Reimbursable Expenses
Conditions: 1. Pertinent to the Project 2.
3. Mutual agreement
Schedule of Payments
CONTRACTOR
1. Downpayment - 20 50% of Project Cost 2. Progressive Billing base on
percentage of completion (not more than 1 month) 3. Final Billing/Payment - 98%
Complete 4. Guarantee Bond enforced for 1 year
ARCHITECT
1. Proposal Fee
5% 2. Schematic Design
15% 4. Contract Docs - 50% 5. Retention
Supervision 5%
SPECIALIZED ALLIED SERVICES SAS
1. Proposal Fee
4. Retention
GASSD
1. G-eneral Conditions Execution, Intent satisfaction to finish the proj.,
Correlation 2. A-greement 3. S-pecifications 4. S-pecial Provisions 5. D-rawings
*Under Construction Phase
5 Ms of Construction
1.
M-achines 2.
M-oney 3.
M-anpower 4.
M-aterial 5.
M-inutes
PROJECT CLASSIFICATION
UAP degree of difficulty/complexity of design FCP risk of occurrence of Fire NCP
use and occupancy ARCHITECTURAL PROJECTS (SCHEDULE OF MINIMUM
BASIC FEE)
SMERM RHEAC
GROUP
S-imple (Hangars)
DEFINITION
Without
MINIMUM BASIC
FEE
P50M & less 6%
partitions
M-oderate (Art
With partitions
E-xceptional
Requires
(Aquariums)
Consultants
R-esidences
Galleries)
or Duplex
M-onumental Buildings Requires
Cost
12% of Proj. Const.
(Expositions,
Concepts
Cost
Construction of
1st Structure
Similar
MBF2nd Structure
Structures
80% of
Mausoleums, Memoria
ls)
R-epetitive Buildings
BF3rd Structure
60% of
BFSucceeding 4
0% of BF
H-ousing Projects
Construction of
several
= A 2 to 10 Units = A
Design of
Structures
Additions
belonging to
MBF + 50% of
MBF
Groups 1 to 5
C-onsultations and
Technical
Arbitration
matters, service
P200, P500
as an expert
witness
UAP Doc 203 Specialized Allied Services SAS
PILAC
SERVICES
PARTICULARS PAYMENTS/SCHEDULE OF
FEES
P-hysical
Must be an
Planning
EnP
L-andscape
Landscape
Design
Architect
A-coustic,
Communicatio
n and
Electronic
Engineering
Services
C-
Must be an
omprehensive EnP
Planning
1.
a.
Same w/ Physical
Planningb.
Physical
MDPE
Component
2.
Economic
Planning
3.
Socio-
Cultural
4.
Transport
5.
Legal &
Administrative
Civil works (preparation of detailed engineering drawings and specifications, roads,
drainage, sewerage, power and communication) 4% cost of the development
FC
1. F-ull Time Supervision Team or Individual, Quality Control, Evaluation, Records
Basic Salary if Architect 1- 1.5% 2. C-onstruction Management CM - Team or
Individual, Time and Cost Control, Coordination and Supervision 1.5 3% of
Construction Cost 3*. P-roject Management PM 2 5% (Refer to UAP Doc 206
Comprehensive Architectural Services)
Before
During
After
Construction
Present
CM
Present
Present
Present
Identifies,
Advertising,
accredits,
Promotional
recommends
Services,
potential
Building
contractors &
Administrator
suppliers
UAP Doc 205 Post-Construction Services (Maintenance and Administration)
1. BE Building and Equipment Maintenance If the building is Safe and habitable
will issue Certificate of Occupancy Good working condition and properly maintained
2. BG Building & Grounds Administration
PM
1.
Billing of Tenants
2.
3.
1.
Local Ordinances
Method of Compensation (BG)
Fixed Salary Basis monthly
2.
Basic Functions
a. Operates as a member of Owner-Architect-Engineer-Contractor b. Contractor
men and equipment, project delivery as per contract, Owner funds are available to
complete project w/in budget estimates c. Plan, Program, Monitor activities, Adviser
of material cost and Construction methods, Exercise Overall cost control.
Detailed Functions
a.
Pre-Construction Phase b.
Construction Phase
2.
3.
Comparative Selection
3. Design Competition Methods of Compensations (Refer to UAP Doc 201 PreDesign Services)
UAP Doc 301 General Conditions of a Contract
1.
1.
2.
3.
2.
1.
2.
3.
its Conditions
3. Current Standards of the Practice whether in DESIGN and CONSTRUCTION
Section 1 Definition of Documents (Glossary of Terms)
Site Conditions b.
Permits c.
Taxes d.
Royalties e.
Patents f.
Surveys
Section 5 Protection
a. Property (work area) b. Adjacent Property and Existing Utilities c.
and Property during emergencies
Life, work,
Payments
Contractor
1. Progressive Billing partial % of Completion 2. Request for inspection Architect
will issue (if accept) a. Certificate of Acceptance < b. Certificate of Payment Owner
for payment pay or not pay c. If 65% completion the contractor will issue of nonfinancial obligation (certificate)
Interest (if money is not fully collected) 6. TOR Terms of Reference 7. Building
Permit validity 120 days, valid 12 months if constructed has not commenced;
exception government structure; excepted if P15,000 proj. cost8. Notary
to legalize document with series no., document no., etc. 9. Arbitration can file a
case after 30 days 10. Specifications are printed documents stipulating
the procedural aspects of the contract 11. Variance is the minimum possible
deviation from standards which is permitted to make a highly beneficial housing project.
12. Project duration is computed immediately from the receipt date of the NTP
13. Design of any religious structures is assessed professional fees
14. Competitive bidding is mandatory for public work projects 15. 7 Days
affectivity of a Construction contract from receipt of Notice of Final Payment 16. Civil
Code liability of Architect for Regular Design of structures 15 years 17. PERT
Prog. Evaluation Review Technique 18. CPM Critical Path Method