Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Elevated Storage Reservoir Design

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 47

DESIGN OF OVERHEAD TANK AT NAI BASTI, JAMMU

1.00 INTRODUCTION
The following sheets pertain to the design of 2 lakh gallon capacity RCC Circular Overhead T
The tank is proposed to be built at east of Jammu city, at Nai Basti under the water supply p
It is basically a circular intze type tank with RCC shaft supporting the tank and the shaft is r
on open foundation.

2.00 REFERENCES
IS 3370 -2009
Code of Practice for Concrete structures for the storage of liquids
Part 1 : General Requirements
Part 2 : Reinforced Concrete Structures
IS 11682 -1985 Criteria for design of RCC staging for overhead water tanks
IS 875 : 1987
Code of Practice for Design Loads (other than earthquake) for buildings & s
Part 2 : Imposed Loads
Part 3 : Wind Loads
IS 1893 : 1984 Criteria for earthquake resistant design of structures
IS 11089: 1984 Code of Practice for Design & Construction of Ring Foundation
Kuang-han Chu & Omar.F.Afandi : Analysis of circular & annular slabs for chimney foundation
3.00 PRINCIPAL PARAMETERS
General
Capacity of tank proposed

V
hb

Free board

909 m3

0.60 m

SBC of soil

Density of water

9.81 kN/m3

Density of concrete

24.00 kN/m3

Density of soil
Type of Foundation
Depth of foundation below ground level

=
=
=

Material Properties
Grade of Concrete

15.00 T/m2

19.00 kN/m3
Solid Circular Raft Foundation
1.50 m

tank
=
shaft
=
foundation =

M30
M30
M30

Fe500

Grade of Reinforcement
Top Dome
Inner Radius

r1

6.00 m

Rise

h1

2.00 m

Thickness

t1

0.10 m

Ring beam below dome

Depth
Width

=
=

400 mm
400 mm

Bottom Dome
Inner Radius

r3

4.00 m

Rise

h2

1.60 m

Thickness

t3

0.20 m

Inner Radius

r2

6.00 m

Thickness
Height

t2

=
=

0.40 m
6.30 m

Cylindrical Tank wall

Ring beam below wall


Depth
Width

=
=

Conical Shell below wall


Thickness

0.60 m

4.00 m

h3

Extent of shell

600 mm
800 mm

Ring beam below bottom dome


Depth
Width

=
=

RCC Shaft
Diameter
Thickness
Height of shaft

=
=
=

8.00 m
0.20 m
20.00 m

Annular Circular Foundation


Width of foundation
Thk. of footing

=
=

3.00 m
0.60 m

Design Parameters

600 mm
800 mm

( IS 3370-2009 Part II)

Clear cover to reinforcement


Concrete stresses
N/mm2
Direct tensile stress in concrete
Bending Tensile stress in concrete
Direct comp. stress in concrete
Comp. stress in bending in concrete
Reinforcement stresses
N/mm2
Direct tension, bending & shear
Direct Compression

=
=
=
=

=
=

40 mm
M30
1.5
2.0
8.0
10.0
IS 3370 Part-2
130
140

Acceleration due to gravity


3.10 DESIGN CONSTANTS
Modular ratio

m=

9.81 m2/s
M30
9.33

280
3 x cbc

Neutral Axis Constant

k=

1.00
1 + (st / m.cbc )

0.42

Lever Arm constant

j=

1 - k/3

0.86

MOR constant

Q=

0.5 x cbc x k x j

1.80

N/mm2

4.00 DESIGN VOLUME


Volume of water inside tank

Total height of structure above ground

3 (r12 + r22) ( h - hb ) + 2 (r22 + r2.r3 +


6
= 3.14
1231.20
+
6.00
=

920.65 m3

30.50 m

5.00 DESIGN OF TOP DOME


Live Load on dome roof
Area exposed

Max.(0.4, 0.75 - 0.52h12/(2r1)2) =

=
=

10.00

x
=

Self weight of roof

0.10 x

Total Load on dome, w

3.14 kN/m2

24.00

From geometry of dome , we have


R2 - (R -

2.00

sin =
=
cos =

)2 =

6.00 2

R=

10.000 m

6.00 =
10.000

D
2R

36.87 o

0.6000

0.644 rad.)

