RCC Estimation
RCC Estimation
RCC Estimation
Item
No.
1
No.
Length Breadth
(m)
(m)
6.3
3.3
Height
or
Quantity
Depth(m)
0.12
2.495
cum
Explanatory notes
27
3.44
Side cover 4 cm
L=3.30-2side covers + 2
hooks = 3.300.08+(18x0.12)=3.44m
26
3.52
Total
184.4
12
6.33
2x3
2x3
6.33
6.33
@ 0.89
= 184.40
kg/M
*0.89=
164.12
kg
1=6.300.08+(18*0.12)=6.33m
Total
151.92 @
33.42 kg
0.22kg/m
151.92 x
0.22 =
33.42 kg
Total =
197.54
kg
1.975
quintal
Length
Total
Description of
Weight
Shape of Bending Dimensions In cm of each No. Length
bars
(kg)
(m)
(m)
Main straight bars
12 mm. DIA
3.44
27
92.88
3.52
26
Total
91.52
184.4
Bottom distribution
buting bars
6 mm dia
6.33
18
113.94
Top distributing
Bars 6mm dia
6.33
37.98
151.92
164.12
33.42
EXAMPLE 2
ESTIMATING OF R.C.C BEAM
Particulars of items
Item No.
& details of works
1
No.
Length Breadth
(m)
(m)
8.6
0.4
8.92
35.68
Height
or
Depth
(m)
Quantity
Explanatory notes
0.75
2.58 cu.m
20 mm dia. bent up
bars @2.47kg/m
9.48
37.92
x 2.47
kg
8.74
17.48
x 0.89
kg
5x2
2.42
Next at 20 cm c/c
4x2
2.42
18 x
2.42
40.32
14
2.42
14 x
2.42 =
33.88 x
0.22 kg
=
7.45 kg
Total
250.01 kg
Total
Stirrups 6mm dia.
@0.22 kg/m At
central remaining
length of 5.20m at 35
cm c. to c.
Total
2.5 quintal
L=(65X2+32X2 cm)+2
hooks+extra 30 cm = 194
cm + (18X10 mm ) + 30
cm = 2.42m
Item No.
Unit
Rate
Rs
per
P
cost
Rs
2.58
cu.m
675
cu.m
1714.5
2.5
quintal
515
quintal
1287.5
Total
3002
2
Steel bars including
(mild steel) in R.C.C
work Main bars
22mm dia. Straight
bars @ 2.98 kg/m.
3152
Descrip
tion of
bars
Total
Weight(
Length
kg)
(m)
Length of
each (m)
No.
Main
straight
bars 22
mm. DIA
8.92
35.68
106.33
Main Bent
up bars
20mm
dia.
9.48
18.96
46.83
Main Bent
up bars
20mm
dia.
9.48
18.96
46.83
Top
straight
Bars 20
mm dia
8.74
17.48
15.56
Stirrups
10 mm
dia
2.24
18
40.32
25
14
31.36
6.9
Stirrups 6
mm dia
Note -- (i) If centering and shuttering is paid separately , the area and xost can be found as follows
Area of centering and shuttering = Bottom and two vertical sides x length + two ends
[(40 cm + 2 x 75 cm ) x 8.60 m] + (2 x 40 cm x 75 cm ) = (1.90 x 8.60 ) + ( 2x 0.40 x 0.75 )
:= 16.34 + 0.60 = 16.94 sq
Cost of centering and shuttering @ Rs 20.00 per sq.m = 16.94 x20.00 = 338.80
(ii) For over lapping at joints 5% of the whole steel may be provided in the estimate .
3.32 cu.m
1.00 cu.m
1.804 cu.m
0.074cu.m
0.233 cu.m
Total
0.307 cu.m
Steel reinforcing bars including bending -(I) 12 mm Dia bars @ 0.89 kg in base footing
No of bars = (200 cm - 8 cm ) /15cm + 1 = 14 nos one way
L = 200 -2 cover +2 hooks = 200 - 2x4 +18x1.2 = 213.6 = 2.14 cm
(ii) 16 mm dia dowel bars @ 1.58 kgs
..
(L= 0.45+0.75-cover + bend = 1.20 - 0.80 + 0.15 = 1.27m
..
No = (3.90/0.15) + 1 = 27 nos
L = (3.14 x 0.22) = 0.70 m
115.96kg
1.16q
ABSTRACT OF COST
Item no
1
2
Rate
(Rs.P)
350 per
3.32 cu.m
cu.m
300per
0.32cu.m
cu.m
Quantity
1.804cu.m
11.62
96
625per
cu.m
1127.5
Amount
(Rs.P)
1.16q
515per
cu.m
Total
181.13
597.4
2013.65
100.68
2114.33
4.531 sq.m
0.630 sq.m
3.109 sq.m
---
Total =
8.27sq.m
Example 4
A detailed estimate of R.C.C.
Staircase
No.
length
m
breadth
m
1
2
2
1.2
3.12
2.7
0.5
1.2
1.35
0.25
0.15
0.15
total
0.15
1.156
1.094
2.4
Explanatory notes
bearing 15cm
cu m
1.2
1/2(.25.25)
0.495
cu m
2
2
1.2
1/2(.25.25)
(.25.25)
Total
10.56
0.41
10.97
sq m
1.2
28.8
2.7
1.2
6.48
sq m
Item No.
6
No.
length
m
11
5.22
L=4.10+0.90+0.18
11
6.25
11
1.8
L=1.3+3.7+1.05+
.18+0.12=6.25m
L=1.08+.61+9.012
1.49
Total
148.950.86
29
1.27
L=1.2-2cover+
2hooks=1.27m
17
2.77
L=2.70-2cover+
2hooks=2.77m
47
breadth
m
L=1.2+.15-2cover+
2hooks=1.49m
132.56kg
83.92
0.39
0.90
2.01
32.73kg
Total
6.82
1
1
1
0.9
Explanatory notes
0.1
0.1
0.1
0.1
Total
85.02kg
250.3kg
2.503q
6.82rm
L=23.21+0.40=6.82
0.01
0.01
0.02
cu m
2 nos
ABSTRACT ESTIMATE
Item No.
Quantity
Unit
Rate
Rs
P
per
cost
Rs
P
2.4
cu m
775
/cu m
1860
0.495
cu m
365
/cu m
180.68
10.97
sq m
9.5
/sq m
104.22
28.8
rm
5.5
/r m
158.4
6.48
sq m
18
/sq m
116.64
2.503
515
/q
1289.05
6.82
rm
24
/r m
163.68
0.02
cu m
675
/cu m
13.5
nos
10
each
Total
20
3905.17
117.18
78.12
4101.47
steel work
including bending in rinforcement and railing