Progress Report
Progress Report
Progress Report
DESCRIPTION
BILL NO. 3 Welding, metal fabrication, Electrical installation and Fittings workshop
4
5
6
7
8
9
AMOUNT (USD)
172,326.56
788,993.93
216,484.37
373,682.86
103,247.05
126,572.41
11,832.54
39,417.48
329,992.16
32,438.24
2,194,987.60
Report
SNO
1
2
3
4
5
6
7
8
Role Name
Site Engineer
Site Administrator
Quantity Surveyor
Foreman
Foreman
Foreman
Healthy & Safety
Storekeeper
Resource Name
Mbayo D. Godfrey
Bayi David
Nahabwe Gillian
Ojok Johnson
Arinaitwe Richard
Mwesigwa Sabath
Edodi Comfort
Bogere charles
4-Apr-14
4-Apr-14
4-Apr-14
4-Apr-14
4-Apr-14
4-Apr-14
4-Apr-14
4-Apr-14
4-Mar-15
4-Mar-15
4-Mar-15
4-Mar-15
4-Mar-15
4-Mar-15
4-Mar-15
4-Mar-15
Total of
Cum.
PersonTotal
total
days
personpersonallocated days this
days to
to the
period
date
project
6 per week
24
168
6 per week
24
168
6 per week
24
168
6 per week
24
168
6 per week
24
168
6 per week
24
168
6 per week
24
168
6 per week
24
168
NO.
6
20
8
1
4
46
85
Dumpy level
8
9
10
11
12
13
14
Concrete Mixers
Concrete Mixers
Dumper truck
17.5Kva Generator
Concrete Vibrator
Pedestrain Roller
Jumping compactor
Swiss level
Terrain
Remark
Good
1NO 350L
2NO 600L
1No.
2No.
1Ton
Report
Good
Good
Good
Good
Good
Good
Good
Unit
TONS
TONS
ROLLS
PCS
PCS
PCS
BAGS
PCS
Qty on site
95
950
16
53
68
337
1222
3505
Percentage progress
by Value of works
done
DESCRIPTION
PRELIMINARIES
BILL No.2.0 1MAIN ADMINISTRATION BLOCK
BILL No.3.0 WORKSHOP
BILL No. 5.0 DORMITORY
BILL No.6.0 KITCHEN
BILL No.7.0 STAFF HOUSE
BILL No.8.0 PUMP HOUSE
BILL NO.9.0 AQUA PRIVY (3NO.)
BILL NO.10.0 EXTERNAL WORKS
Average percentage for the entire project
41%
32%
49%
26%
41%
26%
34%
5%
31%
32%
Staff house
Pump house
awaiting trusses
Substructure works
Compacting borrowed fill, road bed
and gravel
awaiting trusses
Substructure works, ringbeam
Report
Description
Advance payment
Certificate no. 1
Certificate no. 2
Certificate no. 3
Certificate no. 4
8.0 Clarifications
Building
Item
1
Remarks
Paid
Not Paid
Not Paid
Not Paid
Not Paid
Description
External works
Remark
Aqua Privy
Workshop
Cost breakdown
submitted
Approx. date
15/11/2014
15/11/2015
Building
Description
Main
Administr Roof to Ramp (RFI 25)
ation
Date of request to
inspect/RFI
Date of Approval/ No
objection*
Total
Time
(Days)
25-Jul-14
Still no drawing
106
Note: An allowance of seven days is given to enable for preparations of the inspecting team or review
of the request for clarification
Nyamango Technical institute
Report
Kitchen
Dormitory
Nyamango Technical institute
Report
Main Administration
Nyamango Technical institute
Report
Staff House
Access Road
Report
Pump House
Report