MPFS Skid Specification

Download as pdf or txt
Download as pdf or txt
You are on page 1of 26

Document: Intelligent Well Automation

Solution
Our Reference: MPFS Skid
Revision 9 January 2013 Page 1

Emerson Process Management


Valve Automation
Technical specification for Integrated skid mounted well test solution.

Project: XXXXXXXXXXXXXXXXX
Customer: XXXXXX
Chapter: Digital Wellhead / Integrated skid mounted
well test solution.

1|Page
Emerson Process Management 2013. All rights reserved. Unauthorized duplication, in whole or in part, is
prohibited. Trademarks identified in this document are owned by one of the Emerson Process Management group
of companies. Unless otherwise agreed to in writing by the parties, any information provided in this document is
confidential or proprietary and may not be used or disclosed without the expressed written permission of Emerson
Process Management.

Emerson Process Management


Emerson Process Management 2013 Confidential and Proprietary

TABLE OF CONTENTS

INTRODUCTION

TECHNICAL SPECIFICATIONS

2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8

Battery Limit & Scope of supply


Multi Port & Actuator Technical Details
Multiphase flow meter Technical details
RTU Units Technical Details
Isolation valves (Ball Valves) technical details
Check Valve technical details
Skid technical details
Major Sub Vendor list

3.

ATTACHMENTS

3.1

Schematics with scope of supply & skid battery limits

Attachment - I

Attachment II

2|Page

1. INTRODUCTION
This section lays down the outline for an overall Integrated skid mounted well test manifold by Emerson
Process Management. Important components in a well test manifold will be:
1. Bettis Multiport Flow Selector Valve Automation
2. Multiphase Flow Meter - Roxar
3. Remote Transmission Unit Remote Automation Solutions.
Developing a oil field successfully inherently carries with itself a host of challenges. Owing to the large
amount of investment committed for field development there is need to maximize profits, and at the same
time minimize risk and cost.
In Country work Projects are increasingly looking for ways to do as much as possible as Plug & Play
modules.
Remote Operations Capability There is concern around being able to deal with day to day operational
needs remotely and efficiently.
Efficient Spares Management Standardization on equipment ensures that there is an efficient spares
strategy and management.
Training Considerations There is need to administer training in a systematic and efficient manner to
local operational staff.
Service Support A Support Structure is required for Mega Projects with facilities, and headcount.
Project On time Delivery Time to Oil is a major Consideration for Upstream Project and affects Return
on Investment negatively.
Safety Concerns The Volatile Security Situation warrants a solution, where there is minimum human
involvement
In a bid to address these concerns, there is a need to develop efficient, and cost effective solutions, that
can be modular and easy to install. This minimizes manpower, effort, and risk on the field, and can
optimize resources in the right direction.

Vision The Solution


This technical solution is employing the Bettis Multiport Flow Selector, which is a unique pressure
vessel, which is designed to manifold up to 8 well flow lines. These flows are combined together, and it is
possible to single out a particular well flow, and conduct well testing on the same.
The actual well fluid test is done via the Roxar Multiphase meter, which measures 3 distinct phases that
could be present in the crude output from the wells, i.e. water, gas, and oil.
Test data, and a host of other parameters, taken from the actuator, pressure and temperature readings
from the wellheads, and the multiport actuator position and control, is fed back into the RAS Remote
Transmission Unit. This device enables to then feed data back into the SCADA system via radio or
satellite communication. Made for remote locations, these RTUs report by exception, with time stamps,
therefore giving the user a real feel of the changes that occur on critical parameters This contributes to
decisive control on the upstream scope of the project, and is the cornerstone of the Digital Oilfield
As illustrated, below is a brief outline of the solution proposed above:

3|Page

Various parameters from wellhead, multiport and multiphase meter are fed back to the DCS system
(Delta V shown in the example above), via radio or satellite communication.
From each well, there are a host of parameters which are detailed in below layout/diagram. This
elucidates the overall function of solution. Pressure, temperature at well site enables the user to monitor
for any pressure losses or spikes which, in turn give an accurate vision of the condition of the
infrastructure far upstream. The multiport manifold allows the well fluid to be singled out and tested with
the Multiphase meter. This will provide the user with complete and comprehensive information on each
well in terms of flow, the composition of the crude fluid that each well produces enabling pro-active and
decisive reservoir and field management throughout the entire lifecycle of the project. Below image that
outlines the different parameters measured per well flow line.

4|Page

2. TECHNICAL SPECIFICATION
2.1 BATTERY LIMIT AND SCOPE OF SUPPLY FOR INTEGRATED SKID MOUNTED
WELL TEST MANIFOLD

The proposed option should be best for production and testing of oil wells without interruption. It
should include Multiport Flow Selector units (MPFS) for normal operation of manifold.

The basic scope of supply shall be design, manufacturing, testing, delivery, documentation, of a
complete operational multiport Flow selector skid. Supervision of erection & commissioning at
site. Skid will be comprises of following items.

Sr.
No.
1
2

3.
4.
5.

Description

Notes

Multiport Flow Selector


(MPFS)
Electrical actuator to
be mounted on
Multiport Flow Selector
Multiphase flow meter

6.

RTU
Isolation Valves (Ball
Type Valves)
Check Valves

7.

Skid

8.

Any other items


required for
completion of skid.

On the Upstream and


downstream side of MPFS.
Upstream and downstream
of MPFS. As shown in the
attached P&I Diagram.

Any other items required to


complete the skid scope like
Nuts, bolts, flanges, gaskets,
pipes, fittings, structural
steel, cable supports/trays,
etc.

Manufacturer
Name / Brand
name
Emerson - Bettis
Make
Emerson EIM
make

Qty.

One No
One No

Emerson Roxar
Make
Emerson Make
To be advised

One No.

To be advised

As per P&ID.

To be advised

1 No. Duly
mounted with
piping and
fabricated.

One No.
As per P&ID.

As per the
availability in the
market and
suppliers
preference.

Overall skid limit will be as shown in the P&I Diagram.


