Schedule of Rebars
Schedule of Rebars
Schedule of Rebars
BOTTOM REINF.
TOP REINF.
STR
EXTRA
STR
300x600
3T16
3T12
GB2
200x600
2T16
2T12
2T16
GB3
300x600
3T16
3T16
3T16
MB1A
300x700
6T20
6T20
MB1
300X700
4T16
2T12
4T16
MB2
300X700
6T20
4T20
MB3
300X700
8T20
8T20
MB4
200X700
3T16
3T16
MB5
400X700
8T20
8T20
MODEL
SECTION
GB1
COLUMN SCHEDULE
TOP REINF.
EXTRA
GROUND FLOOR to
STIRRUPS
REMARKS
T8 @150 mm o.c.
2T12
T8 @150 mm o.c.
3T16
T8 @150 mm o.c.
2T12
T8 @150 mm o.c.
T8 @150 mm o.c.
T8 @150 mm o.c.
MEZZANINE
MODEL
SECTION
ROUND FLOOR to
MEZZANINE
STEEL
STIRRUPS
REMARKS
FOOTING SCHEDULE
PLAIN CONCRETE
MODEL
LEGNTH
WIDTH
DEPTH
REINFORCED CONCRETE
LENGTH
WIDTH
DEPTH
STEEL
SHORT
LONG
CANTILEVER
EACH WAY
REMARKS
SLAB SCHEDULE
SHORT DIRECTION
SLAB NO.
THICK
BOTTOM STRAIGHT
BOTTOM CUT
SUPPORT TOP
LONG DIRECTION
BOTTOM STRAIGHT
BTOORM CUT
SUPPORT TOP
REMARKS