Bill of Quantity and Project Estimate: Earth Work in Excavation
Bill of Quantity and Project Estimate: Earth Work in Excavation
Bill of Quantity and Project Estimate: Earth Work in Excavation
Item Description
1.
Quantity
& Unit
Unit Rates
(Rr.)
Amount
(Rs.)
231.0 m3
1325.2 m3
120/350/-
27,720/4,63,820/-
221.20 m3
120/-
26,544/-
9 m3
120/-
1,080/-
62.3 m3
5,000/-
31,11,500/-
2.1 m3
4,000/-
8,400/-
4.8m3
4,000/-
19,200/-
3.56m3
4,000/-
14,240/-
Total = 3,53,340/3.
67.47 m3
13,000/-
8,77,110/-
29.87 m3
141.64 m3
14.56 m3
12,400/13,000/13,000/-
3,70,388/18,41,320/1,89,280/-
5.09 m3
66,170/-
Platform+beam
(5 m below GL)
(e) Beams (3 Nos.) and
slabs (2 Nos.) of
control Room (CR)
(f) Columns (2 Non) near CR
13,000/20.69 m3
12,400/-
2,56,556/-
1.16 m3
12,400/-
14,384/-
20.10 m3
2,000/-
40,200/-
24.67 m3
2,000/-
49,340/-
10.58 m3
2,000/-
21,160/-
6.
238.0 m2
60/-
14,280/-
(b) Columns
11.52 m2
60/-
692/-
(c) Ceiling
14.23 m2
60/-
854/-
214.5 m2
60/-
12,870/-
92.0 m2
60/-
5,520/-
Total = Rs. 34,216/Water Proofing (with Mix of 1:3 of coarse sand or as per manufacturer's guidelines
):
(a) Sump wall
280.85 m2
280/-
78,638/-
56.0 m2
280/-
15,680/-
50.29 m2
280/-
14,081/-
GL Railing :
(a) Boundary wall
65 m
1,500/-
97,500/-
24.4 m
1m500/-
36,600/-
26.0 m
7.0 m
1,500/1,500/-
39,000/10,500/-
22.0 m
1,500/-
33,000/-
MS Grating:
(a) On the CR floor level for
Pump lifting
(b) For 250 dia CI
12. m2
4,000/-
48,000/-
Pipes support
(c) At the top and side walls
of the drains receiving
iflow sewage
8.4 m2
4,130/-
34,692/-
13.56 m2
5,300/-
65,090/-
16.8 m
8,100/-
1,36,500/-
18.6 m
Job
4,070/L.S.
75,702/25,000/-
1 no.
3,00,000/-
3,00,000/-
2 Nos.
1,50,000/-
3,00,000/-
1 no.
1 no.
7m
9.6 m
9 m2
2 Nos.
1 no.
100 m2
150 m2
250 m2
72 m2
Job
30,000/10,000/2,200/1,802/2,000/15,000/10,000/200/120/40/300/L.S.
30,000/
10,000/15,400/17,300/18,000/30,000/10,000/20,000/18,000/10,000/21,000/20,000/-
Job
job
L.S.
L.S.
40,000/10,000/-
4 nos.
5,000/-
20,000/-
4 Nos
5,000/-
20,000/-
(c)
mm long
(d) 250 CI D/F pipe 2000
mm long
(e) 250 CI D/F 900 bend
350 mm long
(f) 250 CI D/F NRV 600
mm long
(g) 250 CI D/F Sluice Valve
255 mm long
(h) 250 CI D/F expansion
joint 340 mm long
(i) 250 x 450 CI A/F Tee
950 mm long
(j) 450 CI Blank Flange
(k)
mm long
(l) 450 CI D/F Pipe 450
mm long
(m) 450 CI D/F NRV 1000
mm long
(n) 450 CI D/F Sluice Valve
432 mm long
(o) 450 CI D/F expansion
joint 340 mm long
(p) 450 CI D/F 900 bend
650 mm long
(q) 450 CI F/S pipe 700
mm long
(r) 450 CI S/S pipe
(s) Nuts, Bolts and rubber
Packing etc.
(t) Installation of above CI
Pipes and fittings
8 Nos
13,000/-
1,08,000/-
16 Nos
18,000/-
2,88,000/32,000/-
4 Nos
8,000/2,80,000/-
4 Nos
70,000/-
4 Nos
65,000/-
2,60,000/-
4 Nos
25,000/-
1,00,000/-
4 Nos
35,000/-
1,40,000/-
1 Nos
6,000/-
6,000/-
1 Nos
32,000/
32,000/-
3 Nos
12,000/-
36,000/-
1 Nos
2,30,000/-
2,30,000/-
1 Nos
2,25,000/-
2,25,000/-
1 Nos
50,000/-
50,000/-
1 Nos
20,000/-
20,000/-
1 Nos.
6,000/-
6,000/-
78 m
6,500/-
5,07,000/-
Job
L.S.
1,25,000/-
Job
L.S.
1,75,000/-
14.
1 no.
50,000/-
50,000/-
16.
17.
18.
19.
5,00,000/-
20,00,000/-
5,00,000/-
5,00,000/-
9,00,000/-
9,00,000/-
5,00,000/-
10,00,000/-
10,00,000/
-
10,00,000/-
L.S.
100,000/-