PROJECT AT A GLANCE

General :
The Project

2 X 660 MW Coal Based


Thermal Power Plant to be
installed at Raikheda, Tilda
Block,
Raipur
District
in
Chhattisgarh by GMR Energy
Limited.

Owner

GMR
Energy
Bangalore

Location of TPP

The Coal Based Thermal Power


Plant (TPP) is proposed to be
installed at Raikheda, Tilda
Block
in
Raipur,
District
Chhattisgarh by GMR Energy
Limited.

Main Fuel

About 7.15 MTPY of Indigenous


Coal (based on Coal GCV of
3300 kCal/kg and 85% PLF) is
proposed to be transported to
site by rail.

Auxiliary Fuel

Heavy Fuel Oil (HFO) and Light


Diesel Oil (LDO) from nearby
depot by rail and road tankers.

Fuel Transportation

Coal will be transported by rail


to the power plant.

Water

The
estimated
annual
consumptive
water
requirement for the
Power
Plant is about 36 MCM.
Consumptive water would be
made available from Mahanadi
River which runs about at a
distance of 40 km. from site.
GEL will obtain clearance for

Limited,

Inputs :

265109838.doc

S-GL: 1 OF 4

water allocation from Irrigation


Department of Chhattisgarh.
Land

Land at Raikheda, Tilda Block,


Raipur District in Chhattisgarh
for the project of capacity of
around
2 x 660 MW
including offsite facilities will
be acquired. An area will also
be allotted for ash disposal of
10
years
within
plant
boundary.
GEL will procure the required
land for the project.

Project
Particulars:
Unit Size

2 x 660 MW Reheat Steam


Turbine Generator sets fed
from
two
(2)
Steam
Generators
with
steam
parameters of approximately
250 bar (a), 570 Deg.C.

Cooling System

Closed type cooling water


system with Natural Draft
Cooling Tower using clarified
water as cooling medium.

Consumptive Water

About 4100 Cum/hr of raw


water will be pumped from
River for the Power Plant.

Coal Storage/ Handling


System

Coal will be received by


wagons through the railway
siding. Coal storage for 15
days and mill bunker storage
for 12 hours is proposed. Coal
Handling System would be
designed for double shift
operation.

Ash Disposal area

It will have capacity of storing

265109838.doc

S-GL: 2 OF 4

ash of about 10 years for 2 x


660 MW. The approximate
area requirement will be 300
Acres considering height of 15
meters. It is envisaged that
most of the fly ash will be
utilized in various usages and
nominal ash will be dumped in
Ash Dump Yard.
Power Evacuation

Considering the station size, it


is preferable to evacuate
power at 400kV level. For
evacuation
of
power
generated from the station, it
is envisaged to use the
PGCILs grid and CSEBs grid.
Four nos. of outgoing lines has
been considered from 400 kV
switchyard
for
power
evacuation.

Environmental Aspects

One twin flue stack of 275 M


height for two units will be
constructed to meet the
pollution board standard set
for dispersion of particulate
matter, SOx and NOx.

265109838.doc

S-GL: 3 OF 4

Multiple field twin-path


electrostatic
precipitators
with separation efficiency of
more
than
99.8%
is
envisaged for the steam
generator. Particulate matter
from the stack shall be less
than 50 mg/Nm3

Waste water quality will


be maintained as per State
Pollution
Control
Board
standards
and/or
the
Ministry of Environment &
Forests (MoEF) notification.

Water Reservoir

Project Cost & Tariff


Installation)
Estimated Project
Cost without
IDC
Estimated Project
Cost incl. IDC
The levelised Cost
of Generation

265109838.doc

30 days storage of Raw water


requirement for 2 x 660 MW
capacity of Power Plant will be
maintained inside power plant.

: (For 2 x 660 MW
:

Rs. 55949 Millions

Rs. 64464 Millions

Rs. 2.07/kWh

S-GL: 4 OF 4