Project
Shell Project No: HP-3000-QAT
Project Document Number: T- 4.250.946
2MH127
Tag/Item Number(s):
N/A
Unit(s):
ASU
PCWBS:
LINDE ENGINEERING
Page 2 of 24
5887
24.04.08
CO
UA
ZG
RFC
02.03.08
CO
UA
ZG
ICC
07.12.07
CO
UA
ZG
IFR
03.11.07
CO
UA
ZG
IIR
Date
Description
GAMA
Rev.
No.
Project
Rev
No.
Status
Document Title:
LINDE ENGINEERING AG
Contractor
GAM
PRO
DCC
GTL
001
Org.
Code
Doc.
Type
Disc.
Code
Geogr.
Area
Seq.
No
Rev.
No
LOC470
Vendor Code
Rev No: A
Q A T A R
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
TABLE OF CONTENTS
1
PURPOSE .................................................................................................................................... 5
SCOPE.......................................................................................................................................... 6
REFERENCES ............................................................................................................................ 7
3.1
3.2
DEFINITIONS .............................................................................................................................. 8
RESPONSIBILITY ...................................................................................................................... 9
Incoming Correspondence.............................................................................................................. 11
7.2
Outgoing correspondence............................................................................................................... 12
7.3
7.4
Outgoing Transmittals.................................................................................................................... 15
10
DATA CONTROL.................................................................................................................. 19
11
T- 4.250.946 Rev. A
Page 4 of 24
Q A T A R
1
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
PURPOSE
The purpose of this procedure is to ensure that the all documents and data specified in the
Project Specific Quality Plan Doc.No: GAM-PLN-QAC-GTL-001 and its attachments are
prepared, approved; revised, updated and valid issues of them are distributed to the parties
concerned.
T- 4.250.946 Rev. A
Page 5 of 24
Q A T A R
2
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
SCOPE
This procedure is specific to the PEARL GTL ASU PROJECT. The scope of
this procedure is to define the system for controlling registration, filing and
distribution of all project documents, data and correspondence. The procedure
is based on the document and data control requirements of ISO 9001: 2000
and defines the control mechanism for:
preparation and presentation of documents, data and correspondence
document, and data review and approval
internal issue & distribution of documents, data & correspondence
revision of documents, and data
ensuring that all documents, data and correspondence are available in a
timely manner at all work locations and site offices where work will be
carried out
T- 4.250.946 Rev. A
Page 6 of 24
Q A T A R
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
REFERENCES
3.1
Company Specifications
Contract document EXHIBIT E Specifications - List of attachment 0100-A-SG 1000
"Vendor documentation requirements"
3.2
GAM-PRO-QAC-GTL-019
Project
Communication
and
Co-ordination
Procedure
T- 4.250.946 Rev. A
Page 7 of 24
Q A T A R
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
DEFINITIONS
4.1
Contract definitions
The definitions which follow are applicable for the duration of the contract:
COMPANY means LINDE AG Linde Engineering Division
CONTRACTOR means GAMA Qatar Co. W.L.L.
IPIX-System
TM
means Transmittal
LDCC
GAMADCC
T- 4.250.946 Rev. A
Page 8 of 24
Q A T A R
5
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
RESPONSIBILITY
All principles and requirements of document and data control are critical to the
efficient and smooth operation of a project. Therefore;
The Project Manager shall implement this Document & Data Control
Procedure through the Project Organisation.
The Site Manager shall ensure all communications and documentation
systems are
The Project Quality Assurance Control Manager shall ensure application of the
principles of this procedure shall be applied without exception.
The project Document Control Centre Chief and Project Quality Assurance
Control Manager is custodian of this document and is responsible for logging,
filing and distribution of all project documents data & correspondence received
during the Project.
Each department manager and employee is responsible to implement this procedure.
T- 4.250.946 Rev. A
Page 9 of 24
Q A T A R
6
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
and
CONTRACTORS
gtl299@gama.com.tr
address
will
be
T- 4.250.946 Rev. A
Page 10 of 24
Q A T A R
7
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
7.1
Incoming Correspondence
Upon receipt, all paper format correspondence or original printed copy shall be
dated and numbered with the incoming sequential number, copied and
stamped with the distribution matrix on the copy for Site Manager or his
assigned delegates dispatch, and be logged in electronic database.
