Overview of Liwan 3-1 Deepwater Subsea Tieback Gas Development
Overview of Liwan 3-1 Deepwater Subsea Tieback Gas Development
Overview of Liwan 3-1 Deepwater Subsea Tieback Gas Development
CONTENTS
Pan Yu 34-1/35-2/35-1
Water Depth 200-378m
LW3-1 deepwater field subsea tieback to a shallow water central production platform;
3
A large processing capacity reserved for future tieback developments in the vicinity.
3
Approximately 250km
distance from shore to the
water depth of 200m, small
slope;
Gas Resources
o
Operator-CNOOC
Gaolan Onshore Terminal in Zhuhai
LW3-1
Boosting: 10.0BCM/Year
Central
LW3-1 Central
Platform
Platform
Phase 2
Export
Shallow
Pipeline
Water
Phase 1
Phase 2
Future
Onshore Gas
Plant
PY34-1 Central
Platform
Operator Husky
PY35-1
Subsea
LH29-1
Future
LH34-2
Future
Operator - CNOOC
LW3-1
Subsea
Onshore
Gas
Plant
Central Platform
(CEP)
Pipeline End Manifold
(PLEM)
Main Flowlines
Liuhua 34-2
West Manifold
East Manifold
8
The Subsea Mensa Field in 1610m water depth tie-back 109km to a platform at West
Delta 143 in 112m water depth;
The Red Hawk Cell Spar in 1615m water depth tie-back 96km to Baldpate Platform,
designed as a floating alternative to a long-distance tieback;
The Canyon Express Fields, TLP Ram-Powell tieback to Platform Virgo, Neptune Spar
10
& TLP Marlin tieback to Canyon Express Pipeline.
10
11
11
12
12
13
13
14
14
15
16
ISOPE-2013
17
17
Anchorage
17
18
19
19
ISOPE-2013
20
Anchorage
20
20
ISOPE-2013
21
21
Anchorage
21
Concluding Remark
OSHA incident
rate: 0.042
0
Death
5
Lost time
accidents
15
Near Miss
6341
Safety Observations
ISOPE-2013
22
Anchorage
22
22
Thank You!
Any Question?
ISOPE-2013