04c Process Map Templates-V2.0 PDF
04c Process Map Templates-V2.0 PDF
04c Process Map Templates-V2.0 PDF
Project Title
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Schematic Design
Design Development
Perform Cost
Estimation
Cost
Estimation
Contractor
Contractor
BIM USES
Schematic Design
Validate Program
Owner
Architect
Programming
3D Macro
Coordination
Architect
Schematic Design
Author Schematic
Design
Design Development
Develop Virtual
Prototypes
Design
Authoring
Architect
Develop Virtual
Prototypes
Design
Authoring
Architect
Contractor
4D Modeling
Schematic Design
INFO. EXCHANGE
Architectural Model
Construction Documents
Engineering
Analysis
Engineer
Engineer
Schematic Design
4D Model
Schematic Design
Engineering Analysis
Model
MEP Model
Architectural Model
Architect
Record Model
End
Process
Virtual
Prototyping
Create 4D Model
4D Modeling
Contractor
4D Modeling
Construction Documents
Perform Engineering
Analysis
Engineering
Analysis
Engineer
Engineering
Analysis
Construction
Documents (WP)
Design Development
Cost Estimation
Architectural Model
Construction
Documents (WP)
Cost Estimation
Construction
Documents (WP)
4D Model
Construction
Documents (WP)
Virtual Prototypes
MEP Model
Schematic Design
Virtual Prototypes
Contractor
Construction Documents
MEP Model
Schematic Design
3D Macro Coordination
Model
3D Macro
Coordination
Develop Virtual
Prototypes
Design
Authoring
Design Development
Schematic Design
Cost Estimation
Compile Record
Model
Construction Documents
Author Construction
Documents
Perform Engineering
Analysis
Schematic Design
Program Model
Architect
Design Development
Perform Engineering
Analysis
Operations
Perform 3D
Coordination
Create 4D Model
Create 4D Model
Engineer
Virtual
Prototyping
Cost
Estimation
Construction Documents
Design Development
Schematic Design
Contractor
Contractor
3D Macro
Coordination
Design Development
Author Design
Development
Virtual
Prototyping
Architect
Cost
Estimation
Perform 3D
Coordination
Perform 3D
Coordination
Planning
Perform Cost
Estimation
Design Development
Schematic Design
Architect
Construction Documents
Perform Cost
Estimation
Structural Model
Structural Model
Structural Model
Civil Model
Civil Model
Civil Model
Construction
Construction
Documents (WP)
Documents (WP)
3D Macro Coordination
Engineering
Model
Analysis Model
Construction
Documents (WP)
3D Micro Coordination
Model
Record Model
REFERENCE INFO.
Geotechnical Report
Historical Site /
Facilities Information
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
GIS Data
Survey Existing
Facilities
Responsible Party
PROCESS
Responsible Party
Compile Existing
Conditions
Information
Start
Process
Responsible Party
Responsible Party
End
Process
INFO. EXCHANGE
Responsible Party
Survey Model
Existing Conditions
Information Model
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Cost Database
Cost Reports
Analysis
Method
Evaluate
Quantities and
Cost Breakdown
INFO. EXCHANGE
PROCESS
Contractor
No
No
Establish Cost
Targets
Contractor
Contractor
Start
Process
Yes
Model ready
for QTO/Cost
Analysis?
3D Model
Develop
Quantities
Schedule
Review Quantities
Contractor
Contractor
Contractor
Yes
Evaluate Methods
for Assembly
Construction
Organize
Quantities to Cost
Data
Calculate Costs
from Quantities
Review Costs/
Results
Incorporate
Contingencies/
Overheads
Contractor
Contractor
Contractor
Contractor
Contractor
Results
Acceptable?
No
Yes
Results in
Compliance with
Cost Target?
End
Process
Level 2: 4D Modeling
Project Title
PROCESS
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Productivity
Information
Lead
Times
Set Construction
Sequencing and Flow
Prepare/Adjust
Schedule
All disciplines
All disciplines
Start
Process
No
Establish Information
Exchange
Requirements
Link 3D Elements to
Activities
Validate Accuracy of
4D Model
All Disciplines
All disciplines
4D Modeler
All disciplines
No
Yes
INFO. EXCHANGE
Schedule
(Draft)
Yes
All disciplines
End
Process
Schedule
Optimized?
