Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Schedule of Rebars

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

BEAM SCHEDULE

BOTTOM REINF.

TOP REINF.

STR

EXTRA

STR

300x600

3T16

3T12

GB2

200x600

2T16

2T12

2T16

GB3

300x600

3T16

3T16

3T16

MB1A

300x700

6T20

6T20

MB1

300X700

4T16

2T12

4T16

MB2

300X700

6T20

4T20

MB3

300X700

8T20

8T20

MB4

200X700

3T16

3T16

MB5

400X700

8T20

8T20

MODEL

SECTION

GB1

COLUMN SCHEDULE
TOP REINF.
EXTRA

GROUND FLOOR to

STIRRUPS
REMARKS

T8 @150 mm o.c.

2T12

T8 @150 mm o.c.

3T16

T8 @150 mm o.c.

T10 @150 mm o.c

2T12

T8 @150 mm o.c.

T8 @150 mm o.c.

T10 @150 mm o.c.

T8 @150 mm o.c.

T10 @150 mm o.c.

MEZZANINE
MODEL

SECTION

ROUND FLOOR to
MEZZANINE
STEEL

STIRRUPS

REMARKS

FOOTING SCHEDULE
PLAIN CONCRETE
MODEL

LEGNTH

WIDTH

DEPTH

REINFORCED CONCRETE
LENGTH

WIDTH

DEPTH

STEEL
SHORT

LONG

CANTILEVER
EACH WAY

REMARKS

SLAB SCHEDULE
SHORT DIRECTION
SLAB NO.

THICK

BOTTOM STRAIGHT

BOTTOM CUT

SUPPORT TOP

LONG DIRECTION
BOTTOM STRAIGHT

BTOORM CUT

SUPPORT TOP

REMARKS

You might also like