0.800
wR cos t

5.10 Hoop stress at springing level =


(compressive)

1
1 + cos

=
=
=
<

Hoop stress at crown

0 N/mm2

Hence, providing minimum steel of 0.24% as per IS3370- 2009 Part II, we have
Ast reqd.
Ast provided =

=
T10

0.24 % =
@

200 mm c/c =

5.20 Meridional thrust at springing level, T

240.00 mm2
392.70 mm2

wR
1 + cos

=
=

Meridional stress

17.42

0.10

=
>

Hence, providing minimum steel of 0.24% as per IS3370- 2009 Part II, we have
Ast reqd.

0.24 % =

240.00 mm2

Ast provided =
Total Load of dome

T10

@
=
=
=

c.g of this load

200 mm c/c =

Surface Area of dome x Intensity of loading


2
x
301.59 kN
3 (2R - h1)2
4 (3R - h1)

=
=

392.70 mm2

972.00
112.00
8.68 m

10.00 x

where

h1=
R=

above the centre of the sphere

6.00 DESIGN OF RING BEAM AT JUNCTION OF TOP DOME & WALL


Hoop tension on ring beam =

Steel area reqd.

Provide

T cos .D
2

=
=

83.61

x
130

No. bars

12

Hoop stress in concrete

mm bars
=

Volume of beam

1000

678.58 mm2

T
=
Ac + (m-1) As

Weight of beam

(=

17.42
x
83.61 kN

83.61
160000

x
+

0.50 N/mm2

>

1.50 N/mm2

6.20 x

6.23 m

149.59 kN

7.00 DESIGN OF CYLINDRICAL SIDE WALL


Hoop tension on wall base =

Steel area reqd.


(total of both faces)

6.00 x
370.82 kN

370.82

=
Ast provided =
(each face)

T20

Hoop stress in concrete

Ast provided =
Volume of wall

Weight of wall

=
T12

1000

2852.45 mm2

T
=
Ac + (m-1) As

98.17 m3

2356.04 kN

x
+

0.87 N/mm2

>

1.50 N/mm2

200 mm c/c =
2

1570.80 mm2

370.82
400000

0.24 % =
@

x
130

200 mm c/c =

Distribution steel

61.80

960.00 mm2
565.49 mm2
6.20 x

8.00 DESIGN OF RING BEAM AT BOTTOM OF WALL


Length of beam

=
=

2
40.21

Load of dome on beam

301.59 =
40.21

7.50 kN/m

Load of top ring beam

149.59 =
40.21

3.72 kN/m

Load of wall on beam

2356.04 =
40.21

58.59 kN/m

Self weight of beam

=
=

Total vertical load on beam


V1 =

x
m

6.40

0.60 x
11.52 kN/m

0.80 x

7.50 +
81.33 kN/m

3.72

Angle between wall & conical shell, =

tan-1

h3

r1 - r3
Horz.force on beam due to V1

V1 cot

H=

Hoop tension due to above load ,

Hv

Hoop tension due to water

=
=

H.D /2
40.67

Hv + Hw

Steel area reqd.

