1s, 2s & 5S Audit Sheet
1s, 2s & 5S Audit Sheet
1s, 2s & 5S Audit Sheet
Area:
Level-3
Level-4
Level-5
Can be Created Model Horizontally considered as a Areas within Deployed Role Model for the Zone within the Zone other Zones
0 0% 20 20 20 20
20 20 20 20 20 20 20 20 20
260
5 25%
10 50%
15 75%
20 100%
Entire Plant is divided in 'Zones' & 'Sub-Zones, updated list with zone owners available. 'Zones', 'Zonal & Central Red Tag Rack / Area', are identifiable Computer & Desk Surface is managed: all files in categorized folders, mail box sorted, desk has only items needed at that time Department Heads Participate in Surprised 5'S' checks regularly. There is system for periodic SORTING & Control of Unwanted / Surplus Material / Documents / Records, RED TAGGING SYSTEM understood by ALL and followed, Autonomous '1S' Schedule displayed & followed for work stations Nothing on Floor, Out Skirt of the factory , Roof ,Walls / Windows sill etc :No raw materials, work-in-process, finished goods, tools or gauges, documents/files are stored directly on floor No Cigarette butts, scrap of paper, tools, parts, bins, chips, oi Scrap & Red Tagged item Disposal System & Management : Scrap & Red Tagged items are disposed off at a regular interval as per decided system (dust bins not overflowing) , Last Clearance Date , Next Due Date & person responsible is displayed & Followed. No mix up of two different kinds products: No mix up of OK ( Wanted ),Rejected ( Unwanted) Parts/ Mix up of scrap in scrap yard. No storage of unused/ excess parts like raw material, bought out parts, finished goods etc/ there is no misuse of components used as a tool like hammer etc. Regular Disposal of drums, grinding sludge, paint sludge, spent oil, used consumables welding rods, cutting tools, etc No storage of old machines , equipments , tools & fixtures, old Standards (not in use) , old Drawings/ parts ( obsolete), old documents( obsolete), old furniture( not in use), old racks inside the factory premise.
0 0
S.N. 1
0%
20
25%
50%
75%
100%
2 3 4 5 6 7 8 9 10 11 12 13
20 20 20 20 20 20 20 20 20 20 20 20
260
0 0
0.00
Plant Name:
Audit Zone No.:
A
Date of Audit:
Level-1
Not being Practiced at all.
level-2
Practiced but not thorough ( Partially Done)
Level-4
Horizontally Deployed within the Zone
Level-5
Can be considered as a Role Model for other Zones
0 0%
10 10 20 20 20 20 20 20 20
TOTAL MARKS ACHIEVED FOR 1S SCORE FOR 1S = Score / 160 * 100 (%)
5 25%
10 50%
15 75%
20 100%
1 2 3 4 5 6 7 8 9
Entire Office area is divided in 'Zones' & 'Sub-Zones, updated list with zone owners available. 'Department', 'Zone & Zonal Red Tag Rack / Area', are identifiable List of essential items along with Quantity needed to carryout the work is available & updated regularly Computer is managed: all files in categorized folders, mail box sorted. BG Head, Unit Head, Department Heads Participate in Surprised 5'S' checks regularly. Soft Picture / Video album of 'Before' and 'After' is maintained. There is system for periodic SORTING & Control of Unwanted / Surplus Material / Documents / Records, RED TAGGING SYSTEM understood by ALL and followed, Autonomous '1S' Schedule displayed & followed for work stations Nothing on Floor, Roof ,Walls / Windows sill etc : Books, documents/files are stored directly on floor No Cigarette butts, scrap of paper, samples, parts, etc are lying on the floor & scattered around the office premises. Desk is managed: Desk and Drawers have only items needed at that time. Parts, office tools, items do not touch each other in containers, trays, table drawers, etc. Clean free storage system is followed. All Items are retrievable in 30 Sec. No torn or soi No storage of old machines, old Standards (not in use) , old Drawings/ parts ( obsolete), old documents( obsolete), old furniture( not in use), inside the office premise. Cupboards, almirahs, racks, drawers are transparent .No documents pasted on walls, under the table glass, Calendar and Clocks visible to all
160
0
0.0
S.N. 1 2 3 4 5 6 7 8 9
0%
20 20 20 20 20 20 20 20 20 180
25%
50%
75%
100%
0
#DIV/0!
S.N. 1 2 3 Responsibility & periodicity of cleaning are clearly defined & Understandable & known to all.
0%
25%
50%
75%
100%
All furniture, Desk items, Windows, Curtains at work stations are shining as if new, work station looks like a 'showroom' All cleaning equipment and aids are stored in a neat manner and are kept with proper identification & at an appropriate location.; easily available when needed
60
0
#DIV/0!
S.N. 1 2 3
0%
40 20 40 100 0.0
25%
50%
75%
100%
0%
25%
50%
75%
100%
Ownership and feeling 'My Zone'. Genuine concern for improving TEI in 5 'S', is visible in daily conduct. Uncomfortable when 1S, 2S, 3S Practices are not seen anywhere
100 #DIV/0!
