Executive Summary
EXECUTIVE SUMMARY
In 1991, FTA published the Light Rail Transit Capital Cost Study. This report documented the
as-built construction costs for five light rail transit projects completed in the US over the
period 1984 through 1990. Rather than merely documenting project costs on a per-mile basis
or other gross metric, this analysis provided transit planners and engineers with a detailed
breakout and analysis of unit capital costs for newly completed fixed guideway projects at the
asset component and element level of detail. Specifically, the analysis documented the final
project costs for eight major cost categories and more than sixty related cost elements for each of
the five light rail projects. The resulting cost database provided a valuable data source to
support a broad range capital cost analyses, including the ability to conduct reasonableness
tests of cost estimates for proposed New Starts investments.
Over the 12-year period since this report was completed, the US transit industry has witnessed
a rapid expansion in the total investment in light rail infrastructure at a broad variety of urban
locations across the nation. For example, total track miles invested in light rail roughly doubled
over the period 1991-2003 while the number of agencies operating light rail systems has
increased by more than a third. Light rail continues to be the mode of choice for proposed
investments seeking Section 5309 New Starts funds. This update expanded the list of projects
found in the original study to include 19 projects that have been undertaken since the 1991
report was completed. The update process also involved inflating all unit costs to common 2003
base year and adjusting these costs to a national average metropolitan area value to provide a
consistent comparative basis to the costs, thus providing a more relevant capital cost basis for
FTA and oversight analysts. This study then took the analysis several steps further into variance
analysis to analyze project cost estimates and a project capital cost calculator to provide a test of
reasonableness for the project cost estimates.
The study encompassed five main objectives:
Each of these issues and the related key findings are discussed briefly in the discussion that
follows and the details are presented in the following report.
iii
Executive Summary
the database as available from the projects. The analysis and modeling effort was conducted at
this component level of detail.
In 1994, FTA completed the Heavy Rail
Exhibit 1
Capital Cost Study as a sister report to the
Component Level of Detail Capital Cost Database
1991 Light Rail Capital Cost Study.
Units
FTA FIXED GUIDEWAY
Similar to the Light Rail Study, the Heavy
of
CAPITAL COSTING SYSTEM
Measure
LIGHT RAIL SYSTEMS
Rail study documented the as-built capital
L.F. Guideway
1.00 GUIDEWAY ELEMENTS
costs for completed US heavy rail projects.
1.01 AT GRADE GUIDEWAY
L.F. Guideway
1.03 ELEVATED STRUCTURE GUIDEWAY
L.F. Guideway
Note, however, the Heavy Rail Study
1.05 UNDERGROUND GUIDEWAY
L.F. Guideway
benefited from many of the lessons learned
1.07 DIRECT FIXATION TRACK
Track Feet
1.08 BALLASTED TRACK
Track Feet
from the earlier Light Rail Project leading to
Rev. Vehicle
2.00 YARDS & SHOPS
several useful improvements, particularly in
2.01 LIGHT MAINTENANCE FACILITY / DEPOT
Rev. Vehicle
2.04 STORAGE BUILDING AND YARD
Rev. Vehicle
regards to database structure. Hence, a key
2.07 HEAVY MAINTENANCE FACILITY
Rev. Vehicle
goal of the 2003 Light Rail Update was to
2.10 MAINTENANCE OF WAY BUILDING & YARD
L.F. Guideway
adopt many of the structural improvements
3.00 SYSTEMS
Track Feet
3.01 SIGNAL SYSTEM
Track Feet
from the 1994 Heavy Rail Study. These
3.02 ELECTRIFICATION
Track Feet
improvements include segmentation of
3.03 COMMUNICATIONS
Track Feet
3.04 REVENUE COLLECTION
Station
trackwork costs from the cost of the
Station
4.00 STATIONS
underlying guideway structure, consolidation
4.01 AT-GRADE
Station
4.03 SUBWAY
Station
of several maintenance shop types and
4.05 ELEVATED
Station
segmentation of station platform types (into
4.07 PARKING
Spaces
Rev. Vehicle
5.00 VEHICLES
side and center). The updated database was
5.01 REVENUE VEHICLES
Rev. Vehicle
also expanded to record additional data
5.06 NON-REVENUE VEHICLES
Rev. Vehicle
L.F. Guideway
6.00 SPECIAL CONDITIONS
elements including procurement type (e.g.,
6.01 UTILITY RELOCATION / BETTERMENT
L.F. Guideway
traditional design-bid-build versus design6.05 ROADWAY CHANGES
L.F. Guideway
6.06 ENVIRONMENTAL MITIGATION
L.F. Guideway
build), peak-period ridership design and
L.F. Guideway
7.00
RIGHT-OF-WAY
service capacity.
7.01 LAND ACQUISITION
7.04 RELOCATION
8.00 SOFT-COSTS
8.01
8.03
8.04
8.05
8.06
8.08
PLANNING/FEASIBILITY STUDIES
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
TRAINING/START-UP/TESTING
L.F. Guideway
L.F. Guideway
Total
Total
Total
Total
Total
Total
Total
iv
Executive Summary
Table 1
Projects Documented in Updated Light Rail Capital Cost Database
Portland Westside/Hillsboro MAX
Sacramento Folsom Corridor
Sacramento South Corridor
Sacramento Stage 1 (1991)
Salt Lake North South Corridor
San Diego Mission Valley East
San Jose North Corridor (1991)
Southern New Jersey Light Rail Transit
System
St. Louis St. Clair County Extension
Exhibit 2
Database Projects: Mix of Alignment Grades
120,000
100,000
AT GRADE-IN-STREET GUIDEWAY
AT GRADE GUIDEWAY
80,000
60,000
40,000
Sacramento Stage 1
(1991)
Portland
Westside/Hillsboro MAX
Sacramento Folsom
Corridor
Hiawatha Corridor
Hudson-Bergen MOS-I
Denver Southwest
Corridor
Sacramento South
Corridor
Hudson-Bergen MOS-II
20,000
140,000
The final database sample represents a diverse group of LRT investments ranging in cost from
$200 million to over $1.2 billion ($2003), in length from five to twenty-five miles and completed
over twenty year period. The final project sample also includes a broad range of alignment
types, ranging from those that are entirely at-grade to those with no at-grade and only elevated
and underground segments.
Executive Summary
$4.0
$3.0
$2.0
$1.0
$0.0
0
10
15
20
25
30
Stations
Prior to developing the unit cost functions, the project team hypothesized that capital costs for
most project elements include both fixed and variable cost components. Within this context,
variable costs are driven by the number of units purchased (e.g., stations, vehicles, track miles)
while fixed costs represent a required minimum level of expenditures on purchase related
activities that are independent of the number of units acquired. Examples of such fixed costs
include non-recurring engineering costs for vehicles, systems and common facilities that are
incurred somewhat regardless of quantities of each component category and construction
mobilization costs for civil works. Both of the nonrecurring costs are incurred before any
vehicles systems or structures can be built. The presence of fixed costs manifests itself in the
form of economies of scale. In other words, a decline in unit costs as the number of units
purchased increases (as fixed costs are spread over a larger base). The study analysis supported
these related hypotheses of fixed and variables capital cost components and the related
economies of scale for nearly all LRT project elements. The supporting analyses ranged from
simple scatter plots of unit cost data to statistical comparisons of alternate unit cost models, all
of which clearly pointed in the direction of a declining unit cost function.
In all, the study team estimated over sixty different unit cost functions, including one for each
cost element types identified in the capital cost database (over sixty in all). These unit cost
functions provided the basis for all subsequent study analysis including:
vi
Executive Summary
A key goal of the study was to analyze and contrast the cost experiences of the nineteen LRT
projects documented in the updated Capital Cost Database. To facilitate these comparisons, the
study team developed the Standard LRT Model concept. The objective of the Standard LRT
Model was to create a logical cost and project definition baseline to provide a consistent
reference point among the projects. Specifically, the Standard LRT Model is intended to
represent a typical US LRT investment in terms of the mix of alignment grades (at-grade,
below-grade and above-grade), trackwork types, station grades and spacing, fleet purchase size,
and related characteristics. In practice, this typical system represents the average of the
actual mix of grades, trackwork types, etc. across all nineteen projects documented in the
Capital Cost database. Note here that while a typical LRT project is frequently thought of in
terms of an all at-grade alignment, only four of the nineteen documented projects (less than 25
percent) were
Exhibit 4
entirely at-grade
Standard
LRT
Model
Example
per Foot of Guideway
from end-to-end.
The average LRT
Standard LRT: Total Project Cost per Foot of Guideway
project is roughly
Full Cost and Quantity Baseline
80 percent at$35,000
grade. The
Standard LRT Model
Actuals
$30,000
Standard LRT
Quantity Adjusted
Model reflects this
$25,000
alignment mix.
$20,000
Finally, the
Standard LRT
$15,000
Model was
$10,000
designed to be
scaleable to
$5,000
alternative project
quantities and can
$0
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
therefore be used
Lineal Feet of Guideway (Thousands)
to analyze costs for
projects of any size.
Using this Standard LRT Model as a quantity and cost baseline, an analyst can easily identify
where (i.e., for which cost elements) quantities and costs for a specific LRT investment differ
from typical investment costs as represented by the Standard Model, providing a starting
point to determine the origin of these cost differences. This Standard Model offers comparative
insight into the quantities of proposed projects and the unit costs estimated for each cost
element.
It is important to emphasize that the Standard Model LRT is only intended to provide a baseline
for quantity and cost comparisons among the nineteen database projects. It does not provide
estimates of what costs should have been for a given project, only what they might have been
for a more typical project within a particular region and implementation schedule.
Alternatively, cost actuals that differ significantly from the Standard Model LRT should not be
considered as somehow wrong or the product of bad (or good) project cost management. In
Federal Transit Administration
Office of Program Management
vii
Executive Summary
practice, there can be many numbers of valid reasons why the cost actuals for a specific
investment either exceed or are less than that predicted by the Standard Model. The model is
only intended to provide a consistent point of comparison in the test of reasonableness for
project cost estimates and as a guide that ask the right right sizing type questions.
Project Size As expected, the largest determinant of differences in total project cost
among projects was project size (e.g., total alignment length). Less obvious was the fact
that smaller projects experienced higher costs on a per unit basis. The latter is a direct
outcome of the economies of scale associated with most project components (i.e., unit cost
decreases as the number of units purchased/constructed increases).
Asset Mix (Unit Quantity Variances) After project size, the greatest variation in cost
among projects resulted from differences in asset mix and, in particular, differences in
alignment mix. Whereas a typical LRT investment includes only a small proportion of
above- and below-grade alignment, the projects documented in the database ranged from
those that are entirely at-grade to those with no at-grade alignment. These wide differences
in alignment mix (and related station grades) yielded equally wide variances in project cost.
Variations in station spacing and vehicle procurement size were also primary contributors
to quantity driven differences in costs among projects (though much less significant than
alignment mix). Together, these differences in alignment and station grades, station spacing
and vehicle procurement size explained more than 50 percent of the variation in cost
between projects of the same alignment length.
Unit Costs (Unit Cost Variances) The remaining variation in project costs (close to 50
percent of total cost variation for projects of similar length) was driven by differences in unit
costs. For the most part unit cost differences reflect qualitative differences between cost
elements across projects (e.g., station design) but can also reflect quantitative differences not
documented in the database (e.g. station size). The following cost elements represented the
largest contributors to unit cost variances among projects (both positive and negative):
-
Below-Grade Guideway
Station Size, Grade and Design Standards
Utility Relocation
viii
Executive Summary
The significant cost variation for below-grade guideway investments is well recognized and
results from wide-ranging geotechnical conditions and engineering approaches. Cost
variations in utility relocation and right-of-way acquisition costs appear closely correlated
with the level of existing urban development prior to project construction, with construction
in well-developed urban areas yielding significant increases in total cost for these elements.
Finally, wide soft-cost variances appear to be driven primarily by wide variances in the
preceding items on this list. It is useful to note here that this list of primary contributors to
unit cost variances corresponds closely with the primary sources of project risk on a cost
element basis.
Exhibit 5
Example Cost Variance Analysis By Cost Driver
Special Conditions
Right-Of-Way
Soft-Costs
($50)
$0
$50
$100
$150
$200
$250
Millions of $2003
ix
Executive Summary
size, composition and technological improvements. The second approach focuses strictly on
cost inflation for individual project components.
Total Project Cost Per Route Mile The study identified a significant increase in total cost
per route mile among projects completed during the period 19841987 versus those
completed over the period 19962003. After adjustment for inflation, this increase was
estimated to be almost 60 percent. The primary sources of this increase included decreasing
project length and increasing project complexity. The remaining cost increases were
hypothesized in the following capital cost measures and characteristics.
Technology improvements and betterments not accounted in the element definition and
quantity measures
Incomplete accounting for project characteristics in the quantity values
Higher light rail cost inflation than that measured in the Means Construction Index
Of this 60 percent cost increase above inflation, about half was from the decreasing project
size and the increases in unit costs associated with shorter project lengths, a slight smaller
portion was from unit cost increases above inflation and a small portion was due to
increases in the complexity of the projects.
Exhibit 6
Sources of Unit Cost Increases
Decreasing Project
Size
50%
Smaller Project Sizes As discussed above, LRT capital project costs are subject to
economies of scale (decreasing unit costs as project size increases). At the same time,
average project size has decreased by roughly one third for projects completed in the
nineteen eighties relative to those completed since 1995. This decline in project sizes
yielded roughly, 30 percent of the increase in project costs on a per route mile basis.
Changes in Asset Mix Projects completed since 1995 have tended to include a more
expensive mix of alignment grades and trackwork types than those completed prior to 1987.
The more recent projects have also tended to include more stations per route mile. This
change in asset mix yielded about a 5 percent increase in project unit costs on a per route
mile basis over this time period.
Executive Summary
Cost Increases Over Inflation The remaining increase in project costs per route mile (a
roughly 25 percent increase) originated from other factors that could not be controlled for
using the current database. Likely reasons for this increase include:
Incomplete Accounting of Changes in Unit Quantities: The inflation analysis was based
on gross metrics for several asset types such as per station or per vehicle and hence
did not account for potential increases in the sizes of the individual units (e.g., square
feet, passenger capacity or number of seats).
Higher Cost Inflation for LRT versus a Typical Construction Project: The project costs
for this analysis were adjusted to a common $2003 basis using the Means Construction
Cost Index. This index may not provide a reliable measure of inflation for some LRT
project components. A study of project cost inflation conducted for the FTA found LRT
capital costs increasing at rates greater than the Means Construction Cost Index.
Unit Cost Inflation The preceding unit cost analysis focused on increases in the total
project costs on a per route miles basis after adjustment for inflation. A related analysis
focused solely on increases in the unit cost of individual project elements (e.g., guideway,
vehicles, track feet, etc.) prior to any inflation adjustment. After correcting for differences in
the number of units purchased by each project (to control for economies of scale) it was
observed that the rate of cost increase for most project elements exceeded that of the Means
Construction Cost Index. Specifically, the observed project cost inflation has averaged
around 3.2 percent annually since the mid-nineteen eighties while Means Construction
Index averaged roughly 2.5 percent over this same period. This result supports the related
finding of increased cost per route mile identified above. Moreover, it also suggests that the
higher rate of inflation relative to general construction cost inflation results in part from the
increasing sophistication of LRT systems.
These findings suggest that analysts should use above average rates of inflation when
predicting fixed guideway project costs over the long-term (i.e., over periods when technology
improvements are likely to occur or if a preferred technology option has not been selected). In
contrast, analysts should use a lower, more standard cost inflation measure (such as Means) in
the short term, in particular when technology options are well specified.
xi
Executive Summary
Exhibit 7
Unit Cost Inflation Example: Elevated Guideway
Unit Cost Inflation: Elevated Guideway
($YOE)
$8,000
Actuals
Quantity Adjusted Actuals
Trend
Quantity Adjusted Trend
$7,000
$6,000
Inflation Averages:
Elevated Guideway (trend) = 4.7%
Elevated Guideway (Adj trend) = 4.2%
Mean's Construction = 2.5%
$5,000
$4,000
$3,000
$2,000
$1,000
$0
1982
1984
1986
1988
1990
1992
1994
1996
1998
2000
2002
2004
Year Built
the cost basis used to develop these cost estimates, including the ability to adjust the underlying
unit costs to reflect the cost experience of a specific sub-set of projects documented in the
Capital Cost Database.
The Calculator is intended to provide FTA with a reliable tool for validating capital cost
estimates for light rail projects seeking federal funding approval through FTAs New Starts
process. The Calculator works from the unit cost relationships established for each of the sixty
elements. At the same time, industry analysts and project sponsors can use the Calculator to
develop preliminary cost estimates for new light rail projects currently under consideration.
Exhibit 8
Capital Cost Calculator: Sample View
Move cursor over comments (red triangles) for data entry assistance
Print
FALSE
Units
of
Measure
L.F. Guideway
Select City:
Quantity
100,000
Total Cost
2009
$6,908
$690,759,386
WEEKDAY RIDERSHIP
Unlinked Trips
39,768
L.F. Guideway
100,000
2010
$1,162
$116,158,480
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
Each
100,000
0
0
0
0
0
50,000
150,000
0
200,000
100,000
2010
$750
$0
$0
$0
$0
$0
$248
$125
$0
$30
$39
$75,047,648
$0
$0
$0
$0
$0
$12,379,769
$18,796,132
$0
$6,071,360
$3,863,571
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
xii
2010
2010
2010
2010
Executive Summary
Unit Cost Functions The study team tested the hypothesis that New Starts capital costs
include both fixed and variable components. Data examined under this study supported
the hypothesis implying economies of scale in the sample projects that were evaluated.
Standard LRT Model The study team developed the Standard LRT Model (SLM)
concept in order to facilitate cost comparisons among projects. The SLM represented a
typical LRT investment that included an average mix of alignment grades, station spacing
and vehicle procurements. The SLM was also based on the average of all projects
documented by the study, providing a reasonable basis for assessing why project costs are
higher for some projects/lower for others.
Cost Variance Analysis The study team assessed the reasons for differences in costs
among projects. Variations in cost primarily reflected differences in quantities and
alignment mix. Moreover, smaller projects typically exhibited the higher unit costs than
their larger counterparts due to economies of scale. In addition, costs for higher cost
projects were frequently driven by high-risk elements including: above grade/below grade
investments (alignment and stations); utility and traffic relocations; Right-of-Way
Acquisition; and Soft Costs.
Project Cost Inflation The study identified a significant increase in unit costs between
projects completed in the prior to 1990 versus those completed in recent years. After
adjustment for inflation, the total increase was roughly 50 percent.
xiii
Executive Summary
Development of project capital cost build-up models (Note: unit costs can be selected from
desired peer projects on a component-by-component basis)
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
UNDERGROUND GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
$1,358
$1,838
$4,878
$16,511
$403
$149
Track Feet
Track Feet
Track Feet
Track Feet
Station
L.F. Guideway
4.00 STATIONS
4.01
4.03
4.05
4.07
$10,189
$2,941
Rev. Vehicle
SIGNAL SYSTEM
ELECTRIFICATION
COMMUNICATIONS
REVENUE COLLECTION
CENTRAL CONTROL
AT-GRADE
SUBWAY
ELEVATED
PARKING LOTS
Average
Unit
Cost
L.F. Guideway
L.F. Guideway
Units
of
Measure
$685,245
$509
$176
$224
$74
$271,502
$217
Station
$7,318,267
Station
Station
Station
Spaces
$2,206,162
$24,873,714
$3,593,105
$4,752
Rev. Vehicle
$2,462,686
Rev. Vehicle
Rev. Vehicle
$2,462,686
$20,026
L.F. Guideway
5.00 VEHICLES
L.F. Guideway
% of Hard Costs
$791
$615
31.6%
Project Cost Variance Analysis This report describes the results of cost variance analyses for
all nineteen projects documented in the LRT Capital Cost Database. Since completion of the
database, FTA has already used the projects Cost Variance Analysis Tool to complete similar
cost analyses of several New Starts projects currently seeking Full Funding Grant Agreements
(FFGA). Once again, it is important to stress here that these analyses are not intended to
provide estimates of what the costs for these projects should be. Rather, they are used to
point to areas of possible concern for existing project cost estimates. FTA or grantee analysis
can then pursue these issues further to determine the reasons for any significant cost variances
and whether or not they are appropriate given the needs and goals of the project under
consideration.
Going forward, FTA and other industry analysts can use the Cost Variance Analysis Tool to
analyze the cost estimates of other proposed projects and/or the cost experience of completed
projects not included in the current database.
xiv
Executive Summary
Cost Calculator As described above, the LRT Capital Cost Calculator represents a convenient
tool for generating quick cost estimates for proposed LRT capital investments. For example,
FTA and local agency planning staff can use this tool to generate a preliminary cost estimate for
projects still in the conceptual phase (i.e., for which no detailed cost estimates are available).
Generating such estimates merely requires approximate values of the quantity of assets
required to complete the project (e.g., alignment length by grade type, number and type
stations, fleet size, etc.).
Alternatively, FTA can use the Cost Calculator to conduct reasonability tests of the detailed cost
estimates for projects in more advanced planning stages. Similar to the cost variance analysis,
this analysis would highlight significant unit cost differences between a projects detailed cost
estimates and the unit cost experience of the nineteen projects documented in the LRT Capital
Cost Database. In contrast to the cost variance analysis, this approach eliminates any unit
quantity variances (as the user would input the same unit quantities as used by the proposed
project and not the typical unit quantities used by the Standard LRT Model).
xv
1.0 Introduction
1.0 INTRODUCTION
1-1
1.0 Introduction
funding source increased upon implementation, sometimes beyond the capacity of available
funding mechanisms. On the Federal side, funding priority decisions are sometimes necessary
to accommodate individual project cost increases, often leading to decreased or delayed
funding elsewhere for other projects. Similarly, state and local funding sources that are often
less able to directly absorb capital cost increases, are often more hard pressed by project cost
increases. Unexpected capital cost increases can lead to difficult funding decisions that can
result in reduced project scope and/or project cancellations.
1.1.2 Underlying Issues in the Capital Cost Estimation Process
Differences between planning estimates and actual construction cost results often include other
impacts of ongoing project development, such as:
The sum of these cost impacts, coupled with the underestimation of unit costs and omission of
some asset requirements, identifies most of the causes behind the underestimation of capital
costs. A database of actual project experiences on quantities and unit costs for major capital
investments should help improve the degree of confidence in capital cost estimates.
1-2
1.0 Introduction
highway project over several stages of increasing project definition and several years of study.
To make the process less onerous on the metropolitan regions proposing these projects, the
Federal Transit Administration, Office of Program Management established a research initiative
to refine the analytical process and prepare improved background information to better support
the process. One aspect of the project development process is the estimation of non-recurring or
capital costs for the transportation improvement plans under consideration at each stage in the
process. An FTA research initiative was established to improve the capital cost results of this
process. This report represents the initial portion of the results from this research initiative.
1.2.2 Prior Research Efforts
In recent years, the FTA has undertaken several research efforts aimed at improving the
accuracy of capital cost estimates for large transit projects. This capital asset definition and
structure may also provide an appropriate capital asset and cost definition for the National
Transit Database, the Transit Economic Requirements Model and the Project Management
Oversight Program. These FTA efforts in funding major transit capital projects benefit from a
consistent project definition and cost framework to support these integrated project funding
and development efforts. These current and future applications of this capital cost database and
information structure may also lead to a more systematic approach to asset management in the
U.S. transit industry.
Agencies face a number of challenges in developing capital cost estimates for proposed projects.
For example, agency proposals for new transit systems or extensions to existing systems must
follow a formalized project development structure to be eligible for Federal funding. This
formalized process demands the estimation of project costs at the component or project element
level of detail including both systems and subsystems. Obtaining effective cost estimates at this
fine level of detail represents a well-directed commitment of agency resources in time and
effort. Similarly, while modernizing transit systems have access to their original project
development records as a guide in estimating the cost of system renewal, agency cost data will
not likely reflect either changes in component prices overtime or the availability of improved
component developed in recent years. Within this environment, transit planners and engineers
analyzing the costs of developing either type of system can benefit from:
The availability of recent, "as-built" capital cost data and the trend for each of these elements
The expression of these capital costs on a constant dollar, national average, unit basis
These defined needs were used to guide the development of the initial research efforts and then
used to establish the expectations and the orientation of the detailed task order work plan.
1-3
1.0 Introduction
1-4
1.0 Introduction
Consumer Price Index (CPI) and Producer Price Index (PPI). Specifically, the research evaluated
the ability of such readily available cost indices, constructed using data not directly related to
transit system development costs, to replicate actual changes in the construction and
procurement costs of civil and system elements for light and heavy rail projects. The result was
that these general price indices were not able to forecast major transit capital projects costs
within established forecasting parameters. The research then considered how these transit
element unit costs could be used in the preparation of capital cost projections for both new and
mature fixed guideway transit projects and the potential benefits of doing so.
The analysis was designed to consider variations in fixed guideway procurement costs at
various levels of aggregation; beginning at the element level of detail (e.g. examining variations
in the cost of ballasted trackwork, center platform stations, control systems and electrification),
combining these element costs into capital cost component categories, and concluding with an
examination of variations in cost of entire fixed guideway projects. These cost measures were
found capable of capturing historical changes in light and heavy rail procurement costs with
sufficient accuracy, that they could facilitate the generation of project cost projections featuring
greater accuracy than has been typically achieved in the past. This cost desegregation was
included in the development of this database, but not applied to the inflation of future year
costs in the interest of the schedule and resource constraints of this project.
1.2.6 2003 Light Rail Transit Capital Cost Study
FTA is now publishing this latest capital cost research effort to update and improve the 1991
Light Rail Transit Capital Cost Study. Over the 12-year period since that report was completed,
the US transit industry has witnessed a rapid expansion in the total investment in light rail
infrastructure at a broad variety of urban locations across the nation. For example, total track
miles invested in light rail roughly doubled over the period 1991-2003 while the number of
agencies operating light rail systems has increased by more than a third. Light rail continues to
be the mode of choice for proposed investments seeking Section 5309 New Starts funds.
This extended light rail capital cost effort has updated the original five projects and expanded
the list of projects found in the original study to include many more projects that have been
undertaken since the 1991 report was completed. This proposed update process also inflated all
unit costs to a more recent base year (e.g., 2003), thus providing a more relevant capital cost
basis for project planners and engineers, FTA staff and oversight analysts. Both the projects
included in the prior study and the more recent projects have their unit and total cost estimates
inflated to a common national norm and consistent base year 2003 values.
In addition, the results of this study have benefited from valuable lessons learned since
completion of the initial report. Such improvements include:
More detailed breakout of guideway element costs segmenting trackwork from guideway
structural elements (also found in the Heavy Rail Report)
1-5
1.0 Introduction
Increased definition and related cost impact on project procurement methods (e.g., designbuild) and their impact on project unit costs, soft costs in particular; technological changes,
safety standards and environmental requirements now prevalent in newer light rail projects
but not inherent in the designs of those projects found in the 1991 study.
The critical issue here is to bring the unit costs as close to a consistent basis as possible and then
use a qualitative discussion to explain the remaining differences among the remaining cost
variances.
Finally for this update, FTA desired to develop a capital cost estimation model that can be used
to forecast capital costs of future projects and allows projects to be compared using a variety of
metrics such as cost per mile and passenger trips. Moreover, the Light Rail Capital Cost Model
permits development of more accurate cost estimates than per mile metrics allow by
providing the user with the tools to build a potential system from the ground-up using the
cost detail provided by the study. Specifically, this approach focused on developing project cost
estimates based on not just the total track miles but also the number and type of stations,
vehicles, vertical alignment, facilities, passenger throughput design capacity, and operating
design capacity (vehicle consist and train frequency or headway). This cost calculator or model
has fixed and variable cost elements, similar to the structure of operating cost models to best
estimate project capital costs or provide the tests of reasonableness of existing capital cost
estimates.
1.2.7 Study Audience
The intended audience of the study and its products are those project development planners
and engineers, FTA review staff and contracted oversight staff requiring improved information
on light rail capital costs (e.g., New Starts and Rail Modernization oversight, Transit Economic
Requirements Model). As with the initial reports, the updated analysis should also prove useful
to industry planners and engineers developing the capital cost estimates for these New Starts
and Rail Modernization projects.
1.2.8 Study Products
This revised study provided several updates of the original information, expansions to the
projects included in the database, enhancements to the definition process, and the development
of the Light Rail Capital Cost Model. A detailed breakout of project unit capital costs and
quantities for new projects identified with FTA and FTA PMO contractor assistance, as well as
for those projects included in the original study, all converted to a common base year (e.g.,
$2003) and national average using publicly available price indices (e.g., Means Construction
Index). Unit costs and quantities are presented in an MS Excel workbook and included in this
report. The methods used to obtain the unit cost and quantity data provided in the database are
described to assist the users to better understand the unique characteristics of each project and
its unit costs. Text descriptions of the projects are included such as information on design
standards, procurement methods, geotechnical issues and other factors that contribute to and
help to better explain variations in unit costs across projects. A Light Rail Capital Cost Model
was developed and described here, provides users the ability to develop cost estimates or
complete tests of reasonableness for potential light rail investments using either gross
Federal Transit Administration
Office of Program Management
1-6
1.0 Introduction
investment measures (e.g., cost per mile) or using a more detailed and accurate ground-up or
best fit approach based on more detailed fixed and variable cost drivers.
To reduce some of the original data collection effort needed to generate unit capital cost
data for each study
To provide local and state transportation planning agencies and consultants with
experience-based, or as-built cost information that could be used in generating more
accurate and consistent capital cost estimates
To provide FTA and other state and local agencies with the unit cost information to develop
and check the reasonableness of the capital cost estimates for major capital projects at the
various stages of development.
These study objectives were used to guide the development of the research process, while the
following objectives were used to define the expectations of the technical analysis process and
the database and cost model resulting from those efforts.
Documentation of "as-built" construction and procurement costs for all aspects of project
development
Development of a consistent database structure that can account for the major characteristics
of each cost category typically included within the development of a major capital transit
project
Examination of unit cost characteristics that could be pertinent to the planning of similar
major transit projects, such as the distribution of costs by component categories, consistent
unit cost ranges, and commonalities of component types and capacity requirements for light
rail projects.
These objectives were used to guide the study in the documentation and analysis of
actual capital costs of eleven recent rapid transit projects. It is anticipated that through
the distribution of this "as-built" capital cost information, the reliability of capital cost
estimates for projects in the planning process may be improved.
1-7
1.0 Introduction
1-8
1.0 Introduction
The project team developed a comprehensive list of projects to guide the process and then
focused on those with the readily available capital costs. The limiting factor was the availability
of the capital cost information at the desired format and within the project schedule and
resource limitations. Future efforts will be conducted to collect this same information for the
remaining projects not included in this effort.
1-9
2.0
STUDY APPROACH
The study approach concentrated on the developmental process of a database of actual unit
capital costs that could be drawn from transit system development experience. The two key
requirements of the database were the consistent definition of capital asset components and the
identification of actual construction and procurement costs at the same level of detail. Overall,
complete development of the capital cost databases for light rail systems required the
completion of eight individual steps. These steps included:
1. Definition of a comprehensive list of cost categories and project elements
2. Development of a data collection database form
3. Distribution of the data collection database form to selected light rail projects for completion
4. Review of returned forms for completeness and/or misunderstandings
5. Conduct calls and site visits to fill in missing data and obtain clarifications
6. Entry of data into the light rail capital cost databases
7. Submission of database to the selected transit systems or PMO's for checking and
verification
8. Editing and finalizing of capital cost databases
9. Escalation of database to year 2003
10. Development of the Capital Cost Model.
2-1
Table 2-1
Fixed Guideway Project Elements By Cost Category
FTA FIXED GUIDEWAY
CAPITAL COSTING SYSTEM
LIGHT RAIL SYSTEMS
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
Peak
Midday
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
L.F. Guideway
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
Rev. Vehicle
2-2
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
3.00 SYSTEMS
Track Feet
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
Station
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
Rev. Vehicle
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
2-3
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
8.00 SOFT-COSTS
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Total
8.01
8.02
8.02
8.03
8.04
8.05
8.06
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Guideway This category includes the costs and quantities of those components of each
guideway type including at-grade, above-grade (elevated fill, elevated structure, bridges)
and below-grade (including running tunnels, crossovers and station caverns and cut-andcover). For the purposes of this analysis, guideway is defined as all civil components
supporting both ballast and trackwork, with or w/o direct fixation, but not including them.
Accurate guideway costs are critical due to the high cost variances, uncertainty and risk
associated guideway construction, particularly for above or below-grade investments.
Trackwork The trackwork costs include the costs and quantities of the basic
trackwork components such as running rail, ties, ballast, direct fixation components,
rail fastening systems and welding techniques. Special trackwork components such
as single, double and diamond crossovers and turnouts were also included under
this category.
Systems The systems review included the costs and quantities for traction power,
train control or signalization, communications, and fare collection systems. Traction
2-4
Stations For this analysis, stations were classified as either at-, above, or below
grade and, further more, as either center or side platform. Other descriptive data
was collected to account for the broad variations in station design standards
commonly associated with light rail. The per station cost includes the costs and
quantities for the stations' structures, the station platforms, vertical access means
(stairs, escalators, and elevators), and station finish work. Station costs do not
include the guideway elements through the station areas. Station access facilities
such as roadways, parking and pedestrian needs were identified in separate cost
components. Also included were the station systems such as power facilities,
lighting, ventilating equipment, and the various communicating equipment needed
to fully comply with the ADA requirements. Further considerations include the
need for all aspects of the stations to be compliant with the requirements of NFPA
130.
Facilities The review of this category included the cost of new or expanded
maintenance facilities, administrative facilities and operation/dispatch control
centers. Components included vehicle storage yards, vehicle repair and maintenance
shops, office support areas, control centers and surveillance centers.
Vehicles The vehicle component included the costs and quantities for revenue
vehicles (LRT vehicles) and non-revenue vehicles (maintenance-of-way (MOW) and
support vehicles). Here again, descriptive data was collected to account for
differences in design standards across vehicles, including gross weight, power,
seating and standing capacity and related factors, such as low floor, propulsion and
whether they are FRA compliant, all of which have measurable cost impacts.
Special Conditions Special conditions are typically not included in any other
capital cost category and not covered by contingency factors and yet represent a
significant contributor to total project cost. Utility Relocation, Noise/Environmental
Abatement/Mitigation, Maintenance of Traffic, and Urban Design and Landscape
costs are examples of special condition costs not covered under other specific
categories. Our review identified the general assumptions behind the quantities and
costs of these components to determine their cost relationships for future cost
estimating.
2-5
Costs The ultimate product for this assignment are accurate unit costs and their associated
cost driver for each cost component and element identified in the finalized database
structure. Based on this database, the light rail capital cost model was constructed.
Unit Quantities The 1991 analysis required collection of detailed unit quantities for all
project cost categories and cost elements based from the engineering documentation for
each project (e.g., track miles, number of vehicles, number of stations by type, etc.). This
update required confirmation of the desired units for analysis (e.g., track feet, number of
2-6
vehicles, etc.) of the prior projects and coordination and communication with the FTA, PMO
contractors and grantee agencies of the more recent projects to determine the availability of
this data and the final project definitions for all projects included in the study.
Other Factors Effective analysis of project costs also required documentation of the design,
geotechnical issues, procurement methods and related factors which contribute to variations
in capital costs across projects but which are unrelated to differences in regional price levels,
inflation or project size. A key example here is the design standards for light rail stations. In
practice, a light rail stop may consist of a wide a variety of designs ranging from a simple
bus shelter to full interchange stations (at, below or above grade) complete with full
passenger amenities (e.g., elevators/escalators, ticket vending, restrooms, shops) and
revenue collection systems. It is critical that analysts using the unit cost data are aware of
these design differences to ensure valid cost comparisons across projects. This primarily
descriptive data will be based on that data or technical reports already collected by FTA.
