Chevron Bangka
Chevron Bangka
Chevron Bangka
SECURITY PLAN
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
INTRODUCTION
1.1 GENERAL
Bangka field is a deepwater gas field located in offshore East Kalimantan, Indonesia in 3200 feet of water.
The field will be developed with two well subsea completions, tie in the production to existing West Seno
(WS) Floating Production Unit (FPU) through a new 10 inch pipeline. A new umbilical will be installed for
remote subsea controls from the FPU. Modifications will be made to the existing WS FPU for processing
and handling of the Bangka gas and condensate.
1.2 SCOPE OF WORK
The Bangka field is part of Rapak PSC offshore East Kalimantan about 17 kilometers north of West Seno
Field. Peak gas production will be 115 MMscfd (109.25 MMscfd with a plant efficiency of 95%) and
condensate rate peaking at 3750 bcpd. The peak production is based on available existing, West Seno
Gas Compressor capacity. The water will be separated out, while gas and condensate will be shipped via
existing West Seno pipelines to Chevrons Santan Terminal. Bangka gas production will be exported via
West Senos existing export pipelines via Santan Terminal to the East Kalimantan Petrochemical industry
and the Bontang LNG Plant. Condensate will be exported for sales via tankers from the existing Santan
Terminal.
1.3 PURPOSE
The purpose of security plan includes but not only limited to the following:
Promptly identifying security risks and taking appropriate action to eliminate or reduce risk to
acceptable levels
Immediately reporting and investigation security incidents
Immediately responding to situations that are immediately dangerous or threaten to life, equipment and
buildings
Identifying high-risk areas and implementing appropriate engineering and administrative controls and
safe work practices necessary to eliminate or minimize security risk.
Informing project staff of security risks and the actions for eliminating or minimizing these risks.
1.4 ABBREVIATION
HES
COMPANY
: CHEVRON INDONESIA
CONTRACTOR
CSR COMPANY
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
CTR
: CONTRACTOR
GA
: General Affairs
HES
OFFICE
: Engineering Office
1.5 REFERENCE
1.5.1 CONTRACTOR DOCUMENT
UU No. 1/1970
CHEVRON INDONESIA
HES Requirement
Management Quality
IMS Document/Procedure
Shall demonstrate and show his personnel commitment on the security matters
Shall establish a culture of continues improvement of security during project activity to ensure
such matters are considered to be equal importance to productivity. Progress, etc.
Shall establish a monitoring regime to ensure that unsafe security arrangement are identified
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
and remedied at the earliest stage
Shall provide all members of his project management/ supervisory team with adequate
direction support and encouragement to fulfil their respective security duties and responsibilities
Shall verify that only duly authorized personnel entering or departing the office, project and
accommodation areas
Shall ensure that only personnel and/or visitor with a valid ID card/or badge entering or departing
the office, project site and accommodation areas
Shall maintain a record of all personnel entering and/or leaving the office, project area and
accommodation areas
Shall carry out hourly security patrol of the office, project location and accommodation areas.
This patrol will focus on ensuring the safe and secure condition of the office, project and
accommodation facilities, identifying any anomalies and verifying, there has not been any
unauthorized access
Shall immediately notify the security Leader, SITE Manager, HES Coordinator in case of
emergency situation and must be initiating response efforts.
The vehicle access shall be strictly controlled by Security Guard on duty and shall ensure only a
valid vehicle can enter and depart to the project area
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
2.4 COVERAGE AREAS
SECURITY PROVISION
The Security Leader in charge shall responsible for compliance of security provision in providing protection
of personnel, office, work/site, accommodation facilities, access routes, material, equipments, vehicles
and/or stock and purchase supplies, shall be implemented in accordance with the project requirements
until completion of the project activity.
3.1 SECURITY SERVICES
CONTRACTOR Security performs the provision of Security Services within worksite, CONTRACTOR
work premises and other areas as instructed by COMPANY including but not limited to the following
services:
Shall perform continuously the basis handling of inspection to anyone and certain groups who
may cause disturbance or disruption, and preventing any unauthorized occupation
Shall provide guards for searching the transportation of materials in the worksite, including major
components in relation with modification job. The searching will include the permit to work,
delivery document, etc. as the security worksite requirement to control the entire activities in the
project.
