06-Self Supporting Roofing System-Umeshlavingia
06-Self Supporting Roofing System-Umeshlavingia
06-Self Supporting Roofing System-Umeshlavingia
Professional:
M.I.E., M.GICEA, Registered Valuer, Chairman for
Structural Engineering
Committee at GICEA, Ahmedabad.
Educational Activities: Prof. CEPT University, 2000-2007
Guide for the thesis at SBST CEPT University for
Masters Programme.
Guide for the thesis at Nirma University for Masters
Programme.
Examiner at various universities and institutions.
Professional Activities: Managing Director, Lavingia Consultants Pvt. Ltd., a
consulting engineering
with completion of 1500 projects including Large
School Project at Nairobi,
Kenya and Apartment building in London, U.K.
Director, Lavingia Communication Pvt. Ltd.,
Digital display system design
And development company.
Managing trustee:
Centre, Ahmedabad.
Arbitrator :
and Institutes.
Lectures:
at L.D.Collage of
School of Building
Science and Technology, CEPT University.
5. Pre Engineering Buildings at the Gujarat Institute of Civil
Engineers & Architects,
Ahmedabad.
6. Number of Seminars on Earthquake affected structure
and its restructuring.
Once the panels are fabricated and placed on the ground, they are
taken up for inter-connection with each other. These panels are
placed on top of each other, side ways, so that they fit into their
male-female formation.
ACCESSORIES:
The roofing system provider will provide and ensure the following:
The line, level and the alignment of the slope-beam along the entire
length will be checked by Engineer after the concreting. No plaster
on the slope of the beam will be allowed. Contractor will be given
the guidance by roofing system provider to ensure the work is as
required. In case of any flaw, the Consulting Engineers office should
be referred for the ways the rectification is to be carried out.
Each PICK of panels will be lifted with the crane using a spreader
bar and a sling evenly placed to ensure no distortion of the panel
takes place during lifting and placing. The crane shall hold / support
the PICK of panels till the alignment is done and completed using a
plumb & a water tube, and is bolted into the beam. To ensure these
panels dont shift from their alignment, they shall be tied up with a
guy rope to hold them in place. They will be supported with this
rope till enough panels are installed to form a square, i.e., till the
length and span are of an equal dimension.
The junction of the panels to the gutter beam shall be made using
either 2-3 anchor bolts of the desired size on each end of the panel
(depending on the stability requirement as derived from the Design
calculations). GI anchor Bolts of required sizes and type, with 2.5
inches G.I vicer & neoprene washers would be provided as
determined by the analysis during Design.
After all the panels are in place and installed, the same epoxy
lacquer is applied at the junction of the panels to the beam where it
has been bolted to form a protective layer on the bolts and the
holes underneath.
Material usage:
Standard :
Structural Behaviour:
Structural behavioural pattern needs to be understood very correctly in
this case, otherwise some times wrong interpretation of forces and not
providing proper and simple structural elements leads to failure.
The roofing system provider gives per running meter loading due to the
various kind of forces generated because of dead load, live load, wind
load from different direction etc.
It is absolutely necessary for the designer of the structure to interpret
these loading as per the codal requirement of load combinations and
provide the structure to withstand all these load combinations. Failure to
understand cause the failure of the supporting system and damage to the
human beings also.
A.C.Sheet
MS
Precoated
color
Pre
Engineering
Self
Supporting
Structure.
MS tubuler
Structures.
Roofing
System
@ 5 mts.
c/c
@ 5.5 mts.
c/c
@ 8 mts. c/c
@ 6 mts. c/c
Costly
Long term
moderate.
Support
Spacing.
Cost
Economical Moderate
effectivene
ss
Fabrication
&
installation
speed.
1000 sq.
mts.
Normally
takes 25 to
30 days.
1000 sq.
mts.
Normally
takes 25 to
30 days.
Enclosed
volume
Restriction
due to
Trusses &
steel frame.
Restriction
due to
Trusses &
steel frame.
Less
obstructions
because of
the Portal
system.
Unobstructed
clear span
facilitates
larger
encl.volume.
Leakage
and
corrosion.
Use of J
hooks &
bolts make
it prone to
leakage &
corrosion @
30%chance
s.
Use of J
hooks &
bolts make
it prone to
leakage &
corrosion @
30%chances
.
Leak proof as
well as
corrosion free
@ 10 %
chances.
Leak proof as
well as
corrosion free
@0%
chances
Maintenanc Due to
e
leakage &
corrosion in
roofing
require to
maintain
Due to
leakage &
corrosion in
roofing
require to
maintain
Require less
maintenance
i.e. in @ 10
years.
No
Maintenance
in the long
run.
yearly.
yearly.
Height of
the
structure.
Height can
be
restricted
due to
trusses.
Height can
be restricted
due to
trusses.
Can reduce
height of
overall
structure due
to use of
Portal frames.
Elimination of
truss can
reduce height
of over all
structure.
Lighting
and
Illuminatio
n.
Obstruction
in natural
and
artificial
lights.
Obstruction
in natural
and artificial
lights.
Less
obstructed
natural and
artificial
lights.
Unobstructed
natural and
artificial
lights.
Ventilation
and
temperatur
e
consistency
.
Temperatur
e
consistency
is not good.
Obstruction
in clear air
flow.
Temperature
consistency
is not good.
Obstruction
in clear air
flow
Less
obstructed air
flow and
superior
temperature
consistency.
Unobstructed
air flow,
superior
temp.
consistency &
less
consumption
due to proper
ventilation.
10
Working
Use of
Moderate
Environme asbestos
nt.
sheet is not
recommend
ed.
Comfortable.
Excellent.
11
Suitability
in case of
Gantry
[E.O.T.]
Well
Recommen Recommend Not
ded
ed.
recommended suitability.
12
Aesthetic
Appearanc
e.
Average.
Average.
Good and
appealing.
Beautiful due
to arch shape
& colors.
Indicative costing:
Presently approximate indicative costing for this kind of system of roof
covering can be considered as under.
Span up to 15 mts. : @ Rs. 1250/= per sq. mts of laid area.
Span up to 20 mts.: @ Rs. 1400/= per sq. mts. of laid area.
Span up to 25 mts.: @ Rs. 1600/= per sq. mts. of laid area.
The whole system is fast, elegant, economical and versatile in nature
which give a solution which is absolutely eye pleasing and long lasting
without any trouble in its life span with numerous advantages.