2-7
information to be consistent with all of the additional projects included in this effort. The
second path was to request the information on current projects through the FTA PMO
contractors. The third path was to request this same information directly from some of the
ongoing projects and a few of the recently completed projects that have the capital cost
information readily available for this project. The following sections describe the general
process that was consistent to all three data collection paths.
2.3.1 Data Collection Guide
The data collection guide utilized the same project component, element and cost category
definitions as the file structure used in constructing the capital cost databases. The data
collection guide was distributed to each of the PMO and completed candidate systems outlined
earlier. The guides were distributed by the FTA Office of Engineering and addressed to the
project PMOs to ensure timely and accurate completion of the database. Interaction between
project staff, FTA and PMO staff was necessary to clarify the request; assist in the interpretation
of special conditions; and adapt the original data base structure and component definitions to
better fit the composition of the available cost information.
2.3.2 Review Of Returned Forms
Data collection guides were returned to FTA and project staff by the PMO staff assigned the
responsibility to complete the request. Additional supporting project reports and materials were
submitted by agency staff. These materials provided both a more complete description of the
projects and background information to better understand the cost data and thereby were used
to develop the descriptions included within this report. Additional light rail projects were
included within the capital cost database based on data availability from the remaining projects
included in the projects listing.
2.3.3 Clarification Of Submissions
The supporting reports, materials and data collection guides were reviewed for completeness
and understanding. Initial queries were submitted to PMO staff to ensure completeness of the
materials and to confirm questions about the materials.
2.3.4 Data Entry
After the data collection guides were returned and initially checked for completeness, the cost
information was entered into the database system for review and analysis. The capital cost
databases were prepared using Microsoft Excel for Windows software for ease of access and to
facilitate the addition of other transit modes and/or transit projects developed at a later date.
2-8
levels of detail. Unit costs were compared as an initial test of reasonableness and to identify any
unusual trends or conditions. Logic checks were added to the database to confirm the
reasonableness of each value. Outliers were then checked with the PMO contacts to verify any
unusual unit costs or completion dates. Quantity estimates were checked with submitted project
reports and then crosschecked with the category subtotals.
2-9
The nationwide average cost basis of 100 represents the 30 major city cost average as of January
1, 2003. This provides the unit cost comparative basis for the fixed guideway capital cost
categories. The cost index for each of the light rail transit cities that were used in this study are
the following values:
Exhibit 2-1
Unit Cost Indices Of The Project Cities
Some of the cities examined have localized metropolitan area cost indices that are greater than
100. Values greater than 100 indicate that construction costs in these cities exceed those of the 30
major cities cost average as of January 2003. Those with cost indices of less than 100 have
construction costs below the 30-city average.
2.5.3 Further Desegregation
Finally, each project element was further segmented into the labor, material, and equipment
inputs used in its construction. Specifically, percentage distributions were developed which
depict each input's contribution to the total cost of developing that element. These proportions
were developed across several projects and do not necessarily depict the precise input costs for
the specific projects included in the database. Rather, they are provided here as an estimated
guide to provide further insight and value to the projection of future year component and unit
costs. Future year costs can be projected from a cost base of labor, materials and equipment
costs more easily and more accurately than from a capital cost base of project elements or cost
category subtotals. The methodology used to normalize project capital costs to a consistent year
and national level did not utilize this further desegregation information at this point. This
process has been maintained in the database so it may be used as part of a future related project.
2-10
In addition to these key cost data, the database also presents quantities of each project
element, component and cost category and cost subtotals to each cost category.
2-11
3.0
PROJECT DESCRIPTIONS
The first phase focused on a thorough review of the cost categories and project elements utilized
in the original study report in order to identify gaps and validate assumptions. The emphasis
was on reviewing project definitions, level of detail in the asset categories, estimation of asset
category quantities and the values and basis for the unit costs for each category of the identified
New Start light rail projects. This phase also focused on identifying Section 5309 New Start light
rail projects that have been completed as well as those processing FFGAs since 1991. The study
team also identified the year of expenditure for those estimates, the escalation rate basis used to
form the current year estimates, the developmental process and formulation basis for the unit
costs, the contingency rates use for each asset category and the reasonableness tests used to
confirm each cost estimate. These results were presented to FTA with supporting draft cost
tables in the required format. The following project descriptions highlight the project
characteristics most pertinent to the understanding of the capital cost estimates presented here
and the forecasting basis in the next chapters.
The initial 1991 research effort was to document actual construction, systems procurement and
related developmental costs for the most recently constructed light rail transit systems in the
United States. With the successful opening of the San Diego Trolley in 1981, other U. S. cities
have followed with the development of their own light rail systems. Through the decade of the
1980s, seven light rail systems were constructed or significantly reconstructed.
These new light rail systems represent an important investment of public funds in the
passenger transportation industry. The capital costs of these projects were documented in the
initial report except for San Diego and Buffalo, where cost information to this level of detail was
unavailable to these two projects. Since then, San Diego has documented the costs of their initial
line and it has been included here in this effort. The documentation of the actual "as-built"
element-level capital costs of these systems represents an opportunity to help prepare realistic
capital cost estimates in the planning and engineering of the next set of systems.
This chapter includes an update of these prior projects, plus additional light rail projects
completed since the 1991 light rail capital cost project. It includes references to the light rail
projects included within this database and several others that were requested but not received
in time to include in this project. The following projects represent those that were not
documented in this project, and will be reserved for a future effort.
3-1
The following projects are described to support the better understanding of the capital cost
information provided in the database. These descriptions have been adapted from the project
and agency websites.
3-2
Exhibit 3-1
T-REX Light Rail System
sign in the front window identifies each line: C Line signs are orange and D Line signs are
green. The final destination for each train is identified on the sign above the front window of
the train. The C Line (orange) travels from Littleton/Mineral Station to Union Station in Lower
Downtown. There are 12 stations along this 13-mile line.
The D Line (green) travels from Littleton/Mineral Station through Downtown Denver to 30th &
Downing Station in Five Points. There are 20 stations along the entire 14-mile line. All stations
serve both northbound and southbound trains, except in Downtown Denver between 14th Street
and 19th Street. In that area, northbound trains travel along California Street and southbound
trains travel along Stout Street.
Exhibit 3-2
LACMTA Metro Rail System
The Metro Red Line is a heavy rail subway that meets the Blue Line in Los Angeles and
provides service through Downtown, between Union Station, the Mid-Wilshire area,
Hollywood and the San Fernando Valley. This heavy rail line will be included within a heavy
rail capital cost study at a later date. The following descriptions of these light rail lines was
adapted from the Los Angeles County Metropolitan Transportation Authority website.
3.2.1 Los Angeles - Long Beach Blue Line
The Metro Blue Line (Exhibit 3-3), L.A.'s first light rail transit system, runs from 7th Street in
Downtown L.A., through the communities of Vernon, Huntington Park, South Gate, Watts,
Compton, Carson, finally ending in downtown Long Beach. The Metro Blue Line connects Long
Beach with downtown Los Angeles along a 22.6-mile, mostly at-grade or elevated fill
(approximately 80 percent), and dedicated alignment, that includes a subway section and
connection to the Metro Red Line in downtown Los Angeles. This line was constructed as the
first part of a regional network of rail service, serving the entire Los Angeles area. Construction
3-3
was initiated in October 1987, and the revenue service opening was July 14, 1990. The total
capital costs were $877 Million. Ridership has averaged about 63,000 daily.
Initial revenue service was inaugurated in July 1990, over almost
the full length, and since February 1991, into the tunnel connection
in central Los Angeles. There are 28 highway, 4 pedestrian and two
at-grade railroad crossings that required warning and control systems.
The full alignment is double-tracked except for the one-directional
loop in downtown Long Beach. The Blue Line was designed as a
modern and more state-of-the-art rail line including connections with
other planned lines along its length. There are 22 stations with only 5
offering parking facilities. One station is underground with
connections to the Red Line, three on elevated sections, and one
combined aerial/at-grade station with a link to the planned Green
Line. The service and ridership levels were anticipated at fairly high
rates, which required sophisticated control and support systems for
this light rail line.
Exhibit 3-3
Blue Line Schematic
The vehicle operated on the Blue Line is a P865 model light rail
vehicle, articulated, 6-axle, double-ended, pantograph, powered with
750V DC (Exhibit 3-4). The manufacturer was Sumitomo-Nippon
Sharyo of Japan. The fleet is composed of 54 vehicles, 100-153 series.
The passenger carrying capacity is 150 seated; 230 maximum seated
and standing, plus 2 wheelchair locations. The maximum allowable
operating speed is 55 mile per hour on the grade separated segments
and 35 mph for the street running segments. The cars currently
operate in train lengths of two or three cars. The vehicle maintenance
facility is located in Carson, between the Del Amo and Wardlow stations.
Starting in Downtown L.A., the Blue Line starts
underground at the 7th St/Metro Center station,
which provides transfers to the Metro Red Line.
The alignment begins through a half-mile subway
tunnel. It surfaces at the Pico station, the Los
Angeles Convention Center and the STAPLES
Center sporting arena nearby. The alignment then
travels on Flower Street, and down the middle of
Washington Blvd., before veering south at the
Washington Station. Here, the train reaches its
maximum speed of 55 mph in the separated
alignment, passing through the industrial and
residential districts of Vernon, Huntington Park
and Watts. At the Imperial/Wilmington Station,
passengers can transfer to the Metro Green Line.
3-4
Exhibit 3-4
Blue Line Rail Car
3-5
The maximum operating speed was limited to 55 miles per hour at the inauguration of service
along the Green Line and subsequently increased to 65 mph in the year 2000. The service was
first operated in a single-car train length configuration. Operations of two-car consists has been
gradually phased in for peak hour service.
The vehicle maintenance facility is located in West Hawthorne, near the Marine Station. The
vehicles have only light maintenance service completed here, with heavy service done at the
Blue Line facility in Carson.
3.2.3 Los Angeles Pasadena Gold Line
Construction began in 1994 on 13.6-mile alignment of the
Gold Line that will run from Union Station in downtown
L.A. into Pasadena, serving the communities of Chinatown,
Highland Park and South Pasadena along the way (Exhibit
3-7). It was originally slated to open in May 2001, but lack of
funding and other complications have postponed the
opening of this rail line and construction had been
suspended. In 1998, the Pasadena Blue Line Construction
Authority, independent from the MTA, was formed to
oversee the completion of the line. Ground was re-broken in
Spring 2000 and the line is planned to open in July 2003. At
that time, the operation and maintenance of the line will be
turned over to the MTA. The Pasadena Gold Line is being
constructed by the Los Angeles to Pasadena Metro
Construction Authority. State Legislation (SB1847) created
the Authority effective January 1, 1999. Once completed
LACMTA will operate the light rail system.
Exhibit 3-7
Pasadena Gold Line Schematic
Exhibit 3-8
Chinatown Station
The route alignment for the Pasadena Gold Line extends for
13.7 miles from Union Station in downtown Los Angeles to
the Sierra Madre Villa station in eastern Pasadena, serving a
total of 13 stations. One distinctive feature of the construction
of the Gold Line is its attention to architecture and public art.
Exhibit 3-8 illustrates the Chinatown Station with its ornate
canopy to maintain the community theme.
3-6
Exhibit 3-9
Hudson-Bergen, Newport Station
portion of the state and the Southern New Jersey Light Rail Transit System is located along the
Delaware River waterfront in the southern portion of the state. Exhibit 3-9 shows HudsonBergens Newport Station. The following descriptions present the development of these light
rail lines. Note that the Hudson-Bergen Line is represented as two independent MOS segments
within the study database.
3.3.1 Hudson-Bergen Light Rail Transit System
The Hudson-Bergen Light Rail Transit System is a partnership between New Jersey Transit and
21st Century Rail Corporation, a special purpose company led by Washington Group, STV
Corporation and Kinki Sharyo. As the first design-build-operate-maintain (DBOM) project
development approach in the US, Hudson-Bergen has facilitated the completion of the line
several years ahead of a more typical project development schedule, yielding measurable
capital savings to the state.
Exhibit 3-10
The Hudson-Bergen transportation corridor is a key
link in the expanding commercial and residential
development along the Hudson River waterfront. From
about 1985, New Jersey Transit and the New Jersey
Department of Transportation proposed a light rail transit
system linking Bayonne to the Vince Lombardi Service
Area of the New Jersey Turnpike. This north-south project,
with its natural links to other east-west alignments within
the existing transit operations, represents an important part
of this growing waterfront community.
The Hudson Bergen Light Rail Transit System was first planned as a 20.5 mile, 33-station light
rail system that would run from southern Bayonne north through Jersey City, Hoboken,
Weehawken, and North Bergen in Hudson County, to the New Jersey Turnpike's Vince
Lombardi Service Area in Bergen County. The project was planned in several segments given
the full alignment length and available funding support.
Hudson-Bergen Minimum Operating Segment I (MOS 1) Hudson-Bergen MOS 1 extends
from 34th Street in Bayonne continuing in a northerly direction into Jersey City and Hoboken,
and then connecting with the PATH, ferry and NJ commuter rail terminal along the waterfront.
The West Side Branch extends from Liberty State Park to West Side Avenue in Jersey City. This
9.5-mile segment includes 17 stations, 3 major intermodal transfer sites, and 5 regional parks &
ride sites providing 3,750 total parking spaces. A portion of the alignment that operates in city
streets is shown in Exhibit 3-10. Hudson-Bergen MOS 1 serves many schools, churches, medical
facilities, parks, and 10 major malls and shopping areas. Hudson-Bergen Light Rail ties together
cities in Hudson and Bergen Counties, including Bayonne, Jersey City, Hoboken, and
Weehawken. The Hudson-Bergen MOS 1 opened for revenue service the weekend of April 15th,
2000.
Hudson-Bergen Minimum Operating Segment 2 (MOS 2) A second Operation Segment
(MOS-2) for the Hudson-Bergen Waterfront Light Rail Transit System (HBLRTS) is under
development. The MOS-2 will run 5.1 miles north from Hoboken Terminal to the Tonnelle
Federal Transit Administration
Office of Program Management
3-7
Avenue Park-and-Ride lot in North Bergen and one mile south from 34th Street to 22nd Street
in Bayonne. MOS-2 is scheduled for completion in 2005 and is anticipated to carry 34,900
average weekday boardings in 2010.
The full Hudson-Bergen project includes the Vince Lombardi Park-and-Ride lot in Bergen
County to West Fifth Street in Bayonne in Hudson County. It is projected to serve 94,500
average weekday boardings in the year 2010. The outer ends will provide 8,800 park-and-ride
spaces. The core of the system will serve the high-density commercial and residential centers in
Jersey City and Hoboken and connect to ferries,
PATH and NJ TRANSIT commuter rail lines.
3.3.2 Southern New Jersey Light Rail Transit System
The Southern New Jersey Light Rail Transit
System (SNJLRTS) is a 34-mile light rail line
connecting Trenton to Camden along the
Delaware River waterfront (Exhibit 3-11). It
is being built along an active freight line
that was augmented for passenger operation
using advanced, diesel propelled, light rail
vehicles. The passenger operation is planned
for daytime and evening operation, while
freight service is limited to late night
periods, giving Federal Railway
Administration (FRA) time period and
access separation. The project is being
constructed and operated through the
design-build-operate-maintain project
delivery approach that has been so
successful with the development of the
Hudson-Bergen Line along the Hudson
River in northern New Jersey.
Exhibit 3-11
Southern New Jersey Light Rail Transit System
(SNJLRTS) Connecting Trenton To Camden
The Southern New Jersey Light Rail Transit System will connect the towns that developed
along the Delaware River waterfront with the governmental, commercial and entertainment
areas along the waterfront. In addition, the line
Exhibit 3-12
will connect with the regional bus and rail
SNJLRTS Vehicles
services operated by NJT, Southeastern
Pennsylvania Transit Authority (SEPTA) and
the extended interstate rail services operated by
Amtrak. The 34-mile line includes 20 and
stations, 20 vehicles (Exhibit 3-12) serving these
waterfront towns with direct access to the rail
services. Three of these stations provide parkand-ride facilities for wider access to residents
throughout the area. More than twenty bridges
were reconstructed and about 50 grade
crossings were upgraded.
Federal Transit Administration
Office of Program Management
3-8
Construction was initiated on the SNJLRTS line in May 2000, and revenue operations are
planned to begin by the end of 2003. The cost of the line is $604 million, with an additional $260
million in financing costs according to New Jersey Transit. The project was funded by the State
of New Jersey Transportation Trust Fund.
Exhibit 3-13
Pittsburgh Light Rail Transit System
Stages I and II
3-9
Overbrook Line - Port Authority suspended service on the century-old Overbrook Line
seven years ago due to the deteriorated state of bridges and track bed along its right-of-way.
Currently, construction is underway to reconstruct the entire 5.2 miles of the Overbrook
Line to modern light rail transit standards. Rebuilding five major bridges, consolidating 22
stops into eight ADA accessible stations, installing new traction power sub-stations,
constructing an exclusive right-of-way, and double-tracking old single-track segments of the
line will be a three year undertaking to restore light rail transit service to the communities of
Beltzhoover, Bon Air, Overbrook and Castle Shannon.
Library Line Improvements include a 430-space park and ride facility at the southern end
of the Library Line in South Park Township, a new station at the Castle Shannon Junction,
reconstruction of track on 0.3 miles of the alignment, and improvements to the Logan Road
grade crossing, among other enhancements. The entire Library Line is also slated for
modernization and reconstruction under Stage II.
Drake Line Port Authority suspended operations along the Drake Trolley Line in 1999
and replaced trolley service with a mini-bus route, the 35A South Park. The project includes
modifications to the existing line as necessary to allow for the testing of light rail vehicles.
3-10
Light Rail Vehicles The project includes an order with Construcciones Y Auxiliar De
Ferrocarriles, S.A. and CAF USA, Inc. (CAF) for the purchase of 28 new light rail vehicles
(LRVs).
Traction Power and Overhead Contact System Installation of four new traction power
substations, an overhead contact system, and a feeder cable network that together will
strengthen the existing power system for two-car train operations along the Overbrook,
Library Line.
Park and Ride Lot Expansion -- Stage II will advance the Authority's successful Park and
Ride Lot Improvement Program by adding approximately 2200 new park and ride spaces
along the Overbrook and Library Lines in new or expanded facilities.
The capital costs of these improvements to the Port Authoritys light rail lines are combined in
the database under Stage II.
3-11
Portlands light rail system (Exhibit 3-14) was opened in 1986 and christened MAX, for
metropolitan area express. The system was built in three segments. Eastside MAX Blue Line,
opened in 1986, stretches 15 miles eastward to Gresham; Westside MAX Blue Line, opened in
September 1998, runs 18 miles west to Hillsboro; Airport MAX Red Line, opened in September
2001, runs 5.5 miles northwest from Gateway Transit Center to PDX. With the addition of the
Airport MAX extension, the lines were color coded to help riders distinguish the different
routes. The original 33-mile east/west MAX line became the Blue Line. Airport MAX is the Red
Line. The Interstate MAX line, currently being developed, is designated as the Yellow Line.
The light rail system and the bus system operate as an integrated network. A total of 88 bus
lines connect with MAX at various light rail stations. MAX operates every day of the year
beginning around 5 a.m. During the day, all trains provide service frequencies, 10 to 15 minutes
during the day. MAX carries about 27 percent of all TriMet's weekday riders. During fiscal year
2002 (July 1, 2001 June 30, 2002), MAX averaged 25.4 million rides, or 78,000 rides each
weekday. Combined MAX and bus ridership at TriMet has grown 14 straight years, providing
more than 88.6 million trips during FY02.
3.5.1 MAX Blue Line
The east-west MAX Blue Line was developed as two separate corridor projects the Banfield
Corridor and the Westside Corridor. The 15-mile east-west, initial Banfield Corridor investment
is mostly at-grade with some elevated sections along joint highway alignments. The line utilizes
reserved rights-of-way in city streets, arterials and highway medians to connect the city of
Gresham and other eastern suburbs with central Portland. Passenger access is through 25 atgrade stations that provide spacing of less than one mile and easy walk-on accessibility for most
of the alignment length. Only 5 stations offer park-and-ride facilities, but almost all stations
have coordinated bus transfer facilities. A 26 vehicle articulated fleet was procured to operate
the peak service schedule requirement (for this segment) of 22 peak vehicles with the remaining
4 for scheduled maintenance.
As part of the region's overall
transportation strategy, MAX
was extended west into
Washington County in 1998.
The 18-mile extension runs from
downtown Portland to
Beaverton and Hillsboro.
Exhibit 3-15 presents the MAX
Blue Line in Central Portland
with trains operating to both
terminal destinations Gresham
and Hillsboro.
Exhibit 3-15
TriMet MAX Blue Line in Central Portland With Trains for
Both Terminal Destinations
3-12
Washington Park Station, the deepest transit station in North America at 260 feet underground.
Trains travel through the twin tunnels at speeds up to 55 m.p.h.
Nine of the 20 Westside MAX stations include park & ride lots. A total of 3,868 spaces are
available at nine lots for daily riders. Twenty-four different bus lines connect with Westside
MAX. Destinations along the line include Hillsboro Airport, numerous Washington County
employers such as Intel and Nike, PGE Park stadium, downtown Portland, Rose Garden arena,
Lloyd District and access to Portland State University and Oregon Health and Science
University. It also connects to the new 2.4 miles Portland Streetcar. MAX Blue Line connects to
the 5.5-mile Airport MAX Red Line at all MAX stations between downtown Portland and
Gateway Transit Center.
3.5.2 Portland TriMet MAX Red Line
The MAX system was expanded by an additional 5.5 miles to 38 miles with the opening of MAX
Red Line (Airport MAX) in September 2001. MAX Red Line provides direct service between
Portland International Airport and downtown Portland.
The 5.5-mile MAX Red Line extension to the airport connects to the existing 33-mile MAX light
rail system. The MAX station is just 150 feet from the baggage claim, and the trip to downtown
takes 38 minutes. Route runs north from Gateway Transit Center along I-205 to the Portland
International Airport terminal. MAX Red Line runs every 15 minutes between 5 a.m. and 11:30
p.m. Quick Drops are located at six MAX stations make drop-off or pick-up of passengers and
their luggage easy. Ridership will be an estimated 7,500 trips each day by 2015 (2.7 million rides
annually).
The total capital cost to build the Red Line is approximately $125 million. Project partners (Port
of Portland, TriMet, the City of Portland and Cascade Station Development Company) shared
the cost of the project using an all-local financing plan for construction of the Airport MAX
extension. This innovative cost-sharing venture means that no federal appropriations, state
general funds or any additional property taxes were used to build the project. Design and
construction of the rail extension cost $125 million. Additional elements of the overall project,
including new light rail vehicles, terminal improvements and CascadeStation infrastructure,
will bring the total to approximately $180.4 million.
3.5.3 Portland Interstate MAX Extension
The Interstate MAX, a 5.8-mile segment now under construction, will connect the Expo Center
in North Portland with downtown and the rest of the transit system. The line is set to open in
fall 2004. Between 1990 and 2000 TriMet ridership grew faster than vehicle miles traveled and
population growth. During the same period, TriMet ridership grew 49 percent. The $350
million, 5.8-mile extension will connect MAX to the Expo Center along N. Interstate Avenue.
Local funding sources include the City of Portland ($30 million) and TriMet ($25 million). In
addition, regional transportation funds include $37.5 million. Interstate MAX requires no
additional property taxes. The remaining $257.5 million is being funded through federal funds.
The extension is scheduled to open in fall 2004.
3-13
3-14
Exhibit 3-17
South Sacramento
3-15
3-16
Exhibit 3-20
Salt Lake City Light Rail System
3-17
The Blue Line includes the first operational segments and the most recently developed
segments of the system. The line extends from San Ysidro (Border) through downtown and
continues past Old Town and joins the Mission Valley Run to Mission San Diego. The San
Diego Trolley began operations in summer, 1981 between downtown San Diego and the
USA/Mexico border in San Ysidro. The original downtown terminus was where C Street met
Kettner Blvd. The original line was actually single track, but due to significant ridership growth
a second phase of improvements including double tracking was constructed on the entire
"South Line" shortly after the Trolley began operations.
The downtown terminus changed with the construction of America Plaza adjacent to the
Amtrak Station. The trolley was rerouted through the ground level of the building, in an open,
atrium-like right-of-way, and then a few feet west to a junction connecting with the "Bayside"
Federal Transit Administration
Office of Program Management
3-18
line which parallels the Burlington Northern Santa Fe (BNSF) Railway freight tracks to the
south of the Amtrak station, and the Coaster (North San Diego County commuter rail) and
Amtrak (as well as BNSF) tracks to the north of the station. Subsequent extensions of the line
included a 3.2 mile extension to Old Town (completed in 1996) and a 6.1 mile extension through
the western half of the Mission Valley (the Mission Valley West Project completed in 1998).
Progress to complete a line through the Mission Valley to connect to the Orange Line is
currently underway with construction of the Mission Valley East Segment.
3.9.2 San Diego Mission Valley East
The 5.9-mile Mission Valley East
Extension (Exhibit 3-22) provides the
final link between two separate Trolley
lines. Mission Valley East (MVE)
segment connects the Blue Line
(currently from San Ysidro on the south,
to downtown San Diego, Old Town,
Mission Valley and Mission San Diego)
along Interstate 8 to link with the Orange
Line at Baltimore Drive in La Mesa. The
Orange Line connects Santee, El Cajon, La
Mesa, Lemon Grove and East San Diego
with downtown. The MVE connection
will provide new and more convenient
access for East County and South Bay
riders to a wider variety of shopping,
recreation, entertainment, schools,
medical centers, local attractions and
employment centers.
Exhibit 3-22
Mission Valley East Light Rail Project Extension of
the San Diego Trolley Blue Line
The Mission Valley East Line also includes a short loop to serve San Diego State University
(SDSU). The cut-and-cover method is being used for most of the tunnel (3,000 ft), while a 1,000foot portion is being completed using New Austrian Tunneling Method.
Four new stations are planned Grantville, San Diego State University (an underground
station), Alvarado Medical, and 70th Street. Each station will include public art as an integral
component of the station design. Four artists, one for each station, have been commissioned to
develop artistic themes that reflect the history and character of the station areas.
3.9.3 San Diego Orange Line
The Orange Line (formerly the East Line) comprises several light rail segments developed
through the years in metropolitan San Diego. It includes the three East Line extensions to
Euclid, El Cajon, and Santee. The Euclid extended light rail service 4.5 miles to the east in 1986.
The 1989 El Cajon extension included a 11.1 mile extension to the eastern and northeastern
communities of La Mesa, Lemon Grove, and El Cajon. An extension for 3.6 miles extended
service on the Orange Line to the community of Santee. The Orange Line also includes service
Federal Transit Administration
Office of Program Management
3-19
in Centre City San Diego and extends along a transit mall in the downtown area. It also extends
along a 2 mile segment (the Bayside extension completed in 1992) to connect to the Convention
Center and the Gaslamp Quarter.
This is the original mainline. It starts a Santa Teresa and head north in the median of Guadalupe
Expwy. It then swings thru downtown San Jose and north onto 1st St. Before the Mt View line
opened, trains swung west onto Tasman to Old Ironsides. Now trains swing east and end at the
3-track Baypointe station.
San Jose North Corridor -- Service started on the North Corridor line in December 1987. This
initial nine-mile segment from Santa Clara through downtown San Jose was completed in June
1988. This portion of the Guadalupe Corridor Project opened in December 1987, connecting the
cities of San Jose and Santa Clara with the surrounding suburban areas. The initial phase of the
light rail system consisted of a 20-mile North Line that is mainly located along the median area
of major roadways and along a transitway through downtown San Jose. The alignment is atgrade along the full length and included very little in new structural requirements. Only one
bridge and two overpasses in new guideway facilities were necessary to connect the full length
of the alignment. Almost the entire line is double-tracked with only two small sections of singletrack operation. There were 22 stations in operation with the expansion to 30 upon completion
of that full line length to the southern sections of San Jose. This north section is the portion of
the Guadalupe Corridor included in the cost database.
San Jose South Corridor -- This South Line extension added ten more miles of right-of-way to
this Guadalupe light rail line, but since construction was not completed at the time of the
original capital cost study and actual final construction costs were not available, this section was
not included in that portion of the research project. However, some of the original system
elements and support facilities included in this study for the North Line were designed to
include this additional South Line operational needs and corresponding cost impacts. Service to
the Tamien Station (Alma Avenue), two miles south of downtown, began in August 1990. The
entire 20.8-mile line was completed in April 1991.
3.10.2
This line extends from Mt. View in the West to Milpitas at I-880 in the East. It connects with the
Guadalupe line at Baypointe. This line is to be extended down the Capitol corridor in a few
years.
Federal Transit Administration
Office of Program Management
3-20
The Tasman West line, which connects Mountain View with the existing light rail service, was
completed in December of 1999. Construction is already underway on the Tasman East/Capitol
Light Rail project to extend service from Milpitas to the Baypointe station.
3-21
4.0
This section describes the design, functionality and use of the completed Light Rail Capital
Cost Database. Specifically, this includes the following:
Database Design: How the LRT project cost data are stored in the database,
Normalization and Adjustment: Conversion of the collected cost data to a comparable unit
cost basis (e.g., cost year and cost locality)
Unit Cost Functions: Estimation of unit cost models for use in analyzing cost for
completed projects and estimating/validating costs for proposed projects
Variance Analysis: Use of the model database and unit cost functions to evaluate
differences in the total project costs for individual projects documented in the database.
The completed Light Rail Capital Cost Database, including all related analyses and user tools,
is contained within a single Excel workbook.
4-1
Exhibit 4-1
LRT Capital Cost Database: Workbook Flowchart
LIGHT RAIL CAPITAL COST DATABASE
COST FUNCTIONS
ANALYSIS TOOLS
UnitCostFunctions
This worksheet
converts the total
cost and unit quantity
data reported in the
Cost Database
worksheet to a unit
cost basis. It then
adjusts these unit
costs to a common
$2003 national basis
uses the index data
in the "Cost
Adjustment"
worksheet.
CostDatabase
Detailed total cost,unit
quantity and procurement
date / midpoint of
constuction data for all
projects currently stored in
the model. All cost and
unit quantity data are
reported by cost category
and element. Costs are
reported in their original
year-of-expenditure and
city-of-expenditure dollars
(i.e., unadjusted).
AdjustmentFactors
This worksheet contains all cost index data
required to adjust the year-of-expenditure
and city-of-expenditure data reported in the
CostDatabase to a common $2003
"National" basis. Specifically, this includes
both a time series index to convert to a
common year-of-expenditure ($2003) and a
cross sectional index to convert from city-ofexpenditure dollars to a national cost basis.
These data were obtained directly from
Means Capital Cost Estimation Reports.
ProjectSelect (Optional)
This worksheet allows the user to define model unit
costs based on the unit costs of a carefully
selected list of projects already stored in the model
0database. By doing so, the user can limit the cost
analysis to those database projects with cost
characteristics (e.g.,. design standards) believed to
most closely match the project for which costs are
currently being estimated.
4-2
Cost Model #1
Cost Model #1
Cost Model
Detailed
results #1
for Scenario_1: Projected FTE counts
Cost Model
#1
resultsamounts
for Scenario_1:
Projected
andDetailed
cost account
for Scenario
1 by FTE counts
Capital
Cost
Calculator
results
for
Scenario_1:
Projected
andDetailed
cost account
amounts
for Scenario
1 by FTE counts
4-3
performed using the cost index data reported in the AdjustmentFactors worksheet. The
conversion from year-of-expenditure to a common cost year is calculated based on the
midpoint of construction as reported in the CostDatabase worksheet. The common cost year is
currently set to $2003. This value can be reset on the AdjustmentFactors worksheet. The
Normalization worksheet automatically performs the normalization and adjustment
calculations for any new project cost data entered into the CostDatabase worksheet (up to the
maximum of thirty projects).
The layout and contents of the Normalization worksheet are reported in Appendix C of this
report.
The data reported in the Normalization worksheet provide a valuable unit cost reference for
analysts developing cost estimates for proposed LRT projects. When combined with the
project descriptions from Chapter 3, analysts can pick and choose which unit cost values are
most appropriate to a given cost analysis based on the design, geotechnical and other relevant
characteristics both of the projects reported in the database and of the proposed project for
which the cost estimates are being developed.
$35,000
$30,000
$25,000
$20,000
$15,000
$10,000
$5,000
$0
20,000
40,000
60,000
80,000
100,000
L.F. Guideway
4-4
120,000
140,000
160,000
$ per Foot
$700
$600
$500
$400
$300
$200
$100
$0
0
50,000
100,000
150,000
200,000
250,000
300,000
250,000
300,000
25
30
L.F. Guideway
Communications System
$300
$ per Foot
$250
$200
$150
$100
$50
$0
0
50,000
100,000
150,000
200,000
Track Feet
At-Grade Stations
$5.0
$4.0
$3.0
$2.0
$1.0
$0.0
0
10
15
20
Stations
The unit cost functions were statistically estimated using regression analysis of the unit cost
and quantity data contained in the Normalization and CostDatabase worksheets and were
designed to capture the economies of scale (i.e., decreasing unit costs) associated with
increasing project size. Specifically, it was assumed that the capital costs for each project
element include both fixed and variable cost components. The variable cost component
recognizes the increase in total costs as increasing unit quantities are purchased. At the same
time, the fixed cost concept assumes there are some components of development costs (e.g.,
design costs) that are inescapable and that do not vary regardless of the number of units
purchased. This concept can be expressed mathematically as follows:
4-5
(1)
Where is the slope term and is an asymptote (note: is the variable cost per unit and the
unit cost approaches this value as x, the number of units, gets very large). Regression analysis
was used to estimate these unit cost relationships for all cost elements identified in the capital
cost database structure. The estimated unit cost relationships are located on the CostFunction
worksheet. The layout and contents of the CostFunction worksheet are reported in Appendix
D of this report.
Unlike the unit cost functions for the seven hard cost categories, the cost functions for project
soft-costs are based on a per unit of physical asset. Rather, unit costs for this cost category
are expressed as a percentage of the total project hard costs (i.e., the sum of project costs for
cost categories 1 through 7). These percentage amounts reflect the average ratio of soft costs to
total hard costs (by soft cost element) across all projects documented in the capital cost
database. These ratios will change to reflect any new project cost data added to the
CostDatabase worksheet.
Note that the unit cost functions maintained in the CostFunction worksheet are not
automated, but hard coded into the worksheet. Reasons for not automating these relationships
include the high level of model complexity required and statistical problems relating to the
small sample sizes for many key cost elements. At the same time, it is important that the unit
cost models reflect information available when new projects become added to the underlying
database (i.e., in the CostDatabase worksheet). To do so, the CostFunction worksheet
performs a simple pivot point analysis that recognizes the addition of new data to the
CostDatabase worksheet ad adjusts the unit cost functions accordingly. A more detailed
description of this process is proved in Appendix E.
4-6
functions to reflect the cost experience of that limited set of projects. Use of the CostDatabase
worksheet is optional both for the variance analysis described above and for the cost calculator
described in the next chapter.
4-7
5.0
Simple comparisons of total project costs for the nineteen LRT projects documented in the
Capital Cost Database point to significant cost differences across these light rail investments. A
primary goal of this LRT Capital Cost Study Update is to examine the origins of these cost
differences and to identify their primary cost drivers. This chapter seeks to address these issues.
