Hydrostatic Testing of Pipeline

This document outlines the procedure for hydrotesting an upgradation of a metering skid for ONGC. It involves cleaning, filling, and pressure testing a section of pipeline. The contractor will clean the test section using pigs and water. They will fill the section and conduct a hydrostatic test at a minimum pressure of 1.5 times the maximum operating pressure. The test results will be documented and signed off by the contractor and ONGC to confirm the section passed the hydrotest.

Uploaded by

Hitendra Panchal
Copyright
© © All Rights Reserved
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
806 views

Hydrostatic Testing of Pipeline

This document outlines the procedure for hydrotesting an upgradation of a metering skid for ONGC. It involves cleaning, filling, and pressure testing a section of pipeline. The contractor will clean the test section using pigs and water. They will fill the section and conduct a hydrostatic test at a minimum pressure of 1.5 times the maximum operating pressure. The test results will be documented and signed off by the contractor and ONGC to confirm the section passed the hydrotest.

Uploaded by

Hitendra Panchal
Copyright
© © All Rights Reserved
Available Formats
Download as RTF, PDF, TXT or read online on Scribd
You are on page 1/ 43

UPGRADATION OF METERING SKID

OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

Job Procedure for
HYDROTESTING
Procedure No. SEL/903/ML/JP/0
SEL Savair Energy Ltd
ML Main Line
JP Job Procedure
Rev Date Descripti! Prepare" #$
SEL
C%ec&e" a!"
apprve" '$
SEL
Revie(e" a!"
apprve" '$
Da!ie)
* +r Revie(
a!" apprva)
,P
MD
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

!o"#e"#$
S.N. Decri!tion" Page No.
#. Pur!oe $
%. Sco!e $
$. Re&erence '
'. Met(odo)ogy '
*. In!ection + Tet P)an ,Enc)oed-
.. In!ection re!ort /or0at ,Enc)oed-
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

#.1 P2RPOSE
T%e p-rpse . t%is prce"-re is t )a$ "(! /-i"e)i!es a!" re0-ire1e!ts a!"
t esta')is% a 1et%" r a s$ste1 t c!tr) t%e %$"rstatic testi!/ .
Up/ra"ati! . 1eteri!/ s$ste1.
%.1 SCOPE
T(e !ur!oe o& t(i !rocedure i to de&ine t(e 0et(odo)ogy &or c)eaning(ydrotet and
de3atering o& t(e 456 #156#%5 + #.5 dia S7id &abricated and inta))ed &or ONG8.

3.0 REFERENCES
/o))o3ing docu0ent in !art or in tota)ity (a)) &or0 t(e re&erence docu0ent.
9SME : $#.4

4.0 METHODOLOGY
Detai)s . t%e test secti! s%a)) 'e i))-strate" i! t%e ,$"rtest pac&2 (%ic% s%a))
'e prepare" .r eac% test secti! a!" s-'1itte" t EIL prir t
c11e!ce1e!t . t%e test.
A ca)c-)ate" 3 pre"eter1i!e" )e!/t% . pipe)i!e s%a)) 'e se)ecte" .r t%e
%$"rtest 'ase" ! e)evati!2 avai)a'i)it$ . (ater a!" )cati! . stati!s.
Grap% s%(i!/ t%e e)evati! . t%e c1p)ete test secti! s%a)) 'e "ra(! prir
t start . t%e test a!" e!c)se" i! t%e %$"rtest pac&. ,(ever 1a4. Le!/t%
. t%etest secti! s%a)) !t e4cee" 5* K1.
Hydroteting o& 0ain)ine (a)) e;c)ude va)ve at ta!<o&& tation6 ter0ina)6 !u0!
tation6 S= tation and cra!!er tation &aci)itie.
Prior to any (ydrotatic tet6 EIL (a)) be noti&ied in advance and t(e (ydrotet (a))
co00ence on)y a&ter obtaining ignature on !art > 9 + : o& t(e Pi!e :oo7 and a&ter
0ec(anica) c)earance ,9!!endi; > % + $-.
T(e E?ui!0ent @ Intru0ent to be ued &or !er&or0ing t(e 3or7 (a)) inc)ude6 but not
)i0ited to t(e &o))o3ing"
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

Pig &or &i))ing6 c)eaning and gauging" c)eaning !ig 3it( tee) 3ire
bru(e.
/our cu! batc(ing !ig.
Gauging !ig 3it( gauge !)ate dia0eter e?ua) to A*B o& (eavy 3a))
!i!e ection.
/i))ing !u0! 3it( di&&erentia) (ead %1B greater t(an t(e 0a;i0u0
re?uired and a &)o3 rate !re&erab)y bet3een '110C@( to #111 0C@(.
Poitive di!)ace0ent !u0! e?ui!!ed 3it( a tro7e counter and
ca!ab)e o& e;ceeding t(e 0a;i0u0 tet !reure by at )eat %1 bar.
Poitive di!)ace0ent 0eter to 0eaure t(e vo)u0e o& 3ater ued &or
&i))ing t(e )ine (aving va)id ca)ibration certi&icate.
Portab)e tan7 o& u&&icient iDe to !rovide continuou u!!)y o& 3ater to
t(e !u0! during !reuriDation.
:ourdon !reure gauge o& uitab)e !reure range and accuracy 3it(
va)id ca)ibration certi&icate.
Dead 3eig(t teter 3it( an accuracy o& 1.1# bar6 0eauring in
incre0ent o& 1.1* bar and 3it( a va)id ca)ibration certi&icate.
Te0!erature recorder 3it( va)id ca)ibration certi&icate.
T(er0ocou!)e 3it( va)id ca)ibration certi&icate.
Laboratory t(er0o0eter 1E8 to .1E8 range and accuracy F 1.#E8.
Meauring cy)inder to c(ec7 ?uantity o& 3ater during air vo)u0e
ca)cu)ation.
InGection &aci)itie to inGect additive in t(e tet 0ediu0 in t(e re?uired
!ro!ortion.
8o00unication e?ui!0ent uitab)e &or continuou connection bet3een
t(e t3o end.
Te0!orary tet (eader &abricated in con&or0ity 3it( 9SME ection
=III6 diviion % 3it( !articu)ar re&erence to a!!endi; #4 and #A (aving
u&&icient )engt( o& acco00odate t(e re?uired nu0ber o& !ig. T(e
(eader (a)) a)o (ave !roviion &or !ig to!!er.
Pi!ing and va)ve arrange0ent &or )aunc(ing and receiving o& !ig
inde!endent)y.
9)) 0eauring @ recording intru0ent (a)) 0eet t(e !eci&ication
re?uire0ent o& t(e contract.
TEST MEDI2M
8)eaning6 &i))ing and (ydroteting (a)) be !er&or0ed uing o&t non<aggreive 3ater6
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

&ree &ro0 and and i)t 3it(dra3n &ro0 a uitab)e ource in t(e !i!e)ine route. T(e
3ater (a)) be &i)tered and (a)) not be conta0inated. T(e 3ater (a)) be teted in an
a!!roved )ab &or it non<aggreivene and uitabi)ity &or uing a t(e tet 0ediu0.
T(e tet re!ort (a)) be ub0itted to EIL &or revie3. On t(e bai o& 3ater tet re!ort
and 0anu&acture @ )aboratoryH reco00endation6 t(e re?uired ?uantity o& corroion
in(ibitor6 o;ygen cavenger6 bacteriide etc. (a)) be added to t(e tet 0ediu0 3it(
!rior a!!rova) &ro0 EIL.
TEST PRESS2RE
T(e !i!e)ine (a)) be Hydrotatica))y teted to a 0ini0u0 !reure o& #.*1 ti0e t(e
0a;i0u0 o!erating !reure6 or #.' ti0e o& deign !reure t(at !reure 3(ic(
3i)) induce a (oo! tre o& A1B o& t(e SMYS o& t(e !i!e)ine 0ateria) in t(e yte0 @
ection under tet6 9t )o3et !oint tet !reure a ca)cu)ated in accordance 3it(
above6 (a)) be t(e 0a;. Preure at t(e (ig(et !oint in t(e ection under tet. T(e
(ig(et !oint o& t(e tet ection (a)) be ubGected to t(e 0ini0u0 tet !reure a
decribed above6 and t(e 0a;i0u0 tet !reure at t(e )o3et !oint (a)) not e;ceed
t(e one reu)ting in a (oo! tre corre!onding to A1B o& SMYS o& !i!e 0ateria)
baed on t(e 0ini0u0 3a)) t(ic7ne in t(e tet ection.
I& any ection co0!rie o& bot( nor0a) + (eavy 3a)) t(ic7ne !i!e6 t(i ection (a))
be teted at t(e tet !reure o& nor0a) 3a)) t(ic7ne !i!e.
!%e&"'"( ) Gu&('"( of #*e P'+e%'"e Te$# Sec#'o"
Prir t starti!/ t%e c)ea!i!/ perati!2 t%e sa.et$ c%ec&)ist i))-strate" i!
APPENDI6 7 8 s%a)) 'e .i))e" -p.
T(e c)eaning o!eration (a)) be !er&or0ed by !ro!e))ing air driven !ig !rovided
3it( !ring )oaded bru(e and 8(ie) 3it( &u)) dia0eter circu)ar bru( (aving O.D.
0ini0u0 * 00 0ore t(an t(e I.D. o& !i!e to re0ove a)) 0i)) ca)e6 rut @ and &ro0
t(e interna) o& t(e !i!e ection.
T(e nu0ber o& !ig run (a)) de!end on t(e ube?uent c)eaning reu)t.
9&ter acce!tance o& air c)eaning 6 t(e tet ection (a)) be &)u(ed uing unin(ibited
3ater e?uiva)ent to #1B o& t(e tota) vo)u0e o& t(e tet ection driven by a &our cu!
c)eaning !ig to re0ove 0ud6 dirt6 debri and any ot(er e;traneou 0ateria). T(e
c)eaning (a)) be conidered to be acce!tab)e 3(en no re)evant e;traneou 0ateria) are
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