TOTAL
Plant Name:
Audit Zone No.:
5-S DESCRIPTION
Roads, Roofs & Lawns No unwanted items 5 - Zero non compliance 3 - Two cases of non compliance. 0 - More than Two case of non compliance. Security Gate, Parking No unwanted records. Area, Medical Room 5 - Zero non compliance 3 - One case of non compliance. 0 - More than one case of non compliance. Availability of items such as soap, soap case as per Check Sheet Toilets 10 - Zero non compliance 5 - One case of non compliance. 0 - More than one case of non compliance. Roads, Roofs & Lawns Adequate lighting at proper places. Proper condition of the boundary wall and installations in the area. 5 - Zero non compliance 3 - Two cases of non compliance. 0 - More than Two case of non compliance. Security Gate, Parking Proper arrangement & condition of furniture. Proper lighting. Proper marking of parking area & proper parking of vehicles in the marked areas. Area, Medical Room 5 - Zero non compliance 3 - Two cases of non compliance. 0 - More than Two case of non compliance. Availability of Looking glass, Drinking glasses near water coolers. Proper condition of all equipments. Utensils, raw and Canteen & Pantry cooked food and other equipment placed at identified places. Proper storage of gas cylinders 10 - Zero non compliance 5 - Two cases of non compliance. 0 - More than Two case of non compliance. Condition of Taps - Metal shining, bent, mismatched/ symmetry, leakage. Glass/Mirror - Broken, Mutilated, cleaning, Toilets clear visibility, properly framed. Proper lighting with Sensors. 10 - Zero non compliance 5 - Two cases of non compliance. 0 - More than Two case of non compliance. Roads, Roofs & Lawns No oil / pit holes on Road. No piles of dust / garbage. No Water clogging. Clean drains 5 - Zero non compliance 3 - Two cases of non compliance. 0 - More than Two case of non compliance. Security Gate, Parking Cleaning of floor, racks, tables. Area, Medical Room 5 - Zero non compliance 3 - One case of non compliance. 0 - More than one case of non compliance. Clean floors, chairs, tables, windows. No water accumulation on the floor. Nothing is kept on floor. Wash basins / Canteen & Pantry cleaning arrangements are in place. 5 - Zero non compliance 3 - Two cases of non compliance. 0 - More than Two case of non compliance. Proper upkeep of plants, trees, grass etc. RWH, Horticulture 5 - Zero non compliance 3 - Two cases of non compliance. 0 - More than Two case of non compliance. Washbasin - Choking, Leakage, Spiting marks, dust at corners. No water, spiting, crazy remarks on Walls, doors & Toilets these are in proper condition 5 - Zero non compliance 3 - Two cases of non compliance. 0 - More than Two case of non compliance. Roads, Roofs & Lawns Effluent treatment system is in place. 5 - Zero non compliance 3 - One case of non compliance. 0 - More than one case of non compliance. Personal upkeep / hygiene of canteen workers. Use of uniform including cap, apron and gloves. All eatables and Canteen & Pantry equipment are stored in hygienic condition. Pesticide treatment / fly catching arrangements are evident are in place. Effective exhaust system. Suggestion box / book readily available. 10 - Zero non compliance 5 - Two cases of non compliance. 0 - More than Two case of non compliance. Exhaust System - No suffocation, good condition. Toilets 5 - Excellent . 3 - Good . 0 - Poor Security Gate, Parking Area, Medical Room Physical upkeep of guards. 5 - Zero non compliance 3 - One case of non compliance. 0 - More than one case of non compliance. TOTAL MAXIMUM MARKS MARKS OBTAINED
SEIRI
10
20
5 5
SEITON
10
10
30
5 5
SEISO
5 5
25
5 10
SEIKETSU
20
5
SHITSUKE
5
100 0
0 0
%AGE MARKS
Plant Name:
Plant Name:
A
'MGS' 6th 'S' 'SAFETY' Audit Check List (Shop Floor Area)
'MGS' 6th 'S' 'SAFETY' Audit Check List (Shop Floor Area)
Level of Judgment Criteria for deciding the Level Marks Allocation Safety Awareness Max Marks Level-1
Not being Practiced at all.
level-2
Practiced but not thorough (Partially Done)
Level-5
Can be considered as a Role Model for other Zones
0 0% 20 20 20 20
20 20 120
5 25%
10 50%
15 75%
20 100%
People are using Safety Devices like protective glasses, gloves, Helmet, cap, ear plug, apron, safety shoes etc. where ever required People are aware about Workshop's Safety rules & Safety Precautions while working on machines People are aware about precautions to be taken in material handling People are aware about emergency exit / layout of the building People are aware about corrective action in case of emergencies, e.g. are aware about cutting off electrical Supply in case of Emergency
TOTAL MARKS ACHIEVED FOR Safety Awareness SCORE FOR Safety Awareness = Score / 120 * 100 (%)
0
0%
0
25%
0
50%
0
75%
0
100%
0
20 20
Fire Fighting
Safety & Fire fighting equipments are available in pre fixed locations, as per approved layout. & Stored so that easily accessible
TOTAL MARKS ACHIEVED FOR Fire Fighting SCORE FOR Fire Fighting = Score / 40 * 100 (%)
40
0
0%
0
25%
0
50%
0
75%
0
100%
S N. 1 2
40
0
0%
0
25%
0
50%
0
75%
0
100%
0
20 20 20 20 20 20 20 20 20 20 20 20 20 20 20
300
S.N. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 All Machines are started after checking all points as per check list
0 0.00