Elevated Storage Reservoir Design
Elevated Storage Reservoir Design
Elevated Storage Reservoir Design
1.00 INTRODUCTION
The following sheets pertain to the design of 2 lakh gallon capacity RCC Circular Overhead T
The tank is proposed to be built at east of Jammu city, at Nai Basti under the water supply p
It is basically a circular intze type tank with RCC shaft supporting the tank and the shaft is r
on open foundation.
2.00 REFERENCES
IS 3370 -2009
Code of Practice for Concrete structures for the storage of liquids
Part 1 : General Requirements
Part 2 : Reinforced Concrete Structures
IS 11682 -1985 Criteria for design of RCC staging for overhead water tanks
IS 875 : 1987
Code of Practice for Design Loads (other than earthquake) for buildings & s
Part 2 : Imposed Loads
Part 3 : Wind Loads
IS 1893 : 1984 Criteria for earthquake resistant design of structures
IS 11089: 1984 Code of Practice for Design & Construction of Ring Foundation
Kuang-han Chu & Omar.F.Afandi : Analysis of circular & annular slabs for chimney foundation
3.00 PRINCIPAL PARAMETERS
General
Capacity of tank proposed
V
hb
Free board
909 m3
0.60 m
SBC of soil
Density of water
9.81 kN/m3
Density of concrete
24.00 kN/m3
Density of soil
Type of Foundation
Depth of foundation below ground level
=
=
=
Material Properties
Grade of Concrete
15.00 T/m2
19.00 kN/m3
Solid Circular Raft Foundation
1.50 m
tank
=
shaft
=
foundation =
M30
M30
M30
Fe500
Grade of Reinforcement
Top Dome
Inner Radius
r1
6.00 m
Rise
h1
2.00 m
Thickness
t1
0.10 m
Depth
Width
=
=
400 mm
400 mm
Bottom Dome
Inner Radius
r3
4.00 m
Rise
h2
1.60 m
Thickness
t3
0.20 m
Inner Radius
r2
6.00 m
Thickness
Height
t2
=
=
0.40 m
6.30 m
=
=
0.60 m
4.00 m
h3
Extent of shell
600 mm
800 mm
=
=
RCC Shaft
Diameter
Thickness
Height of shaft
=
=
=
8.00 m
0.20 m
20.00 m
=
=
3.00 m
0.60 m
Design Parameters
600 mm
800 mm
=
=
=
=
=
=
40 mm
M30
1.5
2.0
8.0
10.0
IS 3370 Part-2
130
140
m=
9.81 m2/s
M30
9.33
280
3 x cbc
k=
1.00
1 + (st / m.cbc )
0.42
j=
1 - k/3
0.86
MOR constant
Q=
0.5 x cbc x k x j
1.80
N/mm2
920.65 m3
30.50 m
=
=
10.00
x
=
0.10 x
3.14 kN/m2
24.00
2.00
sin =
=
cos =
)2 =
6.00 2
R=
10.000 m
6.00 =
10.000
D
2R
36.87 o
0.6000
0.644 rad.)
0.800
wR cos t
1
1 + cos
=
=
=
<
0 N/mm2
Hence, providing minimum steel of 0.24% as per IS3370- 2009 Part II, we have
Ast reqd.
Ast provided =
=
T10
0.24 % =
@
200 mm c/c =
240.00 mm2
392.70 mm2
wR
1 + cos
=
=
Meridional stress
17.42
0.10
=
>
Hence, providing minimum steel of 0.24% as per IS3370- 2009 Part II, we have
Ast reqd.