&ound in &ront o& t(e )at &our cu! !ig.
9&ter acce!tance o& t(e c)eaning6 a Guaging !ig &itted 3it( a guage !)ate 0ade o&
#100 t(ic7 co00ercia) a)u0iniu0 !)ate (a)) be !ro!e))ed bet3een t(e te0!orary
tet (ead. 9 co)u0n o& c)ean 3ater (a)) be !u0!ed in &ront o& t(e !ig &or )ubrication
and to &)u( out t(e re0aining dirt inide t(e tet ection.
Trac7ing arrange0ent (a)) be !rovided in t(e &irt !ig or in cae any o& t(e c)eaning @
gauging !ig get tuc7 inide t(e tet ection a econd !ig &itted 3it( a trac7ing
arrange0ent (a)) be !ro!e))ed and it (a)) be trac7ed u!to t(e !oint o& &au)t.
T(e reu)t o& t(e gauge !ig run (a)) be ana)yDed to eva)uate t(e interna) tatu o& t(e
!i!e)ine and t(e gauge !)ate (a)) be Goint)y igned by 8IPL and EIL@G9IL
re!reentative. 9 de&or0ed6 bent o& evere))y nic7ed !)ate or da0aged !ig (a)) be
evidence o& gauging !ig run &ai)ure and t(e a0e (a)) not be acce!tab)e. In uc(
cae 8IPL (a)) re!air and recti&y t(e )ine and re!eat t(e t(e gauging !ig run to t(e
ati&action o& EIL@G9IL.
T(e a0!)e ca)cu)ation &or gauging )ate iDing i a !er EIL @ G9IL.
9&ter acce!tance o& gauging o!eration by EIL @ G9IL6 a !(otogra!( o& t(e gauge !)ate
(a)) be ta7en and attac(ed 3it( t(e gauging re!ort.P(otogra!( (a)) be ta7en !rior to
)aunc( and a&ter recei!t 3it( a)) detai) 3ritten on t(e gauge !)ate i Tet Section
No.IIIIIIIIIIIIIIII /ro0 J0IIIIIIIIIIII
Joint No.IIIIIIIII.Date + Ti0e o& )aunc(ingIIIIIIIIIIand Gauge !)ate OD +
t(7.
T(e !ara0eter o& c)eaning + gauging o!eration (a)) be recorded every $1 0inute
in t(e &or0at enc)oed in 9PPENDIK<* + 9PPENDIK<. re!ective)y.
Te$# Sec#'o" F'%%'"(
O! accepta!ce . Ga-/i!/2 t%e air pi//i!/ %ea"ers s%a)) 'e c-t a!" t%e
te1prar$ test %ea"s2 a)rea"$ preteste" at a press-re res-)ti!/ i! a %p
stress crresp!"i!/ t 9*: . SMYS s%a)) 'e (e)"e" t t%e test secti!.
T%e %$"rtest reprt . t%e te1prar$ test %ea"ers s%a)) 'e s-'1itte" t EIL
prir t start . (e)"i!/ t%e test %ea"er t t%e test secti!.
T(e &i))ing end tet (eader (a)) be !re )oaded 3it( 0in. t(ree nu0ber o& &our cu!
batc(ing !ig.
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

T(e &i))ing o!eration (a)) begin 3it( !u0!ing un<in(ibited 3ater e?ua) to #1B o& t(e
vo)u0e o& t(e tet ection in &ront o& t(e &irt !ig.
/irt Pig " Pu0!ing unin(ibited 3ater e?ua) to ##@% J0 !i!e )engt( be(ind t(e !ig
(a)) )aunc( t(e &irt !ig. T(e 3ater co)u0n be&ore and a&ter t(i !ig (a)) act a
cu(ion to contro) t(e 0ove0ent o& t(e &i))ing !ig and (ence 0ini0iDe air entra!0ent
Second !ig" Pu0!ing in t(e actua) )ine &i))ing in(ibited 3ater be(ind t(e !ig (a))
)aunc( t(e econd !ig.
T(e &i))ing (a)) continue ti)) t(e econd !ig reac(e t(e ot(er end o& t(e tet ection
and t(e !reure at t(e tet end rie to t(e tatic (ead.
Re?uired ?uantity o& corroion in(ibitor (a)) be inGected during t(e &i))ing o!eration
t(roug( any o& t(e noDD)e !rovided on t(e tet (eader or into t(e brea7 tan7. T(e
?uantity o& in(ibitor (a)) be contro))ed by adGuting t(e &)o3 rate o& t(e doing !u0!..
T(e doing rate (a)) be a decribed in t(e &o))o3ing !aragra!(.
During t(e 3(o)e &i))ing o!eration t(e va)ue at t(e receiving end tet (eader (a)) be
t(rott)ed uitab)y to 0aintain ade?uate bac7 !reure and t(u contro) t(e !ig
0ove0ent.
T(e &irt t3o co)u0n o& 3ater (a)) be drained out &ro0 t(e receiving end.
T(e di&&erent !ara0eter6 during &i))ing o!eration (a)) be recorded in once every
t(irty 0inute in t(e !recribed &or0at enc)oed in 9PPENDIK >L.
Do$'"( R&#e
T%e "si!/ rate s%a)) 'e
L*1 !!0 &or &re( &i)) 3ater
.1 !!0 &or reue o& a)ready doed 3ater. , In cae o& 3ater tran&er
&ro0 one tet ection to anot(er- and a)o 0anu&acturerH re!ort (a))
be &o))o3ed.
i.e.6 t(e &i)) 3ater &or t(e &irt tet ection (a)) be doed at a rate o& L*1!!0 and t(ere
a&ter during tran&erring t(e 3ater &ro0 one ection to t(e ne;t an additiona) .1!!0
(a)) be added to t(e 3ater 3(ic( i to be reued6 and i& it i re?uired to add &re(
3ater , in cae o& a )onger tet ection t(an t(e !reviou- t(en6 t(e vo)u0e o& &re(
3ater (a)) be doed at a rate o& L*1!!0.
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