Mechanical Limits.
- All Well inlet connections (Seven Nos.) to be terminated at the inlet flange of skid piping by
others.
- Skid outlet connections will be outlet flange of main production (bulk) header pipe.
Power Supply limits
- Client will supply power supply at one point of skid. Cable connections within the skid will be
taken care by Emerson.
Communication limits
- Communication of Multiport Flow Selector & Multiphase Flow Meter is limited to RTU mounted on
the skid.
- Communication between RTU and User system will be in the scope of contractor.
Civil limits.
- Any Civil work is excluded from the scope of the supplier.;

5|Page

TYPICAL SKID ARRANGEMENT

Note The below arrangement of skid is only for illustrative purpose only Actual dimensions and
arrangement may change as per the plot lay out & contractors / end user requirement.

6|Page

2.2 MULTIPORT AND ACTUATOR TECHNICAL DETAILS


GENERAL DESCRIPTION
Crude oil well test manifold to be provide as Multiport Flow Selector (MPFS) technology. It provides a cost
effective method for selecting and diverting well fluids from an individual well to a single test outlet or
loop. MPFS should be able to operate in a variety of oil and gas or process applications.
Multiport Flow selector is advanced concept for oil Well test & Production Manifold. This is preferred
choice of manifold due to economical and more compact than conventional designs. Multiport valve is a
cluster of connecting more than one well and grouping together before the production.
The maximum number of wells inlets to a single MPFS is 8 (Eight), however for engineering excellence
operation it is recommended to connect maximum 7 (Seven) nos. of wells. The maximum number of
wells that can be connected to a single MPFS in a specific application is determined by the media type
and flow rate.
ARRANGEMENT AND WORKING OF MULTIPORT FLOW SELECTOR VALVE IN PRODUCTION
MANIFOLD:

The well lines can easily be diverted to production and Test separator from MPFS. The seven inlets of the
multiport flow selector are connected to wells along with isolation valve. The remaining one port is kept
free which is home port. During service the home port can be used for seal adjustment.

7|Page

A - SCOPE OF SUPPLY
The basic scope of supply shall be design, sizing, selection, manufacturing, testing, delivery,
documentation, of a complete operational multiport Flow selector along with controller.
Typical arrangement is shown in the attached P&I Diagram.
The VENDORs scope for the Multiport Flow Selector shall be as described in this specification and
associated documents including but not limited to:

Multiport Flow Selector controller, i.e. Electrical Actuator


Sizing calculations
Data and Documentation as per Material Requisition, including maintenance manuals, export
crating and transportation details.
Inspection & Testing
Commissioning and Start-up Spares
Two (2) years operations and maintenance spares list inclusive of sub-vendor.
Itemized special tools required for installation, start-up and maintenance.
Field service rates for technical support and onsite pre-commissioning.
Training.
One session of in house training in vendors facility
One session of on the site training.
Project Management of the complete order and scope of supply.
Storage, preservation packing and suitable for land, sea or air shipment as per the delivery terms.

B - TECHNICAL REQUIREMENTS
i)

GENERAL TECHNICAL REQUIREMENTS

The MPFS shall be used to divert the flow from up to seven well strings (or as mentioned in datasheets)
to a single multiphase flow meter for well testing purposes. An eighth position shall be provided to "park"
the selector . The MPFS shall be equipped with remote and local position control facilities.
The following sub-sections shall constitute common technical requirements for the MPFS.
ii)

HAZARDOUS AREA CLASSIFICATION AND CERTIFICATION

All electrical / electronic field instrumentation items such as motor, transmitters, switches, controller etc
shall be of EExd type suitable for installation in Zone 1, Gas Groups IIB, Temperature Class T3, as a
minimum irrespective of the area classification.
All electrical / electronic Instrumentation items shall be certified by an internationally recognised
organisation (statutory body) such as BASEEFA, PTB, FM, CSA, UL etc for operation in hazardous area
classification.
All electrical / electronic Instrumentation items to be installed in a hazardous area shall conform to
CENELEC / lEC as per EU Directive ATEX 94/9/EC and shall also carry the marking as per ATEX
directive.
iii)

INGRESS PROTECTION

All MPFS components shall have ingress protection of IP-65 in accordance with IEC-60529 as a
minimum.
All field instruments installed under / exposed to direct sun light shall be provided with a UV resistant,
GRP canopy.
iv)

SOUR SERVICE REQUIREMENTS

8|Page

In sour service application as identified in applicable project pipe material class specification / instrument
datasheet all process wetted parts materials including accessories of the corresponding instrument must
conform to the requirements of NACE Standards MR-0175/ISO15156.
v)

POWER SUPPLY

To Specify
vi)

CONNECTIONS

All Threaded end connections shall be NPT (Taper) as per ASME B 1.20.1. Threaded process connection
shall be seal welded. All Flanged end connections shall be as per ASME B 16.5. / NORSOK / SPO
Compact TYPE.
Flange Rating, Facing and finish shall be as specified in data sheet.
Electrical field cable connection shall be of Metric Thread (Eg: M20, M25 etc) and sizes shall be as
specified in datasheet. Separate entries shall be provided for input, output and power supply, as specified
in datasheet.
vii)

DESIGN LIFE

MPFS and its actuator assembly, control circuit and associated accessories within the VENDOR scope of
supply shall be designed for a life expectancy of thirty (30) years, as a minimum.
VENDOR shall warrant the availability of spares and services for all parts for a minimum of 10 years.
viii)

LOW POWER CONSUMPTION

All electrical / electronic items shall be of low power consumption type. Vendor must provide power
consumption of individual component along with the bid.
ix)

SPECIFIC TECHNICAL REQUIREMENTS

The following sub-sections shall constitute specific technical requirements for the MPFS.
C - GENERAL
The MPFS shall be designed and constructed in accordance with the requirements of this specification,
data sheets and other specifications referred in the requisition with the requirements of the referenced
codes and standards.
The MPFS shall be supplied as fully assembled and tested units, complete with all necessary
accessories.
The MPFS shall be vertical type with all inlets horizontal around the valve body and the main production
outlet and test outlet shall be at the bottom. The valve ports shall be sized as per the process conditions
mentioned in the data sheets. MPFS shall have 8 inlets, as a minimum; one of which shall be in parking
position.
The MPFS shall be with the flanged connections for the Process inlet and outlet flanges. The design shall
be constructed such that maintenance, cleaning and testing can be performed easily.
MPFS should be provided with vent connections.
MPFS plug sealing design should allow performing temporary maintenance in-situ condition. Plug seal
should be field adjustable type. VENDOR to provide suitable plug-seal assembly adjustable tool.