Model
Correct?
3D Model
Review 4D Model/
Schedule
4D Model
(Draft)
Schedule
4D Model
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Site
Investigation
Data
PROCESS
No
Start
Process
Responsible Party
Responsible Party
No
Responsible Party
Determine Building
Location and
Orientation
Yes
Responsible Party
Is Site
Acceptable and
Available?
Is Building
Location
Acceptable
Generate Site
Analysis Model
Responsible Party
INFO. EXCHANGE
Yes
Site Analysis
Model
End
Process
REFERENCE INFO.
Level 2: Programming
Project Title
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Site
Information
PROCESS
Owner
Start Process
Not
Acceptable
Identify Area
Requirements
Create Program
Owner
Owner
Start Design
Programming
Generate Conceptual
Building Layout
Architect
Owner
Acceptable
End Process
Program
Validation
INFO. EXCHANGE
Owner
Site Analysis
Model
Existing Conditions
Model
Program
Model
PROCESS
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Parametric Modeling
Content
Start
Process
Create Schematic
Design Architecture
Model
Create Design
Development
Architecture Model
Create Schematic
Design Architecture
Model
Architect
Architect
Architect
Create Schematic
Design Structural
Model
Create Design
Development
Structural Model
Create Schematic
Design Structural
Model
Identify Models
Required
Develop Intitial
Architecture Model
Engineer
All Disciplines
All Disciplines
Architect
Create Schematic
Design MEP Model
INFO. EXCHANGE
Preliminary
Architecture Model
No
Engineer
Engineer
Yes
Create Design
Development MEP
Model
Engineer
Create Schematic
Design MEP Model
Engineer
All Disciplines
All Disciplines
All Disciplines
Schematic Design
Design Development
MEP Model
Other
No
Yes
Yes
Engineer
Program Model
No
MEP Model
Other
Construction Documentation
Architectural Model
MEP Model
Structural Model
Other
End
Process
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
INFO. EXCHANGE
PROCESS
Compile Design
Review Feedback
Start
Process
Create Virtual
Mockups
Architect
Architect/User
All Disciplines
Facility Manager
Return to Design
Authoring
All Disiciplines
No
Yes
Design
Acceptable?
Compile Model for
Constructability
REview
Perform
Constructability
Review
All disciplines
Contractor
Design Model
Design Review
Information
End
Process
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Energy Tariff
Analysis
Method
Space Type
Mechanical
Library
System Library
Construction Type
Library
Weather Data
Assign Construction
Types to Building
Elements
Contractor
PROCESS
No
Adjust BIM for
Energy
Analysis
Assign Outside
Design Criteria and
Energy Targets
Responsible Party
Mechanical Engineer
No
Yes
Analyze Energy
Demand and
consumption
Review Energy
Anaysis Results
Mechanical Engineer
Mechanical Engineer
Mechanical Engineer
Mechanical Engineer
Start
Process
Yes
Results
acceptable ?
Is model ready
for simulation?
End
Process
INFO. EXCHANGE
Mechanical Contractor
Design Model
Energy Analysis
Model
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Soil Data
Wind Loads
Seismic Loads
Snow Loads
INFO. EXCHANGE
PROCESS
No
Start
Process
Generate Structural
Layout
Generate Structural
Design Model
Export Model to
Structural Analysis
Application
Analyze Model
Structural Engineer
Structural Engineer
Structural Engineer
Structural Engineer
Yes
Export Model to
Structural Design
Application
Update Structural
Design Model
Structural Engineer
Structural Engineer
End
Process
Is Site
Acceptable and
Available?
