To achieve expectations reliably and consistently, specifications are clearly spelled out, not only for results
but also for processes. Specifications apply to materials, work steps, qualified personnel and
subcontractors and suppliers, safe work rules, and environmental work conditions.
Pa
g
Standards ensure that materials, methods, and results are specified rather than left to discretionary
practices.
ed
All [CompanyName] construction activities comply with generally accepted good workmanship practices
and industry standards.
ct
Applicable building codes that apply to this project are listed on the Project Building Codes form. A Project
Building Codes form exhibit is included in this subsection.
Se
le
Additional detail on [CompanyName] policies and procedures related to local building codes appear in
Quality Manual section 5 Project-Specific Quality Standards and 5.2 Regulatory Codes.
ACI MCP-2
03
ACI 318M
03
Reinforcement Placement
ACI 318M
03
Reinforcement Splices
ACI 318M
03
03
ASTM C 1116/C
1116M
03
03
ASTM C 494/C
494M
03
ACI 305R
03
ACI 305R
03
ACI 117
05
AWS A3.0M/A3.0
05
AWS D1.1/D1.1M
05
Welding standards
AWS B2.1/B2.1M
05
SDI DDP
05
SDI 31
Design Manual for Composite Decks, Form Decks, and Roof Decks
05
AISI SG02-KIT
05
NFPA 211
05
05
Pa
g
ed
ct
03
Se
le
Description
es
Reference
Standard No.
Division
RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts"
CFSEI
NFPA 70
26
ICC/ANSI A117.1
26
NFPA 70
26
NFPA 70
26
Workmanship
NFPA 70
26
Telecommunications grounding
TIA-569
26
Telecommunications pathways
TIA J-STD-607
26
NFPA 70E
26
NFPA 780
31
AWWA C600
31
AWS D1.1/D1.1M
31
ASTM D 4873
31
Shoring installation
EM 385-1-1
31
PCI JR-382
31
ACI 336.1
Pa
g
es
26
ed
ct
le
Se
J. DESIGN CONTROL
Construction design controls are in place to assure the quality of construction designs for this project. A
design plan is used to document the design control process. The Design Plan is included as an exhibit in
this subsection.
The first control point will be of the review of design inputs. The Design Engineer will assure that all
necessary information is available to perform the required design work. The Design Engineer will also
assure that expectations for design outputs are well defined.
Intermediate reviews will be carried out as indicated on the design control plan. The last review is the
design output review.
A record of all reviews will be recorded on the Design Review form. A Design Review form exhibit is
included in this subsection.
Pa
g
es
The President has appointed [DesignEngineerName] as the Design Engineer. [DesignEngineerName] will
control the design process with specific quality responsibilities, duties, and the authority to carry them
out.
DESIGN PLAN
ed
ct
le
Se
The Quality Manager reviews the design process project plan with the customer and other interested
parties. The customer approves the plan after any discrepancies are resolved and the plan is agreed upon.
Design work may begin only after the customer approves the plan.
DESIGN REVIEWS
DESIGN INPUT REQUIREMENTS REVIEW
The Quality Manager ensures that the information in design inputs clearly defines customer expectations
and that the necessary details are provided to set requirements for design.
The Quality Manager obtains design specifications from the customer and conducts a customer design
input review to ensure that:
Division
Description
Reference
Standard No.
03
Subgrade compaction
ASTM D 1557
03
03
Concrete strength
specimens
Standard Practice for Making and Curing Concrete Test Specimens in the Field
03
Vacuum Testing
ASTM C 1244/ASTM
C 1244M
Standard Test Method for Concrete Sewer Manholes by the Negative Air Pressure
(Vacuum) Test Prior to Backfill
03
ASTM C 231
Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure
Method
03
temperature of concrete at
time of placement
ASTM C
1064/C 1064M
05
ASNT SNT-TC-1A
Q&A Bk C
05
AWS D1.1/D1.1M
05
AWS D1.1/D1.1M
05
05
ct
05
Ultrasonic Inspection
05
ed
Pa
g
es
ASTM E 709
ASTM E 164
Radiographic Inspection
ASTM E 94.D
26
IEEE 400.2
Guide for Field Testing of Shielded Power Cable Systems Using Very Low Frequency
(VLF)
26
NETA ATS
Standard for Acceptance Testing Specifications for Electrical Power Equipment and
Systems
26
IEEE 81
Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface
Potentials of a Ground System
31
ASTM D 1556
31
ASTM D 2167
Density and Unit Weight of Soil in Place by the Rubber Balloon Method
31
ASTM D 6938
Standard Test Method for In-Place Density and Water Content of Soil and SoilAggregate by Nuclear Methods (Shallow Depth)
Se
le
ASTM E 165
es
Work-in-process inspections continuously verify that work conforms to project specifications and
workmanship expectations. Work continues only when it does not adversely impact quality results.
Pa
g
At completion of the work task an inspection verifies that work, materials, and tests have been completed
in accordance with project quality requirements. When appropriate, functional tests are performed.