9|Page

The MPFS shall be provided with a motorised actuator and position indications. Position feedback
mechanism to be specified by the supplier. The Electronic controller shall be integral part of electrical
actuator. EC shall have the following functionalities as a minimum:

Control of the MPFS selector position


Remote well switching and testing as a part of well test programme. i.e., allow the operator to
remotely communicate from the DCS / ICSS through the respective station via RTU system.
Local selector switches and display unit for the field operator to take control of the MPFS.
Serial link to select and confirm valve position and any system diagnostics to the MPFS.
Local interface through the selector switch for the field operator to take control of the MPFS.
Actuator shall have inbuilt local control station. It shall be provided with a Three (3) position
selector switch for REMOTE/ JOG / STEP functions.
REMOTE position shall disable all the local push buttons operations.
JOG/ STEP position shall allow the local operation by the field Operator.
JOG enables continued plug rotation whilst push button is depressed. JOG function shall be
disabled in normal working condition. It should be password protected and shall be accessed only
by authorized person.
STEP rotates plug to next well inlet port
In REMOTE mode operation, the control command will be issued from the USSC control room to
the Multiport Actuator, and multiport actuator in turn shall position the MPFS port to the well inlet
which is to be tested. Only one well at a time will be selected for the test.
The signals from multiport actuator unit to the control room shall include:
Indication of well under the test
Indication of Local / Remote mode position
System status common alarm

D.- MPFS BODY CONSTRUCTION


The MPFS shall be manufactured in accordance with ASME B 16.34 & ASME Sec VIII. When selecting
MPFS ports, factors taken into consideration shall include, process properties, capacity requirements,
normal and shutoff pressure, etc.
The MPFS shall offer a compact manifold design combining production and test manifold in one single
unit. The MPFS shall consist of 8 inlets, one test outlet, one main production outlet and a selector
(moving part). In a MPFS, maximum 7 inlets shall be connected to the flow lines and the 8th inlet shall be
left with blind flange which shall be used as an inspection port called as inspection and parking port. It
shall be possible to divert the flow from any of the 7 inlets to the test outlet by operating the selector. All
other flows shall combine and exit via the common production outlet port.
The MPFS main production outlet shall be sized to cater total flow from 7 different wells whose flow
profile has been given in the Process Data Sheet (PDS). Also, inlet size shall be sized suitability to handle
the flow profile given in the PDS.
The MPFS trim shall be completely replaceable through the bonnet.
E.- PIPING REQUIREMENTS
The MPFS shall be provided with flanged connections for the process inlet and outlet flanges. Nozzle
(inlets, main production outlet and test outlet) size shall be based on the VENDOR sizing calculation.
The flange dimension, rating, facing and surface finish shall be in accordance with the Piping Material
Specification (PMS).

10 | P a g e

F. -MPFS TRIM AND LEAKAGE CLASS


The MPFS trim consist of the manifold assembly that are in contact with the process medium, which
include selector (plug), guide bushing and seat ring.
The seat ring shall be easy / quick replaceable type. It should also allow temporary maintenance in-situ
condition. The MPFS seat leakage class shall be as per process requirement and as specified in the data
sheets.
All MPFS shall be sized to provide different flow from different wells & sizing calculation as per API 14E
shall be submitted for approval.

G. - MATERIALS
The material of the MPFS shall be as per the PMS & as mentioned the data sheet. Seal and gasket
materials shall be selected for long term operation under the specified site conditions. VENDOR shall
highlight clearly, in case other materials offered which shall be superior to the material indicated in the
PMS.
Materials for sour service shall conform to the requirements of NACE Standard MR-0175 / ISO15156.
Asbestos or any other locally and/or internationally prohibited materials shall not be used in any forms.
Materials of construction of the actuator shall be electrochemically compatible with the valve body.
Materials of construction of the MPFS and actuator shall be suitable for prolonged service in the specified
environment.
Castings shall be in the normalized or quenched and tempered condition. Welds or weld repairs shall be
subject to a stress relief heat treatment and shall be certified.
Austenitic stainless steel & Inconel 625 material shall be in the annealed condition.
Forgings in CS shall be in the normalized condition.
G.1 - BODY, TRIM:
The MPFS shall be constructed from material as per data sheet.

G.2 - ACTUATOR:
Motor enclosure material shall be in Carbon Steel or Marine grade Aluminum with low copper content.
MPFS shall be electrically actuated by a motor. Motor shall be provided with integral starter with
associated microprocessor based controller to position the selector (moving part) to the required position.
The controller shall provide the position feedback, diagnostic data etc to platform PCS system. VENDOR
shall provide the power consumption details along with the bid.
Actuator shall be provided with Hand wheel for manual operation. It shall be designed by the VENDOR to
suit the offered MPFM
G.3 MOTOR
Actuator motor shall operate on 24 V DC, 10% (-ve earthed) Power Supply from solar power system.
The minimum class of insulation shall be Class F and temperature rise shall be limited to Class B
insulation.

11 | P a g e

The motor housing shall be certified EExd type suitable for Zone 1, Gas Group IIB, and Temperature
ClassT3 hazardous area classification.
H - CONTROL FEATURES
Actuator shall have following control & diagnostic features.

Control of the MPFS selector position

Modbus over RS-485 or Modbus over TCP/IP serial communication module for remote
communication Remote well switching and testing as a part of well test program i.e., allow the
operator to remotely communicate
Local selector switches and local display unit for the field operator to take control of the MPFS.