Provide

No. bars

25

392.32

mm bars

Weight of beam

Hoop stress in concrete

11.52

wh x d x D/2

Hw =

Hw =
=
Total Hoop Tension

61.80
x
148.33 kN

392.32 kN
x
130

(=

1000

3926.99 mm2

40.21 =

T
=
Ac + (m-1) As

392.32
480000
=

x
+

0.72 N/mm2

<
Min. shear steel,
Provide

Asv
L stirrups

Shear Steel provided

=
10

0.4b.d
fy
mm @

1.50 N/mm2
1476.92 mm2

200 mm c/c
=

1570.80 mm2

9.00 DESIGN OF CONICAL DOME


The conical dome shall be designed for
a) Hoop Tension
b) Meridonial thrust

6.30

10.30

2.00

Area of water on conical slab

Average radius of conical shell

Weight of water on conical slab, Ww

=
=

Lever arm, x =
Weight of conical slab,

0.92 m
=
=

x
4.57
2313.02 kN

=
=

3270.47 +
10699.45 kN

V2

10699.45
x 2
5.000

=
=

Ws

Total load at base of conical slab

Load per unit length

a) Meridional Thrust

Meridional Stress

(6.3 + 10.3)
x
2
(6 + 4 )
=
2
16.60 x 2
5115.96 kN

380.77
1000.00

V2 cosec.
340.57
x
x

1000
600

x
=
>

b) Hoop tension
The hoop tension will be maximum at the top of the conical slab as the diameter is max.

at this location.
Hoop tension

= ( p cosec.

Average height of water


Water pressure,

Angle ,

Hence, H

= (6.3 + 10.3 =
2
p

Conical slab weight,

q cot.

) D/2

8.30

8.30

9.81 =

0.600

24.00 =

14.40

589.40
600000

x
+

63.43 o
=(
=

81.42 x
589.40 kN

Hoop stress in concrete

Ast reqd. =
(both faces)

589.40

Ast provided =

x
130

T25

Distribution steel reqd.


Ast provided =

1.12

@
=

T20

T
=
Ac + (m-1) As

1000

0.92 N/mm2

>

1.50 N/mm2

200 mm c/c =
0.24 % =

c.g of the conical slab from base

200 mm c/c =
=

4533.86 N/mm2

2454.37 mm2
1440.00 mm2
1570.80 mm2
(r22 + 2r2.r3 + 3r32) h3
4 (r22 + r2.r3 + r32)

1.74 m

### DESIGN OF BOTTOM DOME


Total Load on dome, w

5226.59 kN/m2

From geometry of dome , we have


R2 - (R -

1.60

sin =

)2 =
R=

5.80 m

4.00 =
5.80

D
2R

=
cos =

4.00 2

0.6897

43.60 o
0.724

Water Load on dome

=x

4.00

4946.71 kN
2
x

Area of dome surface

Self weight of dome

58.31

Total load intensity on dome =

4946.71
58.31

5.80

0.20

4.80

wR cos t

a) Hoop stress at springing level =


(compressive)

10.30

1
1 + cos

=
=
=
>

Hence, providing minimum steel of 0.24% as per IS3370- 2009 Part II, we have
Ast reqd.
Ast provided =

=
T12

0.24 % =
@

200 mm c/c =

b) Meridional thrust at springing level, T

480.00 mm2
565.49 mm2

wR
1 + cos

=
=

Meridional compresssive stress

301.54

0.20

=
<

Hence, providing minimum steel of 0.24% as per IS3370- 2009 Part II, we have
c.g of this load

3 (2R - h1)2
4 (3R - h1)

=
=

300.00
63.20
4.75 m

where

h1=
R=

above the centre of the sphere

11.0 DESIGN OF RING BEAM AT JUNCTION OF BOTTOM DOME & SHAFT WALL
Weight of water
Weight of top dome & ring beam
Weight of side wall & ring beam
Weight of conical wall & bottom dome
Self wt. of beam
Total Load on beam
Load intensity on beam

Angles

=
920.65
x
=
301.59
+
=
2356.04
+
=
2313.02
+
=2 x x 0.6 x 0.8 x 24

15213.39
25.13
605.32 kN/m

63.43 o

43.60 0

Thrust from conical slab

=
=

451.18 +
10699.45 kN

Thrust intensity of T1

10699.45 =
25.13
4946.71 +

425.72 kN/m

4946.71 =
25.13

196.82 kN/m

Thrust from bottom dome =


Thrust intensity of T2

T1 cos

Hoop tension on ring beam =


Steel area reqd.