Arch. Model
Structural Design
Model
(Draft)
Structural Analysis
Model
Structural Design
Model
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Solar Data
Weather Data
PROCESS
No
Identify Lighting
Criteria
Generate Lighting
Layout
Generate Basic
Lighting Model
Export Model to
Lighting Analysis
Application
Lighting Engineer
Lighting Engineer
Lighting Engineer
Lighting Engineer
Yes
Lighting Engineer
Start
Process
Analyze Model for
Density Levels
Export Model to
Lighting Design
Application
Update Lighting
Model
Lighting Engineer
Lighting Engineer
End
Process
Is Building
Lighting
Acceptable?
INFO. EXCHANGE
Lighting Engineer
Arch. Model
Other Applicable
Models
Struct. Model
Lighting Design
Model (Draft)
Lighting Analysis
Model
Lighting Design
Model
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Information
Exchange
Requirements
Company
Contract
Implementation Requirements
Standards
Define Coordination
Meeting Location
PROCESS
BIM Coordinator
Start
Process
Define the Areas of
Coordination
All Disciplines
All Disciplines
Start Design
Coordination
Process
Create Discipline
Models
Compile Composite
Model
Perform Collision
detection
All Disiciplines
BIM Coordinator
BIM Coordinator
Yes
Identify Solutions to
Collisions
All Disciplines
Any
Collisions?
No
Establish a Protocol
to Address Collisions
End Process
INFO. EXCHANGE
All Disciplines
Design Model
Coordination Model
by Discipline
Coordination
Model
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Construction
Equipment Libraries
Schedule
Add Construction
Equipment
Contractor
Analyze Site Layout
for Phase Transition
No
No
PROCESS
Contractor
Start
Process
Identify Construction
Phases
Determine Temporary
Facilities
Contractor
Contractor
Yes
Yes
Contractor
Analyze Site Layout
for Space and Time
Conflict
Is Plan
Acceptable?
Contractor
INFO. EXCHANGE
Contractor
Design Model
Existing Site
Conditions Model
Distribute Plan to
Various Parties
End
Process
INFO. EXCHANGE
PROCESS
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Design Specifications
and Intent
3D Controls Report
Construction Families
and Libraries
Determine Scope of
Work to be Analyzed
Identify Alternative
Construction Methods
Model Alternative
Methods
Analyze Various
Methods
Coordinate
Construction
Sequences
Contractor
Contractor
Contractor
Contractor
Contractor
Contractor
Start
Process
Is Model
Acceptable?
Design Model
Site Utilization Model
Generate
Construction Plans
Contractor
End
Process
Is Construction
Sequence
Acceptable?
Construction
Model
REFERENCE INFO.
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Equipment
Information
Project
Submittal
Information
COBIE
Requirements
INFO. EXCHANGE
PROCESS
No
Start
Process
Identify Information
Requirements
Compile Information
Generate Additional
Required Information
Compile Information
in FM Application
Owner
Facility Manager
Facility Manager
Facility Manager
Yes
End Process
Model
Acceptable?
Design Model
Coordination
Model
4D Model
Record Model
PROCESS
REFERENCE INFO.
Sensor
Information
CMMS
Information
Collect Building
System Data
Start
Process
Facility Manager
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Warranty and
Specification
Information
Productivity
Information
Prepare/Adjust
Schedule
Perform Maintenance
Responsible Party
Facility Manager
No
Validate Equipment
Performance
Regenerate
Maintenance Data
Yes
Responsible Party
Facility Manager
INFO. EXCHANGE
Correct?
Record Model
Schedule
REFERENCE INFO.
Sensor Data
Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
http://www.engr/psu.edu/ae/cic/bimex
Other Performance
Data
Performance
Targets
Performance Cost
Weather Data
Assign Performance
Targets
No
No
PROCESS
Facility Manager
Yes
Start
Process
Responsible Party
Collect Sensor and
Building Performance
Data
Is Model Ready
For Simulation?
Analyze Performance
Demand and
Consumption
Review Building
Performance Anaysis
Results
Prepare Preformance
Analysis Reports
Responsible Party
Responsible Party
Facility Manager
Facility Manager
Yes
Results
Acceptable?
End
Process
INFO. EXCHANGE
Facility Manager
Energy Analysis
Record Model
Model
Building
Performance
Analysis Model
Building
Performance