By-24 DMR 2013-05-18 G2
By-24 DMR 2013-05-18 G2
By-24 DMR 2013-05-18 G2
Well Name: BY # 24
Field / Area: Bibyana
Location: BY NP/SP
Operator: Chevron Bangladesh
Report For: Shane / Ray
Bit Data
Nozzles/T.F.A
DRILLING ASSEMBLY
8.5-in PDC
15x5 1/32"
OD (in)
ID (in)
Drill Pipe
HW Drill Pipe
Jars
SDF Properties
Sample From
Pit/Flow.
Time Sample Taken
Hour
Flowline Temp
F
Depth
m
True Vertical Depth
m
SDF Weight
lb/gal
Funnel Viscosity
s/qt
Plastic Viscosity
cP
Yield Point
lb/100ft
Gel Strength
lb/100ft
HTHP Filtrate
cc/30min
Cake HTHP
1/32"
Retort Solids
%Vol
Corrected Solids
%Vol
Saraline content
%Vol
Water Content
%Vol
Saraline/Water Ratio
Chlorides Whole SDF
mg/L
Salt-Calcium Chloride
%Wt
Water Phase CaCl2
ppm
Salt-Calcium Chloride
lbs/bbl
Electrical Stability
V @150 F
600/300
rpm
200/100
rpm
6/3
rpm
LSYP
lb/100ft
n
K
Pom
ml
Lime
lb/bbl
%
lb/bbl
%
lb/bbl
sp.gr.
%Vol
CHEMICALS MIXED
LIME
Barite (Chevron)
CALCIUM CARBONATE (
NOVATEC P
ENGINEERING SERVICE
ENGINEERING SERVICE
SARALINE 185V
Recovered Base Oil
CALCIUM CARBONATE (C
MIX II Fine (Chevron)
0
0
MI ENGINEER:
INITIAL
36
57
476
11
0
0
15
25
500
552
0.863
Length (m)
CASING/TUBING/LINER INFORMATION
20.-in @322 m (322 TVD)
13.375-in @2594 m (1741 TVD)
9.625-in @4492 m (2832 TVD)
Date:
Report No.:
Activity:
Depth MD (m):
TVD (m):
FIT / EMW
HOLE VOLUMES
Drill String Volume
Annular Volume
Total Hole Volume
Active Pit Volume
Total Circ. Volume
Check #1
Active
22:00
NA
4,663
2,925
13.5
73
40
17
16/30/34
1.8
1
26.5
24.17
55.0
18.5
75/25
55,500
31.95
319,500
30.41
760
97/57
46/33
10/9
8
0.37
4.91
2.50
3.25
Check #2
Active
05:00
145
4,661
2,924
13.5
69
40
18
17/31/35
1.8
1
26.5
24.20
54.5
19.0
74/26
55,000
31.18
311,800
30.14
740
98/58
47/34
11/9
7
0.38
4.85
2.50
3.25
4.3
39.0
19.9
292.1
3.9
4.4
40.1
19.8
290.8
3.9
RECEIVED
0
0
0
0
0
0
0
0
0
0
USED
12
4
2
1
1
1
15
5
6
8
RETURN
0
0
0
0
0
0
0
0
0
0
VOLUME (bbl)
408
100
0
212
10
49
0
305
80
MW (lb/gal)
13.5
13.5
FLUID TYPE
SBM/VERSACLEAN
SBM/VERSACLEAN
13.5
15.5
13.5
SBM/VERSACLEAN
SLUG
SBM/VERSACLEAN
18-May-13
61
POOH
4,663
2,925
bbl
9
1,056
1,065
457
1,522
13.5
Recovered Base Oil
13.5
SBM/VERSACLEAN
CIRCULATION & HYDRAULICS DATA
Pump Make
EMSCO FB-1600 EMSCO FB-1600 Annular Velocity DP (ft/min)
Liner Size
5.5x12 in
5.5x12 in
Annular Velocity DC (ft/min)
Eff.(%)
97
97
Critical Velocity DP (ft/min)
bbls/stk
0.0855
Critical Velocity DC (ft/min)
Strokes/min
Jet Velocity (ft/s)
bbls/min
E.C.D.at TD
gal/min
Circ. Pressure (psi)
Bottoms Up (min/stroke)
Total Cir. (min/stroke)
SOLIDS CONTROL EQUIPMENT
SDF VOLUME ACCOUNTING (bbl)
Size / Spec.
Hrs Run
Start Volume
2,602
Centrifuge 1
14
SDF Received +
Centrifuge 2
14
Saraline Added +
15
Derrick Shaker 1
270/270/270/270
8
Water Added +
Derrick Shaker 2
230/230/230/230
8
Chemical Added +
16
Derrick Shaker 3
230/230/230/230
8
Other0
Derrick Shaker 4
230/230/230/230
8
Shaker Losses 10
Desander
4
Centrifuge Losses 18
Desilter
8
Cut Back Losses 0
Hole Losses 0
0
Left in Hole/Behind Casing 0
TIME DISTRIBUTION (hrs.)
Trips
34
Rig Up/Service
Evaporation
8
Drilling
8.0
Pit Cleaning 0
Tripping
16.0
SDF Transferred Non-Productive Time
Final Volume
2,563
CLOSING
24
53
474
10
0
0
0
20
494
544
COST (USD)
$111.84
$1,018.44
$32.00
$935.00
$975.00
$750.00
$2,445.00
$815.00
$108.00
$208.00
7.8
Continue drilling fro 4648m to 4663m with sliding and rotating. Stop drilling
@ 4663m due to change MWD tools. Back ream out of hole from 4663m to
4468m. Pump hi-vis @4468m. Start POOH from 4468m to 1773m. Rig
service @ 1773m. Resume POOH from 1773m to 39m.Unload MWD
radioactive source. Continue POOH to 25m.
Used chemicals to maintain the properties of the active system. Used barite
to mix slug. Bleed 20 bbl Base Oil in the active system to maintain the
rheology and to adjust Oil Water Ratio. Adding bridging agents to the active
system to minimize the formation loss tendencies while drilling sand.
Running centrifuges on barite recovery mode, running desilters and de
sanders to discard LGS from the active system during drilling and circulation.
Changed damaged shaker screens.
SDF CHEMICAL COSTS (USD)
SDF TYPE
SBM/Versaclean
DAILY COST
CUMULATIVE COST
5,673.28
981,364.84