After review by the Site Manager or his assigned delegates the original copy
shall be retained in the Document control office.
All project correspondence, including incoming official e-mail and fax copies,
shall be forwarded to the Site Manager or his assigned delegates (original and
copy) who shall indicate the distribution, the for action for Info to and initiate
with his signature all documents to the Project Document Controller, who shall
log in the correspondence using a software program developed by GAMA
based on the Microsoft Tools. (MsAccess and/or MsExcell programs).
Document
Control
Responsible
shall
control
the
correct
login
of
T- 4.250.946 Rev. A
Page 11 of 24
Q A T A R
7.2
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
Outgoing correspondence
All produced outgoing letters shall be signed and be scanned in PDF format.
The correspondence and transmittals shall be numbered in accordance with
GAM-PRO-QAC-GTL-019
Project
Communication
and
Coordination
Procedure.
All outgoing paper format correspondence and documents, whether generated
by GAMA or in response to incoming correspondence shall be checked and
signed by the Project Manager or by delegated responsible before dispatch.
The Project Manager or his delegates shall sign any kind of paper format of
correspondence and transmittals in accordance with technical, commercial or
contractual consideration. If by E-mail upon receipt of letters generated by
GAMA or in response to incoming correspondence shall be checked, signed
and scanned copy in PDF format shall be send to Company through ProCorr system by DCC via e-mail account gtl299@gama.com.
The e-mail exchange between the Company and Contractor under these
systems will be considered official. All document and Information for review
shall be handed over electronically in PDF format (transfer of hard copies only
on request) via the internet Platform IPIX to Company(LDCC) and will be
considered official. The transmittals may not be signed as submission will be
through IPIX system and will be considered as official.
Document Control Centre shall:
1. Verify the correct log in the system of outgoing documentation.
2. File the documentation (original or copy).
3. Register the technical documents.
4. Make the distribution for info of outgoing correspondence as per the
distribution matrix.
T- 4.250.946 Rev. A
Page 12 of 24
Q A T A R
7.2.1
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
Distribution Matrix
Following is the GAMA distribution matrix:
GAMA QATAR PEARL GTL PROJECT
DOCNo.
DATE:
DEP
INFO
ACT
REMARKS
GPM
PSM
HQR
GQD
HSE
CWM
MEC
PTO
FAB
ENG
ADM
QAC
LOG
ACC
EQM
OTHERS
Descriptions:
Page 13 of 24
Q A T A R
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
Logging
The Project/Satellite Document Controller shall establish and maintain the
correspondence log-in and log-out register.
The information to be recorded in each register shall consist of:
1. Log No:
2. Date:
3. From/to:
is sent or received
4. Type:
5. Subject:
7.2.3
As applicable
Filing
Once the document has been logged, it shall be filed as per Project filing
Index.
Filing of documents by Document controller shall be initially per document
type (specification, drawing, procedure etc) and thereafter per discipline and
document number.
All project files shall be identified in their content by means of a project label
on their spine as per Attachment D - Project File Label (example).
7.3
T- 4.250.946 Rev. A
Page 14 of 24
Q A T A R
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
7.4
Outgoing Transmittals
Transmittals shall be used by the project organisation for:
-
approval
All documentation (except letters, faxes or reports) shall be issued to
Company under cover of transmittals including but not limited to drawings,
calculations, procedures, specifications etc., and shall be dealt with as follows:
If document date and transmittal date are different, document delivery date to
be considered the date Companys DCC(LDCC) or other recipient receives
transmittal and correspondent document.
"Log-out" date of original documents issued under cover of a transmittal shall
be inserted in the system by DCC accordingly with the date that the transmittal
and corresponding document have been received.
All document and Information for review and comments shall be handed over
electronically in PDF format (transfer of hard copies only on request) via the
internet Platform IPIX /Pro-Corr to Company .The transmittals may not be
signed as submission will be through IPIX system but to be considered as
official.
T- 4.250.946 Rev. A
Page 15 of 24
Q A T A R
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
7.4.1
T- 4.250.946 Rev. A
Page 16 of 24
Q A T A R
8
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
CONTROL OF DOCUMENTS
All valid documents issued by Document Controllers in accordance with
Distribution matrix included in the Project Quality Plan shall be stamped
Controlled Copy in red .
