1S2S Audit Checklis
1S2S Audit Checklis
1S2S Audit Checklis
Doc.No:BALCO/ENABLING/BE/IMS/AO/Doc 002
Rev.No-01
Ver.No-00
Date-30.11
AREA:
first-aid plant-1
DATE:
AUDITOR:
Arun Biswal
AUDITEE:
1/1/2016
VEDPRAKA
OVERALL SCORE
SORT ACTIVITY DESCRIPTIONS- 1S
Sl.No.
Checkpoints
Unnecessary
Items/Materials
91
CRITERIA
SCORE
MAX
Checkpoint Description
Rejected Materials, Rework Materials, waste materials, obsolete items, shelf life expired, damaged
items are regularly removed from workplace to red tag area and timely disposed off to scrap
yard/dump yard.
10.00
6.00
6.00
4.00
4.00
Lockers,Drawers,Shelves
Tops & insides of all cupboards,shelves,tables,drawers,almirahs,lockers,cabinets etc are free of
,Almirahs,Cabinets and
unwanted items.
Cupboards
2A
2B
Old records/files/obsolete documents etc, are regularly removed from place of work and timely
disposed off.
Unnecessary
Files,Records,Document
s,Notices,Posters
Out-dated or otherwise unnecessary posters,memos,announcements,reports, notices etc. are
removed from the workplace (all visual displays to be updated).
Machines, Equipments
etc.
Unusable machine parts, motors, Equipment are identified periodically as a system, removed from
place of work and disposed off regularly.
10.00
4.00
All leakage points to be identified & arrested.Oil, coolants, grease, cleaning agents, paints are not
No Spillages,Overflows
2 Marks deduction for each
allowed to spill. In case happens immediately attended. No leakage from roofs,water taps, air hoses,
& Leakages
deviation
oil drums etc.No over flowing of sewage, water logging /stagnation in canals,etc. in the work areas.
2.00
Used
Items/Surroundings
Electrical
Tripping dangers such as electrical cables, etc. are removed from standing/walking areas. Danger
Tags on feeders are updated.All feeders,terminal boxes & panel doors are closed.
TOTAL 1S SCORE
4.00
50.00
a.Dividing lines are clearly drawn with Yellow lines on the floor.Red lines are drawn for storage of
Layout & Dividing Lines rejects/scrap/waste materials.
9B
10A
Storage Methods
10B
11
12
Location Charts
13
14
Emergency
CRITERIA
SCORE
4.00
4.00
a.Components are stored in Bins, pallets and trolleys in shop floor & local stores with appropriate
labels.The items are stored based on the frequency of the usage, part number,quantity etc.
8.00
b.Equipments,Lifting Tools & tackels are clearly identified (numbered, named, coluor coded etc.)
4.00
a.Tools have a designated storage location that is within reach of the operator. Labelling of tools as
per their nomenclature is done.
b.Required
items are clearly identified and are stored in the departments, Tool crib and Stationary items etc are
stored with shadow board concept.
4.00
Items are earmarked with Tags. Materials under inspection /Rejections are stored in such a way that
2 Marks deduction for each
they are not allowed to get mixed up and clearly identified with stickers.Item wise location charts are
deviation
displayed prominently in local store and shopfloor.
4.00
a.Fire Hoses,Hydrants,Extinguishers and other emergency equipments are prominently displayed and
are unobstructed.
b.The
workplace layout accomodates easy exit in case of emergency(Safe Assembly Point,Fire Exits).
2 Marks deduction for each
deviation
c.Stop switches and breakers are highly visible and located for easy access in case of emergency.
Contents in
Lockers,Drawers,Shelves Paperwork-Files,Records,Documents,Reports in Cabinets/lockers/shelves/drawers/alimirahs/cupboards
2 Marks deduction for each
,Almirahs,Cabinets and are properly labelled and has a clearly defined location and list of items/index/contents to be placed
deviation
Cupboards
outside cabinets.PEEP(place for everything & everything in its place)is to be strictly followed.
4.00
8.00
TOTAL 2S SCORE
40.00
90.00
5S Score Board
16
17
18
Unidentified ( whether required / not required ) items are duly Red Tagged & Plan for Removal of Red
Tags is decided. No. of Red tags placed/Removed in a month as per due date.
19
CRITERIA
Compliance:100% for 1
mark , else 0
SCORE
1.00
Compliance:<80%=0,>80
% to <=90%=+1, >90%
to 100%=+2
2.00
Compliance:0% to
<=50%=+1, >50% to
<=90%=+2, >90% to
100%=+3
3.00
Compliance:<80%=0,>80
% to <=90%=+1, >90%
to 100%=+2
2.00
2.00
10.00
OVERALL SCORE
100.00
Date-30.11.15
1/1/2016
VEDPRAKASH
91
SCORE
ACTUAL
REMARKS
46
SCORE
REMARKS
2
4
8
4
36
82
SCORE
REMARKS
1
1
2
2
9
OVERALL FULLFILL91ALL THE REQUIREMENT AS DESCRIBE EARLIER IN MY LAST REPORT.
Approved By: Head BE