Course Outline
Architect
BS Architecture (5 years)
Recognize Reputable School
Diversified Training Experience (2 Years)
PRC Board Passer
B. Professionally (Legality)
e. Inter-Professional Relationship
CODE OF ETHICS
d. Construction Services
e. Post Construction Services
f.
1. General Objectives
2. Ideals
3. Success
4. Remuneration
5. Interest of the Client
6. Professional Prerogative
7. Business Venture
8. Behavior
9. Criticism
10. Creative Endeavour
BONDS
Performance Bond
ARCHITECT DEFINED
15 % of contract amount
Payment Bond
Guarantee Bond
Excavation
Rebar
Concreting
Finishing
ARCHITECTS FEE
Group 1
SIMPLE .. 6%
Group 2
MODERATE .. 7%
Group 3
EXEPTIONAL 8%
Group 4
RESIDENTIAL .. 10%
Group 5
MONUMENTAL 12%
Group 6
REPITITIVE 80%
Group 7
Group 8
Group 9
Group 10
60% 40%
PAYMENT SCHEDULE
a. Upon Singing
5%
15%
35%
d. Contract Documents
85%
e. Retention Fee
Architects Liability
Supervision
15%
10%
5%
12% - 20%
5%
with consultant
10% - 15%
5%
3. Landscaping
4. Acoustics, Comm, Elec, Eng
with consultant
5. Comprehensive Planning
Physical
Economic
Socio-Cultural
Transport
Legal & Administrative
10% - 15%
5%
Percentage Method 2 - 5%
COMPENSATION
Percentage Method
Compensation
Combination
Handling projects at the shortest time, at lowest cost with quality and performance
Project constructed under the direct and sole responsibility of the Architect
7% Fee as Compensation separate Architects Fee for regular design services
Client given a guaranteed maximum cost for the construction of the project
10% Fee as Compensation separate Architects Fee for regular design services
COMPARATIVE SELECTION
Clients choose between other architects for the best suited for the project
DESIGN COMPETITION
UAP DOCUMENTS
LAWS
PD 1185
PD 1096
PD 957
PD 23
PD 49
Fire Code
Building Code
Condominium & Subdivision,
Bridges Protective Law
Law that Created the PRC
Intellectual Property Law
RA 545
BP 344
BP 220
5 days
7 days
10 days
- immediately
- from receipt of NOTICE TO PROCEED
-notice to stop, resume before beginning or suspending,
resuming
- request on drwn & matrls from date needed
15 days
201
202
203
204
205
206
207
208
30 days
- arbitration
- certificate of occupancy
60 days
90 days
120 days
365 days