0.24 % =
240.00 mm2
Ast provided =
Total Load of dome
T10
@
=
=
=
200 mm c/c =
=
=
392.70 mm2
972.00
112.00
8.68 m
10.00 x
where
h1=
R=
Provide
T cos .D
2
=
=
83.61
x
130
No. bars
12
mm bars
=
Volume of beam
1000
678.58 mm2
T
=
Ac + (m-1) As
Weight of beam
(=
17.42
x
83.61 kN
83.61
160000
x
+
0.50 N/mm2
>
1.50 N/mm2
6.20 x
6.23 m
149.59 kN
6.00 x
370.82 kN
370.82
=
Ast provided =
(each face)
T20
Ast provided =
Volume of wall
Weight of wall
=
T12
1000
2852.45 mm2
T
=
Ac + (m-1) As
98.17 m3
2356.04 kN
x
+
0.87 N/mm2
>
1.50 N/mm2
200 mm c/c =
2
1570.80 mm2
370.82
400000
0.24 % =
@
x
130
200 mm c/c =
Distribution steel
61.80
960.00 mm2
565.49 mm2
6.20 x
=
=
2
40.21
301.59 =
40.21
7.50 kN/m
149.59 =
40.21
3.72 kN/m
2356.04 =
40.21
58.59 kN/m
=
=
x
m
6.40
0.60 x
11.52 kN/m
0.80 x
7.50 +
81.33 kN/m
3.72
tan-1
h3
r1 - r3
Horz.force on beam due to V1
V1 cot
H=
Hv
=
=
H.D /2
40.67
Hv + Hw
Provide
No. bars
25
392.32
mm bars
Weight of beam
11.52
wh x d x D/2
Hw =
Hw =
=
Total Hoop Tension
61.80
x
148.33 kN
392.32 kN
x
130
(=
1000
3926.99 mm2
40.21 =
T
=
Ac + (m-1) As
392.32
480000
=
x
+
0.72 N/mm2
<
Min. shear steel,
Provide
Asv
L stirrups
=
10
0.4b.d
fy
mm @
1.50 N/mm2
1476.92 mm2
200 mm c/c
=
1570.80 mm2
6.30
10.30
2.00
=
=
Lever arm, x =
Weight of conical slab,
0.92 m
=
=
x
4.57
2313.02 kN
=
=
3270.47 +
10699.45 kN
V2
10699.45
x 2
5.000
=
=
Ws
a) Meridional Thrust
Meridional Stress
(6.3 + 10.3)
x
2
(6 + 4 )
=
2
16.60 x 2
5115.96 kN
380.77
1000.00
V2 cosec.
340.57
x
x
1000
600
x
=
>
b) Hoop tension
The hoop tension will be maximum at the top of the conical slab as the diameter is max.
at this location.
Hoop tension
= ( p cosec.
Angle ,
Hence, H
= (6.3 + 10.3 =
2
p
q cot.
) D/2
8.30
8.30
9.81 =
0.600
24.00 =
14.40
589.40
600000
x
+
63.43 o
=(
=
81.42 x
589.40 kN
Ast reqd. =
(both faces)
589.40
Ast provided =
x
130
T25
1.12
@
=
T20
T
=
Ac + (m-1) As
1000
0.92 N/mm2
>
1.50 N/mm2
200 mm c/c =
0.24 % =
200 mm c/c =
=
4533.86 N/mm2
2454.37 mm2
1440.00 mm2
1570.80 mm2
(r22 + 2r2.r3 + 3r32) h3
4 (r22 + r2.r3 + r32)
1.74 m
5226.59 kN/m2
1.60
sin =
)2 =
R=
5.80 m
4.00 =
5.80
D
2R
=
cos =
4.00 2
0.6897
43.60 o
0.724
=x
4.00
4946.71 kN
2
x
58.31
4946.71
58.31
5.80
0.20
4.80
wR cos t
10.30
1
1 + cos
=
=
=
>
Hence, providing minimum steel of 0.24% as per IS3370- 2009 Part II, we have
Ast reqd.