Provide

No. bars

Hoop stress in concrete

258.91

2819.29 +

279.88

T2 cos

x
130

20

mm bars

T
=
Ac + (m-1) As

Direct stress due to vertical load

(=

1000

2513.27 mm2
258.91
480000

x
+

0.52 N/mm2

>

1.50 N/mm2

605.32
600

x
x

1.26 N/mm2

<

8.00 N/mm2

12.0 DESIGN OF ANNULAR R.C.C SHAFT


Grade of Concrete

AS per IS 11682:1985,
Min. thickness of shaft

<

Hence, provide thk

<
=

Opening size at base

M30

150 + (D-6000) where D


120
166.67 mm
200.00 mm

1.00 m x 2.10m

From sketch,

=
=

0.125

Wind Pressure considered


w=

1.50 kN/m2

Volume of shaft

Slf Weight of shaft

20.00 x 2
103.04

x 4.100 x
24.00 =

Summary of Forces on Shaft

Top dome
Ring beam below top dome
Side wall
Ring beam below wall
Conical slab
Bottom dome
Ring beam below bot. dome
RCC Annular shaft
Total self weight of tank
W=

Weight
(kN)
301.59
149.59
2356.04
463.25
2313.02
279.88
318.48
2473.06
8654.91 kN

Weight of water

9031.54 kN

Component

Wind Load Moment, Mw

Ovalising Moment , Mo
=
where r
=
and
p =
Hence,
Mo =

F.y

Area exposed
A (sqm.)
125.66
5.12
80.64
8.16
44.80
5.76
168.00

12815.31 kNm

3.3pr2 (Refer IS 11682:1985)


mean radius of shaft
=
wind pressure in Mpa
8.32 kNm/m

From IS 11682, we have

Max. compressive stress in concrete

Parameters
W
e (M/P)
e/r

Max. stress in concrete (Mpa)


Permissible stress (Mpa)

As per IS11682, Cl.8.2.2,


Provide vertical steel min.

=
=

Ast provided each face =


Provide hoop steel min.

Full Tank
17686.45
0.72
0.18
0.42

3.27
8.00
OK

5.26
8.00
OK

0.25 % distributed in both faces


500.00 mm2
T10

=
=

Ast provided each face =

Empty Tank
8654.91
1.48
0.36
0.42

200 mm

c/c =

0.20 % distributed in both faces


400.00 mm2
T10

200 mm

c/c =

12.1 Seismic Analysis of shaft


(As per provisions of IS1893:1984)
Since Jammu is in Zone-IV, we have
Mod. of elasticity of concrete
Zone factor
Moment of Inertia
Seismic Zone Factor
Importance Factor
Type of soil
Parameters
Weight considered
Deflection
Time Period
T (sec.)
For 5% damping

Ec

MI
Fo
I

5000 fck =
1.0

(2r)3.t /8

=
0.25
1.5

Medium
Empty
7006.21

(kN)
(m)

=
=
=
=
=
=

=Wl3/3EI
2 / g
Sa/g
.I.Fo.Sa/g

Horizontal Seismic Coefficient


Base shear, H (kNm)
Base Moment, M (kNm)
e/r
Max. compressive stress in conc. (Mpa)
Permissible stress (Mpa)

0.020
0.28
0.20
0.075
525.47
10509.31
0.30
3.03
10.66
OK

14.0 DESIGN OF CIRCULAR RAFT FOUNDATION

ity RCC Circular Overhead Tank.


