MM Project Report
MM Project Report
MM Project Report
Submitted by:
G Shathish
Student SAP MM
EXECUTIVE SUMMARY
This project report deals with the use of SAP MM module for the
management of material in any organization. It contains the enterprise
structure, Purchasing, Inventory Management, Stock Transfer, Transfer
Posting, Master Data Management and External Service Management. In
enterprise structure, we define the company, company code, Plants,
Storage Location and Purchase Organization and the assignment of these
areas with the company code. In Purchasing, we will provide Purchase
Requisitions, Purchase Orders, and Request for Quotations. In Stock
Transfer, Transfer Posting, we will transfer the material from one storage
location to another and from one storage location to another plant. In
Inventory Management, we will provide Goods Receipt, Goods Issue and
Return Delivery. In Master Data Management, we will create new
materials and new vendors. In External Service Management, we will
provide new service organization.
In this report we also show all related transaction codes and path in the
Enterprise structure, Purchasing, Inventory Management, Master Data
Management, Stock Transfer, Transfer Posting and External Service
Management. We have also given the different screen shots of different
paths and features.
Content
Serial no.
Topics
Introduction
Advantage
Disadvantage
Why SAP
ASAP methodology
13
16
17
19
10
ENTERPRISE STRUCTURE
11
Page no.
Company
20
Company code
21
Plant
23
Storage Location
26
Purchase Organization
28
Assignment
30
12
43
48
Info Record
13
14
15
51
PURCHASING
Request for Quotation
56
PurchaseRequestion
67
Purchase Order
71
INVENTORY MANAGEMENT
Goods Receipt
79
Goods Issue
79
Return Delivery
82
Transfer Posting
85
Stock Transfer
87
16
PHYSICAL INVENTORY
92
17
102
Service Category
109
Service Master
113
Service Acceptance
118
INTRODUCTION
SAP, started in 1972 by five former IBM employees in Mannheim, Germany, states that it is
the world's third-largest independent software vendor. The original name for SAP was
German: Systeme, Anwendungen, Produkte. It means "Systems Applications and Products."
The goal of the company was to provide large enterprise customers with the ability to interact
with a corporate database in real-time. Today, the company states that its goal is "to offer the
industry's most comprehensive portfolio of business performance and optimization solutions
for companies of all sizes."
SAP's first software application was a financial accounting software suite that ran on
a mainframe and was known for its stability. It eventually became known as the R/1 system.
The "R" stands for real-time. During the 1980s, the company went international, and the
second iteration of the R system (R/2) accommodated different languages and currencies. In
the 1990s, the third iteration (R/3) moved from the mainframe to a client/server three-tier
architecture composed of a database, software applications and a common graphical user
interface (GUI). SAP used the name R/3 until the 5.0 release. At that time the name was
changed from R/version to ERP Central Component (ECC). The most current version as of
November 2009 is ECC 6.0.
When the Internet became pervasive, SAP responded by providing companies with the
software they needed to sell goods and services online. Their product portfolio got a Web
interface and was rebranded MySAP.com. My SAP was designed to be a corporate
Web portal with role-based permissions for employees . The company promoted how SAP
"solutions" could link commerce conducted over the Internet (e-commerce) with traditional
bricks and mortar commerce to provide one seamless view of the business. Next came SAP
NetWeaver, the companys development and integration platform and middleware
component, and Business Suite, a bundling of SAPs enterprise resource planning (ERP),
customer relationship management (CRM), supply chain management (SCM), product
lifecycle management (PLM) and supplier relationship management (SRM) applications. In
2008, SAP purchased Business Objects, a French enterprise software company that
specializes in business intelligence (BI), which marked a major change in the companys BI
strategy, which was previously focused around SAP's Business Explorer tools.
Page 1
business
processes
across
diverse
technologies
and
organizational
structures. NetWeaver provides the foundation for other SAP software bundles.
SAP Business Suite - software applications for large organizations and international
corporations. The applications support core business operations such as supply chain
managment, warehouse management, sales, customer relationship management and
administrative functions. SAP offers software for 25 vertical industries, including banking,
insurance, chemicals, healthcare, retail and consumer products.
SAP Business All-in-One solutions, SAP Business ByDesign and SAP Business One software products that address the needs of small and mid-market companies.
Page 2
Page 3
WHY SAP?
SAP ERP:
BUSINESS BENEFITS
SAP ERP delivers a comprehensive set of integrated, cross-functional business processes.
With SAP ERP, you can gain the following benefits:
Improve alignment of strategies and operations
Run your enterprise in accordance with strategy and plans, accessing the right information in
real time to identify concerns early.
Pursue opportunities proactively.
Achieve corporate objectives by aligning workforce and organizational objectives.