Ast provided =
=
T12
0.24 % =
@
200 mm c/c =
480.00 mm2
565.49 mm2
wR
1 + cos
=
=
301.54
0.20
=
<
Hence, providing minimum steel of 0.24% as per IS3370- 2009 Part II, we have
c.g of this load
3 (2R - h1)2
4 (3R - h1)
=
=
300.00
63.20
4.75 m
where
h1=
R=
11.0 DESIGN OF RING BEAM AT JUNCTION OF BOTTOM DOME & SHAFT WALL
Weight of water
Weight of top dome & ring beam
Weight of side wall & ring beam
Weight of conical wall & bottom dome
Self wt. of beam
Total Load on beam
Load intensity on beam
Angles
=
920.65
x
=
301.59
+
=
2356.04
+
=
2313.02
+
=2 x x 0.6 x 0.8 x 24
15213.39
25.13
605.32 kN/m
63.43 o
43.60 0
=
=
451.18 +
10699.45 kN
Thrust intensity of T1
10699.45 =
25.13
4946.71 +
425.72 kN/m
4946.71 =
25.13
196.82 kN/m
T1 cos
Provide
No. bars
258.91
2819.29 +
279.88
T2 cos
x
130
20
mm bars
T
=
Ac + (m-1) As
(=
1000
2513.27 mm2
258.91
480000
x
+
0.52 N/mm2
>
1.50 N/mm2
605.32
600
x
x
1.26 N/mm2
<
8.00 N/mm2
AS per IS 11682:1985,
Min. thickness of shaft
<
<
=
M30
1.00 m x 2.10m
From sketch,
=
=
0.125
1.50 kN/m2
Volume of shaft
20.00 x 2
103.04
x 4.100 x
24.00 =
Top dome
Ring beam below top dome
Side wall
Ring beam below wall
Conical slab
Bottom dome
Ring beam below bot. dome
RCC Annular shaft
Total self weight of tank
W=
Weight
(kN)
301.59
149.59
2356.04
463.25
2313.02
279.88
318.48
2473.06
8654.91 kN
Weight of water
9031.54 kN
Component
Ovalising Moment , Mo
=
where r
=
and
p =
Hence,
Mo =
F.y
Area exposed
A (sqm.)
125.66
5.12
80.64
8.16
44.80
5.76
168.00
12815.31 kNm
Parameters
W
e (M/P)
e/r
=
=
Full Tank
17686.45
0.72
0.18
0.42
3.27
8.00
OK
5.26
8.00
OK
=
=
Empty Tank
8654.91
1.48
0.36
0.42
200 mm
c/c =
200 mm
c/c =
Ec
MI
Fo
I
5000 fck =
1.0
(2r)3.t /8
=
0.25
1.5
Medium
Empty
7006.21
(kN)
(m)
=
=
=
=
=
=
=Wl3/3EI
2 / g
Sa/g
.I.Fo.Sa/g
0.020
0.28
0.20
0.075
525.47
10509.31
0.30
3.03
10.66
OK
storage of liquids
water tanks
arthquake) for buildings & structures
ng Foundation
labs for chimney foundations
ar Raft Foundation
h1
r1
h
r2
h2
h3
r3
M25
1.5
2.0
6.0
8.5
IS 456 :2000
230
190
M25
10.98
0.29
0.90
1.11
- (3r32 + h22) h2
80.90
>V, Hence OK
0.74 kN/m2
2.00
125.66 m2
2.40 kN/m2
31.36 x
0.10
125.66
0.24
76.65 kN/m2
0.08 N/mm2
8.00 N/mm2
OK
OK
31.36
1.80
17.42 kN/m
174.20 kN/m2
0.17 N/mm2
8.00 N/mm2
OK
OK
nsity of loading
2.00
2.00 m
10.00 m
2.40
0.800
6.00