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
Shall make co-ordinations meeting with COMPANY security and reports which are to be
submitted to the COMPANY Representative every month or if approved by COMPANY.
Security policies and procedures shall be implemented in accordance with the principles of
Universal Declaration of Human Right, The National and International Laws and the Voluntary
Principles on Security and Human Rights. Respect for human dignity is paramount at all time.
Shall also improve his PERSONNEL qualifications and skills anticipating the security condition
and situation surrounding the WORKSITES/SITES.
Shall issue a Security Management Plan (SMP) as an integrated part of the CONTRACTORs
Project HES plan. In any case, the SMP must be issued for COMPANY APPROVAL before the
work starts effectively on the WORKSITES.
All security personnel mobilized are medically fit and MCU certified for work.
All security guards mobilized are qualified and trained in Police training center to Level 1 (Garda
Pratama) as per Peraturan Kepala Kepolisian Negara Indonesia NO POL. :18, tanggal 12
Desember 2006.
All security guards shall also improve his qualifications, skills, and experience anticipating the
security condition and situation surrounding the worksites.
Training certificates shall be available for all security personnel mobilized in the project upon
COMPANYs request.
In line with emergency or others exceptional situation, CONTRACTOR security personnel shall
be able to become member of the fire fighting team and to give first-aid to injured people.
Therefore internal basic fire fighting and basic first aid training are mandatory for all security
personnel.
All security personnel should have SKKB, no criminal record from local police and free of narcotic
tested through MCU.
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
CONTRACTOR and COMPANYs office and accommodation located at Handil. The
office area including all its facilities are 24 hours guarded by the CONTRACTOR Security
Force
All entrance people who work in the office and plan to stayed in the accommodation with
their belonging and or visitors and their vehicles are subject to the security check.
Personal identity is required; therefore all Tenants employees shall be completed ID card
of COMPANY and CONTRACTOR, to pass the personnel entry.
All vehicles entering the office area shall be checked by security, and obligated to open
the vehicles cabin doors, baggage trunk for visual check and a massive stick mirror is
also be used for vehicles bottom to check hazardous materials.
Construction Site
Security personnel shall conduct site patrol regularly to ensure that the construction site
premises/site is well protected
3.3.2 COMMUNICATION
Worksite
Worksite Security Team Member up to SITE Manager is reachable 24 hours. Refer to the
worksite Key Personnel Communication Link System and Procedure of Security Plan as
mentioned below.
COMPANY
SITE
REP
CPY Security
Officer
SITE
MANAGER
SECURITY
LEADER
SECURITY
GUARD
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
3.3.3 LOCAL COMMUNITIES
Worksite management (CONTRACTOR and COMPANY) team respectively is to handle the
site communities in case necessary needed. Construction Manager and security leader are
responsible to maintain communication among the local communities.
3.3.4 COMMUNICATION WITH LOCAL GOVERNMENT
Communication with local government will be coordinated by the worksite management
(CONTRACTOR and COMPANY).
3.3.5 LOCAL AGENCY SECURITY FORCES SUPPORT
CONTRACTOR shall be in coordination with COMPANY on security and the local support
issues as required.
Local agency security forces support to be communicated for consultation and assistance,
done by security leader.
3.3.6 PREVIOUS INCIDENT EXPERIENCE
Meanwhile minor security incident has to be anticipated and prevented in the earliest stage
before becoming the major security incident.
3.3.7 CRISIS EMERGENCY PLANS
Violation related activities such as brawl theft, demonstration or riot, brawl are referred to the
following but should not be limited to.
A. Theft
The Security Team conducts:
The vehicle access shall be strictly controlled by Security Guard and shall ensure only
valid vehicle can enter and depart to the project area and control vehicles parking on (
WORKSITE)
Verify that only on duty authorized personnel entering or departing the office, project
and accommodation areas and their belonging and or visitors are subject for security
check, including their vehicles (only applied on WORKSITE).