ACTUATOR TECHNICAL DETAILS


Multi-Port Actuator (MPA) Features
Based on EIMs heavy duty 3000 Series gearbox with a capacity of 3000 ft lbs
Configurable for multi-port flow selectors from 3 to 8 ports
Any port may be selected as home port and any port(s) may be skipped
Actuator calibrated at factory for exact match to flow selector port positions
Calibration parameters stored in non-volatile memory and available to DCS
12-bit magnetic encoder coupled directly to valve stem for position feedback
Provides position measurement resolution of 0.088 degrees
EIMs exclusive solid state motor starter and control software provides precise positioning of flow
selector within +1 degree of selected port
High performance microcontroller updates motor control output every 1mS for precision motor control
12-bit magnetic encoder coupled directly to torque pinion for torque feedback
Provides torque measurement resolution of 0.146% of full torque MPA supports all network
protocols available with all other EIM actuators
Modbus RTU RS485
I/O and alarm monitoring include
Integral circuit breaker/disconnect
Motor overload and motor thermal
Loss of control voltage
Encoder failure
Stall detection and alarming (detects mechanical faults)
3-Phase monitoring and phase correction to insure correct motor rotation
Monitor relay for hardwired relay contact status on fault
MPA includes local display module (LDM) standard
Uses rugged LED display for port number, torque, and alarms
(also displays setup menus and setup parameters)
Multiple colour LEDs display
o
- Port position within 1 of port
- Motor running
- Alarm
- Over torque
- Local mode
- Off mode
- Remote mode
Includes Local Off Remote selector switch
Local control knob for Port selection and Jog control

12 | P a g e

Configuration and test may also be performed with EIMs MPA CONFIG software, a Microsoft Windows
XP application
Laptop with RS485 converter and MPA CONFIG may be connected to the RDM
communication port for easy configuration and test for factory and field applications.
Environmental Specifications

ATEX - II 2 GD, EEx d IIB T4 or EEx d IIB 120oC (T4), IP66, Explosionproof
Ambient Temperature rating of -40 oC to + 60 oC
o Enclosures include thermostatically controlled space heaters to keep dry and
o Stable clock frequency over entire temperature range
Operating humidity, 5 - 100% RH

I. - SIZING OF THE MULTIPORT SELECTOR MANIFOLD

MPFS shall be sized and selected accordingly based on the process data sheet and Instrument
datasheet.
VENDOR shall submit the sizing calculation along with the bid. Sizing calculation shall be
approved by EPC CONTRACTOR / COMPANY.

J. - TAGGING AND IDENTIFICATION


Each MPFS and its accessories shall be provided with a permanently fastened SS316L nameplate. Name
plate shall be permanently fixed to the body of the instrument using SS316L screws. Adhesive labels
shall be forbidden. In order to prevent corrosion, name plates in SS316L shall be covered by a
transparent protective film.
The name plate shall indicate the following information as a minimum:
Tag number
Manufacturers name and trade mark
Serial number and model number
Material
Size and rating
Voltage, watts and frequency for electrical instruments
IP rating/Hazardous area classification
The VENDOR shall submit a label schedule with nameplate details to the EPCC / CONTRACTOR for
approval.
K. - PAINTING AND COATING
The protective coatings for the MPFS unit including the parts in SS316L shall be as per Painting Manual
of the COMPANY. Protective coating shall not obscure equipment tag plate etc. It shall be suitable for
offshore environment.
VENDORs standard painting specification may be acceptable if the same conforms to the above
COMPANY Specification or exceeds the specification requirements subject to COMPANYs approval.
L. - INSPECTION AND TESTING
L.1 GENERAL
The inspection and testing requirement shall be in accordance with Inspection and Test Plan attached
with the Material requisition and Purchase Order. The Inspection and Testing shall be witnessed by
EPCC CONTRACTOR /COMPANY/ COMPANYs representatives.
It shall cover in-house inspection & testing by the VENDOR, Factory Acceptance Testing (FAT) and Site
Acceptance Testing (SAT).

13 | P a g e

VENDOR shall be responsible for preparing test procedures, co-ordination with third party system
vendors and the testing of interface to third party equipment.
It shall be VENDOR's responsibility to modify and/or replace any hardware and modify the software if the
specified functions are not completely achieved satisfactorily during testing and factory acceptance.
L.2 - FACTORY ACCEPTANCE TEST (FAT)
A detailed Factory Acceptance Test (FAT) procedure shall be prepared by VENDOR and submitted for
EPCC CONTRACTOR / COMPANY approval.
FAT procedure shall provide the following details, as a minimum:

Description of each test, purpose of test and expected result.


The tests shall be conducted in accordance with approved procedure.
VENDOR shall record all test results, issues and shall take action on all issues till the successful
completion of the tests.

All records shall be verified and signed by the personnel witnessing the tests. One full set of
documentation shall be made available during FAT for reference and use, which shall be used to record
FAT changes and observations. All FAT punch lists shall be cleared by VENDOR prior to the shipment.

M. TRAINING
VENDOR shall provide necessary training to the COMPANY engineers. VENDOR shall indicate the
optimum number of attendees per training session and the pre-requisites for attending these courses.
The course and the documentation shall be in English, and tailored for the application and site concerned.
VENDOR shall provide training materials for all the participants which shall adequately cover every
aspect of the MPFS including site calibration.
Training shall include the theoretical, practical. No. of attendees and required sessions.
VENDOR offer shall cover the following options in terms of location of training:
Training to be held in COMPANYs offices
Training to be held at VENDORs office.
N. - SPARE PARTS AND CONSUMABLES
PRE-COMMISSIONING, COMMISSIONING SPARE PARTS:
VENDOR shall provide spares for:
Pre-commissioning
Commissioning and Start-up
OPERATIONAL SPARE PARTS
VENDOR shall compile a S.P.I.R. list based on 2 years continuous operation of the MPFS. This list
should be based on VENDORs recommendations.
VENDOR shall provide a separate price for all recommended spare parts, repair /replacement policy,
including which spares are currently stocked and where.
CONSUMABLES:
VENDOR shall provide all the consumables required during pre-commissioning, commissioning and
SATs (If applicable).
O.- PACKING, MARKING AND SHIPPING

14 | P a g e

MPFS and its associated accessories shall be packed, marked and shipped as per the EPCC
CONTRACTOR purchase document.
All openings of MPFS must be positively sealed for storage and shipping by proper backing plates or
other methods to ensure against ingress of dirt and transportation hazard. The use of adhesive tape
alone is prohibited.
Easily damageable parts such as machined faces shall be fitted with caps / plates for proper protection.
Machined or threaded surfaces exposed to the atmosphere in shipment or storage shall be coated with
rust preventive.
After the successful test, all the components especially body cavities are to be thoroughly dried prior to
preparation for packing and shipping.

