5s Audit Check List
5s Audit Check List
5s Audit Check List
Date:
S.No
MARKS
IS (SEIRI)- SORT
1
2
3
4
Sub Total
2S (SEITON)- STABILIZE
1
3
4
5
6
use (Z Mark)
Required files are retrievable within one minute
Shadow boards, wherever applicable ,are available &effectively
used
All Items inside the desk drawers are stored properly & easy to
9
10
one minute
Raw material retrievable is within one minute.
Space saved after implementation of 1S,2S is measured & records
are maintained
Sub Total
3S (SEISO)- SHINE
1
2
3
4
Sub Total
4S (SEIKETSU)- STANDARDIZE
1
2
3
4
Fixtures
Condition of Racks/Cupboards/Pallets/Bins
Condition of Walls, Ceiling, Floors, Windows, Fans, Light Fittings,
Sub Total
5S (SHITSUKE)- SUSTAIN
1
2
3
and closed
Trained Employees are operating machines / equipment. Fire
GRAND TOTAL
RATI
NG :
Page 2 of 2