Find the best people and leverage their talent in the right job at the right time.
Improve productivity and insight
Leverage self-services and analytics across your organization.
Improve operational efficiency and productivity within and beyond your enterprise.
Reduce costs through increased flexibility
Use enterprise services architecture to improve process standardization, efficiency, and
adaptability.
Extend transactions, information, and collaboration functions to a broad business community.
Page 4
Page 5
The SAP architecture is typically the technology framework of the SAP system. SAP's
architecture unlike the system landscape has changed over time (and more recently) with the
advent of SAP ECC.
In a prior posting, I "x-rayed" they system architecture of SAP R/3.
They system landscape basically is the set-up or arrangement of your SAP servers. Ideally, in
an SAP environment, a three-system landscape exists. A three-system landscape consists of
the Development Server-DEV, Quality Assurance Server-QAS and the Production ServerPROD. This kind of set-up is not primarily designed to serve as server clusters in case of
system failure, the objective to enhance "configuration pipeline management".
Page 6
At this juncture, it is important to state that a test system - Sandbox can also exit separately.
The essence of the sandbox is to test the configuration of the business processes of a
company, especially at the inception of the project (before the Business Blue Print is signed).
It can also serve as a practice environment, even after go-live.
Pipeline is the environment where the configuration in the development system is moved to
the quality assurance system and finally to the production system. The whole idea is to ensure
that the configuration of these systems is in sync at any point in time. Suffice to say that,
configuration/changes are first made in the Development system, thoroughly tested in the
Quality Assurance system before been loaded into the production (Live) system.
This approach throws up the transport management system concept. Transport management
system is the coordination of the movement of objects and configuration changes from the
development system to the Quality Assurance system and then to the Production system. At
times, this sequence of movement is not possible, especially in cases where an SAP note
mandates that changes be made directly on the production system.
In such rare cases, objectively confirm that the change transport cannot be performed. Very
likely, your system must have been configured to "not modifiable" (a system locking strategy
that enforces the three-system landscape change transport rule); unlock the system by
changing the global setting option to "modifiable" using transaction SE03. After you have
done that, effect the change(s) on the system. Immediately lock the system back by changing
the global setting option to "not modifiable" using transaction SE03. Replicate the changes on
the other system. Note that transaction SCC4 can also be used to lock the system so that
Page 7
client dependent and independent configuration changes are not carried out directly on the
production system.
By and large, the SAP system landscape ensures that the integrity of data is enhanced via
enforcing a controlled configuration changes effect on the target system - production.
ASAP Methodology
Features
The implementation of your SAP System covers the following phases:
Project Preparation
In this phase you plan your project and lay the foundations for successful implementation. It
is at this stage that you make the strategic decisions crucial to your project:
Define your project goals and objectives
Clarify the scope of your implementation
Define your project schedule, budget plan, and implementation sequence
Establish the project organization and relevant committees and assign resources
Business Blueprint
In this phase you create a blueprint using the Question & Answer database (Q&Adb), which
documents your enterprises requirements and establishes how your business processes and
organizational structure are to be represented in the SAP System. You also refine the original
project goals and objectives and revise the overall project schedule in this phase.
Realization
In this phase, you configure the requirements contained in the Business Blueprint. Baseline
configuration (major scope) is followed by final configuration (remaining scope), which can
Page 8
consist of up to four cycles. Other key focal areas of this phase are conducting integration
tests and drawing up end user documentation.
FinalPreparation
In this phase you complete your preparations, including testing, end user training, system
management, and cutover activities. You also need to resolve all open issues in this phase. At
this stage you need to ensure that all the prerequisites for your system to go live have been
fulfilled.
Go Live & Support
In this phase you move from a pre-production environment to the live system. The most
important elements include setting up production support, monitoring system transactions,
and optimizing overall system performance.
Elements of the Enterprise Structure
The enterprise structure consists of the following elements:
Client
R/3 System clients have an independent status both in legal and organizational terms. The
clients within the system can be distinguished by a three-character, alpha-numeric code and
are defined in Customizing.
When your R/3 System is installed, it is set up with two clients:
Client 000
Client 000 is the SAP standard client. The SAP original system is held in this client. Client
000 contains default values for all tables. SAP updates the default values with every system
upgrade and release upgrade.
Page 9
The content of this client is the same as the 000 client. You can do your customizing in this
client in order to adjust the standard system to your requirements.
Clients are a technical structural feature of an R/3 system. The system makes a distinction
between client-independent and client-dependent elements. Client-independent elements are
objects that are used in all clients. Client-specific elements are objects that are only used in a
specific client.