Inspection results are recoded and maintained as part of the project files.
ed
The Quality Manager identifies each Task that is a phase of construction that requires separate quality
controls to assure and control quality results. Each Task triggers as set of requirements for quality control
inspections before, during and after work tasks.
Independent quality audits are conducted to verify that the task quality controls are operating effectively.
ct
Construction projects may execute a work task multiple times in a project, in which case a series of quality
inspections are required for each work task.
Se
le
Independent quality control audits are conducted to verify that the task quality controls are operating
effectively.
[CompanyName]
Work Task Inspection Form
Version October 17, 2012
Work Task :
Project: Id#
[ProjectNumber]
Project Name:
[ProjectName]
Location/Area:
Crew ID/Name
Compliance Verification
es
Pa
g
ed
Production Notes:
ct
Reported Nonconformances:
le
Se
Quality: 5 4 3 2 1
Safety: 5 4 3 2 1
Delivery: 5 4 3 2 1
Quality: 5 4 3 2 1
* On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting
period is in compliance with the contract drawings and specifications to the best of my knowledge except as noted in this report.
le
ct
Bored Piles
Caissons
Clearing and Grubbing
Driven Piles
Excavating and Fill
Grading
Se
METALS
ed
EARTHWORK
Pa
g
ELECTRICAL
es
CONCRETE
Metal Decking
Metal Railings
Metal Stairs
Structural Steel Framing
Sep2011
Phase:
Contract#:
Organization:
Crew:
9101
Field Operations
FTQ 2TQ
1050
1057
es
Pa
g
Compliance Verification
o Compliance with initial job-ready
requirements
o Compliance with material inspection and tests
o Compliance with work in process first article
inspection requirements
o Compliance with work in process inspection
requirements
o Compliance with Task completion inspection
requirements
o Compliance with inspection and test plan
o Compliance with safety policies and procedures
ed
On-Time
5 4 3 2 1
Notes:
Safety
5 4 3 2 1
Notes:
le
5 4 3 2 1
Se
Quality
ct
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
5 4 3 2 1
Notes:
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
Quality Score
On-Time Score
Safety Score
5 = 100% NO problems
5 = On Time
5 = 100% NO problems
4 = 1 minor problems
4 = Late
4 = 1 minor problem
2 = 6+ or major problems
2 = Late by 2 days
2= 4+ or major problem
1 = Excessive problems
1 = Late more than 2 days
1= Injury
Sep2011
Phase:
Contract#:
Organization:
Crew:
9101
Field Operations
FTQ 2TQ
blemishes 2580
dirt/rust 2583
es
Pa
g
Compliance Verification
o Compliance with initial job-ready
requirements
o Compliance with material inspection and tests
o Compliance with work in process first article
inspection requirements
o Compliance with work in process inspection
requirements
o Compliance with Task completion inspection
requirements
o Compliance with inspection and test plan
o Compliance with safety policies and procedures
On-Time
5 4 3 2 1
Notes:
Safety
5 4 3 2 1
Notes:
ct
Notes:
le
5 4 3 2 1
Se
Quality
ed
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
5 4 3 2 1
Notes:
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
Quality Score
On-Time Score
Safety Score
5 = 100% NO problems
5 = On Time
5 = 100% NO problems
4 = 1 minor problems
4 = Late
4 = 1 minor problem
2 = 6+ or major problems
2 = Late by 2 days
2= 4+ or major problem
1 = Excessive problems
1 = Late more than 2 days
1= Injury
Sep2011
Phase:
Contract#:
Organization:
Crew:
9101
Field Operations
FTQ 2TQ
ENGINEER 1652
es
Pa
g
Compliance Verification
o Compliance with initial job-ready
requirements
o Compliance with material inspection and tests
o Compliance with work in process first article
inspection requirements
o Compliance with work in process inspection
requirements
o Compliance with Task completion inspection
requirements
o Compliance with inspection and test plan
o Compliance with safety policies and procedures
Notes:
On-Time
5 4 3 2 1
Notes:
Safety
5 4 3 2 1
Notes:
Se
le
ct
Quality
ed
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
5 4 3 2 1
Notes:
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
Quality Score
On-Time Score
Safety Score
5 = 100% NO problems
5 = On Time
5 = 100% NO problems
4 = 1 minor problems
4 = Late
4 = 1 minor problem
2 = 6+ or major problems
2 = Late by 2 days
2= 4+ or major problem
1 = Excessive problems
1 = Late more than 2 days
1= Injury
Earthwork-Bored
Piles 31.63.00
Questions?
