3. Design Criteria
3.1. Kawamura
3.1.1 Flocculation Time
3.1.2 Settling Time
3.1.3 Surface Loading
3.1.4 Weir Loading
3.1.5 Upflow Velocity
3.1.6 Slurry Circulation rate
= approximate =
= 1 - 2 hr
= 2 - 3 m/hr
20
min
3
= 7.3 - 15 m /hr
= < 10 mm/min
= up to 3 - 5 time the raw water inflow rate
-1
3.1.7 G
= 30 - 50 s
3.1.8 MAXIMUM MIXER TIP SPEE 0.9 m/s
(Baffled Channel)
= 0.9 m/s
(Horizontal Shaft with Paddles)
= 1.8 - 2.7 m/s (Vertical Shaft with Paddles)
Equation mixer tip speed = DN
3.2. Q,Sim
3.2.1 Detention Time
3.2.2 Surface Loading
= 2 Hr
= 2 - 4 m/hr
3
= 7.1 m /m.hr
3.3.3
3.3.4
3.3.5
3.3.6
15:27/25/10/2006
3
= 7.1 m /m.hr
=
=
=
=
<
15:27/25/10/2006
3
= 250 - 350 m /m.day
2/2
30 min
5 Flow Rate
6 Volume in Hopper inside
3
=
150 m /hr
=Q xt
=
75
7 Give Detention Time in Hopper outside (Sedimentation Zone =
2
8 Volume in Hopper outside
=Q xt
m3
Hr
300
m3
Surface Area
A1
m2
= 7.06858
=
d
A1 + A2 +
3
A1 x A2
=
75 m
45 = 7.06858 + A2 + 2.658681
A2
0 = -37.9314 + A2 + 2.658681
A2
( A2 ) 2
= 4.97134
A2
= 24.7142
m2
D 2
m2
D 2
D2
D2
Then
D1
D2
Water Depth
15:27/25/10/2006
=
=
31.4671
5.60956
=
=
=
3
6
5
m.
m.
m.
1/2
m.
A2
D 2
D 2
d
A1 + A2 +
3
A1 x A2
7.068583
m2
28.27433
m2
V
Q
d
A1 + A2 +
3
A1 x A2
82.46681
m3
82.46681
150
0.549779 Hr.
32.98672 min.
A2
D 2
4
229.4801
28.27433 + A3 + 5.317362
A3
-201.206 + A3 + 5.317362
A3
11.77303
m2
138.6043
m2
( A3 )
A3
15:28/25/10/2006
m3
m2
28.27433
Calculate A3
300
1/4
d
A2 + A3 + A2 x A3
3
138.6043
m3
D3
13.28177
28.27433
m2
138.5485
m2
D3 2
4
D2 2
A3
D3 2
d
A2 + A3 + A2 x A3
3
382.3529
m3
82.46681
m3
299.8861
m3
Conclusion
15:28/25/10/2006
2/4
V
Q
1.999 Hr.
1.5 m.
16 Calculate Paddle
16.1 At Depth level
Slope
Then
=
3.333333 =
X1
3.333 m.
1.5 X1
0.45 m.
3.9 m.
Diameter Paddle
Sweep Area
D 2
m2
= 11.94591
m2
15:29/25/10/2006
1.5
m.
Diameter of Flocculator =
Radius
= 1.95 m.
Length of each paddle
=
Height of each paddle =
Area
Length x 4
1/3
1.365
=
3.9
m.
0.218789
m.
m.
Slope
Then
=
3.333333 =
X2
3.5 m.
3.333 m.
3.5 X2
1.05 m.
5.1 m.
Diameter Paddle
Sweep Area
D 2
m2
= 20.42821
= 2.043
3.5
m.
Diameter of Flocculator =
Radius
= 2.55 m.
Length of each paddle
=
Area
15:29/25/10/2006
1.785
Slope
Then
=
=
3.333333 =
X3
5.1
m.
0.286109
m.
m.
4.7 m.
3.333 m.
4.7 X3
1.41 m.
2/3
Diameter Paddle
Sweep Area
5.8 m.
D 2
m2
= 26.60332
m2
15:29/25/10/2006
4.7
m.
Diameter of Flocculator =
Radius
= 2.91 m.
Length of each paddle
=
Height of each paddle =
Area
Length x 4
3/3
2.037
=
5.82
m.
m.
0.326501
m.
17 Power Requirement
Give Shaft rotation speed
1.5
m.
V paddl e
3.5
m.
V paddl e
4.7
m.
V paddl e
15:29/25/10/2006
1/1
=
=
0.428827
0.321621
m/s
m/s
=
=
0.560774
0.420581
m/s
m/s
=
=
0.639942
0.479957
m/s
m/s
1
C D A p ( v ) 3
2
Where :
P
CD
=
=
Ap
=
=
3
mass fluid density (kg/m3)
= 1,000 kg/m
Relative velocity of Paddle with respect to water (m/s)
1.8
Then
P
Efficiency Motor at
=
60
437.27
% =
watt
728.78
or N.m/s
watt
or N.m/s
15:30/25/10/2006
0.97730575
HP
1/1
HP
Where :
G
P
G =
1,933 N .m / s
10 N .s / m 2 x82.49 m 3
G =
94.00646 sec
0.001 N.s/m
-1
Weir Loading
From Diameter D3
Theory
Length of weir
Weir Loading
Q (m 3 / hr )
Weir Loading (m 3 / m.hr )
3
= 12.21322198 m /m.hr OK.
2 side =
50
Length of Orifice
=
1.27
1 side =
0.635
Then Free Space of weir
=
0.365
15:30/25/10/2006
0.0254
m.
pores/side
pores
m./ 1 m. weir
m./ 1 m. weir
m./ 1 m. weir
1/2
0.0146 m.
1.46 cm.
2 side =
Then total orifice
=
25
50
614
pores/side
pores
pores
0.31
m2
0.244
m3/hr
D 2
4
2
Each of orifice area = 0.0005067 m
Theory
Q =
Av
15:30/25/10/2006
0.133906
2/2
m/s
23 Inlet Structure
From Static Mixer Design criteria velocity pass through static mixer = 1 - 2 m/s
Select velocity =
1.5 m/s
Theory
Q =
Area
Av
Q
v
m2
2
= 0.027778 m
D 2
4
D2
D
= 0.035368
= 0.188063
= 7.404063
m.
in.
in.
Doutside2
Dinside2
4
Dinside
=
=
13.28177
3
m.
m.
131.4799
m2
Surface Loading
Q
A
Doutside
=
Design Criteria 1.3 - 1.9 m/hr upflow (radial upflow type)
Text Book (Chularrongkron University < 4.2 m/hr.
Water Works Engineering 0.8333 - 1.6666 m/hr
15:30/25/10/2006
1/1
1.140859