etc., complete.
29 Providing and laying W.P.C. with Smtr.
necessary slope and finishing.
30 Providing and finishing
Wardrobes in Bedrooms
a) Ground Floor Smtr.
b) First Floor Smtr.
31 Providing and laying Terracota Smtr.
Flooring for Parking area
32 Providing and constructing 4.5 Rmtr.
Thk. B.B.M. compound wall
with necessary foundation and
plastering.
33 Providing and fixing M.S. front Smtr.
gate.
34 Providing and constructing B.B. Ltrs.
masonry sump tank with necessary
finishing.
35 Providing and constructing R.C.C. Ltrs.
overhead water tank with necessary
finishing.
36 Cost of steel and fabrication charges.
a) Ground Floor Kgs.
b) First Floor Kgs.
c) Terrace Floor Kgs.
37 Cost of water supply and sanitation L/S
Charges including departmental
deposits.
38 Cost of electrification including L/S
departmental deposits.
39 Miscellaneous if round off like L/S
door and window fittings.
____________
TOTAL
____________
(Rupees..Only)