The following objects are defined as client-independent:
data structures, such as field definitions, table structures, and file set-ups
client-independent tables
transactions
programs
Standard reporting
Authorization objects
R/3 library
client-specific tables that must be copied from the original client, that is, client 000
HR master records
Authorization profiles
customer-specific programs
The following factors must be taken into consideration when you decide whether or not to
create a client:
You cannot access personnel data in other clients. Each clients personnel data is
protected from unauthorized access.
You cannot perform reporting across all clients, and you cannot receive or assign
client-independent access authorizations.
Page 10
If an employee moves between two clients, you must assign him or her a new
personnel number.
Company code
Within a client the company code represents the highest level of the enterprise structure. In
Customizing, the company code is defined by a four-character, alpha-numeric code.
If the Controlling, Financial Accounting, Materials Management or Sales and
Distribution application components are set up in addition to the Personnel
Administration component, you must set up the company code so that it also meets their
requirements. This is not tantamount to a restriction: You define all of the HR Systems most
important control data at the level of the personnel subareas, and these levels belong to
Personnel Administration.
In Personnel Administration, the company code has the following control functions:
The company code is used to generate default values for data entry, for example, an
employees payroll accounting area.
At the company code level, the following control features are assigned which are relevant
for Personnel Administration:
the default country key for the employees personal data, address data, and bank data.
a default value for the currency key for employees basic pay.
a language code for text output, for example, employee remuneration information.
This language code is not the same as the logon language, which determines the language
used in the on-line system.
Page 11
Personnel area
Personnel areas divide a company code into sub-units. The individual personnel areas in a
company code are defined in Customizing and have a four-digit alpha-numeric identifier.
The personnel area has the following functions:
The personnel area is used to generate default values for data entry, for example, an
employees payroll accounting area.
Personnel subarea
Personnel subareas are a subdivision of the personnel area. Organizational control of the main
HR subareas, namely the pay scale and wage type structures and work schedule planning,
takes place at the personnel subarea level. In Customizing, the personnel subarea is defined
by a four-character, alpha-numeric code. The respective country-specific control features are
stored here.
The personnel subarea has the following organizational functions:
Specifying the country grouping; this controls the dialog for entering country-specific
personnel data and the setting up and processing of wage types and pay scale groups
in payroll accounting; within a company code, the country grouping must be
unambiguous
Assigning a legal entity to differentiate between the individual companies from a legal
point of view
It specifies groupings for Time Management. This enables you, for example, to set up
work schedules, substitution types, absence types, and leave types on the basis of a
specific personnel subarea.
The personnel subarea is used to generate default values for pay scale area and pay
scale type for an employees basic pay.
Page 12
SAP
ORACLE
Headquarter
Germany
USA
Position in
Market
Item
Company
Information
Product Line
Experience
in
Insurance
Domain
Product Line
Page 13
Oracle
Oracle Business
Intelligence
(Financial)
PeopleSoft
Data Base Software
Siebel Client
Management Software
Hyperion Enterprise
Performance
Management Software
BEA middleware
products
Oracle business
Partner
Software
Package&
Technical
Support
Modules of
Finance Sub
System
Other
Function
Purchase
Method
Administration
System
Commission
Administration
System
Billing& Payment
Administration
System
Insurance Industry
Client Relationship
Administration
System
Financial Assets
Administration
System
ERP
IBM
Accenture
PWC
Financial
Accounting
Management
Accounting
Capital Management
Asset Management
Financial Reporting
Platform
Budget Management
Expense
Management
Financial
Performance
Management
Audit Information
System
GRC
New-Version
Budget
planning
Software package
includes system
performance monitor,
Backup& Restore,
System function, etc
Not based on
module
Base on module
User accounts&
licenses
Page 14
Oralce Financial
OFSA
I-Expense
Treasury
Hyeperion
There is no System
function in the
software
package
Expense
Allocation
Interface
between
Bank and
Insurance
Focus on
Satisfy CIRC
regulation
Enhancement
Platform
Maintenance
Issue
Technical
support
Develop
Language
Data Base
Open Source
Financial accounting
and
management
accounting
are independent, to
support cost
management and
analysis in more
efficient way
Management
accounting
is flexible
Experienced in
interface
between bank and
insurance
Business user
capability
Easy
There is no expense
allocation function
No such experience
IT capability
Not very easy
Configuration can
satisfy
many enhancement
requirement
User orientation
Many enhancement
Need
to be developed
SAP worldwide
technical support
Java
Open-SQL
IBM DB2
Oracle
MS SQL
Yes
Oracle worldwide
technical support
Java
Page 15
IT orientation
Oracle
No
1. SAP Labs is the research and development organization of the parent company. SAP
has its development organization spread across the globe. Many, but not all, labs
locations are hosting SAP Research groups.