MPFS - Recommended MATERIAL OF CONSTRUCTION FOR OPTION I MULTIPORT


SELECTOR

FLOW

Notes

6 X 16 ----- 1500#
(QTY 1 NO.)

8 Nos. of inlet connections of 6 Size each.


One no of Test outlet connection of 6 size
One no of Production outlet of 16 size.

MAJOR
COMPONENT
DESCRIPTION

MATERIAL

Design Code

ANSI B 16.34 / ASME Sec VIII Div. I

Body

A216-WCB + Inc 625 cladding (Min. 3mm)

Flange

A216-WCB / A 105 + Inc 625 cladding (Min. 3mm)

Bonnet

A216-WCB + Inc 625 cladding (Min. 3mm)

Bonnet Stud

ASTM A 193 GRB7M

Bonnet Nut

ASTM A 194 GR2HM

Plug

Inc 625 (ASTM A 494 CW6MC)

Trim (Back up
plat/Scraper/Adjustment Nut)

Inconel 718

Seat Insert

25% Carbon Teflon

O-Rings

AFLAS

Painting

Std. 3 coat painting.

Quality Certification

3.1 Certificate for Major Raw Material

Quality Certificate

2.1 compliance certificate for small components


like seal, seat, o ring etc.

15 | P a g e

2.3 MULTIPHASE FLOW METER TECHNICAL DETAILS


PURPOSE OF MPFM
MPFMs are in-line flow meters wherein all the measurements of the individual phase fractions and
individual phase flow rates are performed directly in the multi-phase flow line without any separation and/
or sampling of the fluids. The MPFM shall serve the following purpose in the facility:
1. Well Testing
2. Real time Well Surveillance or Monitoring for Production optimization and Flow assurance.

PRE-QUALIFICATION CRITERIA
1. The Supplier shall have previous experience of supplying MPFMs for the similar applications and
the MPFM model shall ahve proven track record of delivering satisfactory performance under the
conditions similar to the Project.
2. Reference List: Supplier shall submit reference list of installations wherein the offered MPFM
model is in use currently. For the purpose of Reference list of installations only installations of
reputed Oil & Gas Companies, or equal, would be considered.
3. Experience: Supplier shall submit documentation indicating their experience in all the activities
related to the supply of MPFM in their previous projects. References shall be considered only
from the reputed Oil & Gas Companies.
4. MPFM evaluation in Third party Laboratory: Offered model of MPFM shall have undergone
performance evaluation in third party laboratory, preferably TUV-NEL, Scotland, UK.
Performance evaluation report of the MPFM from third party laboratory shall be submitted in the
offer for review.
5. MPFM proven track record: Offered model of MPFM shall have at-least 2 years of proven track
record of providing satisfactory performance under the operating conditions.

SCOPE OF WORK
1. Supplier shall supply all aspects of MPFMs including design, engineering, materials,
fabrication, procurement, project management, configuration, programming, integration, inspection,
testing, marking, shipment, training, assistance in installation/ commissioning/ operation & maintenance/
Nucleonic gauge equipment licensing, documentation.
2. Supplier shall provide all the necessary Project management, engineering, consultation and
programming services to fulfil the requirements of this specification.
3. Supplier shall supply all hardware and software required to build complete functioning MPFMs
as per this specification and other referenced project specifications and standards.
4. All hardware, firmware, software and system components necessary for the proper functionality
of the MPFMs shall be identified and provided by the Supplier as part of his scope.
5. Supplier shall support the complete configuration of the MPFM inclusive of the configuration of
the interfaces between MPFM and DCS. As the part of MPFM engineering the Supplier shall
provide complete configuration details of all the components of the MPFM.
6. Supplier shall special tools and test equipment (including pricing, model numbers,etc) required
to properly install, start-up, commission, operate & maintain the MPFMs.
7. Supplier shall provide Priced list of recommended spares for two years of operation.
8. Supplier shall make available an experienced Start-up & Commissioning Engineer to assist and
provide direction during Commissioning of the MPFMs.
9. Supplier shall provide, when necessary, factory trained MPFM troubleshooting assistance.
10. Supplier offer shall include statements of availability and locations of service personnel for the
MPFMs.
11. Supplier shall provide priced options along with the offer for the following:
a. Conducting Training courses for Engineering, Operations and Technicians.
b. Installation, Site-integration, Start-up, Commissioning support.
c. Post Commissioning support related to Operations & Maintenance.
TECHNICAL REQUIREMENTS

16 | P a g e

MPFM shall consist of:


A. In-line, Multi-Phase Flow Meter. The equipment shall strive to make no attempts at separation, but
shall directly measure physical characteristics of the fluids and their flow through the pipe to determine
the phase flow rates & phase fraction.
B. Other Process Instruments inclusive of Multivariable transmitter for Pressure, Temperature and
differential pressure measurement and shall be fitted as integral part of the MPFM.
C. Flow Computer part performing calculations of quantities, reporting functions. This
Flow Computer shall be installed in the field near MPFM and shall have interfaces for DCS.
D. A compact design is encouraged to reduce space requirements and weight.
E. The measurement principle shall use Gamma ray for mixture density measurement and impedance
electrodes for phase fraction measurement.
MPFM DESIGN CONSIDERATIONS
Proven Design: The MPFM shall use proven components, utilize techniques that minimize the need for
maintenance and implement an overall system design that enhances the integrity of the installation.
In-line construction with low pressure loss: The MPFM shall have an in-line construction that exhibits
a low permanent pressure drop and no moving parts.
Furthermore, the meter shall not be dependent on any mixer/flow conditioner or require a phase
separator device. Use of upstream mixers strainers and sampling ports is not recommended due to extra
pressure loss and costs.
Independent of flow regime: The MPFM shall have a measurement technique that is independent of
flow regime and insensitive to fluid flow phase changes.
Pressure & Temperature design rating: The MPFM system shall be pressure rated
to withstand wellhead design conditions. Design Pressure shall be 5000psi and design temperature shall
be -20 to +130 Deg C.
Material of construction: The MPFM materials and construction shall be compatible
with the process fluids and the environmental conditions that it will be exposed to. Further, the MPFM
materials and construction shall comply with the associated piping codes.
Field Transmitters: The Pressure, Temperature and differential pressure transmitters shall be a single
Multivariable transmitter.
Gamma-ray sensor: If MPFM has Gamma-ray source then the isotope source shall have a minimum
half-life of 30 years and with as low an activity as is reasonably practicable for the application. Surface
radiation on the Gamma source must be less than 7,5 microsievert per hour. Source strength shall be
less than 5 milli Currie (mCi). The isotope used for gamma ray shall be Ceasium 137 with half life of 30
years.
Phase fraction measurement: The vendor shall state the technique used by the MPFM for determining
phase fractions. Techniques proposed shall be based on the process conditions and other functional
requirements as enumerated in clause no. 5 of this document.
(Phase) Slip: MPFM designs shall be capable to measure inter-phase slips directly by using cross co
relation methods.
Sampling: The MPFM technology shall be independent of any process sampling requirement at site.
Flow calculation shall be done using the hydro carbon composition input.

17 | P a g e

Interface with DCS: Interface can either be RS 485 or Industrial Ethernet with protocol MODBUS/ RTU
or TCP/IP. Interface should allow remote access to MPFM for remote diagnostics and set-up. The flow
computer shall have 01 no RS 232 port for service console communication and 01 no RS 485 port for
DCS communication.
Flow computation: The vendor shall describe the flow computation software package used for the
calculation of flow rates in Standard conditions and in mass units. The software package shall be part of
the supply.

UNCERTAINITY
The performance specification should be tuned to expected flow conditions.
Given the flow data this meter operating in multiphase mode the uncertainty shall be:
Absolute watercut: 2.5% - 3.5%
Relative gas volume flow rate: 6%
Relative liquid volume flow rate: typically 3.5% - 5%
Also the meter should be able to work in both Multiphase and wetgas modes, if process data requires.
Uncertainty calculations shall be in line with ISO/ IEC Guide 98-1, Uncertainty of Measurement- Part 1:
Introduction to the expression of uncertainty in measurement and NFOGMs Handbook of Uncertainty
Calculations, Rev 2. Confidence level of the specified measurement uncertainties shall be 95% (k=2),
where, k is the coverage factor.
Measurement uncertainties for MPFMs shall be specified by the Supplier as per the
following table.

Multiphase MPFM 2600


Confidence level:

95%

(k=1.96)

Combined expanded uncertainties

Sub range

GVF range

Gas

Liquid

WLR

0 25 %

8(1)

3,0

2,0

25 85%

3,5

2,5

85 96 %

5,0

3,5

96 98 %

8,0 (2)

4,5 (2)

98 100%

Wetgas

Wetgas

Repeatability:

of %

of %

of %

In addition to the expression of MPFM measurement uncertainties in tabular form above, the Supplier
shall also present uncertainties in graphical plots including, the two phase flow map, the composition
map, and the cumulative performance plot. Refer NFOGMs Handbook of Multiphase Flow Metering for
guidance on these plots.

18 | P a g e

MPFM SIZING/ CAPACITY


a. The measurement system shall be capable of measuring the full range of planned quantities of
multiphase well fluid through the MPFM as specified in data sheets by using a field replaceable insert
venturi solution.
b. MPFM shall be designed to measure the flowing conditions as specified in the data
Sheet.
c. MPFM shall be designed to measure Wet gas flow and shall have a wet gas mode to handle the high
GVF range (ie. GVF between 95- 100%).
6.6 The MPFM shall have its own inside mini thermoelement for temperature measurement as integral
part of meter construction. It shall be part of the meter like other sensors.
ENGINEERING/ CONFIGURATION, USER INTERFACE SOFTWARE & LAPTOPS
SUPPLIER shall also supply Engineering/ Configuration, User Interface Software along with Industrial
Laptops.
Engineering/ Configuration, User Interface Software shall be loaded on the supplied
Industrial Laptops
LAYOUT REQUIREMENTS
Any specific layout requirements for the MPFM inclusive of vertical installation,
straight lengths, etc shall be advised by the Supplier during offer stage.

SPECIFICATION OF OUTPUT DATA


Outputs from MPFM shall be typically in actual conditions; however, MPFMs shall also have provision of
giving outputs at standard conditions.

ENGINEERING/ CONFIGURATION, USER INTERFACE SOFTWARE & LAPTOPS


SUPPLIER shall also supply Engineering/ Configuration, User Interface Software along with Industrial
Laptops.
Engineering/ Configuration, User Interface Software shall be loaded on the supplied
Industrial Laptops.
POWER SUPPLY
Power supply for the MPFM shall be 24 VDC/ 230V AC.
The power consumption shall be less than 24 Watts.
OPERATIONAL REQUIREMENTS
MPFM shall not require any operational actions for it to be operated.

MAINTENANCE REQUIREMENTS
MPFM along with other instrumentation shall be selected to reduce need for maintenance and calibration
activities. There should be easy access to all instruments for maintenance.
It shall be possible to calibrate transmitters without moving them from their permanent installations,
without disconnecting any cables.
INSTALLATION/ COMMISSIONING REQUIREMENTS
1. MPFM shall be inline type and mounted in vertical up-flow direction.
2. Vendor shall provide the minimum straight length requirements for various piping
configurations to meet the specified installed accuracy.
3. Vendor shall provide clear commissioning instructions for each model offered.
4. Vendor shall provide the recommended start-up procedures and warm-up time (shall
not exceed 30 minutes) required.