Specifically, it considers the following:
The foundation of the project cost variance analyses is the set of unit cost functions found on the
CostFunctions worksheet and described in detail in Chapter 4. Together with the Standard
Model LRT concept described below, these unit cost relationships provide a powerful tool to
analyze differences in unit and total costs across all projects documented in the Light Rail
Capital Cost Database.
5-1
projects are added to (or removed from) the LRT Capital Cost database and the entire model
cost baseline is updated.
When used to assess the cost attributes of a specific project, the mix of assets within the
Standard Model LRT definition are scaled to reflect the dimensions of the project under
consideration. For example, if the project under consideration consists of 100,000 lineal feet of
guideway, the parameters that define the Standard Model LRT (e.g., x feet of trackwork per
lineal foot of guideway, y stations per lineal foot of guideway, z vehicles per 1,000 design period
passengers) are used to estimate the unit quantities for a typical LRT investment of 100,000
lineal feet in length. In practice, the Standard Model LRT uses two primary drivers to determine
the unit quantities for each of the eight cost categories recognized by the database: these are
Total Guideway Length and Peak Period Ridership. The relationship of these primary unit
quantity drivers to the unit quantity requirements for the eight individual cost categories is
presented below in Exhibit 5-1.
Exhibit 5-1
Standard LRT Model
Stations
Trackwork
Systems
Vehicles
Soft Costs
In addition to this quantity-based definition, the unit costs for the Standard Model LRT are
defined by the unit cost functions described in Chapter 4. As described there, these unit cost
functions provide a measure of the typical unit cost experience of the projects documented in
the LRT Capital Cost Database.
Putting all these pieces togetherincluding the unit quantity relationships and the unit cost
functionsthe Standard Model LRT provides an effective means of determining why the total
cost of a given light rail investment is above, below or close to analysts prior expectations
based on standard metrics such as $X per mile of alignment.
Federal Transit Administration
Office of Program Management
5-2
120,000
100,000
AT GRADE-IN-STREET GUIDEWAY
AT GRADE GUIDEWAY
80,000
60,000
40,000
Sacramento Stage 1
(1991)
Portland
Westside/Hillsboro MAX
Sacramento Folsom
Corridor
Hiawatha Corridor
Hudson-Bergen MOS-I
Denver Southwest
Corridor
Sacramento South
Corridor
Hudson-Bergen MOS-II
20,000
140,000
Based on this analysis of alignment mix and other project characteristics, it quickly becomes
clear that use of a simple cost baseline that assumes an all at-grade alignment, one-mile
station spacing and other industry rule of thumb standards is simply not representative of the
Federal Transit Administration
Office of Program Management
5-3
types of projects completed over the past twenty years. (Note: A cost baseline that assumed a
fully at-grade alignment as typical, would make all but four of the database projects appear to
be above average cost). Rather, the project team choose to select as the cost baseline the
Standard Model LRT. Specifically, this model represents the average alignment mix, station
mix (grade and spacing), fleet size, trackwork types and other project characteristics across all
nineteen projects in the database. A complete listing of the asset mix characteristics for the
Standard Model LRT is presented in Appendix G.
Having established this cost baseline, it is crucial to emphasize that significant cost and/or
quantity differences between an actual LRT project and those for a typical project as represented
by the Standard Model LRT do not imply that the actual project costs are somehow wrong.
There are, of course, imperative reasons why some projects include a higher mix of gradeseparated alignment, larger fleet sizes and other cost and quantity differences relative to a
typical LRT project. Rather, significant cost variations relative to the Standard Model LRT
concept merely provide a means to understanding the cost characteristics of a given project and
how and why they differ from other projects. Once again, the Standard Model LRT is merely
intended to act as a reference point, it does not in any way represent a preferred cost profile for
proposed LRT projects.
5.1.3 Cost Variance Analysis Worksheets
While the cost variance analysis using the Standard Model LRT concept is spread across several
worksheets within the Light Rail Capital Cost Workbook, the foundation for this analysis is
located on the Var_Total worksheet (see Appendix H). Specifically, the Var_Total worksheet
calculates three separate unit and total cost estimates for projects contained in the Capital Cost
Database (where the user selects the specific project). These cost values are as follows:
1. Actual Project Costs The cost actuals for the project under consideration, based on the
actual unit costs and actual unit quantities (Var_Total worksheet: total costs column M)
2. The Quantity Adjusted Cost Estimate Cost estimates based on the actual unit costs for the
project under consideration but using the unit quantities for a typical (Standard Model)
LRT investment of the same length and ridership. (Var_Total worksheet: total costs column
L). This estimate demonstrates the variance in individual project definitions from a
Standard Model LRT project of similar size.
3. The Standard Model Cost Estimate Cost estimates based on the unit costs and unit
quantities for a typical (Standard Model) LRT investment of the same length and
ridership as the project under consideration (Var_Total worksheet: total costs column K).
This estimate demonstrates the variance in the unit costs of the project under analysis from
that of an average LRT project of similar length (based on the unit cost functions described
in Chapter 4).
Comparison of these three cost values reveals to what degree project costs are driven by
variations in unit quantities versus by variations in unit costs relative to a typical LRT
investment as represented by the Standard Model LRT. Specifically, the cost difference between
the Actual Project Cost and the Quantity Adjusted Cost Estimate (i.e., the unit-quantity cost
variance) is determined by the difference between the unit quantities for the actual project versus
those for the Standard Model LRT. In contrast, the cost difference between the Quantity
Federal Transit Administration
Office of Program Management
5-4
Adjusted Cost Estimate and the Standard Model LRT (i.e., the unit-cost variance) is determined
by the difference in unit costs between the actual project and the Standard Model LRT (e.g., the
project alignment may including a higher proportion of underground construction leading to
higher total project costs). Finally, the total cost variance between the Actual Project Cost and
the Standard Model LRT Cost Estimate is the sum of unit-quantity and unit-cost cost variances.
These cost relationships are presented diagrammatically in Exhibit 5-3.
Exhibit 5-3
Cost Variance Analysis
Standard Model
Cost Estimate:
Standard unit costs
and quantities
Unit-Cost Cost
Variance:
Difference in total
costs resulting from
difference in unit
costs between
the project and a
typical LRT
investment
Project Cost
Actuals:
Project unit costs and
unit quantities
Unit-Quantity Cost
Variance:
Difference in total
costs resulting from
difference in unit
quantities between
the project and a
typical LRT
investment
+
Total Cost Variance:
Sum of the unitquanity and unit-cost
cost variances
Performing this cost variance analysis on a cost category and cost element basis provides an
effective means of identifying those cost drivers having the greatest impact on total project cost.
An example of this type of cost category level variance analysis is presented below in Exhibit 54. Specifically this analysis is for Pittsburghs initial Stage 1 light rail segment. The results
suggest that the cost variance relative to the Standard Model LRT results almost entirely from
differences in unit quantities. In particular, the guideway mix includes a higher proportion of
underground and retained cut guideway relative to a typical LRT project. The project also
included a larger then typical vehicle procurement. Partially offsetting these unit quantity
Federal Transit Administration
Office of Program Management
5-5
increases were generally lower unit costs relative to the unit cost values predicted by the
Databases unit cost functions. The higher unit requirements in the project definition are
illustrated by the positive value in the unit-quantity variance while the higher unit costs are
illustrated of the positive unit-cost variance. The total cost variance represents their combined
impact as compared to the Standard Model LRT.
Inspection of the results in Exhibit 5-4 and Exhibit 5-5 demonstrate how elements from the
different LRT cost categories can be grouped into related cost variance drivers. For example,
Pittsburghs Stage 1 alignment includes a segment of underground alignment that, as a
proportion of total system length, is very long relative to the average of the projects
documented in the database. This relatively long subway segment is a primary source of the
significant increase in unit quantity expenditures both on underground guideway elements and
underground stations. Similar groupings can be prepared for trackwork (which drives
investment in systems) and vehicles (which drive investments in yards & shops).
5.1.4 Standard Model LRT Versus Actual Project Costs
The Standard Model LRT concept is intended to provide a cost reference point for projects of all
sizes. As such, it also provides a valuable means of examining how project costs change as a
function of size (e.g., do larger projects enjoy significant economies of scale?). At the same time,
the actual project costs for the nineteen projects documented in the Capital Cost Database
provide a means of confirming (or refuting) the validity of the Standard Model LRT approach.
In other words, does the Standard Model behave help explain actual cost behavior?
Preliminary answers to these questions are provided by Exhibits 5-6 through 5-8. Each of these
exhibits plots the Standard Model LRT costs against project size in the form of total alignment
length. Specifically, Exhibit 5-6 presents the Standard Model LRT in total cost form, Exhibit 5-7
presents the Standard Model LRT in total cost per foot of guideway form and finally Exhibit 5-8
converts the total cost per lineal foot values in Exhibit 5-7 to a log-log scale. As expected, total
project costs increase with project size while total costs per unit of guideway decline reflecting
the form of the unit cost functions underlying development of the Standard Model LRT. Also,
the lumpy nature of the Standard Model LRT cost functions reflects discrete or step-wise
investments in vehicles, stations and maintenance facilities.
Review of Exhibits 5-6 and 5-7 underscores the significant economies of scale from increased
project size. For example, the Standard Model LRT predicts a 25 percent reduction in cost per
lineal foot for projects of 100,000 lineal feet versus a similar project of 50,000 lineal feet. These
economies of scale become less favorable for larger project sizes but are much more significant
(negatively so) for projects of smaller size.
Directly related to these economies of scale is the models prediction of fixed costs. Specifically,
the total cost chart in Exhibit 5-5 suggests that fixed costs for a typical LRT project are roughly
$180 million per project (i.e., the predicted level of expenditures for a project of zero length).
Once again, these fixed costs represent required expenditures for all new investments,
independent of project size, for such elements as design, construction crew mobilization, project
oversight, etc. For smaller projects, these fixed costs are spread over a relatively small base
leading to higher costs on a per foot of guideway basis. As project size increases (e.g., total
Federal Transit Administration
Office of Program Management
5-6
guideway length increases), these fixed costs become distributed over a larger base leading to
lower costs per unit length, in other words economies of scale.
The black diamonds in Exhibits 5-5 through 5-7 represent the cost actuals for the nineteen
projects documented in LRT Capital Cost Database. Though well distributed about the
Standard Model LRT cost function, these actual cost data points generally follow the same cost
trend as the Standard Model function itself (i.e., the total cost actuals tend to increase with
project alignment length while actual cost per foot of guideway tend to decrease). The
relationship between the Standard Model LRT cost function predictions and the cost actuals
becomes even more apparent when the cost actuals are quantity adjusted to eliminate
differences in asset mix (represented by the white triangles). Specifically, this quantity
adjustment modifies each project to utilize the same mix of alignment grades, trackwork types,
number and type of stations, number of vehicles purchased etc. as the Standard Model LRT.
With a few exceptions, this quantity adjustment has the effect of shifting the cost actuals for the
nineteen database projects closer to Standard Model LRT cost function. The remaining
difference between the quantity adjusted actuals and the Standard Model LRT cost function is
strictly the result of differences in unit costs between these two cost values. All unit-quantity
differences have been removed. (Note: the vertical difference between the cost actual and the
quantity adjusted actual is the unit-quantity variance; the difference between the quantity
adjusted actual and the Standard Model LRT cost function is the unit-cost variance). These
quantity adjusted points provide further empirical evidence of declining capital costs per unit of
guideway investment (i.e., economies of scale).
Exhibits 5-9 through 5-11 present revised versions of Exhibits 5-6 through 5-8 respectively.
Specifically, these exhibits present various rebasing of the Standard Model LRT to reflect the
unit cost and unit quantity experiences of subsets of the nineteen projects documented within
the project database. For example, while the Standard Model LRT concept has been defined
thus far to include all nineteen projects documented in the project database, the lowest curve in
this series of exhibits only reflects the unit cost and quantity experience of the four projects that
are entirely at-grade. Similarly, the dotted grey curve captures the average cost experience of
those projects with a high mix of grade separation (65% at-grade, 5% subway, 24% other grade
types) while the dotted dark curve captures the cost experience of the highest-grade separation
(no at-grade alignment). The end result is a family of curves that demonstrates the impact of
alternate alignment mixes (and related project characteristics) on expected project cost.
5-7
Exhibit 5-4
Cost Variance Analysis: By Cost Category
Note: To ensure valid project to project comparisons, the variance analysis exc
5.00 VEHICLES
6.00 SPECIAL CONDITIONS
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
PLANNING/DESIGN
CONST./PROJ MANAGEMENT
PROJECT INITIATION/TRAINING/START-UP/TESTING
OTHER SOFT COSTS
Units
of
Measure
$19,637,682
$16,518,355
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
$5,551,988
($5,534,500)
$26,183,942
($2,860,954)
($6,822,121)
$189,201,100
$88,622,183
($3,579,703)
($9,908,133)
$97,773,788
$4,790,170
($453,938)
$208,838,782
$105,140,538
$1,972,284
($15,442,633)
$123,957,730
$1,929,216
($7,276,059)
Station
($8,365,019)
$16,866,353
$7,968,890
Station
Station
Station
Spaces
Each
$7,968,890
$0
$0
$0
$0
($4,290,864)
$18,548,933
$0
($5,250,036)
($565,779)
$3,678,026
$18,548,933
$0
($5,250,036)
($565,779)
Total
($13,631,346)
($20,054,969)
($921,295)
$21,256,714
$26,090,655
($6,630,318)
($2,152,010)
$45,230,673
$12,459,308
($26,685,287)
($3,073,305)
$66,487,387
Total
Total
Total
Total
$48,148,620
($16,281,364)
($8,129,167)
($2,481,376)
Rev. Vehicle
Track Feet
Rev. Vehicle
L.F. Guideway
L.F. Guideway
5-8
$27,191,582
$2,406,080
$8,442,254
$36,355,873
$8,874,800
$0
$0
$18,826,563
$19,272,434
$16,411,144
$84,504,493
($7,406,564)
($8,129,167)
($2,481,376)
Exhibit 5-5
Cost Variance Analysis: By Cost Driver
Note: To ensure valid project to project comparisons, the variance analysis exc
Units
of
Measure
L.F. Guideway
L.F. Guideway
$13,520,878
($7,870,567)
$5,650,311
L.F. Guideway
($5,534,500)
($9,908,133)
($15,442,633)
L.F. Guideway
$26,183,942
L.F. Guideway
B: TRACKWORK RELATED
TRACKWORK (track, systems)
C: VEHICLE RELATED
REV. VEHICLE (rev veh, non-rev veh, yards & shops, on-board fare
D: STATION RELATED
STATIONS (stations, parking, ped overpasses, elevators/esc)
E: SPECIAL CONDITIONS
F: RIGHT-OF-WAY
G: SOFT-COSTS
L.F. Guideway
($2,860,954)
$189,201,100
$103,334,190
$19,637,682
$31,309,366
$116,322,721
$208,838,782
$134,643,556
$142,506,663
$4,790,170
$1,929,216
Track Feet
$10,044,233
$1,952,142
$11,996,375
Track Feet
$10,044,233
$1,952,142
$11,996,375
$31,285,871
Rev. Vehicle
($21,996,366)
$53,282,237
Rev. Vehicle
($21,996,366)
$53,282,237
$31,285,871
$8,442,254
$16,411,144
$7,968,890
Station
Station
$7,968,890
($20,054,969)
($921,295)
$21,256,714
L.F. Guideway
L.F. Guideway
Total
5-9
$8,442,254
($6,630,318)
($2,152,010)
$45,230,673
$16,411,144
($26,685,287)
($3,073,305)
$66,487,387
Exhibit 5-6
Standard Model LRT: Total Project Cost
Quantity Adjusted
LA Blue Line
Portland Westside/Hillsboro MAX
Hudson-Bergen MOS II
$ Millions
$1,000
Pittsburgh Stage I
Hudson-Bergen MOS I
$800
Southern New Jersey LRT
Hiawatha
$600
$400
Pittsburgh Stage II
$200
$0
0
10
20
30
40
50
60
70
80
90
5-10
100
110
120
130
140
150
Exhibit 5-7
Standard Model LRT: Total Project Cost per Foot of Guideway
$30,000
$25,000
$20,000
Hudson-Bergen MOS I
Mission Valley
$15,000
Pittsburgh Stage II
Portland Westside/Hillsboro MAX
Pittsburgh Stage I
$10,000
LA Blue Line
Hiawatha
Sacramento South Corridor
$5,000
Pasadena Gold
Sacramento Stage I
$0
0
10
20
30
40
50
60
70
80
90
100
110
5-11
120
130
140
150
Exhibit 5-8
Standard Model LRT: Cost per Foot of Guideway
4.6
Actuals
Quantity Adjusted
4.4
Hudson-Bergen MOS I
4.2
Mission Valley
Pittsburgh Stage II
Hiawatha
4.0
Pittsburgh Stage I
LA Blue Line
3.8
Pasadena Gold
Denver Southwest Corridor
3.6
3.4
Sacramento Stage I
3.2
4.2
4.3
4.4
4.5
4.6
4.7
4.8
5-12
4.9
5.0
5.1
5.2
5.3
Exhibit 5-9
Rebasing of Standard Model LRT: Total Project Cost
100% At-Grade
Standard Model (83% at-grade, 5% subway, 24% other)
High Mix Projects (65% at-grade, 11% subway, 24% other)
$1,200
LA Blue Line
Actuals
Portland Westside/Hillsboro MAX
Hudson-Bergen MOS II
$ Millions
$1,000
Pittsburgh Stage I
Hudson-Bergen MOS I
$800
Southern New Jersey LRT
Minneapolis Hiawatha
$600
$400
Pittsburgh Stage II
Pasadena Gold
Salt Lake North-South
Sacramento Stage I
$200
$0
0
10
20
30
40
50
60
70
80
90
5-13
100
110
120
130
140
150
Exhibit 5-10
Rebasing of Standard Model LRT: Total Project Cost per Foot of Guideway
100% At-Grade
Standard Model (83% at-grade, 5% subway, 24% other)
$30,000
$25,000
$20,000
Hudson-Bergen MOS I
San Diego Mission Valley East
$15,000
Pittsburgh Stage II
$10,000
Minneapolis Hiawatha
$5,000
Pasadena Gold
LA Blue Line
Sacramento Stage I
$0
0
10
20
30
40
50
60
70
80
90
100
110
5-14
120
130
140
150
Exhibit 5-11
Rebasing of Standard Model LRT: Cost per Foot of Guideway
4.6
Hudson-Bergen MOS II
4.4
4.2
Hudson-Bergen MOS I
Pittsburgh Stage II
Pittsburgh Stage I
4.0
Minneapolis Hiawatha
LA Blue Line
3.8
Pasadena Gold
3.6
3.4
Sacramento Stage I
3.2
4.3
4.4
4.5
4.6
4.7
4.8
4.9
5-15
5.0
5.1
5.2
5.3
For each project, the analysis provides two exhibits. The first exhibit provides a summary of the
project unit quantities, unit costs (cost category level), total costs (both in Denvers local $1999
year-of-expenditure dollars and also in $2003 adjusted to national average prices) and finally
cost shares for each cost category. The second exhibit presents the cost and quantity variances
for the eight major cost categories, for several of the larger cost elements and for the project as a
whole. Its is important to note here that the cost variance analysis does not include project soft
costs relating to early phases of project design or for project financing. The reason being that
these costs were not reported for all database projects, hence the decision was made to ignore
these costs in the variance analysis to place all projects on an equal basis. Hence, these costs do
appear in the pie chart distributions of project costs but not in the accompanying variance
analysis charts.
5.2.1 Denver Southwest Corridor
Analysis results for Denvers Southwest Corridor project are presented in Exhibits 5-12 and 513. The analysis reveals a project with a total cost per linear foot of $4,644, which is well below
the average of $10,189 per linear foot ($2003), and places the Denver Southwest Corridor in the
lowest cost quartile across the nineteen projects studied. Based on the cost variance analysis
(Exhibit 5-13), the low project cost results from a combination of low unit-quantity expenditures
relative to a typical project (as represented by the Standard Model LRT) and also from below
Federal Transit Administration
Office of Program Management
5-16
average unit costs. The combined impact of these two variances yields a project cost that is 46
percent lower than that predicted by the Standard Model LRT. These cost savings resulted from
the following primary sources:
Relatively low soft cost expenditures (18.7 percent versus the average of 23.5 percent)
Above average unit costs for a project of its size primarily for the Systems, Special
Conditions and Soft-Costs cost categories.
Small unit-quantity variance (i.e., the project has a mix of assets and alignment types
representative of a typical LRT investment)
5-17
SYSTEMS (6.5%)
RIGHT-OF-WAY (21.8%)
STATIONS (10.7%)
Asset Category
Unit
of
Measure
Units
Total Costs
$1999-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
44,687
$1,057
$40,300,000
$47,219,037
22.8%
Rev. Vehicles
18
$26,038
$400,000
$468,675
0.2%
92,546
$147
$11,600,000
$13,591,584
6.5%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
$4,452,415
$19,000,000
$22,262,077
10.7%
5.00 VEHICLES
Rev. Vehicles
18
$2,128,567
$32,700,000
$38,314,206
18.5%
L.F. Guideway
44,687
$37
$1,400,000
$1,640,364
0.8%
7.00 RIGHT-OF-WAY
L.F. Guideway
44,687
$1,012
$38,600,000
$45,227,167
21.8%
L.F. Guideway
44,687
$3,776
$144,000,000
$168,723,111
81.3%
$33,100,000
$38,782,882
18.7%
$177,100,000
$207,505,993
100.0%
% of Hard Costs
L.F. Guideway
$144,000,000
44,687
5-18
23.0%
$4,644
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($180)
($160)
($140)
($120)
($100)
($80)
($60)
($40)
($20)
$0
$20
$40
Millions
5-19
RIGHT-OF-WAY (6.8%)
SYSTEMS (14.4%)
STATIONS (7.5%)
Asset Category
Unit
of
Measure
Units
Total Costs
$1987-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
119,283
$1,705
$148,719,104
$203,346,460
17.0%
Rev. Vehicles
54
$836,212
$33,024,821
$45,155,466
3.8%
238,566
$725
$126,453,164
$172,901,816
14.4%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
22
$4,095,337
$65,893,479
$90,097,407
7.5%
5.00 VEHICLES
Rev. Vehicles
54
$2,024,117
$79,939,129
$109,302,292
9.1%
L.F. Guideway
119,283
$1,901
$152,349,392
$226,720,205
17.4%
7.00 RIGHT-OF-WAY
L.F. Guideway
119,283
$689
$60,084,803
$82,155,094
6.8%
119,283
$7,794
% of Hard Costs
L.F. Guideway
L.F. Guideway
$666,463,892
119,283
5-20
31.0%
$10,210
$666,463,892
$929,678,739
76.0%
$210,805,963
$288,239,003
24.0%
$877,269,855
$1,217,917,742
100.0%
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($50)
$0
$50
$100
$150
$200
$250
$300
$350
$400
Millions
5-21
Above average unit costs for a project of its size (roughly 32 percent higher) primarily
relating to increased unit costs at-grade guideway, systems and trackwork.
5-22
Hiawatha Corridor
SOFT-COSTS (10.8%)
RIGHT-OF-WAY (7.3%)
STATIONS (6.8%)
YARDS & SHOPS (5.4%)
SYSTEMS (15.4%)
Asset Category
Unit
of
Measure
Hiawatha Corridor
Unit Costs
$2003-National
Units
Total Costs
$2002-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
61,248
$4,159
$280,857,379
$254,741,016
41.6%
Rev. Vehicles
26
$1,278,436
$36,647,066
$33,239,329
5.4%
122,496
$768
$103,707,649
$94,064,083
15.4%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
17
$2,456,984
$46,050,906
$41,768,725
6.8%
5.00 VEHICLES
Rev. Vehicles
26
$2,606,299
$74,711,000
$67,763,774
11.1%
L.F. Guideway
61,248
$166
$11,243,000
$10,197,536
1.7%
7.00 RIGHT-OF-WAY
L.F. Guideway
61,248
$726
$49,026,000
$44,467,171
7.3%
61,248
$8,919
$602,243,000
$546,241,633
89.2%
% of Hard Costs
$73,187,000
$66,381,488
10.8%
$675,430,000
$612,623,121
100.0%
L.F. Guideway
L.F. Guideway
$602,243,000
61,248
5-23
12.2%
$10,002
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($100)
($50)
$0
$50
$100
$150
$200
Millions
5-24
SOFT-COSTS (29.4%)
SYSTEMS (5.8%)
RIGHT-OF-WAY (4.6%)
STATIONS (12.0%)
Asset Category
Unit
of
Measure
Hudson-Bergen MOS-I
Unit Costs
$2003-National
Units
Total Costs
$1999-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
45,900
$4,783
$213,937,981
$219,535,351
21.6%
Rev. Vehicles
70
$665,057
$45,367,000
$46,553,960
4.6%
91,800
$646
$57,835,000
$59,348,167
5.8%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
14
$8,693,070
$118,599,991
$121,702,983
12.0%
5.00 VEHICLES
Rev. Vehicles
29
$3,487,505
$98,559,000
$101,137,650
9.9%
L.F. Guideway
45,900
$2,704
$120,964,991
$124,129,860
12.2%
7.00 RIGHT-OF-WAY
L.F. Guideway
45,900
$1,014
$45,338,038
$46,524,241
4.6%
L.F. Guideway
45,900
$15,663
$700,602,000
$718,932,212
70.6%
$291,538,000
$299,165,659
29.4%
$992,140,000
$1,018,097,872
100.0%
% of Hard Costs
L.F. Guideway
$700,602,000
45,900
5-25
41.6%
$22,181
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($50)
$0
$50
$100
$150
$200
$250
$300
$350
$400
$450
Millions
5-26
The primary cost characteristics for the Hudson-Bergen MOS I project are as follows:
High unit-costs driven in part by a relatively short project alignment and also for
construction of a high ridership rail transit system in a well developed urban environment
(leading to high utility relocation expenses)
A 35 percent unit-quantity variance driven primarily by the design requirements for a high
ridership system.
High unit-costs driven by a relatively short project alignment (distributing fixed costs over a
smaller base) and also for construction of a high ridership rail transit system in a well
developed urban environment (leading to high utility relocation expenses)
A small 12 percent unit-quantity variance driven primarily by the design requirements for a
high ridership system.
5-27
RIGHT-OF-WAY (3.2%)
VEHICLES (6.2%)
Asset Category
Unit
of
Measure
Hudson-Bergen MOS-II
Unit Costs
$2003-National
Units
Total Costs
$2000-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
30,704
$13,714
$421,838,000
$421,059,325
34.6%
Rev. Vehicles
$0
$0
$0
0.0%
61,193
$1,222
$74,911,000
$74,772,721
6.1%
$74,349,254
$148,973,500
$148,698,508
12.2%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
5.00 VEHICLES
Rev. Vehicles
23
$3,293,127
$75,882,000
$75,741,929
6.2%
L.F. Guideway
30,704
$5,491
$168,917,500
$168,605,694
13.9%
7.00 RIGHT-OF-WAY
L.F. Guideway
30,704
$1,270
$39,077,000
$39,004,867
3.2%
30,704
$30,220
$929,599,000
$927,883,045
76.3%
% of Hard Costs
$288,875,000
$288,341,763
23.7%
$1,218,474,000
$1,216,224,808
100.0%
L.F. Guideway
L.F. Guideway
$929,599,000
30,704
5-28
31.1%
$39,611
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($200)
($100)
$0
$100
$200
$300
$400
$500
$600
$700
$800
Millions
5-29
Below average unit-quantity related costs resulting primarily from the absence of any
vehicle purchases.
Below average unit-costs for at-grade guideway and right-of-way acquisition due to existing
freight right-of-way purchased prior to the start of this project.
5-30
RIGHT-OF-WAY (2.5%)
SYSTEMS (13.8%)
SPECIAL CONDITIONS (16.9%)
VEHICLES (0.1%)
Asset Category
Unit
of
Measure
STATIONS (12.9%)
Units
Total Costs
$2002-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
73,730
$1,180
$89,154,842
$87,013,905
22.1%
Rev. Vehicles
25
$649,928
$16,647,970
$16,248,191
4.1%
147,166
$370
$55,815,978
$54,475,630
13.8%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
13
$3,899,517
$51,941,011
$50,693,715
12.9%
5.00 VEHICLES
Rev. Vehicles
25
$20,649
$528,933
$516,231
0.1%
L.F. Guideway
73,730
$902
$68,108,837
$66,473,292
16.9%
7.00 RIGHT-OF-WAY
L.F. Guideway
73,730
$134
$10,101,841
$9,859,259
2.5%
L.F. Guideway
73,730
$3,869
$292,299,412
$285,280,224
72.4%
$111,318,897
$108,645,720
27.6%
$403,618,310
$393,925,943
100.0%
% of Hard Costs
L.F. Guideway
$292,299,412
73,730
5-31
38.1%
$5,343
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($160)
($140)
($120)
($100)
($80)
($60)
($40)
($20)
$0
$20
$40
Millions
5-32
Exhibit 5-24
Analysis on Pittsburgh Light Rail Stage 1
RIGHT-OF-WAY (3.9%)
STATIONS (6.2%)
Asset Category
Unit
of
Measure
Units
Total Costs
$1985-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
82,198
$3,932
$202,419,030
$323,177,846
36.4%
Rev. Vehicles
97
$610,922
$37,116,525
$59,259,441
6.7%
164,394
$582
$59,951,818
$95,717,776
10.8%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
12
$4,561,262
$34,282,779
$54,735,144
6.2%
5.00 VEHICLES
Rev. Vehicles
55
$1,666,231
$57,399,440
$91,642,705
10.3%
L.F. Guideway
82,198
$196
$10,038,972
$16,145,284
1.8%
7.00 RIGHT-OF-WAY
L.F. Guideway
82,198
$430
$21,511,920
$35,373,261
3.9%
L.F. Guideway
82,198
$8,225
$422,720,484
$676,051,455
76.1%
$132,804,580
$212,032,920
23.9%
$555,525,064
$888,084,376
100.0%
% of Hard Costs
L.F. Guideway
$422,720,484
82,198
5-33
31.4%
$10,804
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($50)
$0
$50
$100
$150
$200
$250
Millions
5-34
The primary cost characteristics for the Pittsburghs Stage I project are as follows:
High unit-quantity variance driven by a high proportion of subway alignment and related
expenditures. This unit-quantity variance yielded a cost increase of over 50percent relative
to a typical LRT project of the same alignment length.
Project unit costs are only marginally higher than standard industry experience.
High unit-quantity variance driven by a high proportions of elevated, elevated fill and
retained cut guideway alignment, extensive station parking facilities and large revenue
vehicle procurement for a project of this size. This unit-quantity variance yielded a cost
increase of roughly 20 percent relative to a typical LRT project of the same alignment
length.
Project unit costs are only marginally higher than standard industry experience.
5-35
RIGHT-OF-WAY (0.8%)
YARDS & SHOPS (1.0%)
SYSTEMS (15.8%)
VEHICLES (17.7%)
Asset Category
1.00 GUIDEWAY
2.00 YARDS &
3.00
4.00
5.00 VEHICLES
6.00 SPECIAL
7.00 RIGHT-OFTOTAL HARD
8.00 SOFTTOTAL PROJECT
Federal Transit Administration
Office of Program Management
Unit
of
Measure
L.F. Guideway
Rev. Vehicles
STATIONS (10.7%)
Units
28,763
$3,354
Total Costs
$2003-Local
$94,133,841
$2003-National
$96,457,838
Percent of Total
Cost
24.4%
28
$150,982
$3,875,595
$4,227,488
1.0%
Track Feet
57,636
$1,121
$61,009,982
$60,888,206
15.8%
Stations
11
$3,751,421
$41,348,161
$41,265,630
10.7%
Rev. Vehicles
28
$2,371,580
$68,400,544
$66,404,226
17.7%
L.F. Guideway
28,763
$624
$17,520,479
$17,953,028
4.5%
L.F. Guideway
28,763
$105
$2,950,000
$3,022,830
0.8%
L.F. Guideway
28,763
$10,090
$289,238,602
$290,219,246
74.8%
$97,219,739
$99,619,921
25.2%
$386,458,341
$389,839,167
100.0%
% of Hard Costs
L.F. Guideway
$289,238,602
28,763
5-36
34.3%
$13,553
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($40)
($20)
$0
$20
$40
$60
$80
Millions
5-37
RIGHT-OF-WAY (6.1%)
Asset Category
Unit
of
Measure
SYSTEMS (8.6%)
Units
Total Costs
$1984-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
80,179
$1,814
$94,599,637
$145,462,935
38.3%
Rev. Vehicles
100
$182,404
$11,602,000
$18,240,436
4.7%
160,358
$203
$21,167,000
$32,547,841
8.6%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
25
$922,433
$15,107,000
$23,060,829
6.1%
5.00 VEHICLES
Rev. Vehicles
26
$1,747,093
$25,218,000
$45,424,414
10.2%
L.F. Guideway
80,179
$110
$5,756,000
$8,850,823
2.3%
7.00 RIGHT-OF-WAY
L.F. Guideway
80,179
$295
$15,070,000
$23,692,758
6.1%
80,179
$3,708
$188,519,637
$297,280,035
76.4%
% of Hard Costs
$58,278,000
$89,612,278
23.6%
$246,797,637
$386,892,313
100.0%
L.F. Guideway
L.F. Guideway
$188,519,637
80,179
5-38
30.1%
$4,825
7.00 RIGHT-OF-WAY
($120)
($100)
($80)
($60)
($40)
($20)
$0
$20
$40
Millions
5-39
The negative unit-quantity variance accounts for about $68 million or roughly two-thirds of the
relative cost savings and is driven by both the absence of any investment in subway guideway
and also by low special conditions requirements. The $34 million negative unit-cost variance
originates from a variety of cost savings across the project including those for yards & shops,
systems, vehicles and right-of-way. The combined impact of these two negative variances yields
a project cost that is 30 percent lower than that predicted by the Standard Model LRT.
The primary cost characteristics for Portlands MAX Segment 1 project are:
Negative unit-cost variance driven by slightly below average unit costs for yards & shops,
systems, vehicles and right-of-way.
5.2.10
Analysis results for Portland Interstate MAX are presented in Exhibits 5-30 and 5-31. Interstate
MAX has a total cost per linear foot of $11,244 ($2003) placing this 5.8 mile project among the
mid-tier cost projects documented in the database. Based on the cost variance analysis (Exhibit
5-31), this project has offsetting positive unit-quantity variance and negative unit-cost variance.
This offset yields a total project cost that is near the expected value for a project of this size. The
positive unit-quantity variance ($53 million) results primarily from extensive in-street guideway
alignment and higher quantity vehicle purchases relative to a typical LRT project (vehicle
purchases may be driven by the relatively high ridership projects for this project). The offsetting
negative unit-cost variance (-$48 million) is the result of low unit costs for yards & shops, rightof-way acquisition and soft costs.
The primary cost characteristics for Portlands Interstate MAX project are:
The positive unit-quantity expenditures primarily reflect the extensive use of in-street and
elevated guideway and related direct fixation and embedded trackwork. Vehicle quantity
purchases were also above average reflecting above average ridership projections.