2. SAP customer support, also called Active Global Support (AGS) is a global
organization to provide support to SAP customers worldwide.
3. User Groups are independent, not-for-profit organizations of SAP customer
companies and partners within the SAP Ecosystem that provide education to their
members, influence SAP product releases and direction, exchange best practices, and
provide insight into the market needs
4. In 2007, the SAP User Group Executive Network (SUGEN) has been established to
foster the information exchange and best practice sharing among SAP User Groups
and to coordinate the collaboration with SAP for strategic topics.
5. Partnerships are core to SAPs strategy and in its 35 years of history the network of
software solution providers, value-added resellers, distributors, technology and
services partners has developed into a broad ecosystem that is among the industry's
largest.
Page 16
Page 17
Estate supplies
Tata Coffee also deals in plantation requirements such as fertilisers and chemicals, estate
implements, and tyres and tubes through it's Estate Supplies Division
Instant Coffee
Tata Coffee also has the capacity to produce 5000 metric tonnes of Instant Coffee per annum,
for which it has a sizable export market. International Tata Caf, Mysore Gold and Malabar
are the popular Instant Coffee brands which are exported
Timber
Tata Cofee has abundant reserves of timber, which is grown for shade. The company's timber
resources on its estates include Rosewood, Silver Oak, and other softwood trees. As part of
its plans to optimise the utilisation of the company's captive timber resources, the company
has entered into 'Timber Value-Addition' industry by getting its Silver Oak timber converted
into plywood of different types and bearing the brand name 'Conswood'.
Locations
Plantations
The Coorg district of Karnataka, India, is one of the main coffee-growing regions in India
and the main plantation operations of Tata Coffee are in Pollibetta, in the Southern part of
Coorg. The company owns 19 coffee estates and 7 tea estates located in the districts of
Coorg, Hassan and Chickmagalur, including one recently acquired coffee estate and five tea
gardens in the Annamallais region of Tamil Nadu. The coffee grown on these estates are
naturally grown, in a mixed shade of two tiers. The plantation's head office is at Pollibetta,
Coorg, Karnataka.
Instant Coffee
Tata Coffee has two Instant Coffee manufacturing facilities, one at Toopran near Hyderabad
and the other at Theni near Madurai in Tamil Nadu. The combined installed capacity of these
two plants is 6500 metric tonnes.
Corporate office
The company's marketing and corporate functions are based out of it's corporate office
located in Bangalore.
The company's shares are listed in the National Stock Exchange, Mumbai, Bangalore Stock
Exchange Ltd., Madras Stock Exchange and Hyderabad Stock Exchange.
Page 18
ENTERPRISE STRUCTURE
Enterprise structure is the option where new company is created. It consists of
following:
Company
Company Code
Plant
Storage Location
Purchase Organization
The SPRO IMG screen is shown in the figure
IMG SCREEN
Company
Overview screen
Page 19
COMPANY
In order to create a company, click on SPRO IMG Enterprise Structure
Definition Financial Accounting Define Company
Click on New Entries as shown above.
Fill the entries as described below:
Company
TCILTD
Company name
Company 2
CORPORATE OFFICE
Street
PO Box
1234
Postal Code
560020
City
BANGALORE
Country
IN
Language Key
EN
Currency
INR
Page 20
COMPANY CODE
Path: SPRO IMG Enterprise Structure Definition Financial
Accounting Edit, Copy, Delete, Check Company Code Edit Company
Code Data.
The Company Code Overview screen appears.
Click on new entries.
Enter the following details:
Company Code
CORG
Company Name
City
COORG
Country
IN
Currency
INR
Language
EN
Page 21
Page 22
Page 23
TCC1
Name 1
Name 2
Enter the plant details and address of the plant as shown below
Page 24
Similarly other 4 plants for company code CORG in the name of the plant as
TCC2, TCC3, TCC4 and TCC5 are created and the address details are entered.
And also other 5 plants for company code ANAM in the name of the plant as
TCA1, TCA2, TCA3, TCA4 and TCA5 are created and the address details are
entered.
Once plants create, next step is to create Storage locations for both company
codes having 5 plants each. In this preparation our objective is to create 3
storage locations for each and every plant.
Page 25
STORAGE LOCATION
Path: SPRO IMG Enterprise Structure Definition Material
Management Maintain Storage Location.
Enter the plant code and click ok. Then click on new entries and enter the
following details
Plant
TCC1
S Loc
Description :
COORG SLOC 1, 2, 3
Page 26
Similarly 3 different Storage locations for each and every plant is created.