19 | P a g e

5. Vendor shall provide eye-let hoisting facilities for large meters.

HAZARDOUS AREA CERTIFICATION & IP RATING


1. All filed instrumentation items inclusive of JBs, etc of MPFM shall be suitable for Zone 1, Gas
Group IIB, Temp. Class T3.
2. Ingress protection rating of the complete MPFM unit shall be IP 66 to IEC 60529.
3. Supplier shall have all the necessary documents inclusive of Hazardous area certificates/ ATEX
certificates detailing the protection technique(s) used from the accredited notified body/ certification body.
RADIOLOGICAL SAFETY
For MPFMs utilizing radioactive materials following shall be ensured by the Supplier:
1. The offered MPFM with Radioactive material shall be type tested for Radiological
safety. This type test will verify the radiation dose at the surface of the housing of the
Radioactive material. Test shall be performed by a testing laboratory accredited by a
Statutory body on Radiological safety. Supplier shall submit the Type test certificate/
report, covering Radiological safety aspect, to the COMPANY for review.
2. Supplier shall ensure that the proper QA/ QC is in place to replicate the performance as per the
results of type testing of the MPFM in respect of Radiological safety.
3. Supplier shall be responsible for the safe disposal of the Radioactive material in the
event de-commissioning of the MPFMs. An undertaking shall be submitted by the Supplier taking the
responsibility for the safe disposal of the Radioactive material.

MPFM OUTPUTS SPECIFICATION


The units in which measurement data are displayed may be changed by the user.
The following units shall be available:
Liquid flowrate m3/hr, m3/d, kl/d, kT/d, BPD, GPM (US)
Gas flowrate m3/hr, CFM, CFD, km3/d, MMCFD, MCFD, m3/d, kT/d
Liquid volume m3, BBL, Gal (US), kl, kT
Gas volume m3, CFT, km3, MCFT, MMCFT, kT
Flow pressure (Pflow) Bar (g), Bar (a), kPa (g), kPa (a), psi (g), psi (a)
Flow temperature (Tflow) deg C, deg F
Diff. Pressure (dP) mbar, psi, kPa, Inches H20
Density kg/m3, g/ml
Mass Flowrate kg/hr, kg/d, kT/d
Mass Volume kg, kT

20 | P a g e

Instrument configuration summary


The below information is for general information only and does not describe all alternative designs
available. The specifications for the actual configuration offered are found in the attached Instrument Data
Sheet (IDS).
Product
Details
Model
Multiphase meter 2600
Manufacturer
Roxar
Country of origin
Norway
Meter size
Specifications
Body
To Be advised
ID mm
To Be advised
Measurement
Function
Principles
Field replaceable insert
Measures differential pressure and
venture
calculates the speed of the flow
going through the meter
Electric impedance
electronics

Measures the fraction of oil, water


and gas flowing through the meter

Multivariable transmitter

Compact, integrated measurement


solution for pressure, differential
pressure and temperature

Cross-correlation

Calculates the speed of the mixture


flowing through the meter by utilizing
time series analysis

Compact gamma system

Measures total density of the mixture


flowing in the meter pipe

Roxar Zector
technology

Advanced signal processing, new


field electronics and electrode
geometry provides accurate
characterization of flow

Combined

The Roxar Multiphase meter 2600 is based on electrical impedance, single


gamma, cross correlation and venturi based measurement principles. The new
Roxar Zector technology operates seamlessly in both oil- and watercontinuous flow which results in rapid detection of regime changes, and
provides multiple flow velocities and near wall measurements.

Quality of Material
Body and flange material
Meter Connection
Interface Flanges
Electrical Certification
Ex i-a
MMI
Flow Computer
I/O
Software
Utility Consumption
Power Supply
Power Consumption

Specifications
Super Duplex UNS S32760/A479 ------ To be advised
Specifications
Grayloc hub with welded neck
Type of approval.
CENELEC / ATEX
Details
SS316 enclosure including display
RS-232 and RS 485
Roxar Service Console SW
Details
10-36 VDC
20 W

21 | P a g e

2.4 RTU SCADA UNIT TECHNICAL DETAILS


1.0

Introduction
The core components of the proposed solutions shall be:

One Control Wave Micro based Remote terminal unit with required no. of I/O interface.

The Primary function of ControlWave Micro RTU will be,

Scheduled and Controllable Moving from one port to the other (Scheduled testing +
Manual Testing)

Continuous logging of the data from Multiphase Meter.

Collect conventional Analog input signals from two pressure transmitters and one
temperature transmitter.

And transfer these datas to main control room.

Communication interface between the field and control room is taken care by third party. The
ControlWave RTU with serial and Ethernet port are proposed and hence the same can be
interfaced to the Modem provided by the third party.

1.1

ControlWave Micro:
This RTU equipment is ideally suited to wide area telemetry applications and we have a wealth of
experience with this product for the Oil and Gas, and water distribution and transmission markets.
The unit provides an RTU capability in terms of communications capability together with the
flexibility of a fully featured PLC platform with a full implementation of the IEC 61-1131
programming language. The wide area telemetry market has dictated the evolution of our
products and we recognise and emphasise the RTU capabilities such as large local storage
capacity, time synchronisation, and serial interface to field equipment, communication media and
protocol support, and low power consumption as the key features for this application.

The ControlWave Micro is a highly programmable controller that combines the unique capabilities
of a programmable logic controller (PLC) and a remote terminal unit (RTU) into a single hybrid
controller.

1.2

Hardware Features

ARM processor provides exceptional performance and low power consumption


Up to two 10/100 Mbps Ethernet ports
Up to 11 serial communication ports with built-in modem option
Three, four, and eight slot base unit with two, four, and eight slot I/O expansion base
Mixed I/O cards for cost effective small RTU applications
Optional isolated I/O modules

22 | P a g e

IEC 61131-3 programming with ACCOL III process control function block library
Open standards for programming, network configuration, and communication
Security key-lock to prevent unauthorized access
Wide temperature range (40 to 70C)
Class I, Div. 2 hazardous location approval

2.5 ISOLATION VALVES BALL TYPE TECHNICAL DETAILS.

Isolation valves will be used for isolation of flow line during maintenance of Multiport Flow
Selector, & Multiphase flow meter.

Isolation valves will also be used in the drain lines. Drain lines will be tapped form test header &
production header in the skid limit.