Note" Doing rate are to be con&ir0ed be&ore tart o& (ydro tet t(e above doage are
tentative on)y.
T*er,&% S#&b'%'-&#'o"
O!ce t%e test secti! %as 'ee! c1p)ete)$ .i))e" a!" a 1i!i1-1 press-re . ;
'ar %as 'ee! ac%ieve" at t%e %i/%est pi!t2 t%e t%er1a) sta'i)i<ati! peri"
s%a)) 'e starte". Te1perat-re pr'es s%a)) 'e i!sta))e" t 1eas-re t%e pipe
a!" si) te1perat-re at ever$ =.5 K1. . t%e pipe)i!e spaci!/ 1s$ 'e
i!crease" t 1a4. 5 &1s "epe!"i!/ -p! t%e terrai! a!" !at-re . s-'si)
a)!/ t%e a)i/!1e!t . t%e test secti!. . A)s !e pr'e eac% s%a)) 'e
i!sta))e" at .ive %-!"re" 1eters .r1 't% t%e test %ea"s.
T(e !robe &or 0eauring !i!e te0!erature (a)) be inta))ed by cutting a 0a)) !ortion
,a )itt)e bigger t(an t(e !robe ti!- o& t(e coating &ro0 t(e !i!e6 !o)i(ing t(e e;!oed
!ortion and &i;ing t(e !robe to t(e !i!e 3it( ?uic7 etting e!o;y enuring &ir0 contact
bet3een t(e !robe and !i!e. T(e oi) !robe (a)) be !o7ed into t(e eart( adGacent to
t(e !i!e.
T(e te0!erature reading (a)) be ta7en at t3o<(our interva) 3it( a ca)ibrated digita)
te0!erature read out unit one deci0a) !)ace and t(er0a) tabi)iDation (a)) be
conidered to (ave been ac(ieved 3(en a di&&erence not (ig(er t(an #E8 i attained
bet3een t(e average va)ue o& t(e )at t3o reading o& !i!e)ine te0!. T(e te0!erature
reading (a)) be recorded in t(e &or0at enc)oed in 9PPENDIK<4.
Digita)
T(er0o 0eter
Inu)ating 8oating
Soi) Te0!. Ter0ocou!)e
Ground
Leve)
M95
Pi!e Na))
=ie3
=IEN M95
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

T%er1c-p)e Attac%e" t Pipe Wa)) '$ >-ic& Setti!/ Ep4$
FIGURE .
9&ter co0!)etion and acce!tance o& (ydroteting6 t(er0ocou!)e (a)) be re0oved and t(e
corre!onding coating (a)) be re!aired a !er a!!roved coating re!air !rocedure.
PreuriDation
O+er&#'o"&% S#e+$/
M'i)i<e %i/%?press-re p-1p a!" test e0-ip1e!t at press-ri<ati! area. I!sta))
!e press-re /a-/e i! para))e) (it% t%e "ea" (ei/%t tester.
/i)) out and ign !i!e)ine !re<!reuriDation a&ety c(ec7)it. 9PPENDIK<A.
9 oon a t(e te0!erature tabi)iDation i ac(ieved6 t(e !reure (a)) be raied at a
0oderate and contant rate not e;ceeding % > bar !er 0inute.
T(e !ara0eter ,=o)u0e re?uired- during !reuriDation (a)) be recorded t(roug(out
t(e cyc)e in t(e &or0at enc)oed in t(e 9PPENDIK >#1 a &o))o3"
Eac( * bar incre0ent u!to 41B o& t(e tet !reure a recorded by dead
3eig(t teter.
Eac( % bar incre0ent bet3een 41B to A1B o& t(e tet !reure a recorded by
dead 3eig(t teter.
Eac( 1.% bar incre0ent bet3een A1B to &u)) tet !reure a recorded by dead
3eig(t teter.
T(e !reuriDation (a)) be cyc)ed 3it( t(e e?uence (o3n in t(e &o))o3ing !reure
e?uence.
PreuriDe to *1B o& tet !reure6 (o)d !reure &or one (our6and !er&or0 air vo)u0e
tet and dro! !reure to tatic (ead.
PreuriDe to L*B o& tet !reure6 (o)d !reure &or one (our6 and !er&or0 air vo)u0e
tet and dro! !reure to tatic (ead.
PreuriDe to tet !reure6 !er&or0 air vo)u0e tet and raie !reure to t(e tet
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

!reure once again.
In cae6 during t(e (o)d !eriod indicated above6 a decreae in !reure i oberved6 t(e
above o!eration (a)) not be re!eated 0ore t(an t3ice6 a&ter 3(ic( t(e )ine (a)) not be
conidered ca!ab)e o& tet6 unti) t(e caue &or t(e )ac7 o& 3ater tig(tne i e)i0inated.
A'r 0o%u,e !&%cu%&#'o"
In order to c(ec7 t(e !reure o& air in t(e !i!e)ine t3o e!arate conecutive !reure
)o3ering o& 1.* bar by )o3)y b)eeding 3ater &ro0 t(e tet ection (a)) be carried out during
a)) t(e !reuriDing cyc)ing a 0entioned above. T(e 3ater drained during t(e econd
)o3ering (a)) be accurate)y 0eaured ,=#-. T(i ?uantity 0eaured (a)) be co0!ared to t(e
t(eoretica) ?uantity ,=!- corre!onding to t(e !reure )o3ering. T(e air vo)u0e (a)) be
acce!tab)e i& =i @8!O #.1.. T(e obervation (a)) be recorded in t(e air vo)u0e ca)cu)ation
&or0at enc)oed in 9PPENDIK > ##.
12 3our 3o%d Per'od
T%e press-re s%a)) 'e c!si"ere" t 'e sta'i)i<e" (%e! ! .)-ct-ati! is
'serve" i! t%e pipe)i!e press-re as see! .r1 t%e "ea" (ei/%t tester. O!
ac%ievi!/ press-re sta')i<ati!2 press-re p-1p c!!ecti!s s%a)) 'e re1ve"
a!" t%e test secti! c1p)ete)$ is)ate" a!" a)) c!!ecti!s at t%e test %ea"s
s%a)) 'e c%ec&e" .r )ea&a/es. Press-re recr"ers s%a)) t%a! 'e starte" (it%
t%e c%art i! rea) ti1e rie!tati! a!" t%e =8 %-r press-re %)" peri" s%a))
start.
During t(e !reure (o)d !eriod t(e &o))o3ing data (a)) be recorded in t(e &or0at
enc)oed in 9PPENDIK<#%.
a- Every one<(our !reure 0eaure0ent &ro0 dead 3eig(t teter.
b- Every t3o (our t(e a0bient te0!erature6 !i!e and oi) te0!erature &ro0
t(e t(er0ocou!)e.
T(roug(out t(e (o)d !eriod6 care (a)) be ta7en t(at t(e 0a;i0u0 tet !reure i not
e;ceeded. S(ou)d it beco0e neceary to de<!reuriDe6 t(e vo)u0e o& tet 0ediu0
b)eed o&& (a)) be 0eaured and recorded.
Acce+#&"ce !r'#er'&
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

The hydrostatic test shall be considered as positive if pressure has kept a
constant value throughout the test duration, except for change due to
temperature effects.
T(e !reure c(ange va)ue a a &unction o& te0!erature c(ange (a)) be a)gebraica))y
added to t(e !reure va)ue a read on t(e 0eter. T(e !reure va)ue t(u adGuted
(a)) be co0!ared 3it( t(e initia) va)ue and t(e tet (a)) be conidered a acce!tab)e
i& di&&erence i )e t(an or e?ua) to 1.$ bar.
/or ca)cu)ating t(e !reure c(ange due to c(ange in te0!erature t(e &or0u)a and data
i))utrated in 9PPENDIK<#$ (a)) be ued.
On ucce&u) co0!)etion and acce!tance o& t(e (ydrotet6 t(e !i!e)ine (a)) be )o3)y
de!reuriDed at a 0oderate and contant rate.
Le&4$
I. "-ri!/ t%e press-ri<ati! peri" r "-ri!/ t%e test peri"s a!$ "e.ects are
'serve"2 t%ese s%a)) 'e e)i1i!ate".
I& any )ea7 are oberved t(e ection (a)) be initia))y viua))y in!ected to c(ec7 t(e
eventua) )ea7ing !oint. I& t(i c(ec7 i negative6 t(en t(e !rocedure decribed be)o3
(a)) be &o))o3ed. No 3or7 (a)) be carried out to re!air )ea7 unti) t(e
!reure (a been reduced to a a&e !reure ,i.e. tatic (ead !)u # 7g- and t(e 3ater
drained.
Le&4 De#ec#'o"
T )cate '-rie" )ea&i!/ pipe2 t%e .))(i!/ prce"-re '$ e)i1i!ati! s%a)) 'e
.))(e":
#. To cut t(e ection in an inter0ediate !oition
%. To inert t3o tet (ead
$. To re &)ood t(e ection
'. To !reuriDe t(e t3o ection
*. To deter0ine t(e &au)ty ection
T(i !rocedure (a)) be a!!)ied unti) t(e deter0ination o& t(e de&ect. 9 oon a t(e
de&ect (a been )ocated and re!aired6 t(e tet ection (a)) be teted again.
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