sti under the water supply project.
g the tank and the shaft is rested

storage of liquids

water tanks
arthquake) for buildings & structures

ng Foundation
labs for chimney foundations

ar Raft Foundation

h1
r1
h
r2
h2

h3

r3

M25
1.5
2.0
6.0
8.5
IS 456 :2000
230
190

M25
10.98
0.29
0.90
1.11

( h - hb ) + 2 (r22 + r2.r3 + r32) h3


608.00

- (3r32 + h22) h2
80.90

>V, Hence OK

0.74 kN/m2
2.00
125.66 m2
2.40 kN/m2

31.36 x
0.10

125.66

0.24

76.65 kN/m2
0.08 N/mm2
8.00 N/mm2
OK

art II, we have

art II, we have

OK

31.36
1.80
17.42 kN/m
174.20 kN/m2
0.17 N/mm2
8.00 N/mm2
OK

OK

nsity of loading
2.00

2.00 m
10.00 m

entre of the sphere

2.40

0.800

6.00

643.19 mm2

OK
1000
5655
OK
0.40 x

0.40

6.3

OK

61.80 kN/m2

1000
26180
OK

each face
0.40 x

OK
6.30

24

58.59

11.52

81.33
2.00

40.67 kN/m

6.00

63.43 o

where

d =
wh =

0.40

243.99 kN
depth of beam
water load

6.00

3017.82 mm2

OK
463.25 kN
1000
65450

OK
/m

/m

OK

2.00

16.60 m2

5.000 m
x 5.000

x 11.200

5115.96 +

9.81

0.60

x 24

2313.02

= 340.57 kN/m

1.12

0.63 N/mm2
8.00 N/mm2
OK

as the diameter is max.

380.77 kN

81.42 kN/m2
14.40 kN/m2

0.50

)x

6.00

1000
40906
OK

each face

OK

OK
+ 3r32) h3

1.60 2 (
3

3 x5.8-1.6)

