0468 Asom20 00TQ 0001 001 B
0468 Asom20 00TQ 0001 001 B
1) Weld Joints shall comply MODEC Spec 3000-MI60-12S1-0003-001; Section 8.2.2,Section 8.3
Section 8.4, Section 10, Section 10.1
2) Shall comply with MC requirements and ITR to complete
Mukhesh U 15-May-2020
1 2 3 4 5 6 7 8
FABRICATION MATERIALS
1 PIPE, EFSW ASTM A928 UNS S31803 CL.1 + 100% RT, 12 PAX13ABEN1202 1000 MM 49.8
ASME B36.10, BE, DS01 NACE, S20
2 REDUCER CONC, WELDED ASTM A815 UNS S31803 WP-W 12X6 RCX42DBWN1202061S 1 16.3
A + 100% RT, ASME B16.9, BW, DS01 NACE, S20 x 10S A
3 FLANGOLET, ASTM A182 GR F51, MSS SP-97, ASME 12X1 OFX31BRFBBN12020D8S 1 3.1
B16.5, RF, CL 300, DS01 NACE, S20 x 80S
4 ELBOW 90, WELDED ASTM A815 UNS S31803 WP-W + 12 E9X42EBWN1202 2 74.5
100% RT, ASME B16.9, R=1.5D, BW, DS01 NACE, S20
5 FLANGE WN, ASME B16.5, RF, CL 600 10S 6 MODEC-0081 1 31.92
B B
22
0 05
48 9
TOTAL FABRICATION WEIGHT 175.62
3
4 12X1"NS
OLET DIR S 89.4271 D
ERECTION MATERIALS
FR74b S-12b MATL MATL
3 S7
BUILDING CL 2 BUILDING CL MPL-B5DN MPL-A2N PT COMPONENT DESCRIPTION N.B. ITEM CODE QTY (mm/no.) WEIGHT (kg)
PS-6P1-156133-100 NO (INS)
FA EL +52.170M GT1-1"-DS
1 LL TP No.
0.6 CONT. ONTTP-6P1-15-03-01-WI-004---Test Press 24bar
6 H=VAR; WELDED SHOE WITH RPAD 12 MPL-PRIM-SUPP-DS 1 15.4
C ° AND HOLD DOWN FOR SHOE (TYPE - VERTICAL C
6P1-12-WI-A2N-156134
CHANNEL)
57 4 E 122.320M
EBR:
7 1 no of DSS 6" Flange can not be available to provide the welding type of test STRUCTURAL STEEL BRACKET B7A - BEAM
N 9.302M
"N
S 100 MATL
blind (Stainless Steel) for Hydro-Test
EL +53.202M 7 GUSSET FOR TWO DIRECTIONAL BRACING WITH RPAD 1 MPL-PRIM-SUPP-DS 1 1.6
FW 12 +
7 07 DSIC: 8 GASKET, SPIRAL WOUND ASME B16.20, 4.5MM THK 6 1 0.57
LIB-INST-600
I-SP-6P1-WI-156133-01-001 1 no of DSS 6" Flange should be installed at DSIC
(3.175 MM THK SOLID RINGS) FLEXITALLIC TYPE "CGI" CL 600
1 30 to raise TQ to waive the hydro-test on this joint at DSIC with 100% NDT to
267 MM
8 waive the hydro-test (Joint No. 12 golden joint )--Test Press 24bar)
312 9 210 MM LONG, STUDBOLT, ZERON 100 FG, WITH 2 HEX 3/4 BSZ61BG1A210 12 13.09
CONT. ON 240 MM
10 HEAVY NUTS, ASME B18.2.1/B18.2.2, DEGREASED +
6P1-14-WI-B5DN-156131 8/9 PSV WHITFORD XYLAN 1014-GRAY
5
E 121.613M 10/11 1561 10 PRESSURE SAFETY VALVE FLG 150RF x 600RF 8X6 PSV 1561 17 1 196.0
N 11.129M CONT. ON 17
EL +52.164M SHT 2
327
779
589 8X6"NS
E 122.320M 98 1 3
2
D N 10.552M FA FW 12 I-SP-6P1-WI-156133-01-003 D
EL +51.868M L L0
.6°
22
1 7
S6 2
PS-6P1-156133-01 12X6"NS
BP-12"-152x180 12"NS
RP1-340-DS-6.3 452
4
S4-12"-300-100-DS-100
452 89.4° TOTAL ERECTION WEIGHT 226.66
G3-12" 6
EL +52.180M
GUI GAP=3 TOTAL WEIGHT 402.28
HLD GAP=3 I-SP-6P1-WI-156133-01-002
B7A-E-500-509
LIST OF SPOOLS
HOLDS:
1.
2.
3.
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.