Storage locations are:
TCS4, 5, 6
TCC2
TAS1, 2, 3
TCA1
TCS7, 8, 9
TCC3
TAS4, 5, 6
TCA2
TAS7, 8, 9
TCA3
TA10, 11, 12
TCA4
TA13, 14, 15
TCA5
Page 27
TCPO, TAPO
Description
TATA COFFEE PO
Page 28
CONCLUSION
Thus a company called Tata Coffee India Limited is created under
which two company codes created in the name Coorg coffee estate and
Anamallai tea division.
5 Plants are created for each and every company code in the name of
Coorg coffee plant 1, 2, 3, 4, 5 and Anamallai tea division 1, 2, 3, 4, 5.
3 Storage Locations are created under each and every plant.
1 common purchase organization is created for each company code in the
name of Tata coffee PO.
Page 29
ASSIGNMENT
Generally assignment is an option in which Company code is assigned to
company , plant is assigned to company code, purchase organization is assigned
to company code and purchase organization is assigned to plant.
1. Assigning Company Code to Company
Path: SPRO --> IMG --> Enterprise Structure --> Assignment --> Financial
accounting --> Assign Company Code to Company.
Assign Company code overview dialogue box appears
Once the dialogue box appears click on Position tab as shown above.
Once the position tab is clicked, it will ask for Company code. Enter the
company code as CORG and click ok.
The company code will come into the table and it will ask for the company to
which the company code is to be assigned. Give TCILTD as company and
save.
The assignment of company code to company process is shown below
Page 30
Once the Company code CORG is assigned to company TCILTD click save
then the same process for assigning the company code ANAM to the company
TCILTD is done.
Page 31
PLANT
TCC1
TCC2
CORG
TCC3
TCC4
TCC5
TCA1
TCA2
ANAM
TCA3
TCA4
TCA5
Once the company codes are assigned to the plant click on save.
Page 32
Page 33
Page 34
Once it is assigned click save and the same process for Purchase Organization
TAPO to company code ANAM is repeated and click save.
4. Assigning Purchase Organization to Plant
After assigning purchasing organization to company code, our next objective is
to assign Purchase Organization to Plant.
Path: SPRO --> IMG --> Enterprise Structure --> Assignment --> Material
Management --> Assign Purchase Organization to plant.
Assign Purchase Organization to plant overview screen appears, click on new
entries and assign purchase organization to plants
PURCHASE ORGANIZATION
TCPO
TAPO
PLANT
TCC1
TCC2
TCC3
TCC4
TCC5
TCA1
TCA2
TCA3
TCA4
TCA5
Page 35
Page 36
TCILTD
ANAM
CORG
TCS2
TAS2
TCS3
TCC2
TCC3
TCC4
TCS4
TCS5
TCS6
TCS7
TCS8
TCS9
TC10
TC11
TC12
TCC5
TC13
TAS1
TCC1
TCS1
TAS3
TAS4
TAS5
TCA2
TAS6
TAS7
TAS8
TCA3
TAS9
TA10
TA11
TCA4
TA12
TA13
TC14
TA14
TC15
TA15
Page 37
TCA1
TCA5
Once all assigned, the standard data is copied to plant and company code
respectively.
Path: SPRO --> IMG --> Enterprise Structure --> Definition --> Logistics General --> Define, Copy, Delete, Check Plant --> Copy plant.
Organizational object plant screen opens. It will ask for from plant and to plant.
Enter the details From plant : 2000 To plant : TCC1 and click ok.
Page 38
Thus plant 2000 data is copied to plant TCC1. Click Save and the same
procedure is repeated for all other 9 plants.
Next is to copy the standard data to Company Code CORG and ANAM
Path: SPRO --> IMG --> Enterprise Structure --> Definition --> Financial
Accounting --> Edit, Copy, Delete, Check Company Code --> Copy Company
code.
Organizational object company code screen opens. It will ask for from cc and to
cc. Enter the details From cc : 2000 To cc : CORG and click ok.
Page 39
T Code : EC01
Page 40
Page 41
Once the standard data is copied to Company code CORG, the same procedure
for the company code ANAM is done.
Page 42
EA
Material Group
00104
Gross Weight
50
Net Weight
50
Weight unit
KG
Material
Purchasing Group
001
WHEEL
Price Unit
600
Standard Price
500
Basic Data 1
- Purchasing
Accounting 1
Page 43
T Code : MM01
Page 44
Page 45
Purchasing Screen
Page 46
Page 47
Similarly other 4 materials in the name as 1478, 1480, 1481 and 1482 is created
with various price and weights and click save. Material Group for 1480 , 1481
& 1482 is R1121
VENDOR MASTER
Vendor master is the process in which new vendor is created.
Path: SAP --> Logistics --> Material Management --> Purchasing --> Master
Data --> Vendor --> Central.