I& t(e tet ection &ai) to 0aintain t(e !eci&ied tet !reure a&ter io)ation 68IPL (a))
deter0ine by earc( t(e )ocation o& )ea7age or &ai)ure. 9)) )ea7 and &ai)ure 3it(in t(e
!i!e<3a)) or 3e)d ea0 (a)) be re!aired by re!)ace0ent o& entire Goint or Goint in
3(ic( )ea7age or &ai)ure occur. 8IPL (a)) co0!)y 3it( intruction EIL@G9IL
3(et(er to re!)ace a ection o& t(e )ine<!i!e t(at inc)ude t(e )ea7 or 3(et(er to re!air
t(e circu0&erentia) 3e)d. T(e re!air (a)) (o3ever 0eet t(e re?uire0ent o& EIL !ec.
.<LL<1.. 9&ter co0!)etion o& re!air6 t(e (ydrotatic tet (a)) be re!eated.8IPL (a))
(au) and toc7!i)e a)) da0aged and de&ective !i!e to torage )ocation deignated by
EIL@G9IL. 9)) crac7 and !)it reu)ting &ro0 &ai)ure (a)) be coated 3it( an
a!!)ication o& greae to !reerve t(e c(aracteritic o& &ai)ure &ro0 corroion. Joint o&
&ai)ed !i!e (a)) be 0ar7ed 3it( !aint6 3it( a tag indicating &ai)ure detai)6 date and
)ocation o& &ai)ure and !reure at 3(ic( &ai)ure occurred.
P'+e%'"e 5u%4 De6&#er'"(
Writte! per1issi! s%a)) 'e 'tai!e" .r1 EIL 3 GAIL .r 'tai!i!/ t%e
"e(ateri!/ c)eare!ce. Up! s-ccess.-) c1p)eti! . t%e %$"rtest2 prpe))i!/
t%e t%ir" pi/ i! t%e test %ea"er s%a)) "e(ater t%e secti!. Ma&i!/ s-ita')e
"rai!s s%a)) 1a&e !ecessar$ arra!/e1e!ts .r sa.e "ispsa) . %$"rtest
(ater.De(ateri!/ s%a)) start a.ter /etti!/ c)eara!ce .r1 EIL 3 GAIL a!" t%e
(ater s%a)) 'e tra!s.erre" t t%e !e4t secti! (%erever re0-ire".
T%e "e(ateri!/ s%a)) 'e carrie" -t '$ -si!/ .-r?c-p pi/s a!" .a1 pi/s
"rive! '$ c1presse" air. T%e "e(ateri!/ s%a)) 'e "!e i! s-c% a (a$ as t
prvi"e a"e0-ate c!tr) . pi/s "-ri!/ "e(ateri!/ '$ &eepi!/ air press-re =
'ar 1i!i1-1. Pi/s a!" e0-ip1e!t re0-ire" .r "e(ateri!/ s%a)) 'e apprve"
'$ EIL i! a"va!ce. +-r?c-p pi/s s%a)) .irst 'e passe" t%r-/% t%e )i!e t
"isp)ace t%e (ater. +a1
pi/s s%a)) t%e! 'e passe" i! r"er t c1p)ete t%e )i!e "e(ateri!/. T%e )i!e
s%a)) 'e c!si"ere" "e(atere" (%e! a !e/)i/i')e a1-!t . (ater is .)-s%e"
-t '$ t%e )ast .a1 pi/.
D-ri!/ "e(ateri!/ care s%a)) 'e ta&e! t prper)$ "ispse t%e t%e "isc%ar/i!/
(ater i! r"er t avi" p))-ti!2 "a1a/es t .ie)"s -!"er c-)tivati! a!" r
e4isti!/ str-ct-res a!" i!ter.ere!ce (it% t%e tra..ic.
Up! c1p)eti! . t%e testi!/ a!" "e(ateri!/ perati!2 a!$ prvisi!a)
traps .r pi/s a!" a)) t%er te1prar$ i!sta))ati! re)ati!/ t t%e test s%a)) 'e
re1ve". S-'se0-e!t)$ t%e i!"ivi"-a) secti!s . t%e )i!e a)rea"$ teste" s%a))
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

'e @i!e" i! accr"a!ce (it% t%e re0-ire1e!ts . re)eva!t speci.icati!s
iss-e" .r t%e p-rpse.
T%e )i!e press-re "-ri!/ "e(ateri!/ perati! s%a)) 'e recr"e" ever$ A*
1i!-tes i! t%e .r1at e!c)se" i! APPENDI6?;5.
O!ce "e(ateri!/ is ver2 t%e secti!a)i<i!/ va)ve a!" t%er va)ve asse1')ies
s%a)) 'e i!sta))e" at t%e respective )cati!s is accr"a!ce (it% t%e re)eva!t
prce"-res a!" speci.icati!s. A)) t%er1c-p)es i!sta))e" i! t%e pipe)i!e s%a))
'e re1ve" a!" crrsi! cati!/ s%a)) 'e repaire" (%erever re0-ire" -si!/
apprve" prce"-re a!" 1ateria)s.
I. it is re0-ire" t preserve t%e pipe)i!e .r a speci.ie" "-rati!2 s-..icie!t
0-a!tit$ . apprve" crrsi! i!%i'itrs "epe!"i!/ -p! t%e 0-a)it$ . (ater2
"-rati! . preservati! a!" )a'ratr$ test reprts2 s%a)) 'e i!@ecte" i!t t%e
pipe)i!e as per t%e "irecti! . EIL a!" t%e press-re s%a)) 'e raise" t t%e
re0-ire" )eve) as 1-t-a))$ a/ree" -p! (it% EIL3GAIL at a )ater sta/e.
S-'se0-e!t t "e(ateri!/2 t%e SV i!sta))ati! .))(e" '$ .i!a) tie?i! 'et(ee!
t%e teste" secti!s s%a)) 'e ta&e! -p.
7. 3EALT38 SAFET9 ) EN0IRONMENT
T%e apprve" prce"-re . ,ea)t%2 Sa.et$ B E!vir!1e!t s%a)) 'e .))(e"
"-ri!/ t%e e4ec-ti!.
T%e %a<ar"s assciate" (it% t%e %$"rtest %ave 'ee! i"e!ti.ie" a!" t%e
.))(i!/ /-i"e)i!es are s-//este" .r i1p)e1e!tati! . sa.et$ !r1s.
Prvisi!s s%a)) 'e 1a"e .r t%e i!sta))ati! . ! a"1itta!ce si/!s t
-!a-t%ri<e" pers!!e) .r1 t%e ra" t t%e R.O.W. at critica) )cati!s.
War!i!/ si/!s i! E!/)is% a!" Lca) La!/-a/e stati!/ CPipe)i!e U!"er test 7
&eep ..D s%a)) 'e p)ace" i! )cati!s (%ere t%e pipe)i!e is -!cvere"2 a!"
partic-)ar)$ (%ere t%e te1prar$ %ea"ers a!" stati!s are )cate". S-c% areas
s%a)) 'e
s-ita')$ .e!ce" i! s-c% a (a$ as preve!t access . -!a-t%ri<e" pers!!e).
N -!a-t%ri<e" pers!!e) s%a)) 'e c)ser t%a! 8*1 t t%e pipe)i!e -!"er test.
O!)$ a-t%ri<e" pers!!e) as "e.i!e" 3i"e!ti.ie" '$ t%e ,$"rtest E!/i!eer
s%a)) 'e a))(e" (it%i! t%e test area (%e! t%e test secti! is -!"er press-re.
N test activities are i! pr/ress (it% -t speci.ic c)eara!ce . testi!/
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

E!/i!eer. W%e! test e0-ip1e!ts s%a)) 'e i!sta))e" i! c1p)ia!ce (it%
1et%"s a!" s-ita')e i!str-cti!s !)$2 t%is 1a$ !t ca-se a!$ i!@-r$ t
pers!!e).
A)) i!str-1e!ts s%a)) 'e p)ace" i! s-c% a )cati! as t preve!t it .r1 'ei!/
a..ecte" '$ a pers!!e) i! t%e test %ea".
N )ea& ! t%e pipe r test e0-ip1e!t s%a)) 'e a))(e" (%is)t -!"er press-re
e4cept .r ti/%t!i!/ . .)a!/es2 t%e re1va) . c!!ecti!s a.ter c)si!/ t%e
va)ves2 a!" t%e ')i!"i!/ . prts a.ter ac%ievi!/ t%e test press-re .r is)ati!
. t%e test stati!.
N .)e4i')e %ses are per1issi')e i!si"e t%e test ca'i!2 e4cept .r esse!tia)
c!!ecti! t t%e i!str-1e!ts.
+r e..ective c11-!icati!2 a (ire)ess a!" a (a)&ie 7 ta)&ie s$ste1 s%a)) 'e
-se".
4. :UALIT9 ASSURAN!E ) :UALIT9 !ONTROL
T%e 0-a)it$ ass-ra!ce a!" 0-a)it$ c!tr) .r t%e pr@ect prc-re1e!t s%a)) 'e
carrie" -t '$ strict)$ i1p)e1e!ti!/ t%e .))(i!/:
a- I!specti!s a!" Test P)a!.
b- >-a)it$ Recr"s
T%e t$pe . i!specti! activit$ a!" 0-a)it$ recr"s /e!erate" "-ri!/ t%e activit$
is "etai)e" i! I!specti! a!" Test P)a!. >-a)it$ recr"s s%a)) i!c)-"e c-rre!t
ca)i'rati! certi.icates .r a)) 1eas-ri!/ i!str-1e!ts.
T%e vera)) te!tative )a$-t . e0-ip1e!t B i!str-1e!ts .r pi//i!/ %$"rstatic
testi!/ is s%(! t%r-/% Appe!"i4 ? ;E
9.0 APPENDI!ES /FORMATS
Appe!"ices ; t ;9 e!c)se".
Nte:? I!case . a!$ c!.)ict 'et(ee! t%is prce"-re a!" t%e c!tract speci.icati!2
.
t%e )ater s%a)) /ver!.
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