1 PIPE, EFSW ASTM A928 UNS S31803 CL.1 + 100% RT, 12 PAX13ABEN1202 0.7 M 32.4
ASME B36.10, BE, DS01 NACE, S20
2 REDUCER CONC, WELDED ASTM A815 UNS S31803 WP-W 12X6 RCX42DBWN1202061 1 16.3
A + 100% RT, ASME B16.9, BW, DS01 NACE, S20 x 10S A
3 FLANGOLET, ASTM A182 GR F51, MSS SP-97, ASME 12X1 OFX31BRFBBN12020 1 3.1
B16.5, RF, CL 300, DS01 NACE, S20 x 80S
4 ELBOW 90, WELDED ASTM A815 UNS S31803 WP-W + 12 E9X42EBWN1202 2 74.5
100% RT, ASME B16.9, R=1.5D, BW, DS01 NACE, S20
5 FLANGE WN, , ASME B16.5, RF, CL 600, , 10S 6 MODEC-0081 1 32.0
TP No.
TTP-6P1-15-03-02-WI-004---Test Press 24bar
EBR:
1 no of DSS 6" Flange can not be available to provide the welding type of
CONT. ON test blind (Stainless Steel) for Hydro-Test
6P1-12-WI-A2N-156514
E 125.281M DSIC: 9 S10
1 no of DSS 6" Flange should be installed at DSIC ORI = D
B N 11.581M PSV B
267 MM
to raise TQ to waive the hydro-test on this joint at DSIC with 100% NDT to
EL +53.202M 1565 (Joint No. 7 golden joint)--Test Press 24bar) PS-6P1-156513-01
waive the hydro-test
17 BP-12"-152x180
240 MM 10X6"NS RP1-340-DS-6.3
I-SP-6P1-WI-156513-01-003 S4-12"-300-100-DS-100
MATL G3-12"
578
MPL-B5DN GUI GAP=0 TOTAL FABRICATION WEIGHT 159.2
HLD GAP=3
7 B7A-E-500-510
MATL
327
2 LIB-INST-600
6 3 ERECTION MATERIALS
779
12X6"NS FW 1 12X1"NS PT COMPONENT DESCRIPTION N.B. ITEM CODE QTY (m/no.) WEIGHT (kg)
12"NS 452 OLET DIR N 89.4271 D NO (INS)
HOLDS:
1.
2.
3.
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.
1 PIPE, EFSW ASTM A928 UNS S31803 CL.1 + 100% RT, 12 PAX13ABEN1202 0.8 M 38.7
ASME B36.10, BE, DS01 NACE, S20
2 REDUCER CONC, WELDED ASTM A815 UNS S31803 WP-W 12X6 RCX42DBWN1202061 1 16.3
A + 100% RT, ASME B16.9, BW, DS01 NACE, S20 x 10S A
3 FLANGOLET, ASTM A182 GR F51, MSS SP-97, ASME 12X1 OFX31BRFBBN12020 1 3.1
B16.5, RF, CL 300, DS01 NACE, S20 x 80S
4 ELBOW 90, WELDED ASTM A815 UNS S31803 WP-W + 12 E9X42EBWN1202 2 74.5
CONT. ON 100% RT, ASME B16.9, R=1.5D, BW, DS01 NACE, S20
TP No.
6P1-12-WI-A2N-157114 MODEC-0081
5 FLANGE WN, , ASME B16.5, RF, CL 600, , 10S 6 1 32.0
TTP-6P1-15-03-03-WI-004---Test Press 24bar
E 127.560M 2
N 11.581M
EBR:
EL +53.204M
1 no of DSS 6" Flange can not be available to provide the welding type of
test blind (Stainless Steel) for Hydro-Test
DSIC:
9
1 no of DSS 6"PSV
Flange should be installed at DSIC
to raise
267 MMTQ to1571
waive the hydro-test on this joint at DSIC with 100% NDT to
waive the hydro-test (Joint No. 7 golden joint)--Test Press 24bar)
17 2
B 240 MM 10X6"NS B
I-SP-6P1-WI-157113-01-003
578
MATL
LIB-INST-600
2 779
7 MATL S10
327 TOTAL FABRICATION WEIGHT 165.5
MPL-B5DN ORI = D
2 PS-6P1-157113-01
6
12X6"NS BP-12"-152x180
RP1-340-DS-6.3
12"NS 452 23 ERECTION MATERIALS
8 S4-12"-300-100-DS-100
4 FA 452 G3-12" PT COMPONENT DESCRIPTION N.B. ITEM CODE QTY (m/no.) WEIGHT (kg)
LL NO (INS)
89.4° 0.6 GUI GAP=3