Create Vendor Initial Screen appears. Enter the following details.
Vendor
2310
Company Code
CORG
Purchasing Organization :
TCPO
Account Group
0001
Page 48
Similarly other 2 vendors in the name of 2311 & 2312 is created for TCPO and
2 vendors in the name of 2313 & 2314 is created for TAPO and saved.
Page 49
Page 50
Once the vendors created, our next objective is to assign info record for the
materials and vendors which were created.
To do info record Enter T Code as ME11. Create Info Record Initial Screen
appears. Enter the following details
Vendor
2310
Material
1480
Purchasing Organization :
TCPO
Plant
TCC3
Page 51
T Code : ME11
Page 52
Similarly the Info Records are created for other 4 materials by providing their
respective Vendors , Purchasing Organization and Plant.
Once Info records has been created, Every materials should be copied to each
and every plants and every vendors. To assign the materials to different plants,
Enter the T Code as MM01 and enter the material number 1477 and click Enter.
The Organization level dialog box appears. Enter Plant as TCC1 and enter
storage location as TCS2 and click enter for 3 to 4 times. the material 1477 will
be assigned to storage location TCS2 .
Page 53
Similarly assign all the materials to all the plants and storage location and click
save.
TCS1 S2 S3 - TCC1
TCS4 S5 S6 - TCC2
1477,1478, 1480, 1481, 1482
TCS7 S8 S9 - TCC3
TC10 C11 C12 - TCC4
TC13 C14 C15 - TCC5
TAS1 S2 S3 - TCA1
TAS4 S5 S6 - TCA2
TAS7 S8 S9 - TCA3
TA10 A11 A12 - TCA4
TA13 A14 A15 - TCA5
Once all the materials are assigned, Info records are created for each and every
assignment which is done above .
Page 54
CONCLUSION
5 different Materials are created in the name 1477, 1478, 1480, 1481 and
1482.
5 different Vendors are created in the name 2310, 2311, 2312, 2313 and
2314.
Each and every material is assigned to each plant and each storage
locations.
Each and every plant and storage material which is assigned with every
material is assigned with every vendors.
Info Records are created for each and every assigned materials and
vendor.
Page 55
PURCHASING
Purchasing is the process menu which contains the following
Request for Quotations
Purchase Requisitions
Purchase Orders
REQUEST FOR QUOTATION
Request for quotation is a process in which Purchase Organization will ask for
quotation for different materials to different vendors.
Path: SPRO IMG Material Management RFQ/Quotation Define
Document type.
Copy the standard RFQ type AN and enter as TATA and enter the description
as RFQ TATA. Click Save.
Next step is click on Define Number Ranges Change Intervals New
Interval. Enter the Number range from 1 to 100 in the name of the interval as 31
and click save.
Once the number ranges are created, go back to document type and enter the
NoRgeInt as 31 and click save.
Now the next step is to create a RFQ. Enter T Code as ME41. Create RFQ
Initial screen appears. Enter the following details.
RFQ Type
TATA
Language Key
EN
RFQ Date
22.07.2013
25.07.2013
Purchase Organization
TCPO
Purchase Group
001
Coll No
123457
Page 56
Enter the material as 1480, 1481 and 1482 and enter the Quantity in the table
provided for it. Then click on vendor address box. Enter the vendor code to
which you are asking for quotation and click save. RFQ number will be created.
The Screen shots are shown below:
Page 57
Page 58
Page 59
Page 60
T Code : ME41
Page 61
Page 62
RFQ Created
Page 63
Once RFQ is created, next step is to maintain RFQ. To do this Enter the T Code
as ME47 and enter RFQ number as 1 (Number which we created) and click
enter. The RFQ details will get displayed. Enter the Net price for each and every
material and click save. Similarly the same process is repeated for RFQ number
2.
Once the net price is given, next step is to do price comparison. Price
Comparison is the process in which Materials Price difference between vendors
can be compared in order to decide which vendor is to be maintained.
In order to do this, enter the T Code as ME49 and click enter. Price Comparison
list dialog box opens. Enter the following details.
Purchasing Organization :
TCPO
Quotation
1 to 2
Vendor
2310 to 2311
Click enter, the price comparison result will be displayed indicating the
percentage of acceptance and ranking of acceptance.
The Screen shots are shown below:
Page 64
T Code : ME47
Page 65
T Code : ME49
Page 66
PURCHASE REQUISITION
Purchase Requisition is a process in which a plant gives request for purchasing
to purchase organization.
Path: SPRO IMG Material Management Purchasing Purchase
Requisition Define Document Type.
Document Types Purchase requisition Change screen occurs.