1.60 =
24.00

9.81

58.31 m2
=

279.88 kN

89.64 kN/m2

519.90 x
0.20

0.144

374.69 kN/m2
0.37 N/mm2
8.00 N/mm2

OK

art II, we have

OK

519.90
1.724
301.54 kN/m
1507.71 kN/m2
1.51 N/mm2
8.00 N/mm2

OK

art II, we have


1.60 m
5.80 m

entre of the sphere

SHAFT WALL
9.81 =
149.59 =
463.25 =
279.88 =
=

9031.54 kN
451.18 kN
2819.29 kN
2592.90 kN
318.48 kN
15213.39 kN

2313.02 +

5115.96

5226.59 kN

-258.91 kN/m
indicates compression
1991.58 mm2

OK
1000
20944
OK
1000
800
OK

internal dia of shaft


8000 mm
OK

0.20 =

103.04 m3

2473.06 kN

Force (A x w)
F (kN)
188.50
7.68
120.96
12.24
67.20
8.64
252.00
657.22 kN

4100 mm

c.g from GL
y (m)
29.18
28.20
24.85
21.40
18.84
19.80
9.50

oth faces
392.70 mm2

OK

392.70 mm2

OK

oth faces

27386 N/mm2
43.30 m4

Full
16037.74
0.045
0.42
0.18
0.068
1082.55
21650.95
0.30
6.20
10.66
OK

BILL OF QUANTITIES FOR R.C.C OVERHEAD TANK


Sl.
Items of Concrete
1.00 Top Dome

2
2

Measurement
x 10.00
x 2.00
x 10.00
x 2.00

x 0.10

2.00 Top dome beam

2
2

x 6.20
x 6.20

x 0.40
x 1.20

x 0.40

3.00 Side wall

2
2

x 6.20
x 6.20

x 0.40
x 12.60

x 6.30

4.00 Beam below wall

2
2

x 6.40
x 6.40

x 0.60
x 2.00

x 0.80

x 4.57
x 4.57

x 0.60
x 11.20

x 11.20

6.00 Bottom dome

2
2

x 5.80
x 5.80

x 1.60
x 1.60

x 0.20

7.00 Bottom dome beam

2
2

x 4.40
x 4.40

x 0.60
x 2.00

x 0.80

8.00 Shaft

2
2

x 4.10
x 4.10

x 0.20
x 40.00

x 20.00

6
1

0.50
2.10

x 0.50
x 1.50

5.00 Conical slab

8.10 Openings

ventilators
door

9.00 Type of Foundation

Pile Foundation

Annular Footing
kicker
stem
base

2
2
2
2
2
2

x
x
x
x
x
x

4.10
4.10
4.10
4.10
4.10
4.10

x
x
x
x
x
x

0.40
0.60
0.60
0.30
3.00
0.60

x 0.60
x 0.30
x 0.60

OR
Pile Foundation
Dia = 600
Length = 25000
No. = 40
Capacity = 125MT

x 0.090

x 25.00

x 40

Pile cap
Width = 3000
Depth = 1000

2
2

x 4.10
x 4.10

x 3.00
x 1.00

x 1.00

x 7.85
x 7.85

x 7.85
x 1.00

x 1.00

4
4
9
9
1
1
1
1
1
1
1
1

x
x
x
x
x
x
x
x
x
x
x
x

x
x
x
x
x
x
x
x
x
x
x
x

x 0.12

2
2

x 5.80
x 5.80

14.00 Aluminium Ladder inside tank

x 8.00

15.00 Excavation

footings
pilecap

x 5.60
x 4.10

16.00 PCC

footing
pilecap
inside shaft

2
2

x 4.10
x 4.10
x 16.00

inside
outside
inside
outside
inside
outside
inside

2
2
2
2

OR
Solid Circular Footing

10.00 Walkway
10.10 Around tank
( 2 Nos.)
10.20 Landings

1.00 m wide
0.12 m thk
1.00 m wide
0.12 m thk
1.50 m wide
0.15 m thk
5.00 m wide
0.35 m thk
1.90 m wide
0.15 m thk
0.50 m wide
0.15 m thk

11.00 Inner circular partition wall


(optional)

6.90
6.90
1.00
1.00
1.50
1.50
5.00
5.00
1.90
1.90
0.50
0.50

1.00
1.00
1.00
1.00
1.50
1.50
0.75
5.00
1.00
1.90
1.00
0.50

x 0.20
x 12.60

x 0.12
x 0.15
x 0.35
x 0.15
x 0.15

x 6.30

12.00 M.S Ladder with railing


13.00 Additional railing on landings

17.00 Painting
17.10 walls
17.20 conical
17.30 bot.dome
17.40 Top dome

x
x
x
x

6.00
6.40
5.00
5.60

x 5.60
x 4.10
x 3.20
x 3.30

x
x
x
x

6.30
6.30
4.57
4.57

x 1.50
x 1.10
x 0.10
x 0.10
x 0.15

17.50 Shaft
17.60 Partition wall
17.70 Walkways

outside
inside
outside
inside
outside

2
2
2
2

x
x
x
x

4.00
4.20
5.70
5.90

x
x
x
x

20.00
20.00
6.30
6.30

Volume (m3)
12.57

Formwork
(m2) Length (m)

HYSD Steel (MT)


0.75%
0.80

125.66
6.23

1.50%

0.70

2.75%

21.60

1.00%

1.50

3.00%

23.20

0.75%

0.70

0.75%

0.80

1.20%

9.90

1.50%

0.70

2.00%

0.70

1.50%

5.60

2.00%

45.30

46.75
98.17
490.84
19.30
80.42
96.38
321.25
11.66
58.31
13.27
55.29
103.04
1030.44
0.30
0.63

1.50
3.15

57.19
38.64
6.18
15.46
4.64
7.73
46.37
15.46

282.74

77.28

2.75%

17.00

2.00%

31.00

1.50%

1.20

1.50%

0.10

1.50%

0.00

1.50%

0.20

1.50%

0.00

1.50%

0.00

2.20%

8.10

25.76

193.59
49.32

10.40
86.71
1.08
9.00
0.34
2.25
1.31
25.00
0.29
3.61
0.08
0.25
45.92
459.18

131.10
23.00
117.86
16.00
148.00
59.00
8.00
9.00
7.54

237.50
253.34
143.42
160.63
58.31
58.31
125.66

125.66
502.65
527.79
225.63
233.55
126.82

Annular Circular Footing


Solid Circular Footing
Pile Foundation

Detailed Project Report- New OHTat Jewargi Town

Karnataka Municipal Reforms Project (KMRP)

Civil Work Items - RCC Over Head Tank of 2000 cu.m capacity and over 30m staging
height
Si. No. Description
1

Unit

Qty.