The negative unit-cost variance is driven by below average unit costs for most cost
categories, in particular yards & shops, right-of-way acquisition and soft costs
5-40
VEHICLES (20.9%)
STATIONS (3.3%)
Asset Category
Unit
of
Measure
SYSTEMS (10.3%)
Units
Total Costs
$2002-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
30,408
$3,854
$119,609,651
$117,182,944
34.2%
Rev. Vehicles
24
$579,457
$14,194,955
$13,906,960
4.1%
60,816
$566
$36,104,512
$34,450,870
10.3%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
10
$1,117,672
$11,408,179
$11,176,724
3.3%
5.00 VEHICLES
Rev. Vehicles
24
$2,987,696
$73,189,604
$71,704,693
20.9%
L.F. Guideway
30,408
$646
$19,493,599
$19,647,688
5.6%
7.00 RIGHT-OF-WAY
L.F. Guideway
30,408
$209
$6,473,336
$6,342,001
1.9%
L.F. Guideway
30,408
$9,024
$280,473,836
$274,411,879
80.3%
$68,901,236
$67,503,329
19.7%
$349,375,072
$341,915,209
100.0%
% of Hard Costs
L.F. Guideway
$280,473,836
30,408
5-41
24.6%
$11,244
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($60)
($40)
($20)
$0
$20
$40
$60
Millions
5-42
5.2.11
Analysis results for Portland Westside/Hillsboro MAX are presented in Exhibits 5-32 and 5-33.
Westside/Hillsboro MAX has a total cost per linear foot of $11,964 ($2003) placing this 17.4 mile
project among the higher cost projects documented in the database. Based on the cost variance
analysis (Exhibit 5-33), this project has strong positive unit-quantity and unit-cost variances.
The positive unit-quantity variance ($145 million) results primarily from a high level of
investment in underground guideway and stations relative to the Standard Model LRT. The
positive unit-cost variance (over $250 million) is the result of high unit costs for at-grade
guideway, trackwork and soft-costs. Some of these above average costs may be explained by the
projects high than average projected ridership loads.
The primary cost characteristics for Portlands Westside/Hillsboro MAX project are:
Positive unit-quantity and unit-cost variances yielding total project cost per unit of
guideway that are higher than a typical LRT project of similar size. A primary driver of
these cost increases is the large proportion of subway guideway, stations and related
investments.
Unit costs were likewise higher than typical especially for at-grade guideway, trackwork
and soft-costs.
5.2.12
Sacramento Stage 1
Analysis results for Sacramento Stage 1 are presented in Exhibits 5-34 and 5-35. Sacramento
Stage 1 has a total cost per linear foot of $2,327 ($2003) making this 21.1 mile investment the
lowest cost project documented in the LRT Capital Cost Database. While unit costs for a project
of this length are expected to be lower than average (a cost behavior effect captured by the
Standard Model LRT), the total cost variance for this project points to total project costs that are
65 percent lower than that predicted by the Standard LRT model. This variance includes both
negative unit-quantity and negative unit-cost variances. The negative unit-quantity variance is
derived primarily from the absence of any investment in subway alignment, minimal abovegrade investments, low station density and low special conditions requirements. Similarly, the
negative unit-cost variance originates from below average unit costs across all cost categories
but in particular for systems, vehicles and soft-costs.
5-43
Exhibit 5-32
Analysis on Portland Westside/Hillsboro MAX 1
VEHICLES (11.2%)
STATIONS (10.4%)
Asset Category
Unit
of
Measure
SYSTEMS (7.4%)
Units
Total Costs
$1996-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
92,126
$4,439
$357,388,524
$408,917,537
37.1%
Rev. Vehicles
36
$621,051
$19,540,459
$22,357,843
2.0%
153,292
$534
$71,555,861
$81,872,932
7.4%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
20
$5,735,752
$100,259,433
$114,715,045
10.4%
5.00 VEHICLES
Rev. Vehicles
36
$3,441,474
$108,280,886
$123,893,047
11.2%
L.F. Guideway
92,126
$345
$27,762,340
$31,765,171
2.9%
7.00 RIGHT-OF-WAY
L.F. Guideway
92,126
$797
$64,199,462
$73,455,873
6.7%
L.F. Guideway
92,126
$9,302
$748,986,965
$856,977,448
77.8%
$214,280,878
$245,176,336
22.2%
$963,267,843
$1,102,153,784
100.0%
% of Hard Costs
L.F. Guideway
$748,986,965
92,126
5-44
28.6%
$11,964
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($100)
$0
$100
$200
$300
$400
$500
Millions
5-45
Sacramento Stage 1
SOFT-COSTS (20.0%)
GUIDEWAY ELEMENTS (25.8%)
RIGHT-OF-WAY (9.6%)
YARDS & SHOPS (2.2%)
SYSTEMS (10.8%)
SPECIAL CONDITIONS (6.7%)
STATIONS (5.7%)
VEHICLES (19.1%)
Asset Category
Unit
of
Measure
Sacramento Stage 1
Unit Costs
$2003-National
Units
Total Costs
$1984-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
111,936
$601
$46,678,400
$67,274,572
25.8%
Rev. Vehicles
50
$114,694
$3,979,000
$5,734,677
2.2%
154,374
$182
$19,514,037
$28,124,325
10.8%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
28
$528,625
$10,270,000
$14,801,490
5.7%
5.00 VEHICLES
Rev. Vehicles
36
$1,385,188
$34,600,000
$49,866,752
19.1%
L.F. Guideway
111,936
$156
$12,153,425
$17,515,949
6.7%
7.00 RIGHT-OF-WAY
L.F. Guideway
111,936
$224
$17,408,000
$25,089,030
9.6%
L.F. Guideway
111,936
$1,862
$144,602,862
$208,406,794
80.0%
$36,119,000
$52,055,989
20.0%
$180,721,862
$260,462,783
100.0%
% of Hard Costs
L.F. Guideway
$144,602,862
111,936
5-46
25.0%
$2,327
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($350)
($300)
($250)
($200)
($150)
($100)
($50)
$0
$50
Millions
5-47
Negative unit-quantity and unit-cost variances for nearly all cost categories, in particular
guideway elements and soft-costs
These negative cost variances result primarily from the development of an incomplete rail
investment with low station densities and extensive single tracked alignment
Alignment development was completed with construction of the Folsom Corridor project,
an investment that added additional track and station capacity to the original Stage 1 LRT
investment.
5.2.13
Analysis results for Sacramento Folsom Corridor are presented in Exhibits 5-36 and 5-37. The
Folsom Corridor has a total cost per linear foot of $3,133 ($2003) making this the second lowest
cost investment documented in the LRT Capital Cost Database. However, as noted above
(section 5.2.12), the Folsom Corridor project represents in many respects an effort to complete
and upgrade the initial Stage 1 investment through the construction of additional stations,
double tracking of formerly single tracked segments and related improvements. The upgrade
nature of this investment becomes apparent when reviewing the cost analysis in Exhibits 5-36
and 5-37. For example, the project includes no investment in yards & shops and the cost for
right-of-way acquisition is unusually low. Also, as might be expected for an upgrade
investment, the unit-quantity and unit-cost variances for the Folsom Corridor project are both
negative.
5-48
VEHICLES (15.5%)
SYSTEMS (24.5%)
STATIONS (8.1%)
Asset Category
Unit
of
Measure
Units
Total Costs
$2002-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
68,070
$817
$60,103,859
$55,595,398
26.1%
Rev. Vehicles
$0
$0
$0
0.0%
95,262
$550
$56,594,643
$52,349,412
24.5%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
10
$1,725,365
$18,652,818
$17,253,648
8.1%
5.00 VEHICLES
Rev. Vehicles
14
$2,357,882
$35,687,292
$33,010,346
15.5%
L.F. Guideway
68,070
$152
$11,159,388
$10,322,309
4.8%
7.00 RIGHT-OF-WAY
L.F. Guideway
68,070
$72
$5,311,529
$4,913,105
2.3%
68,070
$2,548
$187,509,529
$173,444,219
81.3%
% of Hard Costs
$43,050,471
$39,821,205
18.7%
$230,560,000
$213,265,423
100.0%
L.F. Guideway
L.F. Guideway
$187,509,529
68,070
5-49
23.0%
$3,133
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($350)
($300)
($250)
($200)
($150)
($100)
($50)
$0
$50
Millions
5-50
The Folsom Corridor project represents an effort to complete and upgrade the earlier
Stage 1 investment.
Given the upgrade nature of this investment, project costs are low or non-existent for some
cost elements and the unit-quantity and unit-cost variances are almost all negative
(implying below average costs).
5.2.14
Analysis results for the 6.3 mile Sacramento South Corridor project are presented in Exhibits 538 and 5-39. The South Corridor has a total cost per linear foot of $6,414 ($2003), placing this
project in the second lowest cost quartile documented in the LRT Capital Cost Database and
well below the average cost per foot of $10,189. Unlike the phased Stage 1 and Folsom Corridor
investments, the South Corridor project represents a complete investment unto itself.
Based on the cost variance analysis (Exhibit 5-39), the low project cost for Sacramento South
Corridor results primarily from low unit-quantity expenditures on expensive cost elements. For
example, the project includes no investment in underground guideway, retained cut guideway
or yards & shops. The project also had minimal requirements for special condition investments
such as utility relocations and betterments. Together, these below-average unit quantity
requirements yielded a total cost savings of roughly 33 percent or over $120 million relative to a
typical project cost as predicted by the Standard Model LRT. The project also enjoyed a small
unit-cost advantage yielding an additional 4 percent or $12 million in cost savings.
The primary cost characteristics for Sacramento South Corridor are as follows:
Relatively low soft cost expenditures (16.1 percent versus the average of 23.5 percent)
5-51
RIGHT-OF-WAY (12.4%)
SYSTEMS (12.2%)
SPECIAL CONDITIONS (3.4%)
STATIONS (9.7%)
VEHICLES (26.4%)
Asset Category
Unit
of
Measure
L.F. Guideway
Rev. Vehicles
Units
33,264
$1,262
Total Costs
$2002-Local
$2003-National
$45,383,025
$41,978,791
Percent of Total
Cost
19.7%
$0
$0
$0
0.0%
66,528
$393
$28,230,274
$26,112,688
12.2%
Stations
$3,461,696
$22,454,518
$20,770,178
9.7%
5.00 VEHICLES
Rev. Vehicles
24
$2,347,485
$60,908,467
$56,339,651
26.4%
L.F. Guideway
33,264
$219
$7,878,469
$7,287,496
3.4%
7.00 RIGHT-OF-WAY
L.F. Guideway
33,264
$795
$28,596,906
$26,451,818
12.4%
L.F. Guideway
33,264
$5,379
$193,451,659
$178,940,622
83.9%
$37,198,985
$34,408,645
16.1%
$230,650,644
$213,349,268
100.0%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
% of Hard Costs
L.F. Guideway
$193,451,659
33,264
5-52
19.2%
$6,414
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($160)
($140)
($120)
($100)
($80)
($60)
($40)
($20)
$0
$20
$40
Millions
5-53
5.2.15
Analysis results for the 15.0 mile Salt Lake North South Corridor are presented in Exhibits 5-40
and 5-41. The North South Corridor has a total cost per linear foot of $5,016 ($2003), well below
the average of $10,189 and placing this project in the lowest cost quartile. Based on the cost
variance analysis (Exhibit 5-41), the low project cost for this project results almost entirely from
low unit-quantity expenditures on expensive cost elements. For example, the project alignment
is composed entirely from at-grade alignment with minimal in-street investment. The project
was also characterized by below average vehicle purchases and minimal requirements for
special condition investments such as utility relocations and betterments. Together, these
below-average unit quantity requirements yielded a total cost savings of roughly 33 percent or
close to $140 million relative to a typical project cost as predicted by the Standard Model LRT.
The project also enjoyed a small unit-cost savings of roughly $5 million.
The primary cost characteristics for Salt Lake North South Corridor are as follows:
All at-grade alignment (i.e., below average expenditures on expensive below and above
grade alignments and related investments) leading to significantly lower costs as compared
to a more typical LRT investment
Low special conditions requirements (e.g., for utility relocations and betterments).
Below average investment in the number of fleet vehicles but above average vehicle unitcosts
Low soft cost expenditures (15.3 percent versus the average of 23.5 percent)
5.2.16
Analysis results for 5.5 mile San Diego Mission Valley East project are presented in Exhibits 542 and 5-43. Mission Valley East has a total cost per linear foot of $15,570 ($2003), placing this
project in the highest cost quartile. In part, this projects above average cost per foot of guideway
is explained by its relatively shore alignment length (i.e., project fixed costs are allocated across
a relatively small base). In addition, the project is also characterized by positive unit-quantity
and unit cost variances relative to the Standard Model LRT. Specifically, the total cost variance
suggests that project costs are roughly $130 million or 39 percent higher than that predicted by
the Standard Model LRT. Roughly one-half of this increase originates from the above average
investment in subway, retained cut and elevated guideway alignment, above and below grade
stations and other non-at-grade investments (the project does not include any at-grade
alignment or stations).
5-54
RIGHT-OF-WAY (13.6%)
SYSTEMS (21.1%)
VEHICLES (22.0%)
STATIONS (4.2%)
Asset Category
Unit
of
Measure
Units
Total Costs
$1998-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
79,200
$695
$43,199,327
$55,044,620
13.9%
Rev. Vehicles
23
$1,225,356
$22,118,327
$28,183,191
7.1%
158,400
$529
$65,772,667
$83,807,589
21.1%
16
$1,038,914
$13,045,531
$16,622,627
4.2%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
5.00 VEHICLES
Rev. Vehicles
23
$3,806,697
$68,712,893
$87,554,028
22.0%
L.F. Guideway
79,200
$138
$8,598,856
$10,956,670
2.8%
7.00 RIGHT-OF-WAY
L.F. Guideway
79,200
$684
$42,497,770
$54,150,695
13.6%
79,200
$4,246
$263,945,371
$336,319,421
84.7%
% of Hard Costs
$47,854,816
$60,976,648
15.3%
$311,800,187
$397,296,069
100.0%
L.F. Guideway
L.F. Guideway
$263,945,371
79,200
5-55
18.1%
$5,016
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($160)
($140)
($120)
($100)
($80)
($60)
($40)
($20)
$0
$20
$40
$60
Millions
5-56
SOFT-COSTS (29.1%)
RIGHT-OF-WAY (9.7%)
Asset Category
Unit
of
Measure
SYSTEMS (5.8%)
VEHICLES (8.0%)
STATIONS (12.7%)
Units
Total Costs
$2003-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
28,969
$4,731
$144,602,103
$137,063,605
30.4%
Rev. Vehicles
$0
$0
$0
0.0%
57,938
$450
$27,516,730
$26,082,209
5.8%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
$14,278,198
$60,253,996
$57,112,792
12.7%
5.00 VEHICLES
Rev. Vehicles
11
$3,283,068
$38,100,000
$36,113,744
8.0%
L.F. Guideway
28,969
$673
$20,575,510
$19,502,853
4.3%
7.00 RIGHT-OF-WAY
L.F. Guideway
28,969
$1,512
$46,200,000
$43,791,469
9.7%
L.F. Guideway
28,969
$11,035
$337,248,339
$319,666,672
70.9%
$138,595,538
$131,370,178
29.1%
$475,843,877
$451,036,850
100.0%
% of Hard Costs
L.F. Guideway
$337,248,339
28,969
5-57
41.1%
$15,570
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($60)
($40)
($20)
$0
$20
$40
$60
$80
$100
$120
$140
Millions
5-58
The remaining 50 percent of the positive cost variances originates from above average unit costs
relative to the cost experience of the nineteen sample projects (unit-cost variance). Unit costs
were most notably higher for trackwork and project soft-costs.
The primary cost characteristics for San Diego Mission Valley East are as follows:
Above average unit costs driven in part by the relatively shore alignment length (i.e., project
fixed costs distributed over a small base)
Above average guideway, station and related costs resulting from the absence of any atgrade alignment
Below average investment in the number of fleet vehicles but above average vehicle unitcosts
Above average soft cost expenditures (29.1 percent versus the average of 23.5 percent)
5.2.17
Analysis results for the 15.6 mile San Jose North Corridor project are presented in Exhibits 5-44
and 5-45. The North Corridor project has a total cost per linear foot of $5,938 ($2003), well below
the average of $10,189 and placing it among the lowest cost projects documented in the
database. Based on the cost variance analysis (Exhibit 5-45), the low project cost for this project
results both from the absence of investment in expensive below grade or elevated alignment
and below average unit costs for several project cost elements. The combined impact is a project
that is roughly $100 million or 22 percent less expensive than a typical project of similar size as
predicted by the Standard Model LRT. The negative unit-quantity cost variance originates
almost entirely from the exclusive use of at-grade alignment and stations. Partially offsetting
this unit-quantity variance is a relatively high vehicle order size, likely reflecting above average
ridership expectations. The negative unit-cost variance results from significantly lower unit
costs for yards & shops, systems, revenue vehicles and special conditions. Partially offsetting
these savings are higher than expected costs for right-of-way acquisition and project soft-costs.
The primary cost characteristics for San Jose North Corridor are as follows:
All at-grade alignment (i.e., below average expenditures on expensive below and above
grade alignments and related investments) leading to significantly lower costs as compared
to a more typical LRT investment
Above average vehicle order size offset by a below average cost per unit
Below average unit costs for systems, yards & shops and special conditions
High soft cost expenditures (35.9 percent versus the average of 23.5 percent)
5-59
SYSTEMS (8.7%)
STATIONS (1.3%)
VEHICLES (14.6%)
RIGHT-OF-WAY (14.4%)
Asset Category
Unit
of
Measure
Units
Total Costs
$1986-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
82,252
$1,008
$65,887,000
$82,936,175
17.3%
Rev. Vehicles
50
$569,105
$21,291,136
$28,455,266
5.6%
164,504
$236
$33,124,742
$38,777,934
8.7%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
22
$267,730
$4,914,000
$5,890,055
1.3%
5.00 VEHICLES
Rev. Vehicles
50
$1,530,947
$55,611,000
$76,547,356
14.6%
L.F. Guideway
82,252
$135
$8,487,000
$11,127,202
2.2%
7.00 RIGHT-OF-WAY
L.F. Guideway
82,252
$887
$54,617,000
$72,994,755
14.4%
82,252
$3,851
% of Hard Costs
L.F. Guideway
L.F. Guideway
$243,931,878
82,252
5-60
54.2%
$5,938
$243,931,878
$316,728,744
64.1%
$136,417,000
$171,716,790
35.9%
$380,348,878
$488,445,534
100.0%
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($120)
($100)
($80)
($60)
($40)
($20)
$0
$20
$40
Millions
5-61
5.2.18
Analysis results for the 26.6 mile Southern New Jersey Light Rail Transit System are presented
in Exhibits 5-46 and 5-47. This project has a total cost per linear foot of $6,872 ($2003), well
below the average of $10,189 and placing it among the lower cost projects documented in the
database. This low cost results in part from the projects long total length, allowing project fixed
costs to be allocated across a large unit base. Based on the cost variance analysis (Exhibit 5-47),
the project also enjoys a significant negative unit-quantity variance but a partially offsetting
positive unit-cost variance. The negative unit-quantity variance result from the almost exclusive
use of at-grade alignment and stations, lower station densities and a below average vehicle fleet
size (reflecting modest ridership projections relative to total alignment length). This total unitquantity variance is estimated at just over $400 million dollars or roughly 45 percent lower than
that predicted by the Standard Model LRT. At the same time, these unit-quantity cost savings
are partially offset by above average unit costs for guideway, yards and shops, vehicles and
soft-costs.
The primary cost characteristics for the Southern New Jersey Light Rail Transit System are as
follows:
Almost exclusive at-grade alignment (i.e., below average expenditures on expensive below
and above grade alignments and related investments) leading to significantly lower costs as
compared to a more typical LRT investment
Below average vehicle order size partially offset by an above average cost per unit
Above average unit costs for guideway and yards & shops
High soft cost expenditures (42.5 percent versus the average of 23.5 percent)
5.2.19
Analysis results for the 17.4-mile St. Louis St. Clair County Extension are presented in
Exhibits 5-48 and 5-49. The St. Clair County Extension has a total cost per linear foot of $3,939
($2003), well below the average of $10,189 and placing it among the lowest cost projects
documented in the database. Based on the cost variance analysis (Exhibit 5-49), the low project
cost for this project results both from the absence of any investment in expensive below or
above-grade alignment and below average unit costs for most project cost elements. The
combined impact is a project that is more than $200 million or 40 percent less expensive than a
typical project of similar size as predicted by the Standard Model LRT.
5-62
SYSTEMS (5.7%)
STATIONS (4.8%)
RIGHT-OF-WAY (8.4%)
Asset Category
Unit
of
Measure
VEHICLES (7.3%)
SPECIAL CONDITIONS (5.0%)
Units
Total Costs
$2002-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
139,958
$1,493
$218,795,747
$208,972,855
21.7%
Rev. Vehicles
20
$2,164,772
$45,330,570
$43,295,442
4.5%
295,755
$186
$57,555,962
$54,971,972
5.7%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
20
$2,327,760
$48,743,551
$46,555,197
4.8%
5.00 VEHICLES
Rev. Vehicles
20
$3,531,197
$73,943,650
$70,623,931
7.3%
L.F. Guideway
139,958
$341
$49,960,495
$47,717,506
5.0%
7.00 RIGHT-OF-WAY
L.F. Guideway
139,958
$575
$84,302,000
$80,517,240
8.4%
L.F. Guideway
139,958
$3,949
$578,631,974
$552,654,141
57.5%
$428,413,885
$409,180,132
42.5%
$1,007,045,859
$961,834,273
100.0%
% of Hard Costs
L.F. Guideway
$578,631,974
139,958
5-63
74.0%
$6,872
TOTAL COST VARIANCE: Southern New Jersey Light Rail Transit System
1.00 GUIDEWAY ELEMENTS
At Grade Guideway
Elevated Guideway
Underground Guideway
Retained Cut Guideway
Trackwork
2.00 YARDS & SHOPS
3.00 SYSTEMS
4.00 STATIONS
At-Grade Stations
Subway Stations
Elevated Stations
Parking
5.00 VEHICLES
7.00 RIGHT-OF-WAY
8.00 SOFT-COSTS
($500)
($400)
($300)
($200)
($100)
$0
$100
$200
$300
Millions
5-64
SYSTEMS (13.5%)
VEHICLES (18.4%)
STATIONS (3.1%)
Asset Category
Unit
of
Measure
Units
Total Costs
$1999-Local
$2003-National
Percent of Total
Cost
L.F. Guideway
91,872
$1,276
$106,693,929
$117,191,136
32.4%
Rev. Vehicles
24
$604,261
$13,203,257
$14,502,275
4.0%
183,744
$266
$44,559,729
$48,943,790
13.5%
$1,383,667
$10,077,816
$11,069,334
3.1%
3.00 SYSTEMS
Track Feet
4.00 STATIONS
Stations
5.00 VEHICLES
Rev. Vehicles
24
$2,774,228
$60,617,537
$66,581,464
18.4%
L.F. Guideway
91,872
$91
$7,572,009
$8,316,990
2.3%
7.00 RIGHT-OF-WAY
L.F. Guideway
91,872
$255
$21,349,279
$23,449,753
6.5%
91,872
$3,157
$264,073,556
$290,054,741
80.1%
% of Hard Costs
$65,420,740
$71,857,236
19.9%
$329,494,296
$361,911,977
100.0%
L.F. Guideway
L.F. Guideway
$264,073,556
91,872
5-65
24.8%
$3,939
Exhibit 5-49
Analysis on St. Louis Saint Clair County Extension
8.00 SOFT-COSTS
($250)
($200)
($150)
($100)
($50)
$0
$50
Millions
5-66
Roughly three-quarters of this cost reduction originates from the negative unit-quantity cost
variance, which in turn is driven predominantly by the exclusive use of at-grade alignment and
stations (i.e., no investment in expensive below or above grade segments). Additional unitquantity savings result from below average stations densities, a smaller than expected fleet size
and below average utility relocation requirements (note: some of these lower unit quantities
relate to the relatively low ridership projections relative to the length of guideway). The
negative unit-cost variance results from lower unit costs for a variety of cost categories
including systems, stations, special conditions, and right-of-way. Once again, this lower unit
cost may result in part from design of a relatively low ridership system.
The primary cost characteristics for the St. Louis St. Clair County Extension are as follows:
All at-grade alignment (i.e., below average expenditures on expensive below and above
grade alignments and related investments) leading to significantly lower costs as compared
to a more typical LRT investment
Below average vehicle order size and stations densities, likely driven in art by low ridership
projections relative to total alignment length
Below average unit costs most cost categories, especially systems, stations, special
conditions, and right-of-way
Low soft cost expenditures (19.9 percent versus the average of 23.5 percent)
5-67
the Var_CatChrt and Var_DriverChrt worksheets. The user can next review the numeric values
behind these summary charts on worksheets Var_CostSum, Var_%Sum and Var_%Share (the later
two present these results in percentage terms relative to the Standard model LRT). Review of
these charts and summary numbers provides a quick and reliable understanding of the primary
cost drivers for the project in question. However, to investigate a specific cost driver in greater
detail, the user should next review the detailed, line item based analysis in the Var_Total and
Var_Cost worksheets. These latter two sheets provide the cost variance back up for all eight
capital cost categories at the cost element level of detail. As discussed throughout this
document, significant unit-cost or unit-quantity variances for ant given project or project
element does not imply that these costs were somehow wrong. Rather, these cost variances
are intended to provide a point of reference to identify key cost differences and then to help
point the analyst towards cost elements that may require further review and cost analysis.
Finally, should the user wish to contrast and compare the cost experience of this particular
project against that of a peer group of projects, the user should use the project select option, as
described in section 4.3.
5-68
more detailed analysis of each of the high cost projects than is supported by the current
database) but rather to identify broad trends or common cost characteristics across these high
cost projects.
The results of this high-level analysis are presented below in Exhibit 5-50. Specifically, this
exhibit considers the unit-cost variances for eight major cost categories as well as for total
project costs. The left-most column (a) provides the average of the unit-cost variances across the
five highest cost projects documented in the database (after correction for unit-quantity
differences). As a group, the total unit-cost variances for these projects was 83 percent higher
than that predicted by the Standard Model LRT. At the cost category level, the largest unit-cost
values were associated with Guideway Elements (100 percent increase), Stations (233 percent)
and special conditions (165 percent). All cost categories experienced higher unit costs relative to
the Standard Model LRT.
The high unit-cost variances for guideway elements may originate from the above-average
proportion of below-grade alignment for most of the five high cost projects. While the unitquantity adjustment is designed to eliminate these differences, there remains a very high
variance in unit-costs for below-grade construction resulting from a wide range of construction
techniques (from cut-and-cover to tunneling) and the geotechnical conditions encountered
during the construction process. These differences likely lie at the root of the high guideway
unit-cost variances for these projects. Similarly, the high unit-cost variances for station costs
reflects in part the high ridership projections for three of the five high cost projects and also the
development of intermodal transfer facilities for Hudson-Bergen. Finally, the high special
conditions costs reflect development of new rail lines in highly developed metropolitan areas
(in particular Northern New Jersey and LA) and hence where utility relocations and betterment
requirements were high.
The center column of Exhibit 5-50 (b) documents each cost categorys contribution to the total
unit-cost variance for these projects. This analysis demonstrates that roughly one-third of the
total cost variance originates from the high unit-costs for guideway elements. Other significant
contributors include stations, special conditions and soft-costs, each representing close to onesixth of total project costs. The implication being that while the unit-cost variance for a
particular cost category may be high, this only has significant implications for a projects total
costs if that cost category represents a significant share of total project expenditures. To help put
this issue in better perspective, column (c) documents each cost categorys contribution to total
project expenditures across the five highest cost projects (for these five projects, guideway
elements represents roughly one-quarter for project costs). Column (d) presents the same
information as (c) but calculated across all nineteen projects in the database. Comparison of
columns (a), (b), (c) and (d) suggests that while some cost categories have higher unit-cost
variances (a) than others (e.g., stations), the contribution of each cost category to the total cost
increase (b) still falls roughly in line with that categorys share of total project expenditures (c
and d). This suggests that while these projects experienced some cost increases due to
construction conditions (geotechnical, urban development), ridership design needs and related
factors, there remains a tendency for these project costs to exceed the database cost average.
5-69
COST CATEGORY
0.00 Total Unit-Cost Variance
1.00 Guideway Elements
2.00 Yards & Shops
Avg. Unit-Cost
Share of
Variance Relative
Total Unit-Cost
to Standard LRT
Variance
(a)
(b)
(c)
(d)
83%
100%
100%
100%
100%
30%
26%
27%
34%
5%
3%
3%
3.00 Systems
34%
5%
8%
11%
4.00 Stations
233%
14%
9%
8%
5.00 Vehicles
32%
8%
9%
14%
165%
13%
10%
6%
7.00 Right-Of-Way
70%
7%
6%
7%
8.00 Soft-Costs
55%
17%
28%
23%
Project Size As expected, the largest determinant of differences in total project cost
among projects was project size (e.g., total alignment length). Less obvious was the fact
that smaller projects experienced higher costs on a per unit basis. The latter is a direct
outcome of the economies of scale associated with most project components (i.e., unit cost
decreases as the number of units purchased/constructed increases).
Asset Mix (Unit Quantity Variances) After project size, the greatest variation in cost
among projects resulted from differences in asset mix and, in particular, differences in
alignment mix. Whereas a typical LRT investment includes only a small proportion of
above- and below-grade alignment, the projects documented in the database ranged from
those that are entirely at-grade to those with no at-grade alignment. These wide differences
in alignment mix (and related station grades) yielded equally wide variances in project cost.
Variations in station spacing and vehicle procurement size were also primary contributors
to quantity driven differences in costs among projects (though much less significant than
alignment mix). Together, these differences in alignment and station grades, station spacing
and vehicle procurement size explained more than 50% of the variation in cost between
projects of the same alignment length.
Unit Costs (Unit Cost Variances) The remaining variation in project costs (close to 50% of
total cost variation for projects of similar length) was driven by differences in unit costs. For
the most part unit cost differences reflect qualitative differences between cost elements
5-70
across projects (e.g., station design) but can also reflect quantitative differences not
documented in the database (e.g. station size). The following cost elements represented the
largest contributors to unit cost variances among projects (both positive and negative):
-
Below-Grade Guideway
Station Size, Grade and Design Standards
Utility Relocation
Right-of-Way acquisition costs
Soft-Costs
The significant cost variation for below-grade guideway investments is well recognized and
results from wide-ranging geotechnical conditions and engineering approaches. Cost
variations in utility relocation and right-of-way acquisition costs appear closely correlated
with the level of existing urban development prior to project construction, with construction
in well-developed urban areas yielding significant increases in total cost for these elements.
Finally, wide soft-cost variances appear to be driven primarily by wide variances in the
preceding items on this list. It is useful to note here that this list of primary contributors to
unit cost variances corresponds closely with the primary sources of project risk on a cost
element basis.
How does the rate of cost increase for the eight LRT asset categories compare with general
price inflation for capital projects?
This subsection seeks to address these questions using both the raw data from the LRT Capital
Cost Database and the cost variance analysis tools described above.
5.6.1 Are Project Costs Increasing or Decreasing?
Exhibit 5-51 below compares project costs for the five LRT projects included in the original LRT
Capital Cost database (built over the period 1984 through 1987) with that of the fourteen new
projects added for this update (built over the period 1996 through 2003). While the two project
samples jointly cover a period of twenty years, the samples themselves are separated by a nineyear gap for which no data have been collected. The top portion of Exhibit 5-51 focuses on
differences in total project costs while the lower half considers changes to project unit costs.
Finally the three right-most columns provide (i) the actual project costs, (ii) re-estimated project
costs using actual project unit costs and Standard Model LRT unit quantities and (iii) reestimated project costs using Standard Model LRT unit costs and quantities. All project costs
5-71
have been adjusted to a common $2003-national average basis using Means time cost inflation
and locality construction cost indices (as described above).
Exhibit 5-51
Comparison of Project Costs and Alignment Lengths Over Time ($2003)
Project Sample
Pre 1991 Sample
Post 1991 Sample
$ Change
% Change
Sample
Period
Avg. Alignment
Length (Miles)
1984-1987
1996-2003
17.2
11.5
-5.8
-33%
Quantity
Standard
Adjusted
Model LRT
Average Total Project Cost ($Millions)
$625.0
$645.8
$618.1
$508.8
$555.2
$463.0
$-116.4
$-90.7
$-155.2
-19%
-14%
-25%
Actuals
Note first that the average project alignment length is 33 percent shorter for projects completed
within the last seven year period versus projects completed in the mid-nineteen eighties. While
actual project cost totals have declined to reflect the decrease in average project size, the
proportional decrease is considerably smaller (i.e., a less than 20 percent total cost reduction
versus the 33 percent decrease in alignment length). The implication being that project unit
costs have increased, a conclusion that is confirmed in the lower portion of Exhibit 5-51.
Analysis of the three sample unit cost valuesincluding the Actuals, Quantity Adjusted and
Standard Model LRT valuessuggests that the increase in unit costs for the more recent
projects (over and above inflation) originates from three separate sources. These sources include
(i) a more expensive mix of asset types and grades, (ii) higher fixed costs per unit and (iii) cost
increases over and above inflation. Each of these sources are described greater detail below.
Their estimated contribution to the observed increase in project unit costs is provided below in
Exhibit 5-52.
A More Expensive Mix of Asset Types and Alignment Grades Projects completed within
the past seven years tend to include a more expensive mix of assets and alignment grades
than those completed in the mid-nineteen eighties. Specific differences include the
following:
Guideway Alignment: Projects completed since 1996 feature a higher ratio of belowgrade to at-grade alignment (70 percent more subway alignment and 24 percent more
retained cut).
Trackwork: Projects completed since 1996 are installing roughly 4.3 percent more
trackwork per foot of guideway and include a higher ratio of direct fixation to ballasted
trackwork.
Stations: While average station spacing appears to have dropped relative to the earlier
sample, the proportion of at-grade stations has increased by 16 percent. Moreover, the
5-72
more recent stations feature more than three times the parking capacity and twice as
many passenger overpasses compared to the pre-1991 sample.
Vehicles: Projects completed since 1996 are purchasing 1 percent more vehicles per foot
of guideway as compared to projects in the earlier time period.
Together, these differences in asset mix and alignment proportions account for only 5
percent of the observed increase in project unit costs.
Higher Fixed Costs Per Unit The Standard Model LRT unit cost estimates are roughly 30
percent higher for recently completed projects versus those completed in the mid-nineteen
eighties. Recall that these estimates have been adjusted to remove any differences in asset
mix and also use a common set of unit cost functions (described in Chapter 4). Hence, any
remaining cost differences between projects (when converted to the Standard LRT basis)
originate entirely from differences in project size (e.g., alignment length). In particular, the
smaller projects completed in recent years require a lesser amount of each asset type (e.g.,
trackwork stations, vehicles, etc.) and hence find themselves higher up the corresponding
unit cost curves (see Exhibit 4-2). In reality, this implies that the smaller, more recent
projects are spreading roughly the same level of fixed costs including those for design,
mobilization, project management etc.over a smaller number of units (e.g., guideway feet)
yielding an increase in average unit costs. In total, this effect accounts for roughly one-half
of the increase in project unit costs.
Exhibit 5-52
Analysis on Sources of Unit Cost Increases
Cost Increases
Above Inflation
45%
Changes in
Asset Mix /
Grade Mix
5%
Higher Fixed
Cost Per Unit
50%
Higher Unit Costs The remaining 45 percent increase in unit costs represents a genuine
increase over and above inflation (in effect the unit cost functions may have shifted up over
time). Possible explanations for this increase include the following:
5-73
passenger information systems, environmental mitigation etc. Not only may this lead to
increases in the cost of individual components, it may also lead to purchasing of
additional components not purchased or even available for earlier LRT investments
(e.g., AVL systems). The cost analysis above does not control for these differences.
Higher Cost Inflation for LRT versus a Typical Construction Project: The unit costs for
the two samples were adjusted to a common 2003 dollar basis using Means construction
cost index. Note however that the construction cost index is designed to represent
changes in a weighted basket of inputs (labor, materials, equipment) used to complete a
typical construction project. Hence, this index may not effectively represent the rate of
inflation for many LRT investment components that require a basket of inputs that
includes different inputs (and a different weighting of inputs) than a typical
construction project. Key examples here include vehicles and systems.