Choose NB and click Copy As icon and enter the name as TATA and click
save.
Once the document is copied, click on Define Number Ranges. Then Click on
Change Interval in which click new interval, Enter the number range from 1 to
100. Enter the number as 05 and click save.
Once Intervals are assigned, go back to document type and enter the NoRgeInt
as 05 and click save.
Once Document types are assigned, Next step is to create a Purchase
Requisition. In order to do that, go to SAP Menu Material Management
Purchasing Purchasing Requisition Create
Change Purchase Requisition standard to Purchase Requisition TATA and
enter the following details.
MATERIAL
1477
1478
1480
1481
1482
PLANT
TCC1
TCC1
TCC1
TCC1
TCC1
STORAGE LOCATION
TCS1
TCS1
TCS1
TCS1
TCS1
Enter Various Quantities and delivery dates for every material and click save.
Similarly another set of Purchase Requisition is created with same material but
different quantities.
Page 67
Click Copy As
Click this
Page 68
Page 69
T Code : ME51N
Page 70
Page 71
Choose NB and click Copy As icon and enter the name as TATA and click
save.
Once the document is copied, click on Define Number Ranges. Then Click on
Change Interval in which click new interval, Enter the number range from 101
to 200. Enter the number as 32 and click save.
Once Intervals are assigned, go back to document type and enter the NoRgeInt
as 32 and click save.
Once Document types are assigned, Next step is to create a Purchase Order. In
order to do that, go to SAP Menu Material Management Purchasing
Purchasing Order Create
Change standard PO to Standard PO TATA and enter the following details.
Purchase Organization :
TCPO
Purchasing Group
001
Company Code
CORG
Page 72
Page 73
Page 74
Page 75
TCC1
Storage Location :
TCS1
Click Execute.
The Warehouse stock of material is displayed.
Initially there will no stock of materials found before the goods acceptance.
Page 76
T Code : MB52
Display Warehouse Stocks of
Material Screen
Page 77
CONCLUSION
Request for Quotation is created under the RFQ Type TATA and
quotation is asked between two vendors 2310 & 2311.
Price comparison is done between two vendors for the materials 1480,
1481 & 1482.
2 Purchase Requisition created for all the materials with various
quantities under the number 1 & 2.
2 Purchase Orders created for the 2 Purchase Requisition under the
number 101 & 102.
Stock of Materials is displayed.
Page 78
INVENTORY MANAGEMENT
In a business accounting context, the word inventory is commonly used to
describe the goods and materials that a business holds for the ultimate purpose
of resale (or repair). Inventory management is mainly about identifying the
amount and the position of the goods that a firm has in their inventory.
Inventory management is imperative as it helps to defend the intended course of
production against the chance of running out of important materials or goods.
Inventory Management undergoes following process.
Goods Receipt.
Goods Issue.
Return Delivery.
GOODS RECEIPT
Goods Receipt is the good received from the vendor on the basis of
purchase order created.
Before doing goods receipt, stock of materials is viewed.
In Order to do this, enter the T Code as MB52 and enter the following details
Material
100 100
Plant
2000
Storage Location :
0001
T Code : MB52
Amount of Material is
been displayed.
Page 80
T Code : MIGO
Page 81
RETURN DELIVERY
Return delivery is the process of returning the stock to a vendor with a valid
reason for movement like damaged piece etc.
In Order to do this, enter the T Code as MB52 and choose Return Delivery and
Material Document from drop down box. Enter the Material Document in the
space provided. Material Document No: 5000011992.
Click Execute. The Material document displayed. In the Quantity menu, enter
the amount of material should be returned. In the Where menu enter the
reason for movement as 0003 and click Item OK and click save.
Once the goods returned, to verify that go back to MB52 and enter the details as
said above.
Page 82
Page 83
CONCLUSION
Goods Receipt is done from the Purchase order created.
Return Delivery is done.
Page 84
Once Movement type, plant and storage location is created click enter.
Collective Processing screen appears. Enter the material as 100 100 and enter
the quantity as 10. It means the amount of 10 material 100 -100 is been transfer
from unrestricted to blocked path in plant 2000 and storage location 0001.
In order to verify the amount of stocks, enter the T Code as MB52.
Page 85
Document Posted
Page 86
Unrestricted Stock
Blocked Stock
STOCK TRANSFER
Stock transfer is a process of migration of stocks from one storage location to
another. Before doing the stock transfer process, View the stock in both storage
location for which stock transfer is to be done. In order to do this, enter the T
Code as MB52 and enter the material as 1300 260. Use Storage Locations
0001 & 0002 in plant 2000.
Page 87
Storage
Location
Material
Material Amount
T Code : MB52
Storage
Location
Material
Material Amount
Page 88
Once Movement type, plant and storage location is created click enter.