DO!.NO. RE0.NO. APPENDI; .
INSPE!TION ) TEST PLAN FOR 39DROSTATI! TESTING
S).N

Activit$
I!sp.#
$
CIPL
Veri.i.
#$.
EIL
Dc-1e!t t 'e
s-'1itte" '$ CIPL
Re1ar&s
; Apprva) . Prce"-re B Test Dia/ra1 W A Test Pac&
= Pre ,$"rtest C%ec& List W W
A
Mec%a!ica) C)eara!ce . t%e Pipe
Secti!
, A
Pipe #&2 Part?A
B #
8 S-'1issi! Ca)i'rati! Certi.icates , R Certi.icates
5
S-'1issi! . Water Test Reprt a!"
Dsi!/ Rec11e!"ati!
, R Test Reprt
E I!sta)) a)) Te1prar$ Pipi!/ e0-ip1e!t W RM Test "ia/ra1
F E!s-ri!/ C11-!icati! S$ste1 W RM
G E!s-ri!/ Sa.et$ Re0-ire1e!ts W W
9 C)ea!i!/3Ga-/i!/ W W I!specti! reprt
;* I!sta))ati! . Te1p. Se!srs , W
;; +)-s%i!/ , W I!specti! reprt
;=
I!sta))ati! . Te1prar$ ,ea"ers Wit%
Pi/s
, RM
,$"rtest reprt .
test %ea"ers.
;A
+i))i!/ Rate
Dsi!/ rate
#ac& press-re C!tr)
W
W
W
RM
RM
RM
I!specti! reprt
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

;8 T%er1a) Sta'i)i<ati! , W I!specti! reprt
;5 Air V)-1e Ca)c-)ati! , W I!specti! reprt
;E
Press-ri<ati! Rate
L/ . Te1p.a!" Press-re
#)ee" .. (ater Meas-re1e!t
W
W
W
RM
RM
W
I!specti! reprt
;F Lea& Detecti! B Test E4te!si! W W
;G
Recti.icati! B Stc&i!/ 3 Mar&i!/ .
Da1a/e" Pipe
W W
;9 Accepta!ce B eva)-ati! . recr" "ata W W I!specti! reprt
=*
Depress-ri<ati! B De(ateri!/ t t%e
Accept Pi!t
W W I!specti! reprt
=;
Repair . PE cati!/ at repairi!/ te1p.
Se!srs .i4i!/ pi!t
W W
LEGEND:
CAD ACCEPTANCE3APPROVAL C,D ,OLD CWD WITNESS INSPECTION
CRMD RANDOM INSPECTION CRD REVIEW O+ DOCUMENTS
CIPL EIL GAIL
SIGN: SIGN: SIGN:
NAME: NAME: NAME:
DATE: DATE: DATE:
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

DOC.NO. REV.NO.0 APPENDIX
2
INSPE!TION REPORT FOR TEST PLAN FOR POST 39DROSTAT! TESTING
Line Dia " %1 inc(
Section No " /ro0 $*.$%* ,JM- To $*.*%# ,JM-
Joint No " /ro0 $*@M%$ ,JM- To $*@/T$L,JM-
O.D Wa)) T%ic&
Nr1a)
I.DH11I
Le!/t%
HMtrsI
Av/.Wa))
HMMI
V)-1e
Per Mtrs
H1I
Tta)
V)-1eH1I
Test
press-re
H&/3c1
=
I
Mi!. Ma4.
5*G 11 ;;.;11 8G5.G ;9E.;5* ;;.; *.;G5A AE.AA9 ;A9.9;
Tta) )e!/t%
Nte: ;. Le!/t% . test %ea"ers t 'e i!c)-"e"
=.Test press-re s%a)) 'e as per 1i!. (a)) t%ic&
. pipe i! t%e secti!.
A.stri&e ! (%ic% ever app)ica')e.
Le!/t% . Tta) secti! ?=** 1trs
Test Press-re GENERAL DATA
Water S-rce JJJJJJJJ
START END ,IG, LOW
C%ai!a/e
KMA53M=A KMA53+TAF KMA53M=A KMA53M=G
E)evati! HMI
=;E.=;A =;5.8GA =;E.=;A =*8.FGA
Press-re H&/3c1
=
I
;8=.* ;8=.*F ;8=.* ;8A.;=
I1t ,
=
O K *.*9G*EE5 K/3c1
=
H/I : O+ TEST PRESSURE
5* F5 ;**
Press-re Se0-e!ce H&/3c1
=
I F; ;*E.5 ;8=
Appr4. Water t i!crease Press-re #$ = #ar3Mi! HLt.3Mi!I
Appr4. Water t press-re )( *.5 HLtrsI
Appr4 press-re c%a!/e as a .-!cti! Te1p. C%a!/e H#ar3CI
ELEVATIONHMtrsI.HA S&etc% s%(i!/ e)evati!s Vs K1 HC%ai!a/e I t 'e e!c)se"
C%ai!a/e HK1I +r1 7 KMA531=A t KM A53+TAF
+i)) Directi! DADRI SIDE 7 KMA5?M=A
De(ateri!/ "irecti! #AWANA SIDE 7 KMA53+TAF
REMARKS:
+OR CIPL +OR EIL3GAIL
Si/! Si/!
Na1e Na1e
Date Date
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

DO!.NO. RE0.NO. APPENDI; . 3
!ERTIFI!ATE OF ME!3ANI!AL ) !ONSTRU!TION !OMPLETION FOR P/ L
Line Dia " /ro0 ,J0- ,To-
,J0-
Secti! N. : +r1 HK1I HTI
HK1I
Li!t N. : +r1 HK1I HTI
HK1I
O.DHINC,I WALL T,K
HMMI
I.D HMMI GRADE API 7
5L
GR.6 ? E*
Le!/t% JJJJJJJJJJJHK1I
Mi!: Mi!: V)-1e JJJJJJJJJJJHM
A
I
Ma4: Ma4:
Wa))
T%ic&!essH11I
Le!/t% HMtrI N-1'er . We)"s:JJJJJJJJJJJJJJJJJJJJ
Le!/t% . !t 'ac&.i))e" secti!:
!ONSTRU!TION
Start Date:
E!" Date:
T,IS IS CERTI+Y T,AT ALL WELDS O+ T,E A#OVE TEST SECTION ,AVE #EEN
ACCEPTED AND T,E PIPELINE SECTION ,AS #EEN LAID AND #ACK+ILLED
ACCORDING TO T,E SPECI+ICATIONS.ALL ACTIVITIES UPTO PART 7 # O+
PIPE #OOK IS COMPLETED AND CERTI+IED.
REMARKS:
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

+OR CIPL +OR EIL +OR GAIL
Si/! Si/! Si/!
Na1e Na1e Na1e
Date Date Date
DO!.NO. RE0.NO. APPENDI; <
2
!3E!K LIST FOR !LEANING8 GAUGING AND FILLING
S.N SA+ETY C,ECK LIST YES NO
;
Is a cp$ . t%e apprve" %$"rtest prce"-re avai)a')e i! t%e
area.
=
Is a cp$ . t%e %$"rtest pac& avai)a')e i! t%e area.
A
Is a"e0-ate (ater "ispsa) arra!/e1e!t 1a"e.
8
C%ec& ,-se &eepi!/ sta!"ar"s are accepta')e at t%e .i))i!/
e!" a!" receivi!/ e!".
5
C%ec& t%e c!"iti!s . t%e t)s a!" tac&)es t 'e -se"
E
C%ec& t%at t%e )i/%ti!/ arra!/e1e!ts are a"e0-ate a!" t%e
c!"iti! . t%e e)ectrica) (iri!/2 circ-it 'ar"s2 c!"-it etc.are
accepta')e a!" sa.e.
F
C%ec& t%at test areas at eac% e!" . t%e test secti! %ave 'e!
cr"!e" .. (it% sta&es a!" '-!ti!/ tape.
G
C%ec& t%at e1er/e!c$ e0-ip1e!t are a"e0-ate a!" are
(r&i!/ c!"iti! 7 sta!"'$ ve%ic)e2 c11-!icati! s$ste1
.irst ai" '4es2 1e"ica) .aci)ities2 stretc%er etc.
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