All requests for controlled documents out with those identified within the
distribution matrix shall be made a Document Requisition. The requisition
sheet shall identify whether or not it is a first issue, a replacement copy or if it
is an additional copy.
Note: Any print showing Controlled Copy in black or no stamp at all is to be
assumed as uncontrolled copy and therefore will be not valid.
All obsolete documents shall be identified, marked SUPERSEDED in red by
Document Controller and maintained in Document Control office or related
departments Managers custody for reference purpose.
All Cupboards, drawer files, stick files or box files and so on shall be clearly marked to
show their contents
Controlled copy holders are responsible for ensuring that only the current versions of
documents are used for execution of works and that obsolete or superseded
documents are destroyed or readily identifiable as superseded.
T- 4.250.946 Rev. A
Page 17 of 24
Q A T A R
9
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
T- 4.250.946 Rev. A
Page 18 of 24
Q A T A R
10
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
DATA CONTROL
For each document, correspondence item and transmittal a data file will be
retained in addition to the hard copy. The data files shall be given the same
name as the hard copy file. Document backup will be taken automatically with
the help of RAID-1 (mirroring) system and another Document backup will be
taken (tape method) twice a week for all of these files and a kept away from
original sources in a restricted area.
T- 4.250.946 Rev. A
Page 19 of 24
Q A T A R
11
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
T- 4.250.946 Rev. A
Page 20 of 24
Q A T A R
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
INCOMING
DOCUMENT
DOCUMENT
DATING NUMBERING
LOG IN
+1 COPY
ACTION
DECISION
NO
PSM
DECISION
ACTION
INFO
DCC TO VERIFY
CORRECT LOGING IN
THE SYSTEM
SCANNING
DOCUMENT
FILE
MASTER
COPY
& FIRST COPY
T- 4.250.946 Rev. A
MAKE NECESSARY
COPIES & DISTRIBUTION
SEND DEPARTMENTS
AND ANK ENG FOR
ACTION/INFO/REVIEW
Page 21 of 24
Q A T A R
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
DOCUMENT PRODUCED
BY DISCIPLINE LEADER
AFTER DIC
DOCUMENT
ACTION
INTER DISCIPLINE
REVISION & CHECKING
DECISION
DOCUMENT REGISTER
LOGING IN THE SYSTEM
AND READY TO ISSUE
NO
ON SITE PSM /ANKARA
ENG OR FABRICATION
MNG
DECISION
IF HARD COPY
YES
TRANSMITTAL
IF IN PAPER FORMAT
TRANSMITTAL RECEIPT
COPY SHALL BE THE
DOCUMENT DELIVERY
DATE TO NSERT N THE
DATABASE
TRANSMITTAL
SIGNED BY PSM
T- 4.250.946 Rev. A
Page 22 of 24
Q A T A R
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. D
DOCUMENT AND DATA CONTROL PROCEDURE
Date
24.04.2008
Date (Tarih):
Item
No.
(Sra
No)
Document Number
(Dkman Numaras) Revision
(Revizyon)
LIN Rev/
Project Rev (Revizyon)
Document Title
(Dkman Bala) Status*
(Durum)*
1
2
3
*Status of enclosed documents
(*liikte gnderilen dkmanlarn durumu)
To be delivered by;
(Teslim edilecek)
E-Mail (electronic)
1. For Information
(Bilgi in)
2. For Review/Comment
(nceleme iin/Yorum)
3. For Approval
(Onay iin)
4. As Requested
(nerildii gibi)
T- 4.250.946 Rev. A
5.ForConstruction
(Yapim Iin)
6. For Design
(Dizayn iin)
7. For Procurement
(Temin iin)
8.For Fabrication
(Uretim icin)
Airmail (Uakla)
Hand
(Elden)
Courier (Kurye)
IPIX
Page 23 of 24
Q A T A R
Doc. Title
GAM-PRO-DCC-GTL-001 Rev. C
DOCUMENT AND DATA CONTROL PROCEDURE
Date
21 December 2007
2007
2007
PEARL GTL
PROJECT
FILE NO
DOC TYPE
INCOMING LETTER
FROM-TO
GAM-LIN
1 TO X