sor no
item description
Granular Sub-base with Close Graded Material (Table:- 400-1)
Plant Mix Method (Construction of granular sub-base by providing
close graded Material, mixing in a mechanical mix plant at OMC,
carriage of mixed Material to work site, spreading in uniform
layers with motor grader on prepared surface and compacting
with vibratory power roller to achieve the desired density,
complete as per clause 401)
(i) for grading- I Material
1
Dry Lean Cement Concrete Sub- base (Construction of dry lean
cement concrete Sub base over a prepared sub-grade with
coarse and fine aggregate conforming to IS: 383, the size of
coarse aggregate not exceeding 25 mm, aggregate cement ratio
not to exceed 15:1, aggregate gradation after blending to be as
per table 600-1, cement content not to be less than 150 kg/ cum,
optimum moisture content to be determined during trial length
construction,
concrete strength not to be less than 10 Mpa at 7 days, mixed in
a batching plant, transported to site, laid with a paver with
electronic sensor, compacting with 8-10 tonnes vibratory roller,
finishing and curing.)
2
Cement Concrete Pavement (Construction of un-reinforced,
dowel jointed, plain cement concrete pavement M-40 grade
concrete over a prepared sub base with cement , coarse and fine
aggregate conforming to IS 383, maximum size of coarse
aggregate not exceeding 25 mm, mixed in a batching and mixing
plant as per approved mix design, transported to site,
laid with a fixed form or slip form paver, spread, compacted and
finished in a continuous operation including provision of
contraction, expansion, construction and longitudinal joints, joint
filler, separation membrane, sealant primer, joint sealant,
debonding strip, admixtures as approved, curing compound,
finishing to lines and grades as per drawing as per IRC 15 2011
and as per relevant clauses of section 602 of specifications
complete but excluding cost of steel in dowel bar and tie rods
etc.)
3
Add extra in item no.3 for the cost of steel in dowel bar including
cradle, laps etc, complete required as per design for Mild Steel
Add extra in item no.3 for the cost of steel in tie rod including
cradle, laps etc, complete required as per design for TOR Steel
unit
qty
rate