5-74
ballasted trackwork unit costs (for example) have increased at an average annual compound
rate of roughly 3.0 percent, or slightly higher than the 2.8 percent rate of general construction
inflation as documented by Means construction cost index.
5-75
Exhibit 5-53
Unit Cost Time Series: At-Grade Guideway
Actuals
Quant Adj. Actuals
$3,000
Trend
Adj Trend
$2,500
$2,000
Inflation Averages:
At-Grade Guideway (trend) = 4.9%
At-Grade Guideway (Adj trend) = 4.2%
Mean's Construction = 2.5%
$1,500
$1,000
$500
$0
1982
1984
1986
1988
1990
1992
1994
Year Built
5-76
1996
1998
2000
2002
2004
Exhibit 5-54
Unit Cost Time Series: Elevated Guideway
Actuals
Quantity Adjusted Actuals
Trend
Quantity Adjusted Trend
$7,000
$6,000
$5,000
$4,000
Inflation Averages:
Elevated Guideway (trend) = 4.7%
Elevated Guideway (Adj trend) = 4.2%
Mean's Construction = 2.5%
$3,000
$2,000
$1,000
$0
1982
1984
1986
1988
1990
1992
1994
Year Built
5-77
1996
1998
2000
2002
2004
Exhibit 5-55
Unit Cost Time Series: Subway Guideway
AT GRADE GUIDEWAY
Trend
Quantity Adjusted Actuals
$14,000
$12,000
$10,000
$8,000
$6,000
$4,000
Inflation Averages:
Undergound Guideway (trend) = -0.3%
Mean's Construction = 2.6%
$2,000
$0
1984
1986
1988
1990
1992
1994
1996
1998
Year Built
5-78
2000
2002
2004
Exhibit 5-56
Unit Cost Time Series: Ballasted Track
$175
Actuals
Quant. Adjusted Actuals
$150
Trend
Adj Trend
$125
$100
Inflation Averages:
Ballasted Track (trend) = 3.0%
Ballasted Track (Adj. trend) = 2.2%
Mean's Construction = 2.8%
$75
$50
$25
1982
1984
1986
1988
1990
1992
1994
Year Built
5-79
1996
1998
2000
2002
2004
Exhibit 5-57
Unit Cost Time Series: Yards & Shops
$2,000,000
$1,500,000
Inflation Averages:
Yards & Shops (trend) = 6.3%
Yards & Shops (Adj. trend) = 3.6%
Mean's Construction = 2.5%
$1,000,000
$500,000
$0
1982
1984
1986
1988
1990
1992
1994
Year Built
5-80
1996
1998
2000
2002
2004
Exhibit 5-58
Unit Cost Time Series: Signal Systems
Actuals
$400
$350
$300
Inflation Averages:
Signal System (trend) = 3.8%
Signal System (Adj. trend) = 1.5%
Mean's Construction = 2.5%
$250
$200
$150
$100
$50
$0
1982
1984
1986
1988
1990
1992
1994
Year Built
5-81
1996
1998
2000
2002
2004
Exhibit 5-59
Unit Cost Time Series: Electrification Systems
Actuals
Quant Adj. Actuals
$400
Trend
Quant Adj. Trend
$350
$300
Inflation Averages:
Electrification (trend) = 2.5%
Electrification (Adj. trend) = 1.3%
Mean's Construction = 2.5%
$250
$200
$150
$100
$50
$0
1982
1984
1986
1988
1990
1992
1994
Year Built
5-82
1996
1998
2000
2002
2004
Exhibit 5-60
Unit Cost Time Series: Communications Systems
$250
$200
Inflation Averages:
Communications (trend) = 2.1%
Communications (Adj. trend) = -1.1%
Mean's Construction = 2.6%
$150
$100
$50
$0
1984
1986
1988
1990
1992
1994
Year Built
5-83
1996
1998
2000
2002
2004
Exhibit 5-61
Unit Cost Time Series: At-Grade Center Platform Station
$3,500,000
$3,000,000
Inflation Averages:
At-Grade Center (trend) = 6.0%
At-Grade Center (Adj. trend) = 6.0%
Mean's Construction = 2.6%
$2,500,000
$2,000,000
$1,500,000
$1,000,000
$500,000
$0
1984
1986
1988
1990
1992
1994
Year Built
5-84
1996
1998
2000
2002
2004
Exhibit 5-62
Unit Cost Time Series: At-Grade Side Platform Station
$3,500,000
$3,000,000
Inflation Averages:
At-Grade Side (trend) = 5.8%
At-Grade Side (Adj. trend) = 5.6%
Mean's Construction = 2.6%
$2,500,000
$2,000,000
$1,500,000
$1,000,000
$500,000
$0
1984
1986
1988
1990
1992
1994
Year Built
5-85
1996
1998
2000
2002
2004
Exhibit 5-63
Unit Cost Time Series: Revenue Vehicles
Actuals
Quant Adj. Actuals
Trend
Quant Adj. Trend
$3,500,000
$3,000,000
$2,500,000
$2,000,000
Inflation Averages:
Vehicles (trend) = 4.7%
Vehicles (Adj. trend) = 3.2%
Mean's Construction = 2.9%
$1,500,000
$1,000,000
$500,000
$0
1980
1982
1984
1986
1988
1990
1992
Year Built
5-86
1994
1996
1998
2000
2002
2004
Exhibit 5-64
Unit Cost Time Series: Special Conditions
$2,500
Inflation Averages:
Special Conditions (trend) = 3.3%
Mean's Construction = 2.5%
$YOE Per Track Foot
$2,000
$1,500
$1,000
$500
$0
1982
1984
1986
1988
1990
1992
1994
1996
Year Built
5-87
1998
2000
2002
2004
Exhibit 5-65
Unit Cost Time Series: Right-of-Way
$1,600
Inflation Averages:
ROW (trend) = 3.4%
Mean's Construction = 2.5%
$1,400
$1,200
$1,000
$800
$600
$400
$200
$0
1982
1984
1986
1988
1990
1992
1994
1996
Year Built
5-88
1998
2000
2002
2004
Note, however that the unit cost actual in Exhibits 5-53 through 5-65 do not account for
differences in project size. As discussed above in section 5.4.1, projects completed since 1996
have tended to be smaller in size than those completed in the 1984 to 1987 time period. In the
analysis above, this reduction in project size resulted in increased project unit costs as project
fixed costs were spread across a smaller number of units (in effect, moving back-up the unit
cost curve). To account for this effect, the data points in Exhibits 5-53 through 5-65 have been
adjusted to a common project size using the unit costs function for each cost element (see
Section 4.2 Unit Cost Functions). These adjusted data points are represented by the white
triangles in these exhibits. When these points are converted to a trend line, the estimated
average compound rate of inflation tends to decline, reflecting the generally smaller (and high
unit cost) sizes of projects completed in recent years.
Exhibit 5-66 below presents the results of this analysis across all cost categories and cost
elements wherever sufficient data were available to make the analysis meaningful. In most
instances, the observed inflation trend is in excess of the rate of increase in Means construction
index. Adjusting for differences in project size tends to reduce the observed rate of inflation
(reflecting the decrease in average project size). However, even these adjusted rates tend to
exceed the average annual rate of increase in the Means index for most asset types. This finding
is consistent with the results from 5.4.1 and supports this general conclusion that unit costs for
LRT projects have increased in excess of general price inflation, even when adjusted for the
trend towards (i) smaller project size and (ii) a more expensive mix of alignment types.
Exhibit 5-66
Approximate Inflation Rate Estimates
Category
0.00 Total Project Cost
1.00 Guideway Elements
At Grade Guideway
Elevated Structure Guideway
Underground Guideway
Direct Fixation Track
Ballasted Track
Embedded Track
2.00 Yards & Shops
3.00 Systems
Signal System
Electrification
Communications
Revenue Collection
4.00 Stations
At-Grade Center Platform
At-Grade Side Platform
Subway
Elevated
5.00 Vehicles
6.00 Special Conditions
7.00 Right-of-Way
8.00 Soft Costs
Sample
Period
1984-2003
1984-2002
1984-2003
1983-2003
1985-2002
1983-2002
1983-2002
1983-2002
4.9%
5.1%
-0.3%
2.0%
3.0%
3.2%
6.3%
4.2%
4.6%
-0.3%
1.2%
2.2%
2.8%
3.6%
2.5%
2.5%
2.6%
2.6%
2.8%
2.8%
2.8%
1984-2003
1984-2003
1983-2003
1984-2003
3.8%
2.9%
5.3%
3.5%
3.6%
1.8%
3.3%
2.8%
2.5%
2.5%
2.6%
2.5%
1983-2003
1983-2002
6.0%
6.0%
5.8%
5.6%
Insufficient Data
Insufficient Data
4.7%
3.2%
3.3%
3.1%
3.4%
2.8%
3.5%
3.2%
2.6%
2.8%
1981-2003
1984-2003
1983-2003
1983-2003
5-89
2.9%
2.5%
2.6%
2.6%
5-90
example, installation costs for electrification, train control and communications systems should
be appreciably higher when installed in underground segments versus at-grade segments.
Hence projects with a high proportion of underground investment should have a higher
average unit cost for systems costs. There is likely a similar impact for other cost categories,
likely including special conditions, right-of-way and soft costs. These questions represent areas
for further LRT capital cost research.
5-91
Exhibit 5-67
Analysis of Unexplained Cost Variances
4.6
4.4
4.2
Hudson-Bergen MOS I
San Diego Mission Valley East
Portland Westside/Hillsboro MAX
Pittsburgh Stage II
4.0
LA Blue Line
Minneapolis Hiawatha
Salt Lake North-South
3.8
3.6
Sacramento Stage I
3.4
3.2
4.4
4.5
4.6
4.7
4.8
Log (Lineal Feet of Guideway)
5-92
4.9
5.0
5.1
5.2
This section describes the design and use of the Light Rail Capital Cost Calculator. The
Calculator is a separate worksheet in the Capital Cost Workbook that allows the user to develop
detailed capital cost estimates for a proposed new light rail project. Specifically, the Calculator
allows the user to enter unit quantity amounts (e.g., number of track feet, vehicles, stations, etc.)
and midpoint of construction data for a proposed LRT project. In return, the Calculator
provides detailed estimates of project costs at the cost element, cost category and full project
levels of detail. The Calculator also provides the user with considerable control in defining the
cost basis used to develop these cost estimates, including permitting the user which database
projects are used to adjust the workbooks unit cost functions (using the Project Select option).
The Calculator is intended to provide FTA with a reliable tool for validating capital cost
estimates for light rail projects seeking federal funding approval through FTAs New Starts
process. At the same time, industry analysts and project sponsors can use the Calculator to
develop preliminary cost estimates for new light rail projects currently under consideration.
6-1
worksheet. The user should select this option if it is determined that that the cost characteristics
of one or more projects documented in the CostDatabase worksheet are not truly representative
of the design philosophy or other characteristic of the project for which capital costs are being
estimated. In this instance, the user can choose to limit the adjustment of the unit cost functions
to reflect those select database projects that the user considers representative of the project for
which estimates are being developed. If the user does not use the Project Select option, the
Calculator will then use a unit cost function that reflects the unit cost experience across all
projects documented in the CostDatabase worksheet. In some instances, however, the user may
feel.
6.1.3 Project Cost Worksheet
The final component of the Capital Cost Calculator is the CostCalculator worksheet. As with
most other worksheets in the model, the CostCalculator worksheet is formatted using the same
structure as the cost database itself. This worksheet provides blank spaces where the user is
expected to enter the unit quantities and midpoints of construction for all project cost elements
of a proposed light rail investment. In addition, the user must enter the name of the
metropolitan area in which the project will be constructed. This worksheet provides a
dropdown list that lists close to two hundred different US metropolitan areas. Upon completing
these data entry fields, the model provides a point cost estimate for each cost element using the
unit cost functions found on the CostFunctions. Note that these cost estimates have been
automatically adjusted to the midpoint of construction for that cost element and to the cost
basis of the specific metropolitan area where the project is to be constructed. Finally, the
element totals are also summed up to the category and full project levels. Users can copy the
worksheet to create new scenarios of an existing project as desired.
The CostCalculator worksheet also allows the user to select a specific cost basis for that
worksheet. In particular, this option allows the user to select which unit cost function
adjustment the worksheet will use in estimating project costs. If the user selects the Baseline
Model, the worksheet will select the original unit cost functions estimated for use by the
calculator. As noted above, these baseline cost functions were estimated using the original
dataset recorded in the database as of June 2003. Hence, the Baseline models do not reflect the
entry of new data into the CostDatabase worksheet since that time. In contrast, if the user
selects Adjusted Model 1: Full Database, the model will adjust the unit cost functions to
reflect the full range of unit cost values across all project cost data stored in the CostDatabase
worksheet (see section 4.0 for a discussion of the adjustment process). Finally, if the user selects
Adjusted Model 2: User Selected Projects, the model will limit adjustment of the unit cost
functions to reflect only the unit cost values of those projects selected on the ProjectSelect
worksheet.
In addition to providing space to define project characteristics and the resulting output, the
CostCalculator worksheet also includes several simple data validation checks. These checks are
intended to ensure that the data entered into the calculator are reasonable (e.g., linear feet of
guideway can not exceed the total track feet). If the user has violated a data input rule, the
calculator will flag the error in the validation check columns of the worksheet (column K
performs checks on unit quantities while column L performs checks on midpoint of
construction entries). In addition, the calculator includes several checks within the data entry
cells themselves (using Excels internal validation functions).
Federal Transit Administration
Office of Program Management
6-2
6-3
6-4
Input Type
Unit Quantities
Input
L.F. Guideway
Track Feet
Special Guideway
Structures
Intersections
Stations
Parking Spaces
Elevators / Escalators
Pedestrian Overpasses
Revenue Vehicles
Non-Revenue Vehicles
Year
Metro Area
Description
In total and segmented by alignment type (at-grade,
subway, elevated, fill, etc.)
In total and segmented by type (ballasted, direct fixation,
yard, etc.)
Number of bridges and highway overpasses
Crossing protection is scaled by the number of intersections
In total and segmented by grade (at-grade, subway,
elevated) and platform positioning (center or side)
Parking facilities are scaled by the number of spaces
Number of each
Number of each
Total number by procurement. Also, most maintenance
facilities and yards need to be scaled by their vehicle
capacity
Total number of maintenance vehicles and total number of
support trucks and automobiles
This is the year purchased (for vehicles and other pieces of
equipment) or the mid-point of construction (for civil
structures and other multi-year construction efforts). This
input is required by cost element. These elements are listed
to the left.
Guideway
Trackwork
Special Structures
Yards & Shops
Maintenance Facilities
Admin Facility
Signal System
Electrification
Communications
Revenue Collection
Elevators / Escalators
Stations
Parking
Rev Vehicles (by
procurement)
Utility and other relocations
ROW Acquisition
Soft cost components
Name of metro area where project is to be constructed
6-5
APPENDIX A
Light Rail Capital Cost Database
Appendix A
Move cursor over comments (red triangles) for data entry assistance
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
Sacramento Stage I
Sacramento, CA
Total Cost
Select City:
Quantity
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
111,936
DBB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
18
26
26
Year
$180,721,862
1984
23
8
15
30
0
23,920
0
47
15
32
31
15
16
5
L.F. Guideway
111,936
$46,678,400
1985
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
106,920
0
5,016
0
0
0
10,032
144,342
0
154,374
111,936
$32,954,922
$0
$1,752,000
$0
$0
$0
$248,000
$10,011,078
$0
$1,712,400
$0
1985
50
$3,979,000
1985
0
0
0
0
0
0
0
0
0
0
0
0
50
0
0
111,936
111,936
111,936
111,936
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$3,979,000
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-1
1985
1985
1985
1985
1985
Appendix A
Move cursor over comments (red triangles) for data entry assistance
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
Sacramento Stage I
Sacramento, CA
Total Cost
Select City:
Quantity
Year
111,936
154,374
$180,721,862
$19,514,037
1984
1985
154,374
154,374
0
154,374
90
154,374
154,374
0
154,374
0
154,374
28
0
28
36
111,936
0
0
0
$8,236,632
$6,903,484
$0
$0
$1,333,148
$10,034,456
$4,856,409
$0
$5,178,047
$0
$190,949
$1,052,000
$0
$986,000
$66,000
$0
$0
$0
$0
1985
1985
Station
28
$10,270,000
1985
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
0
28
0
0
0
0
3,850
0
0
28
$0
$10,270,000
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
36
$34,600,000
1985
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
26
10
0
0
36
36
36
36
$20,800,000
$13,800,000
$0
$0
$0
$0
$0
$0
1985
1985
L.F. Guideway
111,936
$12,153,425
1985
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
111,936
111,936
111,936
111,936
111,936
111,936
111,936
111,936
111,936
111,936
111,936
111,936
$4,850,611
$482,480
$0
$333,136
$0
$333,136
$0
$0
$6,487,198
$0
$0
$0
1985
1985
L.F. Guideway
111,936
$17,408,000
1985
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
111,936
111,936
111,936
111,936
111,936
111,936
111,936
111,936
$16,616,000
$0
$792,000
$9,000
$0
$783,000
$0
$0
1985
L.F. Guideway
Track Feet
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
A-2
1985
1985
1985
1985
1985
1985
1985
1985
0
1985
1985
1985
1985
1985
1985
1985
1985
Appendix A
Move cursor over comments (red triangles) for data entry assistance
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-3
Select City:
Quantity
111,936
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
$144,602,862
Sacramento Stage I
Sacramento, CA
Total Cost
Year
$180,721,862
$36,119,000
1984
1982
$16,557,000
$0
$0
$9,050,000
$4,199,000
$0
$1,285,000
$1,285,000
$0
$0
$528,000
$4,500,000
$0
$4,500,000
$0
1980
0
0
1983
1984
0
1985
1985
0
0
1984
1985
0
1985
0
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
Select City:
Quantity
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
82,198
DBB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
31
62
13
Year
$555,525,064
1985
70
28
0
0
0
25,000
0
112
0
112
0
0
0
0
L.F. Guideway
82,198
$202,419,030
1985
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
34,933
19,694
5,012
0
10,721
11,838
21,468
103,180
39,746
164,394
82,198
$18,674,638
$16,901,866
$4,915,157
$0
$145,243,891
$6,084,050
$4,610,360
$3,804,559
$2,184,509
$0
$0
1985
1985
1985
97
$37,116,525
1985
0
0
0
0
0
0
0
0
0
0
0
0
97
0
0
82,198
82,198
82,198
82,198
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$32,090,648
$0
$0
$5,025,877
$5,025,877
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-4
1985
1984
1985
1985
1985
1985
1987
1987
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
Select City:
Quantity
Year
L.F. Guideway
DB / DBB
Track
Feet
82,198
164,394
$555,525,064
$59,951,818
1985
1985
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
164,394
164,394
0
164,394
90
164,394
164,394
0
164,394
0
164,394
12
1
12
55
82,198
0
0
0
$22,913,020
$22,913,020
$0
$0
$0
$27,043,907
$12,031,797
$0
$15,012,110
$0
$8,928,230
$1,066,661
$1,066,661
$0
$0
$0
$0
$0
$0
1985
1985
Station
12
$34,282,779
1985
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
0
9
0
3
0
0
0
0
0
12
$0
$15,733,846
$0
$18,548,933
$0
$0
$0
$0
$0
$0
Rev. Vehicle
55
$57,399,440
1985
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
55
0
0
0
55
55
55
55
$57,399,440
$0
$0
$0
$0
$0
$0
$0
1985
L.F. Guideway
82,198
$10,038,972
1984
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
82,198
82,198
82,198
82,198
82,198
82,198
82,198
82,198
82,198
82,198
82,198
82,198
$4,034,435
$4,939,567
$0
$747,080
$747,080
$0
$0
$0
$0
$317,890
$0
$0
1984
1984
L.F. Guideway
82,198
$21,511,920
1983
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
82,198
82,198
82,198
82,198
82,198
82,198
82,198
82,198
$21,511,920
$0
$0
$0
$0
$0
$0
$0
1983
A-5
1984
1984
1984
1985
1984
1984
1985
1985
1983
1983
1985
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-6
Select City:
Quantity
82,198
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$422,720,484
$555,525,064
$132,804,580
$0
$0
$106,746,730
$11,236,750
$14,821,100
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Year
1985
1985
1985
1985
1985
0
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
Select City:
Quantity
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
80,179
DBB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
30
29
25
Year
$246,797,637
1984
22
12
8
15
0
42,500
0
52
16
36
47
28
19
11
L.F. Guideway
80,179
$94,599,637
1984
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
52,212
0
4,032
23,665
0
270
0
137,194
23,164
160,358
80,179
$41,935,263
$0
$9,599,448
$19,006,221
$0
$1,226,962
$0
$11,481,364
$8,891,742
$2,458,637
$0
1984
100
$11,602,000
1983
0
0
0
0
0
0
0
0
0
0
0
0
100
0
0
80,179
80,179
80,179
80,179
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$11,465,000
$0
$0
$137,000
$137,000
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-7
1984
1983
1984
1983
1984
1983
1983
1983
1983
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
Select City:
Quantity
Year
L.F. Guideway
DB / DBB
Track
Feet
80,179
160,358
$246,797,637
$21,167,000
1984
1984
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
160,358
160,358
0
160,358
21
160,358
160,358
0
160,358
0
160,358
25
1
25
26
80,179
0
0
0
$7,456,000
$6,857,000
$0
$0
$599,000
$10,487,000
$3,550,000
$0
$6,937,000
$0
$0
$3,224,000
$801,000
$2,423,000
$0
$0
$0
$0
$0
1984
1984
Station
25
$15,107,000
1985
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
5
20
0
0
0
0
1,636
0
0
25
$2,201,000
$9,634,000
$0
$0
$0
$0
$3,272,000
$0
$0
$0
1985
1985
Rev. Vehicle
26
$25,218,000
1981
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
26
0
0
0
26
26
26
26
$25,097,000
$0
$0
$0
$0
$121,000
$21,000
$100,000
1981
L.F. Guideway
80,179
$5,756,000
1984
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
80,179
80,179
80,179
80,179
80,179
80,179
80,179
80,179
80,179
80,179
80,179
80,179
$5,656,000
$0
$0
$100,000
$100,000
$0
$0
$0
$0
$0
$0
$0
1984
L.F. Guideway
80,179
$15,070,000
1983
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
80,179
80,179
80,179
80,179
80,179
80,179
80,179
80,179
$13,439,000
$0
$1,473,000
$243,000
$0
$1,230,000
$158,000
$0
1983
A-8
1984
1984
1984
1984
1984
1984
1984
1985
1985
1985
1985
1984
1984
1982
1982
1982
1982
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-9
Select City:
Quantity
80,179
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
$188,519,637
Year
$246,797,637
$58,278,000
1984
1984
$2,535,000
$0
$13,212,000
$17,000,000
$13,172,000
$0
$5,240,000
$5,240,000
$0
$0
$0
$7,119,000
$0
$7,119,000
$0
1980
1982
1984
1985
1985
1985
1985
1985
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
Select City:
Quantity
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
119,283
DBB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
45
44
22
Year
$877,269,855
1987
26
13
10
10
0
54,700
0
101
28
73
92
47
45
68
L.F. Guideway
119,283
$148,719,104
1988
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
63,487
32,766
10,785
8,459
3,296
490
26,324
146,710
65,532
238,566
119,283
$26,655,743
$24,067,146
$31,155,410
$5,810,205
$21,647,205
$2,183,688
$4,981,257
$10,407,580
$8,588,412
$13,222,458
$0
1988
1988
1988
1988
1988
1988
1988
1988
1988
1988
54
$33,024,821
1988
0
0
0
0
0
0
0
0
0
0
0
0
54
0
0
119,283
119,283
119,283
119,283
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$32,290,821
$0
$0
$734,000
$734,000
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-10
1988
1988
1988
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
Select City:
Quantity
Year
L.F. Guideway
DB / DBB
Track
Feet
119,283
238,566
$877,269,855
$126,453,164
1987
1988
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
238,566
238,566
0
238,566
28
238,566
238,566
0
238,566
0
238,566
22
1
22
54
119,283
0
0
0
$40,745,221
$27,715,247
$0
$0
$13,029,974
$49,432,018
$21,059,588
$0
$28,372,430
$0
$19,091,470
$6,004,536
$1,765,229
$4,239,307
$0
$11,179,919
$0
$0
$0
1988
1988
Station
22
$65,893,479
1988
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
15
3
0
1
3
0
1,051
0
2
22
$16,191,134
$2,741,608
$0
$27,684,300
$8,786,682
$0
$8,490,533
$0
$1,999,222
$0
1988
1988
Rev. Vehicle
54
$79,939,129
1988
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
54
0
0
0
54
54
54
54
$78,136,129
$0
$0
$0
$0
$1,803,000
$1,463,000
$340,000
1988
L.F. Guideway
119,283
$152,349,392
1985
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
119,283
119,283
119,283
119,283
119,283
119,283
119,283
119,283
119,283
119,283
119,283
119,283
$2,553,505
$119,761,634
$0
$967,836
$384,438
$583,398
$0
$0
$12,088,912
$0
$16,977,505
$0
1985
1985
L.F. Guideway
119,283
$60,084,803
1988
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
119,283
119,283
119,283
119,283
119,283
119,283
119,283
119,283
$55,437,402
$0
$4,493,401
$2,241,826
$0
$2,251,575
$154,000
$0
1988
A-11
1988
1988
1988
1988
1988
1988
1988
1988
1988
0
1988
1988
1988
1988
1988
1988
1988
1985
1985
1985
1985
1985
1988
1988
1988
1988
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-12
Select City:
Quantity
119,283
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$666,463,892
$877,269,855
$210,805,963
$0
$0
$64,030,705
$79,304,746
$21,374,427
$4,194,136
$32,780,582
$32,780,582
$0
$0
$0
$9,121,366
$0
$9,121,366
$0
Year
1987
1985
1985
1985
1985
1985
1985
1985
1985
1985
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
Select City:
Quantity
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
82,252
DBB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
31
31
22
Year
$380,348,878
1986
15
15
10
10
0
41,200
0
69
11
58
108
55
53
20
L.F. Guideway
82,252
$65,887,000
1987
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
82,252
0
0
0
0
0
0
96,100
68,404
164,504
82,252
$44,381,582
$0
$0
$0
$0
$0
$0
$8,032,209
$6,402,209
$1,605,000
$5,466,000
1987
50
$21,291,136
1985
0
0
0
0
0
0
0
0
0
0
0
0
50
0
0
82,252
82,252
82,252
82,252
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$20,191,136
$0
$0
$1,100,000
$1,100,000
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-13
1987
1987
1987
1987
1985
1985
1985
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
Select City:
Quantity
Year
L.F. Guideway
DB / DBB
Track
Feet
82,252
164,504
$380,348,878
$33,124,742
1986
1990
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
164,504
164,504
0
164,504
6
164,504
164,504
0
164,504
0
164,504
22
0
22
50
82,252
0
0
0
$7,169,292
$6,999,292
$0
$0
$170,000
$18,694,939
$7,697,679
$0
$10,997,260
$0
$2,935,448
$4,325,063
$289,461
$4,035,602
$0
$0
$0
$0
$0
1990
1990
Station
22
$4,914,000
1989
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
3
19
0
0
0
0
0
0
0
22
$577,000
$4,337,000
$0
$0
$0
$0
$0
$0
$0
$0
1989
1989
Rev. Vehicle
50
$55,611,000
1983
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
50
0
0
0
50
50
50
50
$55,611,000
$0
$0
$0
$0
$0
$0
$0
1983
L.F. Guideway
82,252
$8,487,000
1986
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
82,252
82,252
82,252
82,252
82,252
82,252
82,252
82,252
82,252
82,252
82,252
82,252
$5,822,000
$0
$0
$513,000
$0
$513,000
$0
$0
$0
$2,152,000
$0
$0
1986
L.F. Guideway
82,252
$54,617,000
1985
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
82,252
82,252
82,252
82,252
82,252
82,252
82,252
82,252
$51,323,000
$0
$2,772,000
$924,000
$924,000
$924,000
$522,000
$0
1985
A-14
1990
1990
1990
1990
1990
1990
1990
1990
1986
1986
1986
1985
1985
1985
1985
1985
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-15
Select City:
Quantity
82,252
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
$243,931,878
Year
$380,348,878
$136,417,000
1986
1986
$41,085,000
$0
$0
$63,260,000
$19,115,000
$1,457,000
$7,500,000
$0
$7,000,000
$500,000
$0
$4,000,000
$0
$4,000,000
$0
1986
1986
1986
1986
1986
1986
1986
1986
1986
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
Select City:
Quantity
Hudson-Bergen MOS-I
Newark, NJ
Year
Total Cost
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
45,900
DB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
0
0
0
$992,140,000
1999
0
0
0
0
0
31,300
0
0
0
0
0
0
0
0
L.F. Guideway
45,900
$213,937,981
1999
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
42,600
0
3,300
0
0
0
28,600
63,200
0
91,800
45,900
$127,513,057
$0
$50,438,974
$0
$0
$0
$8,821,940
$2,789,010
$0
$6,995,000
$17,380,000
1999
70
$45,367,000
1999
0
0
0
70
70
11,800
0
0
0
0
0
0
70
0
0
45,900
45,900
45,900
45,900
$0
$0
$0
$8,927,000
$5,962,000
$2,965,000
$0
$0
$0
$0
$0
$0
$29,047,000
$0
$0
$7,393,000
$6,000,000
$1,393,000
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-16
1999
1999
1999
1999
1999
1999
1999
1999
0
1999
1999
1999
1999
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
Select City:
Quantity
Hudson-Bergen MOS-I
Newark, NJ
Year
Total Cost
L.F. Guideway
DB / DBB
Track
Feet
45,900
91,800
$992,140,000
$57,835,000
1999
1999
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
91,800
91,800
0
91,800
6
91,800
91,800
0
91,800
0
91,800
14
0
14
29
45,900
14
14
0
$9,413,000
$8,681,000
$0
$0
$732,000
$33,403,000
$16,433,000
$0
$16,970,000
$0
$6,677,000
$5,714,000
$100,000
$5,614,000
$0
$0
$2,628,000
$2,628,000
$0
1999
1999
Station
14
$118,599,991
1999
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
8
6
0
0
0
0
2,700
0
2
14
$59,651,598
$48,111,392
$0
$0
$0
$0
$10,123,000
$0
$714,000
$0
1999
1999
Rev. Vehicle
29
$98,559,000
1999
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
29
0
0
0
29
29
29
29
$94,940,000
$0
$0
$0
$3,619,000
$0
$0
$0
1999
L.F. Guideway
45,900
$120,964,991
1999
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
45,900
45,900
45,900
45,900
45,900
45,900
45,900
45,900
45,900
45,900
45,900
45,900
$38,431,000
$0
$0
$16,096,000
$16,096,000
$0
$0
$0
$7,053,000
$59,384,991
$0
$0
1999
L.F. Guideway
45,900
$45,338,038
1999
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
45,900
45,900
45,900
45,900
45,900
45,900
45,900
45,900
$43,523,000
$0
$1,815,038
$1,244,678
$0
$570,360
$0
$0
1999
A-17
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
0
1999
1999
1999
1999
1999
1999
1999
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-18
Select City:
Quantity
Hudson-Bergen MOS-I
Newark, NJ
Year
Total Cost
45,900
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$700,602,000
$992,140,000
$291,538,000
1999
1999
$5,565,000
$41,707,500
$41,707,500
$10,499,000
$10,684,000
$10,449,000
$45,987,000
$9,387,000
$36,600,000
$0
$124,939,000
$0
$0
$0
$0
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
0
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
Hudson-Bergen MOS-II
Newark, NJ
Total Cost
Select City:
Quantity
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
30,704
DB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
0
0
0
Year
$1,218,474,000
2000
0
0
0
0
0
34,900
0
0
0
0
0
0
0
0
L.F. Guideway
30,704
$421,838,000
2000
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
21,119
215
4,867
0
4,503
0
16,218
44,760
215
61,193
30,704
$140,524,847
$1,364,563
$33,239,731
$0
$206,580,219
$0
$680,395
$2,372,795
$39,450
$5,733,000
$31,303,000
2000
2000
2000
2000
2000
2000
2000
2000
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
30,704
30,704
30,704
30,704
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-19
2000
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
Hudson-Bergen MOS-II
Newark, NJ
Total Cost