Collective Processing screen appears. Enter the material as 1300 260 and enter
the quantity as 10. Enter the Receiving Storage Location as 0002. It means the
amount of 10 material 1300 -260 is been transfer from unrestricted to
unrestricted path in storage location 0001 to 0002 in plant 2000.
In order to verify the amount of stocks, enter the T Code as MB52.
Page 89
Document Posted
Storage Location
Material
Material Amount
T Code : MB52
Page 90
Storage Location
Material
Material Amount
CONCLUSION
Transfer Posting is done for Material 100 100 under the movement
type 344 in storage location 0001 and plant 2000.
Stock Transfer is done for material 1300 260 under the movement type
311 in plant 2000 between storage location 0001 and 0002.
Stocks of Material is displayed.
Page 91
PHYSICAL INVENTORY
Physical Inventory is a process of counting the actual stocks with notebook
stocks. Notebook stocks are the stocks which are entered in computer.
The procedure is explained below with a sample stocks created.
In order to do a physical inventory, the first step is to create a material. (Refer
Material Master Material Creation Procedure). Here the material is created in
the name of S100 with Industry Sector as Mechanical Engineering and the
Material Type as Raw Material.
Here the material is created for the plant 2000 and storage location 0001.
The Material Creation Screenshots are shown below:
T Code : MMO1
Page 92
Page 93
Page 94
Page 95
Material Created
Page 96
Once material is created, Info record is created for the material. (Refer Info
record procedure in Master Data Management).
T Code : ME11
Enter Reminder
Periods here
Page 97
2000
Storage Location :
0001
Document Date
11.11.2006
Page 98
Posting Date
12.12.2006
click enter.
T Code : MI01
Material
S100
Page 99
Page 100
S100
Plant
2000
Storage Location :
0001
T Code : MB52
Page 101
100001170
Count Date
12.12.2006
Click Enter. Collect processing screen appears displaying the material which we
have entered. Enter the Quantity
Page 102
Page 103
Count Entered
100001170
Posting Date
12.12.2006
Click Enter
Inventory difference is posted.
Click Save. Inventory difference is posted with material document created for
additional material. Material Document number is 4900035501
Once Inventory difference is saved, material document 4900035501 is viewed
by entering the T Code as MB03.
Page 104
Page 105
Page 106
CONCLUSION
Actual Stocks are counted and compared with Notebook stocks.
Material document is created for added amount of stocks which found
when the difference in inventory is posted.
Page 107
Page 108
SERVICE CATEGORY
Path: SPRO IMG Material Management External Service
Management Service Master Define Service Category.
Service Category Overview screen appears. Click on New Entries and enter the
following details.
Service Category
TCL1
Electrical Service
TCL2
Engineering Service
Page 109
Once service category is created click save. Next step is to create number ranges
for service category. In order to do this, enter the following path.
Path: SPRO IMG Material Management External Service Management
Service Master Define Number Ranges. The intervals screen appears.
Click Maintain Groups menu. Maintain Group number ranges screen appears.
Go to groups menu and select insert groups and enter the text and number range
for a group and click save. Once the number range is saved, assign the number
Page 110
range with the service category. Once it is done, next step is to create service
master.
Page 111
Page 112
SERVICE MASTER
Path: SAP Menu Logistics Material Management Service Master
Service Service Master. Display Service screen appears. Click Create new
service master. Enter the following details.
Text
Service Category
ELECTRICAL SERVICE
EA
Similarly 2 other various service is created under the name Monthly Voltage
Inspection and Meter Service. Similarly 3 other various service is created in
the name as Gear Service, Chain Service and Monthly Oil Inspection under
the service category Engineering Service.
Page 113
Display Screen
T Code : AC03
Page 114
Once the service master is created, Next step is to create Service PO (Refer
Purchase Order creation in purchasing).
Page 115
Enter PO description
here
Page 116
In Service PO enter the Item category as D and Account category as K and short
text as Electrical Service. Enter the Service assistance No as 101, 102 and 103
in the table provided. Enter the Cost Center as 2 -1000 and click Save.
Similarly create another PO in the name as Engineering Service and service
assistance no 104, 105 and 106.
Page 117
PO Created
Page 118
Once short text is written, enter the service assistance and adopt full quantity
and click accept. Once the accept flag is selected, click on save. Service entry
sheet will be saved and service will be accepted.
Page 119
CONCLUSION
1 Service Organization is created.
2 Service Category is created for the service organization.
3 Service master is created for each service category.
Domestic Service PO is created.
2 PO is created. Each PO has 3 services.
Service Entry sheet is done and accepted.
Page 120