Nte: ,$"rtest e!/i!eer 3 ,SE ..icer t a"" a!$ t%er sa.et$ pi!ts t t%is )ist as
per t%e site circ-1sta!ces i. "ee1e" !ecessar$.
,YDROTEST ENGINEER ,SE O++ICER EIL
Si/!: Si/!: Si/!:
Na1e: Na1e: Na1e:
Date: Date: Date:
DO!.NO/ RE0.NO / APPENDI; . =
INSPECTION REPORT FOR AIR CLEANING
Li!e Dia : +r1 HKMI T
HKMI
Secti! N. : +r1 HKMI T
HKMI
Li!t N : +r1 HKMI T
HKMI
O.D HINC,I
WALL T,KHMMI I.D HMMI GRADE API
7 5L GR.6 7
E*
Le!/t%JJJJJJJJJHKMI
Mi!: Mi!:
V)-1eJJJJJJJJJJHMAI
Ma4: Ma4:
C1pressr
Lcati!JJJJJJJJJJJJ
Ma&eJJJJJJJ
M"e)JJJJJJJJJ
C-t -tJJJJJJJJJJJJJ
Ma4.Press-reJJJJJJJJJJJJ
Pipi!/ Directi! +r1JJJJJJJJJJJHKMI TJJJJJJJJJJHKMI
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

R-! N Pi/ T$pe
Start E!" Av/.Va)
K13,r
Press-re
HK/3C1=I
>-a!tit$
. De'ris
HI! K/I. Date Ti1e Date Ti1e Mi!. Ma4.
REMARKS
ACCEPTANCE O+ SECTION CLEANING : YES 3 NO
FOR !IPL FOR EIL FOR GAIL
Si/! Si/! Si/!
Na1e Na1e Na1e
Date Date Date
DO!.NO/ RE0.NO/ APPENDI; . >
INSPECTION REPORT FOR GAUGING
Li!e Dia : +r1 HKMI T
HKMI
Secti! N : +r1 HKMI T
HKMI
Li!t N. : +r1 HKMI T
HKMI
O.D HINC,I
WALL T,K. HMMI I.D HMMI GRADE
API?5L
GR.6?E*
Le!/t% JJJJJJJH&1I
Mi!: Mi!:
V)-1eJJJJJJJHMAI
Ma4: Ma4:
C1pressr Lcati! Ma&e M"e)
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

O-t P-t Ma4.Press-re
Pi//i!/ Directi! +r1 HKMI. T HKMI
Ga-/e P)ate Start E!"
Av/.va).
K13,r
Press-re
H&/3c1=I
DiaHi!c%I
T%&
H11I
Materia) Date Ti1e Date Ti1e Mi! Ma4
E!c)s-re: T%e P%t/rap% . Ga-/e p)ate 'e.re a!" a.ter R-!
Detai)s . Ga-/e P)ate Da1a/e Hi. a!$I:
REMARKS:
ACCEPTANCE O+ SECTION CLEANING: YES 3 NO
FOR !IPL FOR EIL FOR GAIL
Si/! : Si/! : Si/! :
Na1e : Na1e : Na1e :
Date : Date : Date :
DOC.NO: REV.NO.; APPENDI6
7 F
INSPECTION REPORT FOR WATER FILLING
Li!e Dia : +r1 HKMI T
HKMI
Secti! N : +r1 HKMI T
HKMI
Li!t N. : +r1 HKMI T
HKMI
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

O.D HINC,I
WALL T,K.HMMI I.D HMMI GRADE
API?5L
GR.6?E*
Le!/t%JJJJJJJH&1I
Mi!: Mi!:
V)-1eJJJJJJJJHMAI
Ma4: Ma4:
Test Me"i-1 Water S-rce Lcati! HK1I
I!%i'iti! : Y 3 N T$pe Dsa/e pp1
T$pe Dsa/e pp1
T$pe Dsa/e pp1
+i)) p-1p Lcati! Ma&e O-tp-t Ltrs3Mi!
Ma4.Press-re 'ar
+)( Meter Ma&e M"e) Sr.N
+i))i!/ Directi! +r1 &1 T &1
Pi/ Se0-e!ce
Pre.i))i!/ Le!/t% HMtrsI V)-1eH1AI
;
st
Pi/ T$pe
#et(ee! pi/ ; B Pi/ = Le!/t% H1trsI V)-1eH1AI
=
!"
Pi/ T$pe
Ti1e
+i)) press-re
H K/3c1=I
+)( 1eter
Rea"i!/
H1AI
V)-1e
t%is peri"H1AI
C-1-)ative V)-1e H1AI +i)) (ater
Te1perat-r
e HcI
Re1ar&s
I!c)-"i!/ pre .i))
+i)) v)-1e
A.ter Sec.Pi/
Rea"i!/ t 'e Recr"e" ,-r)$
+i)) (ater te1perat-re t 'e recr"e" c!ti!--s)$ ! Te1perat-re Recr"er
REMARKS:
ACCEPTANCE O+ SECTION CLEANING
FOR !IPL FOR EIL FOR GAIL
Si/! : Si/! : Si/! :
Na1e : Na1e : Na1e :
Date : Date : Date :
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
DOC.NO: REV.NO:; APPENDI6 7 G
T3ERMAL STA5ILISATION
S!read" /ro0 To Re!ort No.
SectionNo. /ro0 To Date "
/ro0 To
O.DJJJJJJJHINC,I
WALL T%&. H11I I.D H11I
Gra"e API 7 5L
GR. 6 ? E*
Le!/t%JJJJJJJJJJJH&1I
Mi!: Mi!:
V)-1eJJJJJJJJJJJH1AI
Ma4: Ma4:
S?;
H&1I
S?=
H&1I
S?A
H&1I
S?8
H&1I
S?5
H&1I
S?E
H&1I
S?F
H&1I
S?G
H&1I
S?9
H&1I
s?;*
H& I
Aver.
Si).
Te1p
P?;
H&1I
P?=
H&1I
P?A
H&1I
P?8
H&1I
P?5
H&1I
P?E
H&1I
P?F
H&1I
P?G
H&1I
P?9
H&1I
P?;*
H&1I
Aver.
Pipe.
Te1p
A1'ie
et
Te1p.
To be ta7en at ' interva)
Stabi)iDation be conidered to (ave been ac(ieved 3(en t(e di&&erent bet3een t(e avg.!i!e Te0!. and avg. oi) Te0!. i not (ig(er
T(an # deg. /or % cinecutive reading.
O& Section T(er0a) tabi)iDation" YES @ NO
FOR !IPL FOR EIL FOR GAIL
Si/! : Si/! : Si/! :
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
Na1e : Na1e : Na1e :
Date : Date : Date :

DO8.NO" RE=.NO"# 9PPENDIK < #%
PRESS2RE TEST ,%' HO2RS HOLD-
Line Dia" /ro0,70- To,70- Dead.Nt.Teter"< Ma7e"IIIIIIIII Re!ort No.
SectionNo. /ro0,70- To,70- Mode)"IIIIIIIII Date "