Select City:
Quantity
Year
L.F. Guideway
DB / DBB
Track
Feet
30,704
61,193
$1,218,474,000
$74,911,000
2000
2000
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
61,193
61,193
0
61,193
0
61,193
61,193
0
61,193
0
61,193
2
0
2
23
30,704
4
4
0
$20,594,000
$20,594,000
$0
$0
$0
$25,095,000
$14,793,000
$0
$10,302,000
$0
$9,347,000
$2,000,000
$0
$2,000,000
$0
$0
$17,875,000
$17,875,000
$0
2000
2000
Station
$148,973,500
2000
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
2
0
0
0
0
0
975
0
0
2
$145,273,500
$0
$0
$0
$0
$0
$3,700,000
$0
$0
$0
2000
Rev. Vehicle
23
$75,882,000
2000
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
0
23
0
0
23
23
23
23
$0
$72,382,000
$0
$0
$3,500,000
$0
$0
$0
L.F. Guideway
30,704
$168,917,500
2000
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
30,704
30,704
30,704
30,704
30,704
30,704
30,704
30,704
30,704
30,704
30,704
30,704
$30,674,000
$13,879,000
$20,762,000
$3,654,000
$3,654,000
$0
$0
$0
$3,703,000
$96,245,500
$0
$0
2000
2000
2000
2000
2000
L.F. Guideway
30,704
$39,077,000
2000
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
30,704
30,704
30,704
30,704
30,704
30,704
30,704
30,704
$37,577,000
$0
$1,500,000
$0
$0
$1,500,000
$0
$0
2000
A-20
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
0
2000
2000
2000
2000
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-21
Select City:
Quantity
30,704
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
$929,599,000
Hudson-Bergen MOS-II
Newark, NJ
Total Cost
$1,218,474,000
$288,875,000
$0
$22,932,000
$22,932,000
$25,807,000
$18,999,000
$8,414,000
$16,291,000
$16,291,000
$0
$0
$173,500,000
$0
$0
$0
$0
Year
2000
2000
2000
2000
2000
2000
2000
2000
2000
2000
0
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
Hiawatha Corridor
Minneapolis, MN
Total Cost
Select City:
Quantity
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
61,248
DB
CON
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
0
0
0
Year
$675,430,000
2002
0
0
0
0
0
19,300
0
0
0
0
0
0
0
0
L.F. Guideway
61,248
$280,857,379
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
44,248
0
0
0
17,000
0
34,000
76,996
11,500
122,496
61,248
$117,305,809
$0
$0
$0
$117,748,272
$0
$7,117,340
$33,658,742
$5,027,216
$0
$0
2002
26
$36,647,066
2002
0
0
0
0
0
0
0
0
0
0
0
0
26
0
0
61,248
61,248
61,248
61,248
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$33,359,066
$0
$0
$3,288,000
$3,288,000
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-22
2002
2002
2002
2002
2002
2002
2002
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
Hiawatha Corridor
Minneapolis, MN
Total Cost
Select City:
Quantity
Year
L.F. Guideway
DB / DBB
Track
Feet
61,248
122,496
$675,430,000
$103,707,649
2002
2002
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
122,496
122,496
0
122,496
0
122,496
122,496
0
122,496
0
122,496
17
0
17
26
61,248
0
0
0
$29,923,930
$29,923,930
$0
$0
$0
$48,231,792
$20,518,177
$0
$27,713,614
$0
$21,973,927
$3,578,000
$0
$3,578,000
$0
$0
$0
$0
$0
2002
2002
Station
17
$46,050,906
2002
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
16
0
1
0
0
0
1,100
0
1
17
$20,761,794
$0
$18,677,389
$0
$0
$0
$3,632,140
$0
$979,584
$2,000,000
2002
Rev. Vehicle
26
$74,711,000
2002
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
26
0
0
0
26
26
26
26
$74,711,000
$0
$0
$0
$0
$0
$0
$0
2002
L.F. Guideway
61,248
$11,243,000
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
61,248
61,248
61,248
61,248
61,248
61,248
61,248
61,248
61,248
61,248
61,248
61,248
$11,243,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
2002
L.F. Guideway
61,248
$49,026,000
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
61,248
61,248
61,248
61,248
61,248
61,248
61,248
61,248
$21,299,000
$27,727,000
$0
$0
$0
$0
$0
$0
2002
2002
0
A-23
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-24
Select City:
Quantity
61,248
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
$602,243,000
Hiawatha Corridor
Minneapolis, MN
Total Cost
$675,430,000
$73,187,000
$0
$0
$17,297,000
$0
$42,935,000
$0
$6,115,000
$6,115,000
$0
$0
$3,100,000
$2,740,000
$0
$2,740,000
$1,000,000
Year
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
Select City:
Quantity
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
30,408
DBB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
0
0
0
2002
2002
0
0
0
0
0
18,100
0
0
0
0
0
0
0
0
L.F. Guideway
30,408
$119,609,651
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
0
26,448
3,960
0
0
0
7,920
20,466
32,430
60,816
30,408
$0
$63,988,925
$25,483,760
$0
$0
$0
$3,586,691
$5,040,368
$16,917,687
$4,592,219
$0
24
$14,194,955
0
0
0
22
22
0
0
0
0
0
0
0
24
0
0
30,408
30,408
30,408
30,408
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$14,194,955
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-25
Year
$349,375,072
2002
2002
2002
2002
2002
2002
2002
2002
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
Select City:
Quantity
Year
L.F. Guideway
DB / DBB
Track
Feet
30,408
60,816
$349,375,072
$36,104,512
2002
2003
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
60,816
60,816
0
60,816
0
60,816
60,816
0
60,816
0
60,816
10
0
10
24
30,408
0
0
0
$11,472,500
$11,472,500
$0
$0
$0
$10,508,067
$0
$0
$0
$0
$12,664,285
$1,459,660
$0
$1,459,660
$0
$0
$0
$0
$0
2003
2003
Station
10
$11,408,179
2002
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
10
0
0
0
0
0
600
0
1
10
$8,227,892
$0
$0
$0
$0
$0
$1,756,287
$0
$1,424,000
$0
2002
Rev. Vehicle
24
$73,189,604
2002
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
0
17
7
0
24
24
24
24
$0
$48,988,283
$18,600,308
$0
$5,601,013
$0
$0
$0
L.F. Guideway
30,408
$19,493,599
2001
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
30,408
30,408
30,408
30,408
30,408
30,408
30,408
30,408
30,408
30,408
30,408
30,408
$7,947,805
$0
$0
$86,000
$0
$86,000
$0
$0
$0
$9,582,997
$1,876,797
$0
2001
L.F. Guideway
30,408
$6,473,336
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
30,408
30,408
30,408
30,408
30,408
30,408
30,408
30,408
$2,262,018
$0
$334,700
$0
$0
$334,700
$315,000
$3,561,618
2002
A-26
2002
2003
2003
2003
2002
2002
2002
2002
2002
0
2001
2001
2001
2001
2002
2002
2002
2002
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-27
Select City:
Quantity
30,408
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$280,473,836
$349,375,072
$68,901,236
$0
$0
$18,677,500
$17,046,868
$17,046,868
$0
$4,230,000
$4,230,000
$0
$0
$7,595,000
$4,305,000
$0
$0
$0
Year
2002
2002
2001
2002
2002
2001
2001
2003
2004
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
28,969
DBB
CON
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
0
0
0
$475,843,877
2003
2003
0
0
0
0
0
10,800
0
0
0
0
0
0
0
0
L.F. Guideway
28,969
$144,602,103
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
0
0
12,896
5,253
3,279
7,541
47,432
10,506
0
57,938
28,969
$0
$0
$37,158,222
$16,649,471
$37,958,146
$25,125,015
$9,243,536
$4,452,520
$0
$14,015,192
$0
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
28,969
28,969
28,969
28,969
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-28
2003
2003
2003
2003
2003
2003
2003
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
L.F. Guideway
DB / DBB
Track
Feet
28,969
57,938
$475,843,877
$27,516,730
2003
2003
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
57,938
57,938
0
57,938
1
57,938
57,938
0
57,938
0
57,938
4
0
4
11
28,969
0
0
0
$14,250,531
$10,289,749
$0
$3,940,782
$20,000
$10,467,757
$4,388,423
$0
$6,079,334
$0
$1,698,442
$1,100,000
$0
$1,100,000
$0
$0
$0
$0
$0
2003
2003
Station
$60,253,996
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
0
0
0
1
0
3
370
0
0
4
$0
$0
$0
$46,868,372
$0
$13,385,624
$0
$0
$0
$0
Rev. Vehicle
11
$38,100,000
2003
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
11
0
0
0
11
11
11
11
$38,100,000
$0
$0
$0
$0
$0
$0
$0
2003
L.F. Guideway
28,969
$20,575,510
2003
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
28,969
28,969
28,969
28,969
28,969
28,969
28,969
28,969
28,969
28,969
28,969
28,969
$14,365,902
$0
$0
$1,747,137
$845,000
$902,137
$0
$0
$3,205,081
$1,257,390
$0
$0
2003
L.F. Guideway
28,969
$46,200,000
2003
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
28,969
28,969
28,969
28,969
28,969
28,969
28,969
28,969
$31,200,000
$0
$0
$0
$0
$0
$0
$15,000,000
2003
A-29
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-30
28,969
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$337,248,339
$475,843,877
$138,595,538
$0
$7,000,000
$40,150,350
$44,062,447
$18,800,000
$0
$26,158,831
$0
$22,546,954
$3,611,877
$0
$2,423,910
$0
$0
$0
2003
2003
2003
2003
2003
2003
2003
2003
2003
2003
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
91,872
DBB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
0
0
0
$329,494,296
1999
0
0
0
0
0
15,000
0
0
0
0
0
0
0
0
L.F. Guideway
91,872
$106,693,929
1999
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
91,872
0
0
0
0
0
0
183,744
0
183,744
91,872
$81,994,541
$0
$0
$0
$0
$0
$0
$24,699,388
$0
$0
$0
1999
24
$13,203,257
1999
0
0
0
24
0
0
0
0
0
0
0
0
24
0
0
91,872
91,872
91,872
91,872
$0
$0
$0
$737,604
$0
$0
$0
$0
$0
$0
$0
$0
$12,465,653
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-31
1999
1999
1999
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
L.F. Guideway
DB / DBB
Track
Feet
91,872
183,744
$329,494,296
$44,559,729
1999
1999
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
183,744
183,744
0
183,744
0
183,744
183,744
0
183,744
0
183,744
8
0
8
24
91,872
0
0
0
$16,787,026
$16,787,026
$0
$0
$0
$16,250,944
$0
$0
$0
$0
$9,577,756
$1,944,003
$0
$1,944,003
$0
$0
$0
$0
$0
1999
1999
Station
$10,077,816
1999
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
8
0
0
0
0
0
4,000
0
0
8
$10,077,816
$0
$0
$0
$0
$0
$0
$0
$0
$0
1999
Rev. Vehicle
24
$60,617,537
1999
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
24
0
0
0
24
24
24
24
$60,617,537
$0
$0
$0
$0
$0
$0
$0
1999
L.F. Guideway
91,872
$7,572,009
1999
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
91,872
91,872
91,872
91,872
91,872
91,872
91,872
91,872
91,872
91,872
91,872
91,872
$4,493,656
$0
$0
$881,457
$881,457
$0
$0
$0
$0
$2,196,897
$0
$0
1999
L.F. Guideway
91,872
$21,349,279
1999
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
91,872
91,872
91,872
91,872
91,872
91,872
91,872
91,872
$16,704,282
$946,498
$1,472,649
$0
$0
$1,472,649
$2,225,850
$0
1999
1999
1999
A-32
1999
1999
1999
1999
1999
1999
1999
1999
1999
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-33
91,872
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$264,073,556
$329,494,296
$65,420,740
$0
$0
$23,519,814
$18,758,352
$12,009,715
$2,510,092
$4,403,053
$4,403,053
$0
$0
$0
$4,019,714
$0
$0
$200,000
1999
1999
1999
1999
1999
1999
1999
1999
1999
1999
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
79,200
DBB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
0
0
0
$311,800,187
1998
0
0
0
0
0
23,000
0
0
0
0
0
0
0
0
L.F. Guideway
79,200
$43,199,327
1998
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
65,208
13,992
0
0
0
0
0
130,416
27,984
158,400
79,200
$27,280,231
$5,624,696
$0
$0
$0
$0
$0
$8,287,215
$2,007,185
$0
$0
1998
1998
23
$22,118,327
1998
0
0
0
0
0
0
0
0
0
0
0
0
23
0
0
79,200
79,200
79,200
79,200
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$22,118,327
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-34
1998
1998
1998
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
L.F. Guideway
DB / DBB
Track
Feet
79,200
158,400
$311,800,187
$65,772,667
1998
1998
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
158,400
158,400
0
158,400
0
158,400
158,400
0
158,400
0
158,400
16
0
16
23
79,200
0
0
0
$22,637,947
$0
$0
$0
$0
$36,710,486
$0
$0
$0
$0
$1,682,935
$4,741,299
$0
$0
$0
$0
$0
$0
$0
1998
Station
16
$13,045,531
1998
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
16
0
0
0
0
0
0
0
0
16
$13,045,531
$0
$0
$0
$0
$0
$0
$0
$0
$0
1998
Rev. Vehicle
23
$68,712,893
1998
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
23
0
0
0
23
23
23
23
$68,712,893
$0
$0
$0
$0
$0
$0
$0
1998
L.F. Guideway
79,200
$8,598,856
1998
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
79,200
79,200
79,200
79,200
79,200
79,200
79,200
79,200
79,200
79,200
79,200
79,200
$8,598,856
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
1998
L.F. Guideway
79,200
$42,497,770
1998
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
79,200
79,200
79,200
79,200
79,200
79,200
79,200
79,200
$42,497,770
$0
$0
$0
$0
$0
$0
$0
1998
A-35
1998
1998
1998
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-36
79,200
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$263,945,371
$311,800,187
$47,854,816
$0
$0
$0
$0
$22,857,356
$0
$0
$0
$0
$0
$24,997,460
$0
$0
$0
$0
1998
1998
1998
0
1998
0
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
139,958
DB
CON
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
0
0
0
$1,007,045,859
2002
0
0
0
0
0
16,000
0
0
0
0
0
0
0
0
L.F. Guideway
139,958
$218,795,747
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
139,958
0
0
0
0
0
0
279,915
15,840
295,755
139,958
$112,332,723
$0
$0
$0
$0
$0
$0
$32,171,006
$2,294,824
$0
$71,997,194
2002
20
$45,330,570
2002
0
0
0
0
0
0
0
0
0
0
0
0
20
0
0
139,958
139,958
139,958
139,958
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$45,330,570
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-37
2002
2002
2002
2002
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
L.F. Guideway
DB / DBB
Track
Feet
139,958
295,755
$1,007,045,859
$57,555,962
2002
2002
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
295,755
295,755
0
295,755
0
295,755
295,755
0
295,755
0
295,755
20
0
20
20
139,958
0
0
0
$37,135,590
$27,367,333
$0
$0
$9,768,257
$0
$0
$0
$0
$0
$7,326,374
$4,636,300
$0
$4,636,300
$0
$8,457,698
$0
$0
$0
2002
2002
Station
20
$48,743,551
2002
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
1
19
0
0
0
0
3,620
0
0
20
$1,600,475
$29,007,121
$0
$0
$0
$0
$17,830,955
$0
$305,000
$0
2002
2002
Rev. Vehicle
20
$73,943,650
2002
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
20
0
0
0
20
20
20
20
$73,943,650
$0
$0
$0
$0
$0
$0
$0
2002
L.F. Guideway
139,958
$49,960,495
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
139,958
139,958
139,958
139,958
139,958
139,958
139,958
139,958
139,958
139,958
139,958
139,958
$18,300,000
$10,200,000
$4,200,000
$0
$0
$0
$0
$0
$10,763,876
$2,673,470
$3,823,149
$0
2002
2002
2002
0
L.F. Guideway
139,958
$84,302,000
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
139,958
139,958
139,958
139,958
139,958
139,958
139,958
139,958
$84,302,000
$0
$0
$0
$0
$0
$0
$0
2002
A-38
2002
0
2002
2002
2002
2002
0
2002
2002
2002
2002
2002
2002
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-39
139,958
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$578,631,974
$1,007,045,859
$428,413,885
2002
2002
$13,047,850
$19,566,160
$35,700,000
$44,474,480
$28,200,395
$0
$8,925,000
$8,925,000
$0
$0
$268,000,000
$1,800,000
$0
$0
$8,700,000
1999
1999
2000
2002
2002
2002
2002
2002
2002
2002
2002
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
92,126
DBB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
0
0
0
$963,267,843
1996
0
0
0
0
0
27,100
0
0
0
0
0
0
0
0
L.F. Guideway
92,126
$357,388,524
1996
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
65,154
9,653
1,869
0
15,450
0
6,778
127,208
19,306
153,292
92,126
$75,416,973
$32,942,979
$13,741,812
$0
$166,887,812
$0
$12,907,577
$22,165,549
$11,755,771
$21,570,051
$0
1996
1996
1996
36
$19,540,459
1996
0
0
0
0
0
0
0
0
0
0
0
0
36
0
0
92,126
92,126
92,126
92,126
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$19,540,459
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-40
1996
1996
1996
1996
1996
1996
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
L.F. Guideway
DB / DBB
Track
Feet
92,126
153,292
$963,267,843
$71,555,861
1996
1996
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
153,292
153,292
0
153,292
0
153,292
153,292
0
153,292
0
153,292
20
0
20
36
92,126
0
0
0
$25,603,599
$25,603,599
$0
$0
$0
$26,143,705
$0
$0
$0
$0
$14,753,114
$5,055,443
$0
$5,055,443
$0
$0
$0
$0
$0
1996
1996
Station
20
$100,259,433
1996
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
19
0
1
0
0
0
2,733
880
0
20
$34,165,962
$0
$44,841,563
$0
$0
$0
$7,481,332
$13,770,576
$0
$0
1996
Rev. Vehicle
36
$108,280,886
1996
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
36
0
0
0
36
36
36
36
$108,280,886
$0
$0
$0
$0
$0
$0
$0
1996
L.F. Guideway
92,126
$27,762,340
1996
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
92,126
92,126
92,126
92,126
92,126
92,126
92,126
92,126
92,126
92,126
92,126
92,126
$10,291,816
$0
$0
$0
$0
$0
$0
$0
$0
$17,470,524
$0
$0
1996
L.F. Guideway
92,126
$64,199,462
1996
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
92,126
92,126
92,126
92,126
92,126
92,126
92,126
92,126
$64,199,462
$0
$0
$0
$0
$0
$0
$0
1996
A-41
1996
1996
1996
1996
1996
1996
1996
1996
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-42
92,126
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$748,986,965
$963,267,843
$214,280,878
$0
$0
$95,138,864
$0
$93,897,518
$0
$15,438,722
$15,438,722
$0
$0
$1,397,973
$8,407,801
$0
$0
$0
1996
1996
1996
1996
1996
1996
1996
1996
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
33,264
DBB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
6
13
7
$230,650,644
2002
16
16
15
15
0
15,000
0
0
0
0
0
0
0
0
L.F. Guideway
33,264
$45,383,025
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
32,614
0
650
0
0
0
1,300
65,228
0
66,528
33,264
$30,007,683
$0
$4,771,138
$0
$0
$0
$675,367
$9,115,763
$0
$813,074
$0
2002
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
33,264
33,264
33,264
33,264
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-43
2002
2002
2002
2002
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
L.F. Guideway
DB / DBB
Track
Feet
33,264
66,528
$230,650,644
$28,230,274
2002
2002
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
66,528
66,528
0
66,528
0
66,528
66,528
0
66,528
0
66,528
6
0
6
24
33,264
0
0
0
$16,518,394
$14,534,876
$0
$0
$1,983,518
$10,812,037
$6,188,197
$1,615,040
$3,008,800
$0
$0
$899,843
$0
$899,843
$0
$0
$0
$0
$0
2002
2002
Station
$22,454,518
2002
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
6
0
0
0
0
0
0
0
0
6
$22,454,518
$0
$0
$0
$0
$0
$0
$0
$0
$0
2002
Rev. Vehicle
24
$60,908,467
2002
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
24
0
0
0
24
24
24
24
$60,908,467
$0
$0
$0
$0
$0
$0
$0
2002
L.F. Guideway
33,264
$7,878,469
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
33,264
33,264
33,264
33,264
33,264
33,264
33,264
33,264
33,264
33,264
33,264
33,264
$7,586,004
$0
$0
$292,465
$292,465
$0
$0
$0
$0
$0
$0
$0
2002
L.F. Guideway
33,264
$28,596,906
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
33,264
33,264
33,264
33,264
33,264
33,264
33,264
33,264
$28,325,447
$0
$271,459
$0
$271,459
$0
$0
$0
2002
A-44
2002
2002
2002
2002
2002
2003
2003
2002
2002
2002
2002
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-45
33,264
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$193,451,659
$230,650,644
$37,198,985
$0
$0
$15,134,754
$7,757,783
$12,887,194
$0
$0
$0
$0
$0
$0
$576,960
$0
$0
$842,294
2002
2002
2001
2002
2002
0
2002
2002
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
68,070
DBB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
11
18
10
$230,560,000
2002
12
12
15
30
0
15,000
0
0
0
0
0
0
0
0
L.F. Guideway
68,070
$60,103,859
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
59,928
7,392
750
0
0
0
1,500
78,978
14,784
95,262
68,070
$37,088,543
$4,269,713
$2,973,366
$0
$0
$0
$420,887
$11,266,793
$1,523,656
$2,560,901
$0
2002
2002
2002
$0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
68,070
68,070
68,070
68,070
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-46
2002
2002
2002
2002
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
L.F. Guideway
DB / DBB
Track
Feet
68,070
95,262
$230,560,000
$56,594,643
2002
2002
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
95,262
95,262
0
95,262
0
95,262
95,262
0
95,262
0
95,262
10
0
10
14
68,070
0
0
0
$24,897,129
$24,659,129
$238,000
$0
$0
$29,521,129
$5,322,000
$0
$24,199,129
$0
$924,825
$1,251,560
$0
$1,251,560
$0
$0
$0
$0
$0
2002
2002
2002
Station
10
$18,652,818
2002
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
4
6
0
0
0
0
0
0
0
10
$9,154,189
$8,654,189
$0
$0
$0
$0
$0
$0
$0
$844,440
2002
2002
Rev. Vehicle
14
$35,687,292
2002
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
0
14
0
0
14
14
14
14
$0
$35,687,292
$0
$0
$0
$0
$0
$0
L.F. Guideway
68,070
$11,159,388
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
68,070
68,070
68,070
68,070
68,070
68,070
68,070
68,070
68,070
68,070
68,070
68,070
$7,496,000
$0
$0
$34,060
$34,060
$0
$0
$0
$0
$3,379,328
$0
$250,000
2002
L.F. Guideway
68,070
$5,311,529
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
68,070
68,070
68,070
68,070
68,070
68,070
68,070
68,070
$3,715,677
$0
$1,040,852
$0
$236,274
$804,578
$555,000
$0
2002
A-47
2002
2002
2002
2002
2002
2002
2003
2003
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-48
68,070
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$187,509,529
$230,560,000
$43,050,471
$0
$1,513,672
$14,085,877
$10,385,042
$10,930,435
$0
$779,564
$0
$779,564
$0
$0
$4,167,636
$0
$0
$1,188,245
2002
2002
2000
2001
2002
2002
2002
2002
2002
2002
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
Select City:
Quantity
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
73,730
DB
CON
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
14
28
13
25
20
12
$403,618,310
2002
8
10
1,859
68,000
31,500
0
0
0
0
0
0
0
L.F. Guideway
73,730
$89,154,842
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
49,098
3,557
7,070
3,895
2,222
7,888
18,527
121,526
7,113
147,166
73,730
$5,506,595
$11,945
$4,146,563
$893,810
$21,769,499
$10,568,640
$4,388,945
$14,257,475
$5,568,225
$83,147
$21,960,000
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
25
$16,647,970
2002
25
0
0
25
25
5,000
0
0
0
0
0
0
0
0
0
73,730
73,730
73,730
73,730
$14,316,600
$0
$0
$2,083,160
$0
$2,083,160
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$248,210
2002
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-49
2002
2002
0
2002
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
Select City:
Quantity
L.F. Guideway
DB / DBB
Track
Feet
73,730
147,166
$403,618,310
$55,815,978
2002
2002
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
147,166
147,166
0
147,166
26
147,166
147,166
0
147,166
0
147,166
13
0
13
25
73,730
15
13
2
$18,213,777
$16,471,644
$0
$0
$1,742,133
$22,969,661
$9,821,863
$297,495
$12,850,303
$0
$6,495,337
$3,863,068
$0
$0
$0
$0
$4,274,135
$4,072,010
$202,125
2002
2002
2002
2002
2002
Station
13
$51,941,011
2002
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
7
3
0
1
1
1
0
0
1
13
$18,222,152
$5,665,886
$0
$7,525,701
$3,005,440
$3,284,013
$481,198
$10,415,000
$1,337,913
$2,003,707
2002
2002
Rev. Vehicle
25
$528,933
2002
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
0
0
0
0
25
25
25
25
$0
$0
$0
$0
$13,270
$515,663
$515,663
$0
L.F. Guideway
73,730
$68,108,837
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
73,730
73,730
73,730
73,730
73,730
73,730
73,730
73,730
73,730
73,730
73,730
73,730
$13,038,627
$41,287
$6,257,077
$1,316,348
$881,572
$59,094
$87,569
$288,113
$11,662,797
$14,606,239
$3,940,462
$17,246,000
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
L.F. Guideway
73,730
$10,101,841
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
73,730
73,730
73,730
73,730
73,730
73,730
73,730
73,730
$2,672,000
$0
$4,026,466
$1,000,000
$3,026,466
$0
$20,000
$3,383,375
2002
A-50
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-51
Select City:
Quantity
73,730
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$292,299,412
$403,618,310
$111,318,897
$0
$13,481,788
$24,009,723
$546,058
$21,430,000
$2,200,000
$18,872,000
$8,472,000
$10,400,000
$0
$0
$6,287,560
$6,287,560
$0
$24,491,768
2002
2001
2000
2001
2002
2002
2002
2001
2002
2000
2003
2003
2002
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
44,687
DB
OPS
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
0
0
0
$177,100,000
1999
0
0
0
0
0
22,000
0
0
0
0
0
0
0
0
L.F. Guideway
44,687
$40,300,000
1999
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
37,149
0
858
5,094
0
1,586
1,456
91,090
0
92,546
44,687
$20,842,628
$0
$1,469,462
$4,216,906
$0
$4,126,913
$327,331
$8,716,761
$0
$600,000
$0
1999
18
$400,000
0
0
0
18
18
1,600
0
0
0
0
0
0
0
0
0
44,687
44,687
44,687
44,687
$0
$0
$0
$400,000
$0
$400,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-52
1999
1999
1999
1999
1999
1999
1999
1999
1999
0
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
L.F. Guideway
DB / DBB
Track
Feet
44,687
92,546
$177,100,000
$11,600,000
1999
1999
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
92,546
92,546
0
92,546
0
92,546
92,546
0
92,546
0
92,546
5
0
5
18
44,687
0
0
0
$3,700,000
$3,700,000
$0
$0
$0
$7,100,000
$0
$0
$0
$0
$0
$800,000
$0
$0
$0
$0
$0
$0
$0
1999
1999
Station
$19,000,000
1999
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
3
2
0
0
0
0
2,335
262
1
5
$11,400,000
$7,600,000
$0
$0
$0
$0
$0
$0
$0
$0
1999
1999
Rev. Vehicle
18
$32,700,000
1999
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
16
2
0
0
18
18
18
18
$29,066,667
$3,633,333
$0
$0
$0
$0
$0
$0
1999
1999
L.F. Guideway
44,687
$1,400,000
1999
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
44,687
44,687
44,687
44,687
44,687
44,687
44,687
44,687
44,687
44,687
44,687
44,687
$800,000
$0
$0
$0
$0
$0
$0
$0
$0
$600,000
$0
$0
1999
L.F. Guideway
44,687
$38,600,000
1999
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
44,687
44,687
44,687
44,687
44,687
44,687
44,687
44,687
$8,600,000
$0
$0
$0
$0
$0
$0
$30,000,000
1999
A-53
1999
1999
1999
1999
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-54
44,687
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$144,000,000
$177,100,000
$33,100,000
$0
$0
$21,600,000
$11,500,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
1999
1999
1999
1999
Appendix A
Headway
Peak
Midday
Ridership
Peak Period - Peak Direction
Weekday
Annual
0.04 STAFFING
Administrative
Operators
Maintenance
Vehicle
Non-Vehicle
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
L.F. Guideway
DB / DBB
PE/FD/CON/OPS
28,763
Route Miles
Track Miles
Each
Revenue Vehicles
Revenue Vehicles
Revenue Vehicles
Minutes
Minutes
Minutes
Unlinked Trips
Unlinked Trips
Unlinked Trips
Unlinked Trips
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
FTE's
0
0
0
$386,458,341
2003
0
0
0
0
0
24,000
0
0
0
0
0
0
0
0
L.F. Guideway
28,763
$94,133,841
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
7,588
978
3,032
6,204
0
10,961
4,462
49,501
335
54,298
28,763
$10,239,448
$485,500
$16,640,660
$21,117,016
$0
$32,216,144
$1,798,100
$8,047,204
$55,000
$3,534,769
$0
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
28
$3,875,595
2000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
28,763
28,763
28,763
28,763
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,820,703
$1,820,703
$0
$2,054,892
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
A-55
2000
2000
2000
Appendix A
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
L.F. Guideway
DB / DBB
Track
Feet
28,763
54,298
$386,458,341
$61,009,982
2003
2003
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
54,298
54,298
83
54,298
4
54,298
54,298
0
54,298
0
54,298
11
0
11
28
28,763
0
0
0
$20,886,124
$14,365,169
$5,732,584
$0
$788,371
$21,912,171
$12,240,806
$961,084
$8,710,281
$0
$4,837,329
$0
$0
$0
$0
$13,374,358
$0
$0
$0
2003
2003
2003
Station
11
$41,348,161
2003
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
0
11
0
0
0
0
433
1,538
2
11
$0
$14,740,981
$0
$0
$0
$0
$3,100,000
$22,950,000
$190,000
$367,180
Rev. Vehicle
28
$68,400,544
2004
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
28
0
0
0
28
28
28
28
$68,203,410
$0
$0
$0
$0
$197,134
$197,134
$0
2004
L.F. Guideway
28,763
$17,520,479
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
28,763
28,763
28,763
28,763
28,763
28,763
28,763
28,763
28,763
28,763
28,763
28,763
$3,631,852
$0
$431,244
$387,521
$387,521
$0
$0
$0
$12,185,253
$0
$884,609
$0
2002
L.F. Guideway
28,763
$2,950,000
2002
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
28,763
28,763
28,763
28,763
28,763
28,763
28,763
28,763
$2,707,000
$0
$0
$0
$0
$0
$226,000
$17,000
2002
A-56
2003
2003
2003
2003
2003
2003
0
2003
0
2002
2002
2004
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
2002
Appendix A
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
L.F. Guideway
DBTotal
/ DBB
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
A-57
28,763
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$289,238,602
$386,458,341
$97,219,739
2003
2002
$300,845
$11,600,789
$35,198,539
$20,338,449
$13,683,245
$0
$0
$0
$0
$0
$0
$0
$0
$0
$16,097,872
1999
1999
2002
2002
2002
0
2002
APPENDIX B
Cost Adjustment Worksheet
Appendix B
2003
Estimated
Year
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
Inflation
Index
% Increase
28.7
32.1
11.8%
34.8
8.4%
37.7
8.3%
41.4
9.8%
44.8
8.2%
46.9
4.7%
49.5
5.5%
53.5
8.1%
57.8
8.0%
62.9
8.8%
70.0
11.3%
76.1
8.7%
80.2
5.4%
82.0
2.2%
82.6
0.7%
84.2
1.9%
87.7
4.2%
89.9
2.5%
92.1
2.4%
94.3
2.4%
96.8
2.7%
99.4
2.7%
101.7
2.3%
104.4
2.7%
107.6
3.1%
110.2
2.4%
112.8
2.4%
115.1
2.0%
117.6
2.2%
120.9
2.8%
125.1
3.5%
128.7
2.9%
132.1
2.7%
135.8
2.8%
139.8
2.9%
143.9
3.0%
148.0
2.8%
152.2
2.8%
156.6
2.9%
161.1
2.9%
165.8
2.9%
170.5
2.9%
175.4
2.9%
180.5
2.9%
185.6
2.9%
191.0
2.9%
B-1
Appendix B
2003
Year
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050
Inflation
Index
% Increase
196.5
2.9%
202.1
2.9%
207.9
2.9%
213.9
2.9%
220.0
2.9%
226.3
2.9%
232.8
2.9%
239.5
2.9%
246.4
2.9%
253.5
2.9%
260.8
2.9%
268.3
2.9%
276.0
2.9%
283.9
2.9%
292.1
2.9%
300.4
2.9%
309.1
2.9%
318.0
2.9%
327.1
2.9%
336.5
2.9%
346.1
2.9%
356.1
2.9%
366.3
2.9%
376.8
2.9%
387.7
2.9%
398.8
2.9%
410.3
2.9%
422.0
2.9%
434.2
2.9%
446.6
2.9%
459.5
2.9%
472.7
2.9%
486.2
2.9%
500.2
2.9%
B-2
APPENDIX C
Cost Normalization and Adjustment Worksheet
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
$YOE
Sacramento Stage I
Unit Costs
$City
$National
L.F. Guideway
$1,615
$417
$2,602
$667
$2,344
$601
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$308
$0
$349
$0
$0
$0
$25
$69
$0
$11
$0
$493
$0
$559
$0
$0
$0
$40
$111
$0
$18
$0
$444
$0
$503
$0
$0
$0
$36
$100
$0
$16
$0
L.F. Guideway
$79,580
$127,310
$114,694
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$79,580
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$127,310
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$114,694
$0
$0
$0
$0
$0
$0
Track Feet
$126
$202
$182
$53
$85
$77
$45
$0
$0
$14,813
$72
$0
$0
$23,697
$64
$0
$0
$21,349
$65
$104
$94
$31
$0
$34
$0
$1
$50
$0
$54
$0
$2
$45
$0
$48
$0
$2
$37,571
$60,106
$54,149
$0
$35,214
$1,833
$0
$0
$56,335
$2,933
$0
$0
$50,752
$2,642
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
C-1
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$YOE
Sacramento Stage I
Unit Costs
$City
$National
$1,615
$2,602