643.19 mm2
OK
1000
5655
OK
0.40 x
0.40
6.3
OK
61.80 kN/m2
1000
26180
OK
each face
0.40 x
OK
6.30
24
58.59
11.52
81.33
2.00
40.67 kN/m
6.00
63.43 o
where
d =
wh =
0.40
243.99 kN
depth of beam
water load
6.00
3017.82 mm2
OK
463.25 kN
1000
65450
OK
/m
/m
OK
2.00
16.60 m2
5.000 m
x 5.000
x 11.200
5115.96 +
9.81
0.60
x 24
2313.02
= 340.57 kN/m
1.12
0.63 N/mm2
8.00 N/mm2
OK
380.77 kN
81.42 kN/m2
14.40 kN/m2
0.50
)x
6.00
1000
40906
OK
each face
OK
OK
+ 3r32) h3
1.60 2 (
3
3 x5.8-1.6)
1.60 =
24.00
9.81
58.31 m2
=
279.88 kN
89.64 kN/m2
519.90 x
0.20
0.144
374.69 kN/m2
0.37 N/mm2
8.00 N/mm2
OK
OK
519.90
1.724
301.54 kN/m
1507.71 kN/m2
1.51 N/mm2
8.00 N/mm2
OK
SHAFT WALL
9.81 =
149.59 =
463.25 =
279.88 =
=
9031.54 kN
451.18 kN
2819.29 kN
2592.90 kN
318.48 kN
15213.39 kN
2313.02 +
5115.96
5226.59 kN
-258.91 kN/m
indicates compression
1991.58 mm2
OK
1000
20944
OK
1000
800
OK
0.20 =
103.04 m3
2473.06 kN
Force (A x w)
F (kN)
188.50
7.68
120.96
12.24
67.20
8.64
252.00
657.22 kN
4100 mm
c.g from GL
y (m)
29.18
28.20
24.85
21.40
18.84
19.80
9.50
oth faces
392.70 mm2
OK
392.70 mm2
OK
oth faces
27386 N/mm2
43.30 m4
Full
16037.74
0.045
0.42
0.18
0.068
1082.55
21650.95
0.30
6.20
10.66
OK
2
2
Measurement
x 10.00
x 2.00
x 10.00
x 2.00
x 0.10
2
2
x 6.20
x 6.20
x 0.40
x 1.20
x 0.40
2
2
x 6.20
x 6.20
x 0.40
x 12.60
x 6.30
2
2
x 6.40
x 6.40
x 0.60
x 2.00
x 0.80
x 4.57
x 4.57
x 0.60
x 11.20
x 11.20
2
2
x 5.80
x 5.80
x 1.60
x 1.60
x 0.20
2
2
x 4.40
x 4.40
x 0.60
x 2.00
x 0.80
8.00 Shaft
2
2
x 4.10
x 4.10
x 0.20
x 40.00
x 20.00
6
1
0.50
2.10
x 0.50
x 1.50
8.10 Openings
ventilators
door
Pile Foundation
Annular Footing
kicker
stem
base
2
2
2
2
2
2
x
x
x
x
x
x
4.10
4.10
4.10
4.10
4.10
4.10
x
x
x
x
x
x
0.40
0.60
0.60
0.30
3.00
0.60
x 0.60
x 0.30
x 0.60
OR
Pile Foundation
Dia = 600
Length = 25000
No. = 40
Capacity = 125MT
x 0.090
x 25.00
x 40
Pile cap
Width = 3000
Depth = 1000
2
2
x 4.10
x 4.10
x 3.00
x 1.00
x 1.00
x 7.85
x 7.85
x 7.85
x 1.00
x 1.00
4
4
9
9
1
1
1
1
1
1
1
1
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x 0.12
2
2
x 5.80
x 5.80
x 8.00
15.00 Excavation
footings
pilecap
x 5.60
x 4.10
16.00 PCC
footing
pilecap
inside shaft
2
2
x 4.10
x 4.10
x 16.00
inside
outside
inside
outside
inside
outside
inside
2
2
2
2
OR
Solid Circular Footing
10.00 Walkway
10.10 Around tank
( 2 Nos.)