Isolation valves location details and quantity of isolation valves is indicated in the attached P&I
Diagrams.

1
2
3

Description
Type of Valve
Operator
Size

4
5
6
7

Pressure rating
Service
Design Temp
Construction

8
9

End Connection
Body Material

10

Trim

11
12
13
14
15
16

Stem
Seat
Seals
Bolting
Leakage class
Operation

17

Material Certificates

Technical Details
Ball Valve (Two Piece or Three Piece design)
Manual / Gear Operated.
Based on the location of valve in the skid limit.
Please refer P&I Diagram for more details
To Be Decided
Crude Oil, Water & Gas
To Be Decided
As per API 6D.
Trunnion Mounted / Floating for 4 size & below
Flanged RF
Carbon Steel / ASTM A 105 / ASTM A 216 Gr WCB
+ NACE compliant --- To Be Decided
SS 316 / ASTM A 351 Gr. CF8M / NACE compliant
To Be Decided
SS / ASTM A 479 Gr 316 NACE compliant
Devlon / RPTFE
Viton , PTFE, Graphite
ASTM A 193Gr B7M / A 194 Gr. 2HM
FCI 70-2 Class VI
Manual ( Through gear operation or manual wrench)
as per the torque requirement.
For Major raw material as per EN 10204. 3.1

23 | P a g e

2.6 CHECK VALVES TECHNICAL DETAILS.

Check valves are proposed upstream of MPFS. This is ensure no back flow through the flow lines
during normal operation of well test manifold.

Check valves are also used downstream of Multiphase flow meter. This is to ensure no back flow
form production header test line.

Check valves are also used downstream of Multiport Flow selector. This is to ensure no back flow
from production header to MPFS and through bypass lines.

Description
Type of Valve

2
3

Operator
Size

4
5
6
7
8
9

Pressure rating
Service
Design Temp
Construction code
End Connection
Body Material

10

Trim

11
12
13
14

Seat
Spring
Hing Stop Pin & Other
Material Certificates

Technical Details
Swing TYPE Check Valve (Lug Type or Two Piece
or Three Piece design)
Not Applicable
Based on the location of valve in the skid limit.
Please refer P&I Diagram for more details
ANSI 600#
Crude Oil, Water & Gas
To Be Decided
As per API 594
Flanged or lug type based on the size of the valve.
Carbon Steel / ASTM A 105 / ASTM A 216 Gr WCB
+ NACE compliant - To Be Decided
SS 316 / ASTM A 351 Gr. CF8M / NACE compliant
- To Be Decided
EPDM
Inconel X 750
SS 316
For Major raw material as per EN 10204. 3.1

2.7 SKID TECHNICAL DETAILS.


Scope of work
The vendor shall design and construct a structural steel frame to accommodate the entire unit and it shall
have following features as minimum :
General

All components shall be properly supported on the skid considering piping loads due to
thermal expansion .

Anchoring of piping and other equipments on the skid shall be done to avoid vibrations
due to possible hammering effect of flow lines

Lifting eyes to permit the entire package to be lifted by a crane for transportation and
installation. All lifting eye welds shall be full penetration welds and shall be ultrasonically tested.

Fabrication & Assembly

All welding assembly testing and erection within the skid shall comply with the
requirements of ASME B 31.3

24 | P a g e

Welding shall be carried out only by qualified welders.


Structural welding shall be in accordance with BS 5135 or AWS D1.1. All welding shall
be performed according to shop drawings produced by the vendor.

Skid Arrangement

All components shall be mounted on skid ready for use.


The steel frame of sledge-type runner shall be of welded design. It shall be capable of
withstanding the total weight of all units and its accessories for lifting.

The skid shall be sufficiently rigid such that it does not deflect during lifting. Lifting lugs
shall be attached to the skid frame by certified full penetration welds and painted as per painting
specification. The lifting lugs shall be designed to lift the total weight of the skid. Lifting calculation to be
furnished.

Two earthing bosses shall be welded on opposite side of the skid. The metal work of the
structure shall be bonded to the skid and all the equipment shall be bonded to the skid to ensure that a
conducting path to the main earthing grid is established.

The equipment shall be cleaned of all debris and all flanged openings covered with
wooden discs.

Any special lifting accessory such as spreader beams shall be supplied as part of the
order along with calculations.

The skid layout shall allow for removal of the Multiport flow selector & Multiphase Flow
meter without having to drain the connected flow lines i.e. the downstream side of the flow lines from the
block valves shall drain towards the Multiport Flow Selector.

The vendor shall attach a stainless steel nameplate.

Material of construction will be as below;


o
o
o
o
o
o

Skid Design
Pipes
Flanges
Fittings
Structural steel Pipe Support frame -

API RP 2A/ En 12079


A 106 Gr. B + NACE MR 0175
A 105 + NACE MR -0175
A 234 WPB + NACE MR 0175
A36/ S 275 / S 355 / Equivalent
As per the design requirement

Inspection & Testing


NDT :
All Butt Welds
Pad eye Attachment weld
RT

: 100% visual
: 100% MPI
: 100% as per B 31.3

Codes & Standards

Piping shall be in accordance with ASME / ANSI B 31.3


Welding to be in accordance with the requirement of ASME VIII, ASME/ANSI B 31.3 & AWSD 1.1
Welding procedure/performance qualification shall be in accordance with ASME IX & AWS D 1.1

25 | P a g e

2.8 MAJOR SUB VENDOR LIST


Sr. No.

Description

Location

A.
B.
C.
D.
E.
F.
G.
H.

Multiport Flow Selector


Electrical Actuator
Multi Phase Flow Meter
RTU
Ball Valve (Isolation Valves)
Check Valve
SKID
Other
Any other items required to
complete the skid scope like Nuts,
bolts, flanges, gaskets, pipes,
fittings, structural steel,
cable
supports/trays, junction box /etc.

Emerson FZE. UAE


EIM Controls USA.
Roxar Make / Norway
Emerson Global (UAE, Asian countries)
To Be Decided
To Be Decided
To Be Decided

From reputed Stockist.

26 | P a g e