$2,344
Station
$366,786
$586,773
$528,625
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$0
$366,786
$0
$0
$0
$0
$0
$0
$0
$0
$0
$586,773
$0
$0
$0
$0
$0
$0
$0
$0
$0
$528,625
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
$961,111
$1,537,558
$1,385,188
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$800,000
$1,380,000
$0
$0
$0
$0
$0
$0
$1,279,817
$2,207,685
$0
$0
$0
$0
$0
$0
$1,152,988
$1,988,905
$0
$0
$0
$0
$0
$0
L.F. Guideway
$109
$174
$156
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$43
$4
$0
$3
$0
$3
$0
$0
$58
$0
$0
$0
$69
$7
$0
$5
$0
$5
$0
$0
$93
$0
$0
$0
$62
$6
$0
$4
$0
$4
$0
$0
$84
$0
$0
$0
L.F. Guideway
$156
$249
$224
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$148
$0
$7
$0
$0
$7
$0
$0
$237
$0
$11
$0
$0
$11
$0
$0
$214
$0
$10
$0
$0
$10
$0
$0
L.F. Guideway
C-2
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$YOE
Sacramento Stage I
Unit Costs
$City
$National
$1,615
$2,602
$2,344
Total
$36,119,000
$62,717,548
$56,502,296
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$16,557,000
$0
$0
$9,050,000
$4,199,000
$0
$1,285,000
$1,285,000
$0
$0
$528,000
$4,500,000
$0
$4,500,000
$0
$34,783,158
$0
$0
$14,911,187
$6,766,593
$0
$2,055,706
$2,055,706
$0
$0
$850,860
$7,198,972
$0
$7,198,972
$0
$31,336,179
$0
$0
$13,433,502
$6,096,029
$0
$1,851,988
$1,851,988
$0
$0
$766,540
$6,485,560
$0
$6,485,560
$0
Total
25.0%
25.0%
25.0%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
11.4%
0.0%
0.0%
6.3%
2.9%
0.0%
0.9%
0.9%
0.0%
0.0%
0.4%
3.1%
0.0%
3.1%
0.0%
11.4%
0.0%
0.0%
6.3%
2.9%
0.0%
0.9%
0.9%
0.0%
0.0%
0.4%
3.1%
0.0%
3.1%
0.0%
11.4%
0.0%
0.0%
6.3%
2.9%
0.0%
0.9%
0.9%
0.0%
0.0%
0.4%
3.1%
0.0%
3.1%
0.0%
L.F. Guideway
C-3
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$6,758
$2,463
$10,812
$3,940
$10,790
$3,932
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$535
$858
$981
$0
$13,548
$514
$215
$37
$55
$0
$0
$855
$1,373
$1,569
$0
$21,673
$828
$344
$59
$88
$0
$0
$854
$1,370
$1,566
$0
$21,630
$827
$343
$59
$88
$0
$0
$382,645
$612,144
$610,922
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$330,831
$0
$0
$61
$61
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$529,255
$0
$0
$92
$92
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$528,198
$0
$0
$92
$92
$0
$0
Track Feet
$365
$583
$582
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$139
$223
$223
$139
$0
$0
$0
$223
$0
$0
$0
$223
$0
$0
$0
$165
$265
$265
$73
$0
$91
$0
$54
$118
$0
$147
$0
$87
$118
$0
$147
$0
$87
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
C-4
$88,888
$143,242
$142,956
$1,066,661
$0
$0
$0
$1,718,900
$0
$0
$0
$1,715,469
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$6,758
$10,812
$10,790
Station
$2,856,898
$4,570,384
$4,561,262
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$0
$1,748,205
$0
$6,182,978
$0
$0
$0
$0
$0
$0
$0
$2,796,729
$0
$9,891,352
$0
$0
$0
$0
$0
$0
$0
$2,791,146
$0
$9,871,608
$0
$0
$0
$0
$0
$0
Rev. Vehicle
$1,043,626
$1,669,563
$1,666,231
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$1,043,626
$0
$0
$0
$0
$0
$0
$0
$1,669,563
$0
$0
$0
$0
$0
$0
$0
$1,666,231
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$122
$197
$196
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$49
$60
$0
$9
$9
$0
$0
$0
$0
$4
$0
$0
$79
$97
$0
$15
$15
$0
$0
$0
$0
$6
$0
$0
$79
$97
$0
$15
$15
$0
$0
$0
$0
$6
$0
$0
L.F. Guideway
$262
$431
$430
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$262
$0
$0
$0
$0
$0
$0
$0
$431
$0
$0
$0
$0
$0
$0
$0
$430
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
C-5
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$6,758
$10,812
$10,790
Total
$132,804,580
$212,456,986
$212,032,920
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$0
$106,746,730
$11,236,750
$14,821,100
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$170,770,380
$17,976,233
$23,710,374
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$170,429,521
$17,940,352
$23,663,048
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Total
31.4%
31.4%
31.4%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
0.0%
25.3%
2.7%
3.5%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
25.3%
2.7%
3.5%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
25.3%
2.7%
3.5%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
L.F. Guideway
C-6
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$3,078
$1,180
$4,960
$1,901
$4,733
$1,814
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$803
$0
$2,381
$803
$0
$4,544
$0
$84
$384
$15
$0
$1,294
$0
$3,837
$1,323
$0
$7,323
$0
$138
$619
$25
$0
$1,235
$0
$3,661
$1,263
$0
$6,988
$0
$132
$590
$24
$0
$116,020
$191,160
$182,404
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$114,650
$0
$0
$2
$2
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$188,902
$0
$0
$3
$3
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$180,250
$0
$0
$3
$3
$0
$0
$132
$213
$203
$46
$75
$71
$43
$0
$0
$28,524
$69
$0
$0
$45,965
$66
$0
$0
$43,860
$65
$105
$101
$22
$0
$43
$0
$0
$36
$0
$70
$0
$0
$34
$0
$67
$0
$0
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
C-7
$128,960
$207,816
$198,298
$801,000
$96,920
$0
$0
$1,290,793
$156,184
$0
$0
$1,231,673
$149,031
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$3,078
$4,960
$4,733
Station
$604,280
$966,710
$922,433
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$440,200
$481,700
$0
$0
$0
$0
$2,000
$0
$0
$0
$704,219
$770,610
$0
$0
$0
$0
$3,200
$0
$0
$0
$671,965
$735,315
$0
$0
$0
$0
$3,053
$0
$0
$0
Rev. Vehicle
$969,923
$1,830,953
$1,747,093
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$965,269
$0
$0
$0
$0
$4,654
$808
$3,846
$1,822,168
$0
$0
$0
$0
$7,445
$1,292
$6,153
$1,738,710
$0
$0
$0
$0
$7,104
$1,233
$5,871
L.F. Guideway
$72
$116
$110
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$71
$0
$0
$1
$1
$0
$0
$0
$0
$0
$0
$0
$114
$0
$0
$2
$2
$0
$0
$0
$0
$0
$0
$0
$108
$0
$0
$2
$2
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$188
$310
$295
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$168
$0
$18
$3
$0
$15
$2
$0
$276
$0
$32
$5
$0
$27
$3
$0
$264
$0
$30
$5
$0
$25
$3
$0
L.F. Guideway
C-8
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$3,078
$4,960
$4,733
Total
$58,278,000
$93,913,667
$89,612,278
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$2,535,000
$0
$13,212,000
$17,000,000
$13,172,000
$0
$5,240,000
$5,240,000
$0
$0
$0
$7,119,000
$0
$7,119,000
$0
$5,325,561
$0
$22,941,506
$27,395,112
$21,072,191
$0
$8,382,803
$8,382,803
$0
$0
$0
$11,388,774
$0
$11,388,774
$0
$5,081,642
$0
$21,890,750
$26,140,374
$20,107,052
$0
$7,998,858
$7,998,858
$0
$0
$0
$10,867,150
$0
$10,867,150
$0
Total
30.9%
30.9%
30.9%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
1.3%
0.0%
7.0%
9.0%
7.0%
0.0%
2.8%
2.8%
0.0%
0.0%
0.0%
3.8%
0.0%
3.8%
0.0%
1.3%
0.0%
7.0%
9.0%
7.0%
0.0%
2.8%
2.8%
0.0%
0.0%
0.0%
3.8%
0.0%
3.8%
0.0%
1.3%
0.0%
7.0%
9.0%
7.0%
0.0%
2.8%
2.8%
0.0%
0.0%
0.0%
3.8%
0.0%
3.8%
0.0%
L.F. Guideway
C-9
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$7,355
$1,247
$11,081
$1,833
$10,308
$1,705
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$420
$735
$2,889
$687
$6,568
$4,457
$189
$71
$131
$55
$0
$617
$1,080
$4,246
$1,010
$9,654
$6,550
$278
$104
$193
$81
$0
$574
$1,004
$3,950
$939
$8,980
$6,093
$259
$97
$179
$76
$0
$611,571
$898,928
$836,212
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$597,978
$0
$0
$6
$6
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$878,949
$0
$0
$9
$9
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$817,627
$0
$0
$8
$8
$0
$0
Track Feet
$530
$779
$725
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$171
$251
$234
$116
$0
$0
$465,356
$171
$0
$0
$684,012
$159
$0
$0
$636,290
$207
$305
$283
$88
$0
$119
$0
$80
$130
$0
$175
$0
$118
$121
$0
$163
$0
$109
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
C-10
$272,933
$401,176
$373,187
$1,765,229
$192,696
$0
$94
$2,594,654
$283,237
$0
$138
$2,413,631
$263,477
$0
$128
$0
$0
$0
$0
$0
$0
$0
$0
$0
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$7,355
$11,081
$10,308
Station
$2,995,158
$4,402,487
$4,095,337
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$1,079,409
$913,869
$0
$27,684,300
$2,928,894
$0
$8,079
$0
$999,611
$0
$1,586,589
$1,343,267
$0
$40,692,265
$4,305,087
$0
$11,874
$0
$1,469,296
$0
$1,475,896
$1,249,551
$0
$37,853,270
$4,004,732
$0
$11,046
$0
$1,366,787
$0
Rev. Vehicle
$1,480,354
$2,175,925
$2,024,117
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$1,446,965
$0
$0
$0
$0
$33,389
$27,093
$6,296
$2,126,848
$0
$0
$0
$0
$49,077
$39,823
$9,255
$1,978,463
$0
$0
$0
$0
$45,653
$37,044
$8,609
L.F. Guideway
$1,277
$2,043
$1,901
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$21
$1,004
$0
$8
$3
$5
$0
$0
$101
$0
$142
$0
$34
$1,606
$0
$13
$5
$8
$0
$0
$162
$0
$228
$0
$32
$1,494
$0
$12
$5
$7
$0
$0
$151
$0
$212
$0
L.F. Guideway
$504
$740
$689
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$465
$0
$38
$19
$0
$19
$1
$0
$683
$0
$55
$28
$0
$28
$2
$0
$635
$0
$52
$26
$0
$26
$2
$0
L.F. Guideway
C-11
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$7,355
$11,081
$10,308
Total
$210,805,963
$337,241,378
$313,712,910
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$0
$64,030,705
$79,304,746
$21,374,427
$4,194,136
$32,780,582
$32,780,582
$0
$0
$0
$9,121,366
$0
$9,121,366
$0
$0
$0
$102,434,500
$126,869,475
$34,194,200
$6,709,660
$52,441,442
$52,441,442
$0
$0
$0
$14,592,101
$0
$14,592,101
$0
$0
$0
$95,287,907
$118,018,116
$31,808,559
$6,241,544
$48,782,737
$48,782,737
$0
$0
$0
$13,574,048
$0
$13,574,048
$0
Total
31.6%
31.6%
31.6%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
0.0%
9.6%
11.9%
3.2%
0.6%
4.9%
4.9%
0.0%
0.0%
0.0%
1.4%
0.0%
1.4%
0.0%
0.0%
0.0%
9.6%
11.9%
3.2%
0.6%
4.9%
4.9%
0.0%
0.0%
0.0%
1.4%
0.0%
1.4%
0.0%
0.0%
0.0%
9.6%
11.9%
3.2%
0.6%
4.9%
4.9%
0.0%
0.0%
0.0%
1.4%
0.0%
1.4%
0.0%
L.F. Guideway
C-12
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
$YOE
$National
L.F. Guideway
$4,624
$801
$7,257
$1,207
$6,063
$1,008
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$540
$0
$0
$0
$0
$0
$0
$84
$94
$10
$66
$813
$0
$0
$0
$0
$0
$0
$126
$141
$15
$100
$679
$0
$0
$0
$0
$0
$0
$105
$118
$12
$84
$425,823
$681,219
$569,105
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$403,823
$0
$0
$13
$13
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$646,024
$0
$0
$21
$21
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$539,703
$0
$0
$18
$18
$0
$0
$201
$282
$236
$44
$61
$51
$43
$0
$0
$28,333
$60
$0
$0
$39,703
$50
$0
$0
$33,169
$114
$159
$133
$47
$0
$67
$0
$18
$66
$0
$94
$0
$25
$55
$0
$78
$0
$21
$196,594
$275,484
$230,145
$0
$183,436
$0
$0
$0
$257,047
$0
$0
$0
$214,742
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
C-13
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$YOE
$National
$4,624
$7,257
$6,063
Station
$223,364
$320,473
$267,730
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$192,333
$228,263
$0
$0
$0
$0
$0
$0
$0
$0
$275,952
$327,502
$0
$0
$0
$0
$0
$0
$0
$0
$230,536
$273,602
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
$1,112,220
$1,832,544
$1,530,947
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$1,112,220
$0
$0
$0
$0
$0
$0
$0
$1,832,544
$0
$0
$0
$0
$0
$0
$0
$1,530,947
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$103
$162
$135
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$71
$0
$0
$6
$0
$6
$0
$0
$0
$26
$0
$0
$111
$0
$0
$10
$0
$10
$0
$0
$0
$41
$0
$0
$93
$0
$0
$8
$0
$8
$0
$0
$0
$34
$0
$0
L.F. Guideway
$664
$1,062
$887
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$624
$0
$34
$11
$11
$11
$6
$0
$998
$0
$54
$18
$18
$18
$10
$0
$834
$0
$45
$15
$15
$15
$8
$0
L.F. Guideway
C-14
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$YOE
$National
$4,624
$7,257
$6,063
Total
$136,417,000
$214,089,030
$178,854,661
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$41,085,000
$0
$0
$63,260,000
$19,115,000
$1,457,000
$7,500,000
$0
$7,000,000
$500,000
$0
$4,000,000
$0
$4,000,000
$0
$64,477,652
$0
$0
$99,278,477
$29,998,547
$2,286,575
$11,770,291
$0
$10,985,604
$784,686
$0
$6,277,488
$0
$6,277,488
$0
$53,866,041
$0
$0
$82,939,413
$25,061,443
$1,910,255
$9,833,158
$0
$9,177,614
$655,544
$0
$5,244,351
$0
$5,244,351
$0
Total
55.9%
55.9%
55.9%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
16.8%
0.0%
0.0%
25.9%
7.8%
0.6%
3.1%
0.0%
2.9%
0.2%
0.0%
1.6%
0.0%
1.6%
0.0%
16.8%
0.0%
0.0%
25.9%
7.8%
0.6%
3.1%
0.0%
2.9%
0.2%
0.0%
1.6%
0.0%
1.6%
0.0%
16.8%
0.0%
0.0%
25.9%
7.8%
0.6%
3.1%
0.0%
2.9%
0.2%
0.0%
1.6%
0.0%
1.6%
0.0%
L.F. Guideway
C-15
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
$YOE
Hudson-Bergen MOS-I
Unit Costs
$City
$National
L.F. Guideway
$21,615
$4,661
$24,288
$5,237
$22,181
$4,783
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$2,993
$0
$15,285
$0
$0
$0
$308
$44
$0
$76
$379
$3,363
$0
$17,174
$0
$0
$0
$347
$50
$0
$86
$425
$3,072
$0
$15,684
$0
$0
$0
$317
$45
$0
$78
$389
$648,100
$728,237
$665,057
$0
$0
$0
$127,529
$85,171
$251
$0
$0
$0
$0
$0
$0
$414,957
$0
$0
$161
$131
$30
$0
$0
$0
$0
$143,297
$95,703
$282
$0
$0
$0
$0
$0
$0
$466,266
$0
$0
$181
$147
$34
$0
$0
$0
$0
$130,865
$87,400
$258
$0
$0
$0
$0
$0
$0
$425,814
$0
$0
$165
$134
$31
$0
Track Feet
$630
$708
$646
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$103
$115
$105
$95
$0
$0
$122,000
$106
$0
$0
$137,085
$97
$0
$0
$125,192
$364
$409
$373
$179
$0
$185
$0
$73
$201
$0
$208
$0
$82
$184
$0
$190
$0
$75
$408,143
$458,609
$418,821
$0
$401,000
$0
$0
$0
$450,583
$0
$0
$0
$411,492
$0
$0
$187,714
$210,925
$192,626
$187,714
$0
$210,925
$0
$192,626
$0
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
C-16
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$YOE
Hudson-Bergen MOS-I
Unit Costs
$City
$National
$21,615
$24,288
$22,181
Station
$8,471,428
$9,518,912
$8,693,070
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$7,456,450
$8,018,565
$0
$0
$0
$0
$3,749
$0
$357,000
$0
$8,378,433
$9,010,053
$0
$0
$0
$0
$4,213
$0
$401,143
$0
$7,651,537
$8,228,359
$0
$0
$0
$0
$3,847
$0
$366,340
$0
Rev. Vehicle
$3,398,586
$3,818,818
$3,487,505
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$3,273,793
$0
$0
$0
$124,793
$0
$0
$0
$3,678,595
$0
$0
$0
$140,224
$0
$0
$0
$3,359,447
$0
$0
$0
$128,058
$0
$0
$0
L.F. Guideway
$2,635
$2,961
$2,704
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$837
$0
$0
$351
$351
$0
$0
$0
$154
$1,294
$0
$0
$941
$0
$0
$394
$394
$0
$0
$0
$173
$1,454
$0
$0
$859
$0
$0
$360
$360
$0
$0
$0
$158
$1,328
$0
$0
L.F. Guideway
$988
$1,110
$1,014
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$948
$0
$40
$27
$0
$12
$0
$0
$1,065
$0
$44
$30
$0
$14
$0
$0
$973
$0
$41
$28
$0
$13
$0
$0
L.F. Guideway
C-17
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$YOE
Hudson-Bergen MOS-I
Unit Costs
$City
$National
$21,615
$24,288
$22,181
Total
$291,538,000
$327,586,397
$299,165,659
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$5,565,000
$41,707,500
$41,707,500
$10,499,000
$10,684,000
$10,449,000
$45,987,000
$9,387,000
$36,600,000
$0
$124,939,000
$0
$0
$0
$0
$6,253,107
$46,864,593
$46,864,593
$11,797,191
$12,005,066
$11,741,009
$51,673,249
$10,547,694
$41,125,555
$0
$140,387,589
$0
$0
$0
$0
$5,710,600
$42,798,715
$42,798,715
$10,773,691
$10,963,531
$10,722,383
$47,190,182
$9,632,597
$37,557,585
$0
$128,207,844
$0
$0
$0
$0
Total
41.6%
41.6%
41.6%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.8%
6.0%
6.0%
1.5%
1.5%
1.5%
6.6%
1.3%
5.2%
0.0%
17.8%
0.0%
0.0%
0.0%
0.0%
0.8%
6.0%
6.0%
1.5%
1.5%
1.5%
6.6%
1.3%
5.2%
0.0%
17.8%
0.0%
0.0%
0.0%
0.0%
0.8%
6.0%
6.0%
1.5%
1.5%
1.5%
6.6%
1.3%
5.2%
0.0%
17.8%
0.0%
0.0%
0.0%
0.0%
L.F. Guideway
C-18
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
$YOE
Hudson-Bergen MOS-II
Unit Costs
$City
$National
L.F. Guideway
$39,685
$13,739
$43,374
$15,016
$39,611
$13,714
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$6,654
$6,347
$6,830
$0
$45,876
$0
$42
$53
$183
$94
$1,020
$7,273
$6,937
$7,465
$0
$50,142
$0
$46
$58
$201
$102
$1,114
$6,642
$6,335
$6,817
$0
$45,791
$0
$42
$53
$183
$94
$1,018
Rev. Vehicle
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,224
$1,338
$1,222
$337
$368
$336
$337
$0
$0
$0
$368
$0
$0
$0
$336
$0
$0
$0
$410
$448
$409
$242
$0
$168
$0
$153
$264
$0
$184
$0
$167
$241
$0
$168
$0
$152
$1,000,000
$1,092,979
$998,154
$0
$1,000,000
$0
$0
$0
$1,092,979
$0
$0
$0
$998,154
$0
$0
$4,468,750
$4,884,249
$4,460,501
$4,468,750
$0
$4,884,249
$0
$4,460,501
$0
L.F. Guideway
Track Feet
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
C-19
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$YOE
Hudson-Bergen MOS-II
Unit Costs
$City
$National
$39,685
$43,374
$39,611
Station
$74,486,750
$81,412,433
$74,349,254
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$72,636,750
$0
$0
$0
$0
$0
$3,795
$0
$0
$0
$79,390,423
$0
$0
$0
$0
$0
$4,148
$0
$0
$0
$72,502,669
$0
$0
$0
$0
$0
$3,788
$0
$0
$0
Rev. Vehicle
$3,299,217
$3,605,974
$3,293,127
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$0
$3,147,043
$0
$0
$152,174
$0
$0
$0
$0
$3,439,652
$0
$0
$166,323
$0
$0
$0
$0
$3,141,234
$0
$0
$151,893
$0
$0
$0
L.F. Guideway
$5,501
$6,013
$5,491
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$999
$452
$676
$119
$119
$0
$0
$0
$121
$3,135
$0
$0
$1,092
$494
$739
$130
$130
$0
$0
$0
$132
$3,426
$0
$0
$997
$451
$675
$119
$119
$0
$0
$0
$120
$3,129
$0
$0
L.F. Guideway
$1,273
$1,391
$1,270
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$1,224
$0
$49
$0
$0
$49
$0
$0
$1,338
$0
$53
$0
$0
$53
$0
$0
$1,222
$0
$49
$0
$0
$49
$0
$0
L.F. Guideway
C-20
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$YOE
Hudson-Bergen MOS-II
Unit Costs
$City
$National
$39,685
$43,374
$39,611
Total
$288,875,000
$315,734,230
$288,341,763
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$22,932,000
$22,932,000
$25,807,000
$18,999,000
$8,414,000
$16,291,000
$16,291,000
$0
$0
$173,500,000
$0
$0
$0
$0
$0
$25,064,188
$25,064,188
$28,206,502
$20,765,503
$9,196,323
$17,805,716
$17,805,716
$0
$0
$189,631,810
$0
$0
$0
$0
$0
$22,889,670
$22,889,670
$25,759,363
$18,963,930
$8,398,469
$16,260,928
$16,260,928
$0
$0
$173,179,735
$0
$0
$0
$0
Total
31.1%
31.1%
31.1%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
2.5%
2.5%
2.8%
2.0%
0.9%
1.8%
1.8%
0.0%
0.0%
18.7%
0.0%
0.0%
0.0%
0.0%
0.0%
2.5%
2.5%
2.8%
2.0%
0.9%
1.8%
1.8%
0.0%
0.0%
18.7%
0.0%
0.0%
0.0%
0.0%
0.0%
2.5%
2.5%
2.8%
2.0%
0.9%
1.8%
1.8%
0.0%
0.0%
18.7%
0.0%
0.0%
0.0%
0.0%
L.F. Guideway
C-21
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
$YOE
Hiawatha Corridor
Unit Costs
$City
$National
L.F. Guideway
$11,028
$4,586
$11,323
$4,708
$10,002
$4,159
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$2,651
$0
$0
$0
$6,926
$0
$209
$437
$437
$0
$0
$2,722
$0
$0
$0
$7,112
$0
$215
$449
$449
$0
$0
$2,405
$0
$0
$0
$6,282
$0
$190
$396
$396
$0
$0
$1,409,503
$1,447,189
$1,278,436
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,283,041
$0
$0
$54
$54
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,317,346
$0
$0
$55
$55
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,163,734
$0
$0
$49
$49
$0
$0
Track Feet
$847
$869
$768
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$244
$251
$222
$244
$0
$0
$0
$251
$0
$0
$0
$222
$0
$0
$0
$394
$404
$357
$168
$0
$226
$0
$179
$172
$0
$232
$0
$184
$152
$0
$205
$0
$163
$210,471
$216,098
$190,899
$0
$210,471
$0
$0
$0
$216,098
$0
$0
$0
$190,899
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
C-22
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$YOE
Hiawatha Corridor
Unit Costs
$City
$National
$11,028
$11,323
$10,002
Station
$2,708,877
$2,781,306
$2,456,984
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$1,297,612
$0
$18,677,389
$0
$0
$0
$3,302
$0
$979,584
$117,647
$1,332,307
$0
$19,176,777
$0
$0
$0
$3,390
$0
$1,005,776
$120,793
$1,176,950
$0
$16,940,616
$0
$0
$0
$2,995
$0
$888,494
$106,707
Rev. Vehicle
$2,873,500
$2,950,330
$2,606,299
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$2,873,500
$0
$0
$0
$0
$0
$0
$0
$2,950,330
$0
$0
$0
$0
$0
$0
$0
$2,606,299
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$184
$188
$166
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$184
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$188
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$166
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$800
$822
$726
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$348
$453
$0
$0
$0
$0
$0
$0
$357
$465
$0
$0
$0
$0
$0
$0
$315
$411
$0
$0
$0
$0
$0
$0
L.F. Guideway
C-23
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$YOE
Hiawatha Corridor
Unit Costs
$City
$National
$11,028
$11,323
$10,002
Total
$73,187,000
$75,143,844
$66,381,488
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$0
$17,297,000
$0
$42,935,000
$0
$6,115,000
$6,115,000
$0
$0
$3,100,000
$2,740,000
$0
$2,740,000
$1,000,000
$0
$0
$17,759,480
$0
$44,082,979
$0
$6,278,500
$6,278,500
$0
$0
$3,182,887
$2,813,261
$0
$2,813,261
$1,026,738
$0
$0
$15,688,587
$0
$38,942,561
$0
$5,546,378
$5,546,378
$0
$0
$2,811,737
$2,485,213
$0
$2,485,213
$907,012
Total
12.2%
12.2%
12.2%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
0.0%
2.9%
0.0%
7.1%
0.0%
1.0%
1.0%
0.0%
0.0%
0.5%
0.5%
0.0%
0.5%
0.2%
0.0%
0.0%
2.9%
0.0%
7.1%
0.0%
1.0%
1.0%
0.0%
0.0%
0.5%
0.5%
0.0%
0.5%
0.2%
0.0%
0.0%
2.9%
0.0%
7.1%
0.0%
1.0%
1.0%
0.0%
0.0%
0.5%
0.5%
0.0%
0.5%
0.2%
L.F. Guideway
C-24
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$11,490
$3,933
$11,797
$4,039
$11,256
$3,854
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$0
$2,419
$6,435
$0
$0
$0
$453
$246
$522
$76
$0
$0
$2,484
$6,607
$0
$0
$0
$465
$253
$536
$78
$0
$0
$2,370
$6,305
$0
$0
$0
$444
$241
$511
$74
$0
$591,456
$607,271
$579,457
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$591,456
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$607,271
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$579,457
$0
$0
$0
$0
$0
$0
Track Feet
$594
$594
$566
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$189
$189
$180
$189
$0
$0
$0
$189
$0
$0
$0
$180
$0
$0
$0
$173
$177
$169
$0
$0
$0
$0
$208
$0
$0
$0
$0
$208
$0
$0
$0
$0
$199
$145,966
$145,966
$139,281
$0
$145,966
$0
$0
$0
$145,966
$0
$0
$0
$139,281
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
C-25
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$11,490
$11,797
$11,256
Station
$1,140,818
$1,171,321
$1,117,672
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$822,789
$0
$0
$0
$0
$0
$2,927
$0
$1,424,000
$0
$844,789
$0
$0
$0
$0
$0
$3,005
$0
$1,462,074
$0
$806,096
$0
$0
$0
$0
$0
$2,868
$0
$1,395,109
$0
Rev. Vehicle
$3,049,567
$3,131,105
$2,987,696
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$0
$2,881,664
$2,657,187
$0
$233,376
$0
$0
$0
$0
$2,958,712
$2,728,234
$0
$239,615
$0
$0
$0
$0
$2,823,199
$2,603,276
$0
$228,641
$0
$0
$0
L.F. Guideway
$641
$677
$646
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$261
$0
$0
$3
$0
$3
$0
$0
$0
$315
$62
$0
$276
$0
$0
$3
$0
$3
$0
$0
$0
$333
$65
$0
$263
$0
$0
$3
$0
$3
$0
$0
$0
$318
$62
$0
L.F. Guideway
$213
$219
$209
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$74
$0
$11
$0
$0
$11
$10
$117
$76
$0
$11
$0
$0
$11
$11
$120
$73
$0
$11
$0
$0
$11
$10
$115
L.F. Guideway
C-26
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$11,490
$11,797
$11,256
Total
$68,901,236
$70,743,489
$67,503,329
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$0
$18,677,500
$17,046,868
$17,046,868
$0
$4,230,000
$4,230,000
$0
$0
$7,595,000
$4,305,000
$0
$0
$0
$0
$0
$19,728,744
$17,502,660
$17,502,660
$0
$4,468,081
$4,468,081
$0
$0
$7,595,000
$4,187,714
$0
$0
$0
$0
$0
$18,825,138
$16,701,012
$16,701,012
$0
$4,263,436
$4,263,436
$0
$0
$7,247,137
$3,995,911
$0
$0
$0
Total
24.6%
24.6%
24.6%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
0.0%
6.7%
6.1%
6.1%
0.0%
1.5%
1.5%
0.0%
0.0%
2.7%
1.5%
0.0%
0.0%
0.0%
0.0%
0.0%
6.7%
6.1%
6.1%
0.0%
1.5%
1.5%
0.0%
0.0%
2.7%
1.5%
0.0%
0.0%
0.0%
0.0%
0.0%
6.7%
6.1%
6.1%
0.0%
1.5%
1.5%
0.0%
0.0%
2.7%
1.5%
0.0%
0.0%
0.0%
L.F. Guideway
C-27
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$16,426
$4,992
$16,426
$4,992
$15,570
$4,731
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$0
$0
$2,881
$3,170
$11,576
$3,332
$195
$424
$0
$242
$0
$0
$0
$2,881
$3,170
$11,576
$3,332
$195
$424
$0
$242
$0
$0
$0
$2,731
$3,004
$10,973
$3,158
$185
$402
$0
$229
$0
Rev. Vehicle
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Track Feet
$475
$475
$450
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$246
$246
$233
$178
$0
$68
$20,000
$178
$0
$68
$20,000
$168
$0
$64
$18,957
$181
$181
$171
$76
$0
$105
$0
$29
$76
$0
$105
$0
$29
$72
$0
$99
$0
$28
$275,000
$275,000
$260,664
$0
$275,000
$0
$0
$0
$275,000
$0
$0
$0
$260,664
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
C-28
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$16,426
$16,426
$15,570
Station
$15,063,499
$15,063,499
$14,278,198
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$0
$0
$0
$46,868,372
$0
$4,461,875
$0
$0
$0
$0
$0
$0
$0
$46,868,372
$0
$4,461,875
$0
$0
$0
$0
$0
$0
$0
$44,424,997
$0
$4,229,265
$0
$0
$0
$0
Rev. Vehicle
$3,463,636
$3,463,636
$3,283,068
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$3,463,636
$0
$0
$0
$0
$0
$0
$0
$3,463,636
$0
$0
$0
$0
$0
$0
$0
$3,283,068
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$710
$710
$673
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$496
$0
$0
$60
$29
$31
$0
$0
$111
$43
$0
$0
$496
$0
$0
$60
$29
$31
$0
$0
$111
$43
$0
$0
$470
$0
$0
$57
$28
$30
$0
$0
$105
$41
$0
$0
L.F. Guideway
$1,595
$1,595
$1,512
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$1,077
$0
$0
$0
$0
$0
$0
$518
$1,077
$0
$0
$0
$0
$0
$0
$518
$1,021
$0
$0
$0
$0
$0
$0
$491
L.F. Guideway
C-29
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$16,426
$16,426
$15,570
Total
$138,595,538
$138,595,538
$131,370,178
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$7,000,000
$40,150,350
$44,062,447
$18,800,000
$0
$26,158,831
$0
$22,546,954
$3,611,877
$0
$2,423,910
$0
$0
$0
$0
$7,000,000
$40,150,350
$44,062,447
$18,800,000
$0
$26,158,831
$0
$22,546,954
$3,611,877
$0
$2,423,910
$0
$0
$0
$0
$6,635,071
$38,057,204
$41,765,353
$17,819,905
$0
$24,795,100
$0
$21,371,520
$3,423,580
$0
$2,297,545
$0
$0
$0
Total
41.1%
41.1%
41.1%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
2.1%
11.9%
13.1%
5.6%
0.0%
7.8%
0.0%
6.7%
1.1%
0.0%
0.7%
0.0%
0.0%
0.0%
0.0%
2.1%
11.9%
13.1%
5.6%
0.0%
7.8%
0.0%
6.7%
1.1%
0.0%
0.7%
0.0%
0.0%
0.0%
0.0%
2.1%
11.9%
13.1%
5.6%
0.0%
7.8%
0.0%
6.7%
1.1%
0.0%
0.7%
0.0%
0.0%
0.0%
L.F. Guideway
C-30
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$3,586
$1,161
$4,030
$1,305
$3,939
$1,276
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$892
$0
$0
$0
$0
$0
$0
$134
$0
$0
$0
$1,003
$0
$0
$0
$0
$0
$0
$151
$0
$0
$0
$980
$0
$0
$0
$0
$0
$0
$148
$0
$0
$0
$550,136
$618,159
$604,261
$0
$0
$0
$30,734
$0
$0
$0
$0
$0
$0
$0
$0
$519,402
$0
$0
$0
$0
$0
$0
$0
$0
$0
$34,534
$0
$0
$0
$0
$0
$0
$0
$0
$583,626
$0
$0
$0
$0
$0
$0
$0
$0
$0
$33,757
$0
$0
$0
$0
$0
$0
$0
$0
$570,504
$0
$0
$0
$0
$0
$0
$243
$272
$266
$91
$103
$100
$91
$0
$0
$0
$103
$0
$0
$0
$100
$0
$0
$0
$88
$99
$97
$0
$0
$0
$0
$52
$0
$0
$0
$0
$59
$0
$0
$0
$0
$57
$243,000
$273,047
$266,908
$0
$243,000
$0
$0
$0
$273,047
$0
$0
$0
$266,908
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
C-31
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$3,586
$4,030
$3,939
Station
$1,259,727
$1,415,491
$1,383,667
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$1,259,727
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,415,491
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,383,667
$0
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
$2,525,731
$2,838,035
$2,774,228
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$2,525,731
$0
$0
$0
$0
$0
$0
$0
$2,838,035
$0
$0
$0
$0
$0
$0
$0
$2,774,228
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$82
$93
$91
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$49
$0
$0
$10
$10
$0
$0
$0
$0
$24
$0
$0
$55
$0
$0
$11
$11
$0
$0
$0
$0
$27
$0
$0
$54
$0
$0
$11
$11
$0
$0
$0
$0
$26
$0
$0
L.F. Guideway
$232
$261
$255
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$182
$10
$16
$0
$0
$16
$24
$0
$204
$12
$18
$0
$0
$18
$27
$0
$200
$11
$18
$0
$0
$18
$27
$0
L.F. Guideway
C-32
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$3,586
$4,030
$3,939
Total
$65,420,740
$73,509,952
$71,857,236
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$0
$23,519,814
$18,758,352
$12,009,715
$2,510,092
$4,403,053
$4,403,053
$0
$0
$0
$4,019,714
$0
$0
$200,000
$0
$0
$26,428,017
$21,077,804
$13,494,705
$2,820,462
$4,947,486
$4,947,486
$0
$0
$0
$4,516,748
$0
$0
$224,730
$0
$0
$25,833,838
$20,603,914
$13,191,305
$2,757,050
$4,836,253
$4,836,253
$0
$0
$0
$4,415,198
$0
$0
$219,677
Total
24.8%
24.8%
24.8%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
0.0%
8.9%
7.1%
4.5%
1.0%
1.7%
1.7%
0.0%
0.0%
0.0%
1.5%
0.0%
0.0%
0.1%
0.0%
0.0%
8.9%
7.1%
4.5%
1.0%
1.7%
1.7%
0.0%
0.0%
0.0%
1.5%
0.0%
0.0%
0.1%
0.0%
0.0%
8.9%
7.1%
4.5%
1.0%
1.7%
1.7%
0.0%
0.0%
0.0%
1.5%
0.0%
0.0%
0.1%
L.F. Guideway
C-33
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$3,937
$545
$4,520
$626
$5,016
$695
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$418
$402
$0
$0
$0
$0
$0
$64
$72
$0
$0
$480
$462
$0
$0
$0
$0
$0
$73
$82
$0
$0
$533
$512
$0
$0
$0
$0
$0
$81
$91
$0
$0
$961,666
$1,104,046
$1,225,356
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$961,666
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,104,046
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,225,356
$0
$0
$0
$0
$0
$0
Track Feet
$415
$477
$529
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$143
$164
$182
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$232
$266
$295
$0
$0
$0
$0
$11
$0
$0
$0
$0
$12
$0
$0
$0
$0
$14
$296,331
$340,204
$377,585
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
C-34
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$3,937
$4,520
$5,016
Station
$815,346
$936,062
$1,038,914
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$815,346
$0
$0
$0
$0
$0
$0
$0
$0
$0
$936,062
$0
$0
$0
$0
$0
$0
$0
$0
$0
$1,038,914
$0
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
$2,987,517
$3,429,834
$3,806,697
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$2,987,517
$0
$0
$0
$0
$0
$0
$0
$3,429,834
$0
$0
$0
$0
$0
$0
$0
$3,806,697
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$109
$125
$138
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$109
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$125
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$138
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$537
$616
$684
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$537
$0
$0
$0
$0
$0
$0
$0
$616
$0
$0
$0
$0
$0
$0
$0
$684
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
C-35
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$3,937
$4,520
$5,016
Total
$47,854,816
$54,939,960
$60,976,648
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$0
$0
$0
$22,857,356
$0
$0
$0
$0
$0
$24,997,460
$0
$0
$0
$0
$0
$0
$0
$0
$26,241,501
$0
$0
$0
$0
$0
$28,698,458
$0
$0
$0
$0
$0
$0
$0
$0
$29,124,863
$0
$0
$0
$0
$0