Ensure that only personnel and/or visitors with a valid ID card/badge entering or
departing the office project and accommodation areas
Monitoring of work activities and carry out hourly security patrol of the office, project
and accommodation areas. This patrol will focus on ensuring the safe secure
condition of the office, project and accommodation facilities, identifying any anomalies
and verifying there has not been any unauthorized access
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
B. Demonstration or Riot
The security Team to conducts:
Security Leader activates emergency alarm and asd all security members and all
personnel to standby alert, report to management on the latest situation
The management get back-up Local security forces. i.e.: Local Police and
KORAMIL
Note:
In general, a security guard has many responsibilities during a dispute, including the protection
of property damage and protection against injuries that can occur during the demonstration or
Riot. The following shall be observed by Security Guards however not limited to:
The security guards in direct confrontation with demonstration shall not carry firearms.
The security guards shall avoid direct contact, either physically or otherwise, with
demonstrators.
The security guards shall stay only within perimeter of the installation which they are
protecting at all times
The security guards shall protecting and securing the assets and employees, also shall use
only sufficient and reasonable force necessary to overcome the risk or danger posed by
demonstrators.
C. Brawl
The Security Team conducts:
Checking any personnel / visitor belonging during entering and departing the office,
project and accommodation areas. The sharpen object or any fire arm / gun shall
take from the personnel and shall take it away.
The management get back-up from Local security force, i.e.: Local Police and
KORAMIL.
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
INSTRUCTIONS
Brawl
Security Guard
Security Leader
Project Management
Team
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
3.3.10 SECURITY DRILL
CONTRACTORs Security Team shall plan Security Drill once during fabrication phase with
scenario based on the project security risk assessment. Drill to be scheduled at the same time
with Emergency Drill. All personnel on the location are mandatory to attend the drill as
planned. Security Team report the drill and its evaluation to CONTRACTOR and COMPANY
Representative. COMPANY security officer assigned to project shall be invited as observer.
ENTRY OF VEHICLE
All vehicle/equipment leaving and entering worksite shall be checked thoroughly. Passes shall be issued
by authorized personnel. All the equipment/material/consumables is allowed to be taken in and out
through designated main gate after searching approved dispatch document completely.
REGULAR INSPECTION
Security personnel shall conduct frequent inspection of project office and worksite to ensure that
everything is in order with respect to the project security requirement. Security personnel shall check and
ensure that equipment; assets and access are in a safe manner but shall take immediate action on the
security hazards finding. Any violation noticed shall be reported to related department
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
9
10
SECURITY RECORDS
All records of man movement register, visitor, vehicle, equipment / material register, returnable material
register shall be maintained and the record shall be kept until completion of the project activity.
11
SECURITY INFRASTRUCTURE
All infrastructures of each phase of the project such as security post which is detailed in attached layout
and equipment as listed in the equipment inventory, such as handy talky radio, night lamps and torches
shall be provided to security personnel.
12
13
14
Proposal To
CHEVRON INDONESIA COMPANY
BANGKA TOPSIDE ENGINEERING, PROCUREMENT,
CONSTRUCTION AND INSTALLATION
CONTRACT No. C1028785
Security leader along with security personnel will act upon emergency situation such as incidents /
accidents, fire, explosion, natural disaster, local community disturbances, bomb threats, employee
strike, etc
Shall coordinate with HES personnel and Security Leader in case of emergency, including brawl, and
theft incident that very likely to happen.
Security personnel shall smoothly handle the emergency situation without any loss / injury to
personnel and property damage, with respect of human right.
In addition, the emergency drills shall be organized by HES Coordinator, in order to make clear the roles
and responsibilities of security personnel in case of an emergency.
15
REPORTING
Any serious violation on security threat and/or undesirable situations if noticed shall be immediately
reported to his/her superior using anomaly report form. This report shall be registered prior to be
submitted to COMPANY.