Joint No" /ro0,70- To ,70- 8a)ibration certi&icate No"IIIIIIIIII
Te0!erature"< Ma7e"IIIIIIII
Mode)"IIIIIIIII 8erti&icate No"IIIIIIII
O.DJJJJJJJHINC,I
WALL T%&. H11I I.D H11I
Gra"e API 7 5L
GR. 6 ? E*
Le!/t%JJJJJJJJJJJH&1I
Mi!: Mi!:
V)-1eJJJJJJJJJJJH1AI
Ma4: Ma4:
S?;
H&1I
S?=
H&1I
S?A
H&1I
S?8
H&1I
S?5
H&1I
S?E
H&1I
S?F
H&1I
S?G
H&1I
S?9
H&1I
s?;*
H& I
Aver.
Si).
Te1p
P?;
H&1I
P?=
H&1I
P?A
H&1I
P?8
H&1I
P?5
H&1I
P?E
H&1I
P?F
H&1I
P?G
H&1I
P?9
H&1I
P?;*
H&1I
Aver.
Pipe.
Te1p
A1'ie
et
Te1p.
Dead 3eig(t teter reading to be recorded (our)y6 !i!e + oi) te0!erature reading to be recorded at every t3o (our
Preure and a0bient te0!erature to be recorded continuou)y on recorder.9)) detai) o& t(er0ocou!)e6 ca)ibration tatu6 certi&icate No.etc.
are to be recorded and enc)oed.
REM9RJS"
9cce!tance o& Tet Preure ,%' Hour Ho)d-" Ye @ No.
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
FOR !IPL FOR EIL FOR GAIL
Si/! : Si/! : Si/! :
Na1e : Na1e : Na1e :
Date : Date : Date :
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
DO8.NO" RE=.NO.# 9PPENDIK < A
PRE PRESSURI?ATION SAFET9 !3E!K LIST
S.NO C,EC, POINT YES NO
;
T%e test secti! %as 'ee! is)ate" .r1 a)) t%er pipe)i!e
Secti!s.
=
A)) te1prar$ pipi!/2 test %ea"s a!" t%er e0-ip1e!t
c!!ecte" t t%e test secti! %ave 'ee! pre teste" t a
press-re . at )east ;.=5 ti1es t%e test press-re.
A
T%e test secti! %as 'ee! c1p)ete)$ .i))e" (it% (ater a!"
air ve!te" ...
8
A)) i!str-1e!ts a!" /a-/es (%ic% are -se" %ave va)i"
ca)i'rati! certi.icates.
5
A)) (ar!i!/ !tices2 1ar&er tapes2 prtective 'arriers a!"
t%er sa.et$ e0-ip1e!t %ave 'ee! psiti!e" a!" a)) t%e
c!cer!e" i!.r1e".
E
A)) pers!s (% 1a$ 'e a..ecte" '$ t%e perati!s are
i!.r1e" . t%e activit$.
F
C11-!icati! c%a!!e) is teste" a!" e!s-re" t%at t%e$ are
(r&i!/ prper)$. #ac&-p i!str-1e!ts are avai)a')e.
G
I!.r1 t%e pers! perati!/ t%e press-ri!/ e0-ip1e!t . t%e
1a4i1-1 test press-re (%ic% s%a)) 'e app)ie" t t%e test
secti!.
9
Li!t i!specti! . t%e e!tire .aci)ities '$ t%e ,$"rtest ?
E!/i!eer a!" ,SE ..icer t e!s-re a)) t%e sa.et$ 1eas-res
%ave 'ee! -!"erta&e 'e.re t%e test.
39DROTEST ENGINEER 3SE OFFI!ER@!IPLA EIL
Si/! : Si/! : Si/! :
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
Na1e: Na1e : Na1e:
Date : Date : Date :
DO!.NO/ RE0.NO/ APPENDI; . 0
PRESSURIZATION
+r1 :
C$c)e
: 5*: 3
F5: 3 ;**
Reprt N :
Date :
T :
Pipe)i!e Dia : ;=D
Test Me"i-1 : Water
Secti! Le!/t% : H&1I Materia) : API 5L 4 E*
T%eretica) v)-1e : H1AI Wa)) T%ic&!ess : E.8 3 F.; 11
S-rce . Water:
E)evati!3Press-re at :
,i/%est Pt ? Press-ri<i!/ Pt ?
L(est Pt ?
Receivi!/ Pt ?
S).N Ti1e ,rs.
Dea" Wt.
K/3#ar
Str&es
C-!te"
V)-1e
MA
C-1. V)
MA
Te1p.C Re1ar&s
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
;. Press-ri<ati! P-1p : Ma&e M"e) V)-1e
=. Dea" Wei/%t Tester : Ma&e M"e) V)-1e
A. +)( Meter : Ma&e M"e) V)-1e
Ntes:
ACCEPTANCE O+ CLEANING:
FOR !IPL FOR EIL FOR GAIL
Si/! : Si/! : Si/! :
Na1e : Na1e : Na1e :
Date : Date : Date :