$31,851,785
$0
$0
$0
$0
Total
18.1%
18.1%
18.1%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
0.0%
0.0%
0.0%
8.7%
0.0%
0.0%
0.0%
0.0%
0.0%
9.5%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
8.7%
0.0%
0.0%
0.0%
0.0%
0.0%
9.5%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
8.7%
0.0%
0.0%
0.0%
0.0%
0.0%
9.5%
0.0%
0.0%
0.0%
0.0%
L.F. Guideway
C-36
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$7,195
$1,563
$7,388
$1,605
$6,872
$1,493
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$803
$0
$0
$0
$0
$0
$0
$115
$145
$0
$514
$824
$0
$0
$0
$0
$0
$0
$118
$149
$0
$528
$767
$0
$0
$0
$0
$0
$0
$110
$138
$0
$491
$2,266,528
$2,327,130
$2,164,772
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$2,266,528
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$2,327,130
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$2,164,772
$0
$0
$0
$0
$0
$0
Track Feet
$195
$200
$186
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$126
$129
$120
$93
$0
$0
$0
$95
$0
$0
$0
$88
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$25
$0
$0
$0
$0
$25
$0
$0
$0
$0
$24
$231,815
$238,013
$221,408
$0
$231,815
$0
$60
$0
$238,013
$0
$62
$0
$221,408
$0
$58
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
C-37
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$7,195
$7,388
$6,872
Station
$2,437,178
$2,502,342
$2,327,760
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$1,600,475
$1,526,691
$0
$0
$0
$0
$4,926
$0
$0
$0
$1,643,268
$1,567,511
$0
$0
$0
$0
$5,057
$0
$0
$0
$1,528,621
$1,458,149
$0
$0
$0
$0
$4,705
$0
$0
$0
Rev. Vehicle
$3,697,183
$3,796,036
$3,531,197
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$3,697,183
$0
$0
$0
$0
$0
$0
$0
$3,796,036
$0
$0
$0
$0
$0
$0
$0
$3,531,197
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$357
$367
$341
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$131
$73
$30
$0
$0
$0
$0
$0
$77
$19
$27
$0
$134
$75
$31
$0
$0
$0
$0
$0
$79
$20
$28
$0
$125
$70
$29
$0
$0
$0
$0
$0
$73
$18
$26
$0
L.F. Guideway
$602
$618
$575
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$602
$0
$0
$0
$0
$0
$0
$0
$618
$0
$0
$0
$0
$0
$0
$0
$575
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
C-38
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$7,195
$7,388
$6,872
Total
$428,413,885
$439,868,642
$409,180,132
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$13,047,850
$19,566,160
$35,700,000
$44,474,480
$28,200,395
$0
$8,925,000
$8,925,000
$0
$0
$268,000,000
$1,800,000
$0
$0
$8,700,000
$14,661,204
$21,985,497
$39,019,341
$45,663,621
$28,954,406
$0
$9,163,633
$9,163,633
$0
$0
$275,165,675
$1,848,128
$0
$0
$8,932,617
$13,638,330
$20,451,625
$36,297,061
$42,477,787
$26,934,331
$0
$8,524,310
$8,524,310
$0
$0
$255,968,070
$1,719,189
$0
$0
$8,309,411
Total
74.0%
74.0%
74.0%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
2.3%
3.4%
6.2%
7.7%
4.9%
0.0%
1.5%
1.5%
0.0%
0.0%
46.3%
0.3%
0.0%
0.0%
1.5%
2.3%
3.4%
6.2%
7.7%
4.9%
0.0%
1.5%
1.5%
0.0%
0.0%
46.3%
0.3%
0.0%
0.0%
1.5%
2.3%
3.4%
6.2%
7.7%
4.9%
0.0%
1.5%
1.5%
0.0%
0.0%
46.3%
0.3%
0.0%
0.0%
1.5%
L.F. Guideway
C-39
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$10,456
$3,879
$12,538
$4,652
$11,964
$4,439
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$1,158
$3,413
$7,352
$0
$10,802
$0
$1,904
$174
$609
$141
$0
$1,388
$4,092
$8,816
$0
$12,952
$0
$2,283
$209
$730
$169
$0
$1,324
$3,905
$8,413
$0
$12,359
$0
$2,179
$199
$697
$161
$0
$542,791
$650,862
$621,051
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$542,791
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$650,862
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$621,051
$0
$0
$0
$0
$0
$0
Track Feet
$467
$560
$534
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$167
$200
$191
$167
$0
$0
$0
$200
$0
$0
$0
$191
$0
$0
$0
$171
$205
$195
$0
$0
$0
$0
$96
$0
$0
$0
$0
$115
$0
$0
$0
$0
$110
$252,772
$303,100
$289,217
$0
$252,772
$0
$0
$0
$303,100
$0
$0
$0
$289,217
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
C-40
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$10,456
$12,538
$11,964
Station
$5,012,972
$6,011,068
$5,735,752
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$1,798,209
$0
$44,841,563
$0
$0
$0
$2,737
$15,648
$0
$0
$2,156,237
$0
$53,769,644
$0
$0
$0
$3,282
$18,764
$0
$0
$2,057,478
$0
$51,306,912
$0
$0
$0
$3,132
$17,905
$0
$0
Rev. Vehicle
$3,007,802
$3,606,664
$3,441,474
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$3,007,802
$0
$0
$0
$0
$0
$0
$0
$3,606,664
$0
$0
$0
$0
$0
$0
$0
$3,441,474
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$301
$361
$345
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$112
$0
$0
$0
$0
$0
$0
$0
$0
$190
$0
$0
$134
$0
$0
$0
$0
$0
$0
$0
$0
$227
$0
$0
$128
$0
$0
$0
$0
$0
$0
$0
$0
$217
$0
$0
L.F. Guideway
$697
$836
$797
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$697
$0
$0
$0
$0
$0
$0
$0
$836
$0
$0
$0
$0
$0
$0
$0
$797
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
C-41
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$10,456
$12,538
$11,964
Total
$214,280,878
$256,944,800
$245,176,336
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$0
$95,138,864
$0
$93,897,518
$0
$15,438,722
$15,438,722
$0
$0
$1,397,973
$8,407,801
$0
$0
$0
$0
$0
$114,081,278
$0
$112,592,777
$0
$18,512,615
$18,512,615
$0
$0
$1,676,313
$10,081,818
$0
$0
$0
$0
$0
$108,856,181
$0
$107,435,856
$0
$17,664,709
$17,664,709
$0
$0
$1,599,536
$9,620,055
$0
$0
$0
Total
28.6%
28.6%
28.6%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
0.0%
12.7%
0.0%
12.5%
0.0%
2.1%
2.1%
0.0%
0.0%
0.2%
1.1%
0.0%
0.0%
0.0%
0.0%
0.0%
12.7%
0.0%
12.5%
0.0%
2.1%
2.1%
0.0%
0.0%
0.2%
1.1%
0.0%
0.0%
0.0%
0.0%
0.0%
12.7%
0.0%
12.5%
0.0%
2.1%
2.1%
0.0%
0.0%
0.2%
1.1%
0.0%
0.0%
0.0%
L.F. Guideway
C-42
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$6,934
$1,364
$7,119
$1,401
$6,414
$1,262
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$920
$0
$7,340
$0
$0
$0
$520
$140
$0
$12
$0
$945
$0
$7,536
$0
$0
$0
$533
$143
$0
$13
$0
$851
$0
$6,790
$0
$0
$0
$481
$129
$0
$11
$0
Rev. Vehicle
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Track Feet
$424
$436
$393
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$248
$255
$230
$218
$0
$0
$0
$224
$0
$0
$0
$202
$0
$0
$0
$163
$167
$150
$93
$0
$45
$0
$0
$96
$0
$46
$0
$0
$86
$0
$42
$0
$0
$149,974
$149,974
$135,112
$0
$149,974
$0
$0
$0
$149,974
$0
$0
$0
$135,112
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
C-43
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$6,934
$7,119
$6,414
Station
$3,742,420
$3,842,483
$3,461,696
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$3,742,420
$0
$0
$0
$0
$0
$0
$0
$0
$0
$3,842,483
$0
$0
$0
$0
$0
$0
$0
$0
$0
$3,461,696
$0
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
$2,537,853
$2,605,709
$2,347,485
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$2,537,853
$0
$0
$0
$0
$0
$0
$0
$2,605,709
$0
$0
$0
$0
$0
$0
$0
$2,347,485
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$237
$243
$219
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$228
$0
$0
$9
$9
$0
$0
$0
$0
$0
$0
$0
$234
$0
$0
$9
$9
$0
$0
$0
$0
$0
$0
$0
$211
$0
$0
$8
$8
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
$860
$883
$795
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$852
$0
$8
$0
$8
$0
$0
$0
$874
$0
$8
$0
$8
$0
$0
$0
$788
$0
$8
$0
$8
$0
$0
$0
L.F. Guideway
C-44
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$6,934
$7,119
$6,414
Total
$37,198,985
$38,193,596
$34,408,645
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$0
$15,134,754
$7,757,783
$12,887,194
$0
$0
$0
$0
$0
$0
$576,960
$0
$0
$842,294
$0
$0
$15,986,598
$7,965,207
$13,231,767
$0
$0
$0
$0
$0
$0
$592,387
$0
$0
$864,815
$0
$0
$14,402,341
$7,175,863
$11,920,510
$0
$0
$0
$0
$0
$0
$533,682
$0
$0
$779,113
Total
19.2%
19.2%
19.2%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
0.0%
7.8%
4.0%
6.7%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.3%
0.0%
0.0%
0.4%
0.0%
0.0%
7.8%
4.0%
6.7%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.3%
0.0%
0.0%
0.4%
0.0%
0.0%
7.8%
4.0%
6.7%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.3%
0.0%
0.0%
0.4%
L.F. Guideway
C-45
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$3,387
$883
$3,478
$907
$3,133
$817
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$619
$578
$3,964
$0
$0
$0
$281
$143
$103
$27
$0
$635
$593
$4,070
$0
$0
$0
$288
$146
$106
$28
$0
$572
$534
$3,667
$0
$0
$0
$260
$132
$95
$25
$0
Rev. Vehicle
$0
$0
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Track Feet
$594
$610
$550
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$261
$268
$242
$259
$0
$0
$0
$266
$0
$0
$0
$239
$0
$0
$0
$310
$318
$287
$56
$0
$254
$0
$10
$57
$0
$261
$0
$10
$52
$0
$235
$0
$9
$125,156
$125,156
$112,753
$0
$125,156
$0
$0
$0
$125,156
$0
$0
$0
$112,753
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
C-46
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$3,387
$3,478
$3,133
Station
$1,865,282
$1,915,155
$1,725,365
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$2,288,547
$1,442,365
$0
$0
$0
$0
$0
$0
$0
$84,444
$2,349,737
$1,480,930
$0
$0
$0
$0
$0
$0
$0
$86,702
$2,116,881
$1,334,171
$0
$0
$0
$0
$0
$0
$0
$78,110
Rev. Vehicle
$2,549,092
$2,617,249
$2,357,882
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$0
$2,549,092
$0
$0
$0
$0
$0
$0
$0
$2,617,249
$0
$0
$0
$0
$0
$0
$0
$2,357,882
$0
$0
$0
$0
$0
$0
L.F. Guideway
$164
$168
$152
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$110
$0
$0
$1
$1
$0
$0
$0
$0
$50
$0
$4
$113
$0
$0
$1
$1
$0
$0
$0
$0
$51
$0
$4
$102
$0
$0
$0
$0
$0
$0
$0
$0
$46
$0
$3
L.F. Guideway
$78
$80
$72
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$55
$0
$15
$0
$3
$12
$8
$0
$56
$0
$16
$0
$4
$12
$8
$0
$50
$0
$14
$0
$3
$11
$8
$0
L.F. Guideway
C-47
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$3,387
$3,478
$3,133
Total
$43,050,471
$44,201,537
$39,821,205
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$1,513,672
$14,085,877
$10,385,042
$10,930,435
$0
$779,564
$0
$779,564
$0
$0
$4,167,636
$0
$0
$1,188,245
$0
$1,654,411
$14,878,686
$10,662,713
$11,222,689
$0
$800,408
$0
$800,408
$0
$0
$4,279,069
$0
$0
$1,220,016
$0
$1,490,461
$13,404,222
$9,606,048
$10,110,530
$0
$721,088
$0
$721,088
$0
$0
$3,855,017
$0
$0
$1,099,113
Total
23.0%
23.0%
23.0%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
0.8%
7.5%
5.5%
5.8%
0.0%
0.4%
0.0%
0.4%
0.0%
0.0%
2.2%
0.0%
0.0%
0.6%
0.0%
0.8%
7.5%
5.5%
5.8%
0.0%
0.4%
0.0%
0.4%
0.0%
0.0%
2.2%
0.0%
0.0%
0.6%
0.0%
0.8%
7.5%
5.5%
5.8%
0.0%
0.4%
0.0%
0.4%
0.0%
0.0%
2.2%
0.0%
0.0%
0.6%
L.F. Guideway
C-48
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
$YOE
$National
L.F. Guideway
$5,474
$1,209
$5,621
$1,242
$5,343
$1,180
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$112
$3
$586
$229
$9,798
$1,340
$237
$117
$783
$1
$298
$115
$3
$602
$236
$10,060
$1,376
$243
$120
$804
$1
$306
$109
$3
$572
$224
$9,563
$1,308
$231
$115
$764
$1
$291
$665,919
$683,724
$649,928
$572,664
$0
$0
$83,326
$0
$417
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$3
$587,976
$0
$0
$85,554
$0
$428
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$3
$558,912
$0
$0
$81,325
$0
$407
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$3
Track Feet
$379
$389
$370
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
$124
$127
$121
$112
$0
$0
$67,005
$115
$0
$0
$68,797
$109
$0
$0
$65,396
$156
$160
$152
$67
$0
$87
$0
$44
$69
$0
$90
$0
$45
$65
$0
$85
$0
$43
$297,159
$305,104
$290,023
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$284,942
$292,561
$278,100
$313,232
$101,063
$321,607
$103,765
$305,710
$98,636
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
C-49
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$YOE
$National
$5,474
$5,621
$5,343
Station
$3,995,462
$4,102,291
$3,899,517
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$2,603,165
$1,888,629
$0
$7,525,701
$3,005,440
$3,284,013
$0
$0
$1,337,913
$154,131
$2,672,767
$1,939,126
$0
$7,726,921
$3,085,799
$3,371,820
$0
$0
$1,373,685
$158,252
$2,540,653
$1,843,276
$0
$7,344,982
$2,933,269
$3,205,152
$0
$0
$1,305,785
$150,430
L.F. Guideway
Rev. Vehicle
$21,157
$21,723
$20,649
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$0
$0
$0
$0
$531
$20,627
$20,627
$0
$0
$0
$0
$0
$545
$21,178
$21,178
$0
$0
$0
$0
$0
$518
$20,131
$20,131
$0
L.F. Guideway
$924
$948
$902
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$177
$1
$85
$18
$12
$1
$1
$4
$158
$198
$53
$234
$182
$1
$87
$18
$12
$1
$1
$4
$162
$203
$55
$240
$173
$1
$83
$17
$12
$1
$1
$4
$154
$193
$52
$228
L.F. Guideway
$137
$141
$134
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$36
$0
$55
$14
$41
$0
$0
$46
$37
$0
$56
$14
$42
$0
$0
$47
$35
$0
$53
$13
$40
$0
$0
$45
C-50
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$YOE
$National
$5,474
$5,621
$5,343
Total
$111,318,897
$117,584,370
$111,772,215
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$13,481,788
$24,009,723
$546,058
$21,430,000
$2,200,000
$18,872,000
$8,472,000
$10,400,000
$0
$0
$6,287,560
$6,287,560
$0
$24,491,768
$0
$14,735,308
$25,361,087
$560,658
$22,002,987
$2,258,823
$19,934,192
$8,698,521
$11,366,979
$0
$0
$6,287,560
$6,287,560
$0
$25,146,619
$0
$14,006,946
$24,107,497
$532,945
$20,915,387
$2,147,170
$18,948,851
$8,268,556
$10,805,113
$0
$0
$5,976,768
$5,976,768
$0
$23,903,630
Total
38.1%
38.1%
38.1%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
4.6%
8.2%
0.2%
7.3%
0.8%
6.5%
2.9%
3.6%
0.0%
0.0%
2.2%
2.2%
0.0%
8.4%
0.0%
4.6%
8.2%
0.2%
7.3%
0.8%
6.5%
2.9%
3.6%
0.0%
0.0%
2.2%
2.2%
0.0%
8.4%
0.0%
4.6%
8.2%
0.2%
7.3%
0.8%
6.5%
2.9%
3.6%
0.0%
0.0%
2.2%
2.2%
0.0%
8.4%
L.F. Guideway
C-51
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$3,963
$902
$4,453
$1,013
$4,644
$1,057
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$561
$0
$1,713
$828
$0
$2,602
$225
$96
$0
$6
$0
$630
$0
$1,924
$930
$0
$2,924
$253
$108
$0
$7
$0
$657
$0
$2,007
$970
$0
$3,049
$263
$112
$0
$8
$0
L.F. Guideway
$22,222
$24,970
$26,038
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$0
$0
$0
$22,222
$0
$250
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$24,970
$0
$281
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$26,038
$0
$293
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Track Feet
$125
$141
$147
$40
$45
$47
$40
$0
$0
$0
$45
$0
$0
$0
$47
$0
$0
$0
$77
$86
$90
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$160,000
$179,784
$187,470
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
C-52
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$3,963
$4,453
$4,644
Station
$3,800,000
$4,269,866
$4,452,415
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$3,800,000
$3,800,000
$0
$0
$0
$0
$0
$0
$0
$0
$4,269,866
$4,269,866
$0
$0
$0
$0
$0
$0
$0
$0
$4,452,415
$4,452,415
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
$1,816,667
$2,041,296
$2,128,567
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$1,816,667
$1,816,667
$0
$0
$0
$0
$0
$0
$2,041,296
$2,041,296
$0
$0
$0
$0
$0
$0
$2,128,567
$2,128,567
$0
$0
$0
$0
$0
$0
L.F. Guideway
$31
$35
$37
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$18
$0
$0
$0
$0
$0
$0
$0
$0
$13
$0
$0
$20
$0
$0
$0
$0
$0
$0
$0
$0
$15
$0
$0
$21
$0
$0
$0
$0
$0
$0
$0
$0
$16
$0
$0
L.F. Guideway
$864
$971
$1,012
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$192
$0
$0
$0
$0
$0
$0
$671
$216
$0
$0
$0
$0
$0
$0
$754
$225
$0
$0
$0
$0
$0
$0
$787
L.F. Guideway
C-53
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$3,963
$4,453
$4,644
Total
$33,100,000
$37,192,784
$38,782,882
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$0
$0
$21,600,000
$11,500,000
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$24,270,819
$12,921,964
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$25,308,467
$13,474,415
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Total
23.0%
23.0%
23.0%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.0%
0.0%
15.0%
8.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
15.0%
8.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
15.0%
8.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
L.F. Guideway
C-54
Appendix C
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
Units
of
Measure
L.F. Guideway
$13,436
$3,273
$13,436
$3,360
$13,409
$3,354
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
$1,349
$496
$5,488
$3,404
$0
$2,939
$403
$163
$164
$65
$0
$1,386
$510
$5,635
$3,495
$0
$3,018
$414
$167
$169
$67
$0
$1,383
$509
$5,624
$3,488
$0
$3,012
$413
$167
$168
$67
$0
$138,414
$151,284
$150,982
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$63
$63
$0
$71
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$69
$69
$0
$78
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$69
$69
$0
$78
$1,124
$1,124
$1,121
$385
$385
$384
$265
$69,067
$0
$197,093
$265
$69,067
$0
$197,093
$264
$68,929
$0
$196,699
$404
$404
$403
$225
$0
$160
$0
$89
$225
$0
$160
$0
$89
$225
$0
$160
$0
$89
$0
$0
$0
$0
$0
$0
$465
$0
$0
$0
$465
$0
$0
$0
$464
$0
$0
$0
$0
$0
$0
$0
$0
$0
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
Each
Station
Rev. Vehicle
L.F. Guideway
Each
Each
Each
C-55
Appendix C
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
7.01 LAND ACQUISITION - PURCHASED
7.02 LAND ACQUISITION - DONATED
7.03 ACQUISITION-RELATED COST
Property Management
Agency
Contractor
7.04 RELOCATION
7.05 OTHER
Units
of
Measure
$13,436
$13,436
$13,409
Station
$3,758,924
$3,758,924
$3,751,421
Station
Station
Station
Station
Station
Station
Spaces
Spaces
Each
Station
$0
$1,340,089
$0
$0
$0
$0
$7,159
$14,922
$95,000
$33,380
$0
$1,375,920
$0
$0
$0
$0
$7,351
$14,515
$97,540
$34,273
$0
$1,373,174
$0
$0
$0
$0
$7,336
$14,486
$97,345
$34,204
Rev. Vehicle
$2,442,877
$2,376,323
$2,371,580
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
$2,435,836
$0
$0
$0
$0
$7,041
$7,041
$0
$2,369,474
$0
$0
$0
$0
$7,229
$7,229
$0
$2,364,744
$0
$0
$0
$0
$7,214
$7,214
$0
L.F. Guideway
$609
$625
$624
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$126
$0
$15
$13
$13
$0
$0
$0
$424
$0
$31
$0
$130
$0
$15
$14
$14
$0
$0
$0
$435
$0
$32
$0
$129
$0
$15
$14
$14
$0
$0
$0
$434
$0
$32
$0
L.F. Guideway
$103
$105
$105
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
$94
$0
$0
$0
$0
$0
$8
$1
$97
$0
$0
$0
$0
$0
$8
$1
$96
$0
$0
$0
$0
$0
$8
$1
L.F. Guideway
C-56
Appendix C
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
Units
of
Measure
$13,436
$13,436
$13,409
Total
$97,219,739
$99,819,161
$99,619,921
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
$300,845
$11,600,789
$35,198,539
$20,338,449
$13,683,245
$0
$0
$0
$0
$0
$0
$0
$0
$0
$16,097,872
$338,044
$13,035,216
$36,139,663
$20,882,250
$14,049,102
$0
$0
$0
$0
$0
$0
$0
$0
$0
$16,528,290
$337,369
$13,009,197
$36,067,528
$20,840,569
$14,021,060
$0
$0
$0
$0
$0
$0
$0
$0
$0
$16,495,300
Total
33.6%
33.6%
33.6%
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
Total
0.1%
4.0%
12.2%
7.0%
4.7%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
5.6%
0.1%
4.0%
12.2%
7.0%
4.7%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
5.6%
0.1%
4.0%
12.2%
7.0%
4.7%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
5.6%
L.F. Guideway
C-57
APPENDIX D
Cost Functions Worksheet
Appendix D
Units
of
Measure
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Asymptote
L.F. Guideway
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
5,476,681.14
1,000,491.86
1,104,469.29
13,796,397.58
1,382,304.95
1,486,387.03
181,749.99
3,032,517.61
3,841,351.04
2,622,882.05
642.21
1,050.01
3,509.70
212.76
9,304.70
2,044.49
226.31
96.16
132.73
15.08
35.88
Rev. Vehicle
Slope
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
D-1
558,912.22
558,912.22
558,912.22
67,996.34
67,996.34
67,996.34
27,919,011.21
27,919,011.21
27,919,011.21
2,202,319.60
37,851.55
37,851.55
37,851.55
1.43
40.61
APPENDIX E
Cost Functions Worksheet
Appendix E
E-1
Appendix E
database since the unit model was first estimated. The upper curve represents a modified
version of the original (lower) unit cost curve. Specifically, the new, modified curve has been
shifted upward relative to the original curve to reflect the higher positioning of the new
pivot point. Note however, that the curve has only been shifter upwards (i.e., has
changed); there is no change to the slope ().
Exhibit E-1
Adjusted Unit Cost Function: Example
At-Grade Guideway
$2,500
$2,000
$1,500
$1,000
$500
Original Model (original dataset)
$0
20,000
40,000
60,000
80,000
100,000
120,000
140,000
Linear Feet
Exhibit E-2
Adjusted Unit Cost Function: Example
At-Grade Guideway
$1,000
$900
$800
Full
Adjustment
$700
Partial Adjustment
Expected
$600 Difference
Old Pivot Point
$500
70,000
72,000
74,000
76,000
78,000
80,000
82,000
84,000
Linear Feet
At the same time, note that the new curve has shifted up by an amount less than the vertical
difference between the two pivot points. This is more easily seen in Exhibit E-2. The reason
for this is as follows: it is already hypothesized that unit costs decrease (increase) as the
number of units increases (decreases). Hence, given that the new pivot point represents a
E-2
Appendix E
lower number of units than the original pivot point, it should be expected that the unit cost
for the new point should be higher than the original. This is represented by the expected
difference in Exhibit E-2. The remaining difference in vertical distance between the old
and new pivot points reflects the actual difference in the unit costs between the two samples
(the original dataset and the new, updated dataset). This is represented as the partial
adjustment in Exhibit E-2. Hence, in the revised unit cost model, the curve has shifted up
by the amount of the partial adjustment ( increased) while the slope of the unit cost
function () remains unaltered.
The CostFunctions worksheet houses the unit cost model parameters (i.e., slope and
asymptote coefficients) for all cost elements used by the model. Once again, these
relationships have been estimated using the baseline dataset available during development
of the model and the slope component to these relationships remains fixed regardless of
addition of new cost data to the CostDatabase worksheet. However, the CostFunctions
worksheet does include calculations to adjust the asymptote parameter to reflect the
addition of new unit cost data to the CostDatabase worksheet. (Note: the asymptote
parameter represents the theoretic minimum unit cost value which is approached as project
sizes approach an infinite number of units). Moreover, should the user decide to limit the
unit cost analysis to a preferred set of database projects using the SelectProjects option,
the CostFunctions worksheet also includes calculations to automatically adjust the unit cost
function asymptote parameter to reflect this choice.
E-3
APPENDIX F
Select Projects Worksheet
Appendix F
Select Projects
Scroll right to determine which projects are currently selected => (project titles for p
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Units
of
Measure
Units
$National
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
Each
$0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Rev. Vehicle
$0
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
F-1
APPENDIX G
Standard Model LRT Parameters
Appendix G
Units
of
Measure
L.F. Guideway
Unlinked Trips per L.F. Guideway
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
% of Guideway
% of Guideway
% of Guideway
% of Guideway
% of Guideway
% of Guideway
% of Guideway
Track Feet per L.F. Guideway
Track Feet per L.F. Guideway
Track Feet per L.F. Guideway
Yes/No
Yes/No
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
Central Revenue Counting
Revenue Collection - In Station
Revenue Collection - On Vehicle
3.05 CENTRAL CONTROL
3.06 ELEVATORS / ESCALATORS
Elevators
Escalators
100%
0.39767605
100%
100%
75%
9%
5%
4%
4%
3%
0.170611252
1.487877040
0.246351487
1
1
75%
9%
5%
4%
4%
3%
0.170611252
1.487877040
0.246351487
1
1
0.000412154
0.000477779
0.000
0
0
0.000
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
1.000
0
0
0.000
Yes/No
Track Feet Per L.F. Guideway
Yes/No
Yes/No
Yes/No
Yes/No
Intersections per L.F. Guideway
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Elevators/Escalators per L.F. Guideway
G-1
100%
Yes/No
Yes/No
Yes/No
Yes/No
0.000
0.000
0
0
0.000
0
0
0
0
0
0
0
0
1.000
0
0
0.000
0
0
0.000
1.9048398
1.9048398
1
0
0
0
0.000000000
1
0
0
0
0
1
1
0
0
0
0
0
0
0
1
0
0
0
0
1
0.947
0
0
0
0
0
Appendix G
4.00 STATIONS
4.01
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
5.00 VEHICLES
5.01
5.02
5.03
5.04
5.05
5.06
46.4%
47.5%
0.8%
2.3%
1.5%
1.5%
0.011208181
0.001825255
0.000006794
0
0.000412154
0.000412154
Yes/No
Yes/No
0
0
Yes/No
Yes/No
Yes/No
Yes/No
1
1
1
1
Yes/No
Yes/No
Yes/No
Yes/No
1
1
1
0
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
1
1
1
1
1
1
1
0
UTILITY RELOCATION - AS IS
UTILITY RELOCATION - BETTERMENTS
UTILITY RELOCATION - OTHER
DEMOLITIONS
Buildings
Other Removals
Asbestos Abatement
Railroads
6.05
6.06
6.07
6.08
ROADWAY CHANGES
ENVIRONMENTAL MITIGATION
LANDSCAPING
THIRD-PARTY AGREEMENTS
7.00 RIGHT-OF-WAY
1
1
1
1
0
0
0
0
1
1
1
0
0
0
0
0
0
0
0
0
1
1
1
0
0
0
1
0
8.01
8.02
8.02
8.03
8.04
8.05
8.06
PLANNING/FEASIBILITY STUDIES
PRELIMINARY ENGINEERING & DESIGN
FINAL DESIGN
CONSTRUCTION MANAGEMENT
PROJECT MANAGEMENT
PROJECT MANAGEMENT OVERSIGHT
PROJECT INITIATION
Insurance
Mobilization
Maintenance of Traffic
8.07 FINANCE CHARGES
8.08 TRAINING/START-UP/TESTING
Safety Certification
Off-Site LRV Testing
8.09 OTHER SOFT COSTS
G-2
APPENDIX H
Cost Variance Worksheet
Appendix H
Select
Project
Adjusted Model 2: User Selected Projects
Units
of
Measure
L.F. Guideway
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
3.00 SYSTEMS
3.01 SIGNAL SYSTEM
Train Control - Wayside
Train Control - On Board Systems
Train Control - Centralized Systems
Crossing Protection
3.02 ELECTRIFICATION
Substations
Power Distribution / Connections
Catenary
Third Rail
3.03 COMMUNICATIONS
3.04 REVENUE COLLECTION
$361,253,145
$576,768,959
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
L.F. Guideway
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Rev. Vehicle
Track Feet
Intersections
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Track Feet
Station
H-1
$97,278,492
$28,297,252
$5,306,967
$9,434,572
$9,075,899
$21,286,161
$4,154,834
$2,101,684
$9,265,249
$4,089,449
$2,419,106
$1,847,319
$18,417,848
$0
$0
$0
$0
$364,557,892
$555,525,064
$582,045,247
$886,939,303
$113,796,847
$202,419,030
$33,048,573
$6,107,634
$3,900,072
$9,075,899
$47,470,103
$1,293,880
$3,011,708
$4,509,598
$1,112,955
$2,419,106
$1,847,319
$18,674,638
$16,901,866
$4,915,157
$0
$145,243,891
$6,084,050
$4,610,360
$3,804,559
$2,184,509
$0
$0
$9,924,943
$37,116,525
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
$32,090,648
$0
$0
$5,025,877
$5,025,877
$0
$0
$40,679,384
$57,545,738
$59,951,818
$13,772,036
$21,823,116
$19,413,881
$25,757,509
$6,310,393
$1,183,074
$8,503,541
$1,461,572
$22,913,020
$22,913,020
$0
$0
$0
$27,043,907
$12,031,797
$0
$15,012,110
$0
$8,928,230
$1,066,661
$0
$0
$0
$0
$18,417,848
$0
$0
$0
$9,924,943
$0
$0
$0
$0
APPENDIX I
Capital Cost Calculator Worksheet
Appendix I
Move cursor over comments (red triangles) for data entry assistance
Units
of
Measure
Select City:
Quantity
L.F. Guideway
100,000
Total Cost
2009
$6,908
$690,759,386
WEEKDAY RIDERSHIP
Unlinked Trips
39,768
L.F. Guideway
100,000
2010
$1,162
$116,158,480
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
Track Feet
Track Feet
Track Feet
Track Feet
Each
100,000
0
0
0
0
0
50,000
150,000
0
200,000
100,000
2010
2010
2010
$750
$0
$0
$0
$0
$0
$248
$125
$0
$30
$39
$75,047,648
$0
$0
$0
$0
$0
$12,379,769
$18,796,132
$0
$6,071,360
$3,863,571
45
2010
$935,312.69
$42,089,071
2010
$0
$0
$0
$73,216
$0
$0
$0
$3,294,707
$0
$0
$0
$0
$31,896,129
$0
$0
$2,525,806
$4,372,429
1.01
1.02
1.03
1.04
1.05
1.06
1.07
1.08
1.09
1.10
1.11
AT GRADE GUIDEWAY
AT GRADE-IN-STREET GUIDEWAY
ELEVATED STRUCTURE GUIDEWAY
ELEVATED FILL GUIDEWAY
UNDERGROUND GUIDEWAY
RETAINED CUT GUIDEWAY
DIRECT FIXATION TRACK
BALLASTED TRACK
EMBEDDED TRACK
SPECIAL TRACKWORK
GUIDEWAY-SPECIAL STRUCTURES
2.05
2.06
2.07
2.08
2.09
2.10
2.11
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Track Feet
Rev. Vehicle
Rev. Vehicle
Rev. Vehicle
L.F. Guideway
L.F. Guideway
L.F. Guideway
L.F. Guideway
I-1
0
0
0
45
2010
2010
45
0
0
100,000
2010
2010
$708,803
$0
$0
$25
100,000
2010
$44
APPENDIX J
LRT Comments
Reviewer
Thorpe, Greg
Appendix J
Page
Comment
Edits
Response
Sawyer, Bryan
(TRAX)
J-1
Excel Files
Attached
to E-mail
PMO cost
worksheet.xls
Reviewer
Appendix J
Page
Section
5.2.15
(SLC
Project
specific
comment
s)
Comment
Edits
Response
J-2
Excel Files
Attached
to E-mail
Reviewer
Appendix J
Page
Comment
Edits
Response
Excel Files
Attached
to E-mail
Completed
Completed
Completed
J-3
Reviewer
Appendix J
Page
Comment
Pg. A-52
Edits
Completed
Completed
Completed
Response
J-4
Excel Files
Attached
to E-mail
Reviewer
Appendix J
Page
Comment
Edits
Response
Pg. 3-11
(3.4.2
(Project
Descriptions)
Pittsburgh
Stage II)
Completed
J-5
Excel Files
Attached
to E-mail
Reviewer
Page
Pg. 3-12
(3.4.2
(Project
Descriptions)
Pittsburgh
Stage II
Third
paragraph)
Appendix J
Comment
Edits
Response
Completed
3-12 (3.4.2
(Project
Descriptions)
Pittsburgh
Stage II
Fourth
paragraph)
Completed
3-12 (3.4.2
(Project
Descriptions)
Pittsburgh
Stage II
Completed
3-12 (3.4.2
(Project
Descriptions)
Pittsburgh
Stage II
Sixth
paragraph)
Completed
3-12 (3.4.2
(Project
Descriptions)
Pittsburgh
Stage II
Seventh
paragraph)
Completed
J-6
Excel Files
Attached
to E-mail
Reviewer
Page
Appendix J
Comment
Edits
Response
3-12 (3.4.2
(Project
Descriptions)
Pittsburgh
Stage II
Eighth
paragraph)
Completed
3-13 (3.4.2
(Project
Descriptions)
Pittsburgh
Stage II
First
paragraph)
Completed
3-13 (3.4.2
(Project
Descriptions)
Pittsburgh
Stage II
Second
paragraph)
Completed
3-13 (3.4.2
(Project
Descriptions)
Pittsburgh
Stage II
Third
paragraph)
Completed
3-13 (3.4.2
(Project
Descriptions)
Pittsburgh
Stage II
Fourth
paragraph)
Completed
J-7
Excel Files
Attached
to E-mail
Reviewer
Page
4-4 (4.1.3
(Normalizatio
n Worksheet))
5-31 (5.2.7
(Cost
Variance
Analysis)
Pittsburgh
Stage II
Appendix J
Comment
Edits
Response
Completed
Completed
5-31 (5.2.7
(Cost
Variance
Analysis)
Pittsburgh
Stage II
Second
paragraph)
Completed
5-32 (5.2.7
(Cost
Variance
Analysis)
Pittsburgh
Stage II
Exhibit 5-22)
Completed
J-8
Excel Files
Attached
to E-mail
Reviewer
Appendix J
Page
Comment
5-33 (5.2.7
(Cost
Variance
Analysis)
Pittsburgh
Stage II
Exhibit 5-23)
5-66 (5.4.1
(Are Project
Costs
Increasing
or
Decreasing?
))
Bhattacharya,
Steve
Edits
Response
Completed
Completed
Completed
Completed
J-9
Excel Files
Attached
to E-mail
Reviewer
Appendix J
Page
Comment
Edits
Schachenmayr,
Martin
Section 2
Response
Completed
Completed
Revised
J-10
Excel Files
Attached
to E-mail
Reviewer
Appendix J
Page
Comment
Edits
Response
Section 2
Section 2
J-11
Excel Files
Attached
to E-mail
Reviewer
Engineering
Meeting
Olson, Eric
Appendix J
Page
Comment
Edits
Response
See above.
Completed
Completed
J-12