Cum

59.00

Earth work excavation


0 to 2 mtr Depth
a In all soils
b In disintegrated rock, soft rock wihtout resorting to blasting.
2m to 4 mtr Depth

Cum

c Earthwork in excavation for foundation for pile caps in all types of strata other
than hard rock upto 3m depth
Cum
2

Boring in all types of soil (excluding rock) for piling of 600 dia piles including
protection of sides by either using temporary liner or driller's mud, etc.
complete
PCC M7.5B below pilecap
PCC M10B within shaft wall area at ground level

R.M

25.00

Cum

9.00

Cum

7.60

Cum
Cum

282.80
77.30

Providing M-35 for R.C.C. 600 dia cast in situ bored piles, each of load
capacity as designed, place through steel shell sunk to the required depth
through all type of strata excluding provision of reinforcement including
placing concrete by tremmy arrangment including all leads and
lifts,compaction of concrete including chipping and dressing of RCC
Piles,cleaning the reinforcement etc complete.

Pilecap

Shah Technical Consultants Pvt Ltd (STC)

44of 47

Detailed Project Report- New OHTat Jewargi Town

Karnataka Municipal Reforms Project (KMRP)

Si. No. Description


5

RCC M 30C grade concrete for RCC Shaft.

RCC M 30C grade for RCC work (excluding cost of reinforcement)


Top, middle and bottom ring beam
Bottom dome
Conical dome
Walkway Slab
Side wall
Top dome
Internal RCC Circular Partition wall

Shah Technical Consultants Pvt Ltd (STC)

Unit

Qty.

102.20

Cum
Cum

38.90
11.66

Cum
Cum
Cum
Cum
Cum

96.38
13.50
98.20
12.60
46.00

45of 47

Detailed Project Report- New OHTat Jewargi Town

Karnataka Municipal Reforms Project (KMRP)

Si. No. Description

Unit

Qty.

Cement mortar plastering 1:3 proportion 12 mm thick for both inside and
outside surface for top dome

Cum

3.10

HYSD steel reinforcement

M Ton

132.00

Plastering in C.M. 1:3 proportion including smooth finishing with minimum 2%


of approved quality of water proof compound for RCC over head tank and
giving satisfactory water proof testing for side walls, shell portion, bottom
dome, bottom slabs
Sqm

564.90

10

11

Two coats of water proof cement painting of approved colour and shade over
one coat of primer before removal of scaffolding for new R.C.C. over head
tanks

2779.30

M.S. ladder 45 cms. wide using angle iron of size 65 mm x 65 mm x 8 mm


and 20 mm M.S. bars at 25cms. centre to centre with necessary supports of
same angle iron as directed including hand railing on both sides with 25mm
dia G.I. pipes with angle iron props at 2 mtrs, interval and 0.5 mtr, height
23.00

12

M.S. Inspection door of size 60 cms x 60 cms. including M.S. frame, size 50
x 50 x 6 mm and shutters of 3mm thickness with hinges at top and locking
arrangements, painting
1

13

Aluminium monkey ladder 45 cms. wide including hand railing & cage to be
provided inside the tank

Shah Technical Consultants Pvt Ltd (STC)

16.00

46of 47

Detailed Project Report- New OHTat Jewargi Town

Karnataka Municipal Reforms Project (KMRP)

Si. No. Description


14

Unit

Supplying & fixing 40 mm dia G.I. medium duty pipes hand railing
3 rows fixed to 1:2:4 (M-150) vibrated R.C.C. post of size 100 x 150 mm at
top and 150 x 150 mm at bottom placed at 2 Mtr. intervals for a height of 750
mm painting G.I. pipes with two coats of anticorrosive steel paint over a
primer coat
Mtr

15

16

Qty.

117.90

Pull and push type rolling shutters of approved make as per specifications

Refilling pipeline trenches and foundation with selected available earth from
trench excavation and foundation

Shah Technical Consultants Pvt Ltd (STC)

Sqm

3.15

Cum

41.00

47of 47

You might also like