Call Ed Caldeira
410-451-8006
Project:
Phase:
Contract#:
Sep2011
Organization:
Crew:
9101
Field Operations
FTQ 2TQ
areas 2242
es
Pa
g
Compliance Verification
o Compliance with initial job-ready
requirements
o Compliance with material inspection and tests
o Compliance with work in process first article
inspection requirements
o Compliance with work in process inspection
requirements
o Compliance with Task completion inspection
requirements
o Compliance with inspection and test plan
o Compliance with safety policies and procedures
benchmark 2248
ed
On-Time
5 4 3 2 1
Notes:
Safety
5 4 3 2 1
le
5 4 3 2 1
Se
Quality
ct
Notes:
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
5 4 3 2 1
Notes:
Sign and date*: Cell # / ID #:: _________________________________ Signed: _________________________________ Date: _________________
Task has been has been verified complete and in compliance with contract drawings and specifications except for non-conformances and incomplete items reported above.
Quality Score
On-Time Score
Safety Score
5 = 100% NO problems
5 = On Time
5 = 100% NO problems
4 = 1 minor problems
4 = Late
4 = 1 minor problem
2 = 6+ or major problems
2 = Late by 2 days
2= 4+ or major problem
1 = Excessive problems
1 = Late more than 2 days
1= Injury
Industry-Specific Information
Available by Division
08 Openings
27 Communications
04 Masonry
09 Finishes
05 Metals
21 Fire Suppression
06 Wood Plastic
Composite
22 Plumbing
07 Thermal and
Moisture Protection
23 HVAC
es
03 Concrete
Se
le
ct
ed
Pa
g
31 Earthwork
26 Electrical
32 Exterior
Improvements
33 Utilities
Quality Manual
Pa
g
es
Se
le
ct
ed
The documents provided by [CompanyName] disclose proprietary company information that is copyright
registered. Please hold these quality documents in confidence and do not share them with other
organizations, even if you do not charge a fee.
QUALITY MANUAL
TABLE OF CONTENTS
1. Quality System Management and Responsibilities ............................................................................... 6
1.1. Overview .............................................................................................................................................. 6
1.2. [CompanyName] Quality Policy ........................................................................................................... 6
1.3. Quality Duties, Responsibilities, and Authority ................................................................................... 6
1.4. Quality System Performance Measures .............................................................................................. 9
1.5. Customer Satisfaction Performance Measures ................................................................................... 9
1.6. Exceptions............................................................................................................................................ 9
es
ct
ed
Pa
g
le
Se
Pa
g
es
ct
ed
le
Se
es
Pa
g
Se
le
ct
ed
7. PROCESS CONTROLS
HOW WORK IS CARRIED OUT
7.1. OVERVIEW
The construction process plan defines how project work is to be done and approved for the overall
project. The construction process plan is communicated to all key personnel, subcontractors and suppliers
in a startup meeting. As the project proceeds, work task plans provide additional details of how each
individual work task is carried out. Work tasks planning meetings are used to communicate expectations
of the work task plan to key personnel responsible for carrying out the work task.
es
ct
ed
le
Pa
g
Prior to the commencement of work, the Director of Construction holds a meeting to discuss and
coordinate how project work will be performed and controlled. Key personnel from [CompanyName],
subcontractors and suppliers meet to review expectations for project quality results as well as quality
assurance and quality control policies and procedures including:
Se
In preparation for the start of an upcoming work task, the Construction Supervisor reviews an integrated
and coordinated set of documents that collectively define quality requirements for the work task
including:
Personnel training
es
Prior to the start of a work task, the Construction Supervisor conducts a meeting with key company,
subcontractor personnel responsible for carrying out, supervising, or inspecting the work, and interested
customer representatives.
ed
ct
Se
le
Pa
g
During the meeting, the Construction Supervisor communicates the work task quality requirements and
reinforces heightened awareness for critical requirements. Topics for a work task quality plan meeting
include:
YY&z>
MilitaryForms:
PreparatoryPhaseChecklist
InitialPhaseChecklistForm
ContractorProductionReport
ContractorQualityControlReport
TestingPlanandLog
StandardForms:
le
ct
ed
Pa
g
es
ProjectOrganizationChartForm
QualityManagerAppointmentForm
ProjectManagerAppointmentForm
ProjectSuperintendentAppointmentForm
ProjectDesignManagerAppointmentForm
ProjectPersonnelQualificationForm
PersonnelCertificationsandLicensesForm
QualityControlledTaskListForm
QualityInspectionandTestPlanForm
ProjectQualityCommunicationsPlanForm
PointOfContactListForm
ProjectQualityTrainingPlanForm
TaskTrainingPlanandLogForm
ProjectQualityRecordsPlanForm
ProjectSubmittalForm
ChangeOrderForm
ProjectDesignProcessPlanForm
DesignReviewMeetingParticipantForm
DesignReviewForm
ProjectRegulatoryBuildingCodesForm
TestEquipmentCalibrationForm
LotControlledMaterialsForm
ProjectSubcontractororSupplierQualificationForm
SubcontractorandSupplierCertificationsandLicensesForm
SourceofSupplyForm
PreconstructionMeetingForm
TaskProjectQualityControlPlanForm
TaskProjectQualityControlPlanningMeetingForm
Se
DailyQualityControlReportForm
MonthlyQualityControlReportForm
TaskInspectionForm
ProjectCompletionInspectionForm