10.20 Landings
1.00 m wide
0.12 m thk
1.00 m wide
0.12 m thk
1.50 m wide
0.15 m thk
5.00 m wide
0.35 m thk
1.90 m wide
0.15 m thk
0.50 m wide
0.15 m thk
6.90
6.90
1.00
1.00
1.50
1.50
5.00
5.00
1.90
1.90
0.50
0.50
1.00
1.00
1.00
1.00
1.50
1.50
0.75
5.00
1.00
1.90
1.00
0.50
x 0.20
x 12.60
x 0.12
x 0.15
x 0.35
x 0.15
x 0.15
x 6.30
17.00 Painting
17.10 walls
17.20 conical
17.30 bot.dome
17.40 Top dome
x
x
x
x
6.00
6.40
5.00
5.60
x 5.60
x 4.10
x 3.20
x 3.30
x
x
x
x
6.30
6.30
4.57
4.57
x 1.50
x 1.10
x 0.10
x 0.10
x 0.15
17.50 Shaft
17.60 Partition wall
17.70 Walkways
outside
inside
outside
inside
outside
2
2
2
2
x
x
x
x
4.00
4.20
5.70
5.90
x
x
x
x
20.00
20.00
6.30
6.30
Volume (m3)
12.57
Formwork
(m2) Length (m)
125.66
6.23
1.50%
0.70
2.75%
21.60
1.00%
1.50
3.00%
23.20
0.75%
0.70
0.75%
0.80
1.20%
9.90
1.50%
0.70
2.00%
0.70
1.50%
5.60
2.00%
45.30
46.75
98.17
490.84
19.30
80.42
96.38
321.25
11.66
58.31
13.27
55.29
103.04
1030.44
0.30
0.63
1.50
3.15
57.19
38.64
6.18
15.46
4.64
7.73
46.37
15.46
282.74
77.28
2.75%
17.00
2.00%
31.00
1.50%
1.20
1.50%
0.10
1.50%
0.00
1.50%
0.20
1.50%
0.00
1.50%
0.00
2.20%
8.10
25.76
193.59
49.32
10.40
86.71
1.08
9.00
0.34
2.25
1.31
25.00
0.29
3.61
0.08
0.25
45.92
459.18
131.10
23.00
117.86
16.00
148.00
59.00
8.00
9.00
7.54
237.50
253.34
143.42
160.63
58.31
58.31
125.66
125.66
502.65
527.79
225.63
233.55
126.82
Civil Work Items - RCC Over Head Tank of 2000 cu.m capacity and over 30m staging
height
Si. No. Description
1
Unit
Qty.
Cum
59.00
Cum
c Earthwork in excavation for foundation for pile caps in all types of strata other
than hard rock upto 3m depth
Cum
2
Boring in all types of soil (excluding rock) for piling of 600 dia piles including
protection of sides by either using temporary liner or driller's mud, etc.
complete
PCC M7.5B below pilecap
PCC M10B within shaft wall area at ground level
R.M
25.00
Cum
9.00
Cum
7.60
Cum
Cum
282.80
77.30
Providing M-35 for R.C.C. 600 dia cast in situ bored piles, each of load
capacity as designed, place through steel shell sunk to the required depth
through all type of strata excluding provision of reinforcement including
placing concrete by tremmy arrangment including all leads and
lifts,compaction of concrete including chipping and dressing of RCC
Piles,cleaning the reinforcement etc complete.
Pilecap
44of 47
Unit
Qty.
102.20
Cum
Cum
38.90
11.66
Cum
Cum
Cum
Cum
Cum
96.38
13.50
98.20
12.60
46.00
45of 47
Unit
Qty.
Cement mortar plastering 1:3 proportion 12 mm thick for both inside and
outside surface for top dome
Cum
3.10
M Ton
132.00
564.90
10
11
Two coats of water proof cement painting of approved colour and shade over
one coat of primer before removal of scaffolding for new R.C.C. over head
tanks
2779.30
12
M.S. Inspection door of size 60 cms x 60 cms. including M.S. frame, size 50
x 50 x 6 mm and shutters of 3mm thickness with hinges at top and locking
arrangements, painting
1
13
Aluminium monkey ladder 45 cms. wide including hand railing & cage to be
provided inside the tank
16.00
46of 47
Unit
Supplying & fixing 40 mm dia G.I. medium duty pipes hand railing
3 rows fixed to 1:2:4 (M-150) vibrated R.C.C. post of size 100 x 150 mm at
top and 150 x 150 mm at bottom placed at 2 Mtr. intervals for a height of 750
mm painting G.I. pipes with two coats of anticorrosive steel paint over a
primer coat
Mtr
15
16
Qty.
117.90
Pull and push type rolling shutters of approved make as per specifications
Refilling pipeline trenches and foundation with selected available earth from
trench excavation and foundation
Sqm
3.15
Cum
41.00
47of 47