k8v07 Raikheda CHH Glance
k8v07 Raikheda CHH Glance
k8v07 Raikheda CHH Glance
General :
The Project
Owner
GMR
Energy
Bangalore
Location of TPP
Main Fuel
Auxiliary Fuel
Fuel Transportation
Water
The
estimated
annual
consumptive
water
requirement for the
Power
Plant is about 36 MCM.
Consumptive water would be
made available from Mahanadi
River which runs about at a
distance of 40 km. from site.
GEL will obtain clearance for
Limited,
Inputs :
265109838.doc
S-GL: 1 OF 4
Project
Particulars:
Unit Size
Cooling System
Consumptive Water
265109838.doc
S-GL: 2 OF 4
Environmental Aspects
265109838.doc
S-GL: 3 OF 4
Water Reservoir
265109838.doc
: (For 2 x 660 MW
:
Rs. 2.07/kWh
S-GL: 4 OF 4