DO!.NO/ RE0.NO/ APPENDI; .
AIR 0OLUME !AL!ULATION @=0B / 7=B / 00B cCc%eA
S(eet No " /ro0,70- To,70- Date
Line Dia " JointNo. /ro0 To
Section No. " Tet Section Lengt( =o)u0e
Air V)-1e Test carrie" -t at : . test press-re.
Test Stati! Lcati! Test Press-re #ar.
Date B Ti1e Av/. Pipe Te1p. H C I
S.N Descripti!
Dea"
.Wt.Tester
H&/3c1=I
Press-re
L(eri!/
H&/3c1=I
V)-1e .
(ater
Re1ar&s
; I!itia) A.ter +irst L(eri!/
= A.ter +irst L(eri!/
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
A A.ter sec!" L(eri!/
T ca)c-)ate t%e t%eatrica) v)-1e . (ater re0-ire" t ac%ieve a c%a!/e i! press-re2 t%e v)-1e press-re e0-ati!
=! P ,1.144' Ri@T Q 9- ; #1
?E
; =t ; R P ; J
N(ere"
=! P 8o0!uted 3ater a0ount re?uired to raie by P t(e !reure in t(e ection to be teted ,0C-
=t P Geo0etrica) vo)u0e o& t(e ection ,0C-
Ri P No0ina) inner radiu0 o& t(e !i!e ,00-
T P No0ina) !i!e t(ic7ne ,00-
9 P Iot(er0a) co0!reibi)ity va)ue &or 3ater at t(e !reuriDation te0!erature in t(e P range ,bar
?;
- ; #1
E
. Re&er gra!(.
RP P Preure Rie ,bar-
J P 9 di0enion)e coe&&icient t(at i e?ua) to a va)ue o& #.1% &or )ongitudina))y 3e)ded !i!e.
T(ere&ore =! P 0C
P Liter
9ctua) vo)u0e o& 3ater drained to dro! !reure by 1.* Jg. P Liter ,=i-
T(ere&ore
=# @ =! P
Since t(e ratio i )e t(an #.1. t(e &i))ing i acce!tab)e and t(e tet ection 0ay be !reuriDed to t(e &ina) tet !reure.
Re0ar7
988EPT9N8E O/ SE8TION 8LE9NING
FOR !IPL FOR EIL FOR GAIL
Si/! : Si/! : Si/! :
Na1e : Na1e : Na1e :
Date : Date : Date :
DO8.NO" RE=.NO"# 9PPENDIK < #$
HYDROSTATIC TEST CALCULATIONS
S%eet N: +r1 H&1I T H&1I Date
Li!e Dia : Li!t N: +r1 T
Secti! Stati! Lcati! Test Secti! Le!/t% V)-1e
Test Stati! Lcati! Test Press-re H#arI
Dea" .Wt.Tester Ma&e: Certi.icate N.
M"e): Date :
Date B Ti1e H,rsI Dea" Wei/%t H#arI Avera/e pipe Te1p.
Start . Test
E!" . Test
A)/e'ic Di..ere!ce
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
Ca)c-)ati! . Press-re C%a!/e HMPI "-e t c%a!/e i! te1perat-re:
Mp K H#3 H*.*GG8 Ri3T N AI MT
W%ere:
# K Di..ere!ce 'et(ee! t%er1a) E4pa!si! . (ater a!" stee) at te1perat-re a!"
press-re as 1eas-re" .r1 e!c)se" ta')e at t%e e!" . t%e test.
Ri K N1i!a) i!!er ra"i-s . pipe
T K N1i!a) (a)) t%ic&!ess . pipe
A K A)/e'raic c1pressi'i)it$ .actr . (ater
MT K A)/e'ric "i..ere!ce 'et(ee! (ater te1perat-re at t%e 'e/i!!i!/ a!" at e!" . t%e test HCI
Ri K R; L; N R= L=
JJJJJJJJJJ
L; N L=
Ti K T; L;N T= L=
JJJJJJJJJJ
L; N L=
A K Ist%er1a) c1pressi'i)it$ va)-e . (ater as esti1ate" at t%e press-re a!" te1perat-re va)-es 'tai!e" at t%e e!" .
test H'ar
7;
I 4 ;*
?E
I
REMARKS:
+OR CIPL +OR EIL +OR GAIL
Si/! : Si/! : Si/! :
Na1e : Na1e : Na1e :
Date : Date : Date :
DOC.NO: REV.NO:; APPENDI6 7 ;8
39DROTEST E0ALUATION REPORT
Reprt N: Date :
Sprea" : +r1 T
O.D HINC,I Wa)) T%&. H11I I.D H11I Gra"e
API 7 5L Gr.
6 7 E*
Le!/t%JJJJJJJJJH&1I
Mi! : Mi!: V)-1eJJJJJJJJH1AI
Ma4 : Ma4:
Secti! N:JJJJJJJJJJJJJJJ +r1 K1 JJJJJJJJJJJJ T K1JJJJJJJJJJJJJJJJ
O#SERVATION
I!itia) Test Press-re JJJJJJJJJJJJJ#ar Date B Ti1e JJJJJJJJJJJJJJJJJJJ
+i!a) Test Press-reJJJJJJJJJJJJJ #ar Date B Ti1eJJJJJJJJJJJJJJJJJJJJ
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
,9- De)ta P "-ri!/ =8 ,-rs ,)" Peri"
I!itia) Pipe Wa)) Te1p JJJJJJJJJJJJ #ar Date B Ti1eJJJJJJJJJJJJJJJJJJJJ
+i!a) Pipe Wa)) Te1pJJJJJJJJJJJJJ#ar Date B Ti1eJJJJJJJJJJJJJJJJJJJJ
,:- De)ta T D-ri!/ =8 ,-rs ,)" Peri"
I!itia) Si) Te1pJJJJJJJJJJJJJJJJJ #ar Date B Ti1eJJJJJJJJJJJJJJJJJJJJ
+i!a) Si) Te1pJJJJJJJJJJJJJJJJJ #ar Date B Ti1eJJJJJJJJJJJJJJJJJJJJ
,8- De)ta T2 Si) Te1p.JJJJJJJJJJJJJ De/.C
,D- Lea&a/e D-ri!/ =8 ,-rs ,)" Peri"
EVALUATION
De)ta P D-ri!/ =8 ,-rs ,)" Peri" HAI JJJJJJJJJJJJJJJJJJ 'ar
Acc-!ta')e Press-re Lss D-e t Te1p.# JJJJJJJJJJJJJJJJJJ 'ar
U!acc-!ta')e Press-re Lss JJJJJJJJJJJJJJJJJJ 'ar
A))(a')e -!acc-!ta')e press-re Lss JJJJJJJJJJJJJJJJJJ 'ar
C!c)-si!
Test Accepta')e 3 U! accepta')e
Secti! Re)ease" .r "epress-ri<ati!
REMARKS:
+OR CIPL +OR EIL +OR GAIL
Si/! : Si/! : Si/! :
Na1e : Na1e : Na1e :
Date : Date : Date :
OC.NO: REV.NO:; APPENDI6 ? ;5
INSPECTION REPORT FOR DEWATERING
Reprt N:
Date:
Sprea" : +r1 T
O.D JJJJJJ
JJJHINC,I
Wa)) t%ic&
H11I
I.D H11I Gra"e
API 7 5L
Gr. 6?E*
Le!/t%JJJJJJJJJJJH&1I
Mi!: Mi!: V)-1eJJJJJJJJJJJJH1AI
Ma4: Ma4:
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
C1pressr: Lcati! Ma&e
O-tp-t Ma4.Press-re
De(ateri!/ Directi! +r1 K1. T K1
Disc%ar/e Pi!t
R-! N.
T$pe .
P3G
Start E!"
Av/.Va)
K13,r
Press-reHK/3C1=I >t$ .
Water
HLtrsI
Date Ti1e Date Ti1e Mi! Ma4
REMARKS:
ACCEPTANCE O+ SECTION DEWATERING: YES3NO
FOR !IPL FOR EIL FOR GAIL
Si/! : Si/! : Si/! :
Na1e: Na1e: Na1e:
Date : Date : Date :
DOC.NO: REV.NO:; APPENDI6 7 ;E
LIST O+ ATTAC,MENTS TO ,YDROSTATIC TEST RECORD
Sprea" : +r1 T
Sprea" : +r1 T
O.DJJJJJJJJJJJ
HINC,I
Wa)) T%&. H11I I.D H11I Le!/t%JJJJJJJJJHK1I
Mi! : Mi!: V)-1eJJJJJJJJJJH1AI
Ma4 : Ma4:
;. Test P)a! .r ,$"rtest HAppe!"i4 7 =I
YES3NO
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
=. Certi.icate . 1ec%a!ica) a!" c!str-cti! c1p)eti!
HAppe!"i4 7 AI YES3NO
A. Air C)ea!i!/ HAppe!"i4 7 5I
YES3NO
8. a.
Ga-/i!/ HAppe!"i4 7 EI
YES3NO
'.
P%t/rap%$ . Ga-/e P)ate
YES3NO
5. a. Water
.i))i!/ HAppe!"i4 7 FI
YES3NO
'. +i))
Water Te1perat-re C%arts
YES3NO
E. T%er1a) Sta'i)i<ati! HAppe!"i4 7 GI
YES3NO
F. a.
Press-ri<ati! HAppe!"i4 7 9I
YES3NO
'.
Press-re recr"s c%artsHsI
YES3NO
c.
Te1perat-re Recr"ers C%arts
YES3NO
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
G. Air V)-1e Ca)c-)ati!s HAppe!"i4 7 ;AI
YES3NO
9. a. =8
%-rs ,)" HAppe!"i4 7 ;=I
YES3NO
'.
Press-re recr"ers C%arts
YES3NO
c. A1'ie!t
Te1perat-re Recr"er C%arts
YES3NO
;*. ,$"rstatic Test Ca)c-)ati!s HAppe!"i4 7 ;AI
YES3NO
;;. ,$"rstatic Test Eva)-ati! HAppe!"i4 7;8I
YES3NO
;=. Ca)i'rati! Certi.icates
YES3NO
;A. De(ateri!/ HAppe!"i4 7;5I
YES3NO
FOR !IPL FOR EIL FOR GAIL
Si/! : Si/! : Si/! :
Na1e: Na1e: Na1e :
Date : Date : Date :
DO!.NO/ RE0.NO/ APPENDI; < 7
INSPE!TION REPORT FOR SDA55ING
Reprt N:
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
Date:
Sprea" : +r1 T
O.DJJJJJJJJ
HINC,I
Wa)) t%ic&H11I I.D H11I Gra"e
API?5L
Gr. 6?E*
Le!/t% JJJJJJ HK1I
Mi!: Mi!:
V)-1eJJJJJJJJH1AI
Ma4: Ma4:
C1pressr:
Lcati!
Ma&e

O-tp-t

Ma4.Press-re
S(a''i!/ +r1 K1
T
K1 Dista!ce Pi!t

Secti! Re)ease" .r S(a''i!/ Yes3N
Water Treat1e!t Carrie"
Yes3N
T$pe .
Pi/
Start E!" Wt...Pi/
Av/.Va).
K13,r
Press-re
HK/3c1=I
Re1ar&s
Date Ti1e Date Ti1e I!itia) +i!a)
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
ACCEPTANCE O+ SECTION SWA##ING: YES 3
NO
FOR !IPL FOR EIL FOR GAIL
Si/! : Si/! : Si/! :
Na1e: Na1e : Na1e :

UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD

APPENDI; <E
TENTATI0E LA9OUT OF E:UIPMENT AND INSTRUMENTS FOR 39DROSTATI! TEST
+r1 Water S-rce
+)( Meter
Li!es .r Pi/
Ga-/e
AIR !M"R#$$!R
%or &ackpressure
Temporary Test 'eader Receiving #nd Temporary Test 'eader
&R#A(
TA)(
"*M" $(ID
%illing
+"ressurising
"ump
AIR .!M"
"ressure, Impulse line from test 'eader
Temp. -auge
Recorder
$tock ounter Dead .t. Tester -auge
T#$T A&I)
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
APPENDI; < 9
39DROTEST 3EADER
N5 OD N; 8D3ED N5 OD NE OD N= ;;3=D NF OD NG OD N8 ;;3=D
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
TENATIVE LAYOUT O+ E>UIPMENT AND INSTRUMENTS
+OR AIR PIGGING
P!e-1atic ,se
AIR
UPGRADATION OF METERING SKID
OWNER : ONGC
LSTK CONTRACTOR : DANIEL MEASUREMENT SOLUTIONS PVT LTD.
CONTRACTOR : SAVAIR ENERGY LTD
!OMPRESSOR
Ga-/e Ga-/e
R 7 Receivi!/ L 7 La-!c%i!/ .
Air
piggingheader
R. #nd
Air pigging
header L . #nd