° 10
EL +52.181M 5 80 HLD GAP=0
6 GUSSET FOR TWO DIRECTIONAL BRACING WITH RPAD 1 MPL-PRIM-SUPP-DS 1 1.1
C B7A-E-500-509 C
4
7 GASKET, , SPIRAL WOUND ASME B16.20, 4.5 MM THK 6 1 0.6
1 39
0 (3.175 MM THK SOLID RINGS), FLEXITALLIC TYPE
EL +52.170M "CGI", CL 600
I-SP-6P1-WI-157113-01-002 8 210 MM LONG, STUDBOLT, ZERON 100 FG, WITH 2 HEX 1 BSZ61BG1A210 12 1.1
312 HEAVY NUTS, ASME B18.2.1/B18.2.2, DEGREASED +
3 WHITFORD XYLAN 1014-GRAY
12X1"NS 9 PRESSURE SAFETY VALVE FLG 150RF x 600RF PSV 10X6 1 227.0
OLET DIR N 89.4271 D CONT. ON 1571 17
3
S6 6P1-14-WI-B5DN-157115 10 H=VAR; WELDED SHOE WITH RPAD 12 MPL-PRIM-SUPP-DS 1 15.4
PS-6P1-157113-100 60 E 128.017M
7 AND HOLD DOWN FOR SHOE (TYPE - VERTICAL
GT1-1"-DS 8/9 312 N 9.626M
FA CHANNEL)
10/11 0
LL0 60 EL +52.164M STRUCTURAL STEEL BRACKET B7A - BEAM
.6°
D 3 20 D
55
6
FR75b S-12b
CONT. ON BUILDING CL 1 BUILDING CL
2
SHT 2
TOTAL ERECTION WEIGHT 244.1
E 127.560M
N 10.237M 4 12"NS TOTAL WEIGHT 409.6
EL +51.858M
I-SP-6P1-WI-157113-01-001
LIST OF SPOOLS
457
E I-SP-6P1-WI-157113-01-001 I-SP-6P1-WI-157113-01-002 I-SP-6P1-WI-157113-01-003 E
2
HOLDS:
1.
2.
3.
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.
1 PIPE, EFSW ASTM A928 UNS S31803 CL.1 + 100% RT, 8 PAX13BBEN081S 0.9 M 17.9
ASME B36.19, BE, DS01 NACE, 10S
2 TEE EQUAL, WELDED ASTM A815 UNS S31803 WP-W + 14X14 TEX42DBWN1402 1 90.0
A 100% RT, ASME B16.9, BW, DS01 NACE, S20 A
3 TEE RED, WELDED ASTM A815 UNS S31803 WP-W + 14X12 TRX42DBWN14021202 1 95.0
100% RT, ASME B16.9, BW, DS01 NACE, S20 x S20
CONT. ON 4 REDUCER CONC, WELDED ASTM A815 UNS S31803 WP-W 14X8 RCX42DBWN1402081S 1 22.6
6P1-12-WI-B5DN-156133
CONT. ON + 100% RT, ASME B16.9, BW, DS01 NACE, S20 x 10S
E 121.613M
6P1-18-WI-B5DN-156137 5 COMPACT FLANGE, ASTM A182 GR F51, MANUF STD, 8 MODEC-0054 1 99.0
N 11.129M
E 121.622M HUB-TYPE, CL API 10000, , 10S
EL +52.164M
N 11.687M
EL +52.164M
279 2
6
14X14"NS
279
B 5
3 B
14X12"NS
279
CONT. ON
SHT 2 TP No.
270 S6
E 121.343M 1. TTP-6P1-15-03-01-WI-004---Test Press 24bar TOTAL FABRICATION WEIGHT 324.47
558 3
N 11.966M ORI=D
1
EL +52.164M SPS-6P1-156131-01 4
BP-8"-150x120 EBR:
330 4 27 2 ERECTION MATERIALS
6 RP2-440-DS-3.8 1 no of DSS 8" CF (C6X31CHTKKN081S0836) can not be available
S3-8"-400-DS to provide the welding type
PTof COMPONENT
test blind (Stainless Steel) for Hydro-Test
DESCRIPTION N.B. ITEM CODE QTY (m/no.) WEIGHT (kg)
G2-8" NO (INS)
GUI GAP=3 DSIC:
4 6 WELDED SHOE WITH RPAD 8 MPL-PRIM-SUPP-DS 1 12.0
C LS2A-8" 1 no of DSS 8" CF (C6X31CHTKKN081S0836) should be installed at DSIC C
14X8"NS WITH GUIDE FOR SHOE (TYPE - WT)
AXL GAP=3 to raise TQ to waive the hydro-test
ANDon this
LINE joint
STOP FIG.at DSIC
LS2A with
FOR SHOE100%
(TYPENDT
- WT) to
SPECIAL SECONDARY waive the hydro-test (Joint No. 1 golden joint)--Test
14 SPECIAL SECONDARY SUPPORTPress 24bar)
71
58
6 +1
80 8"N
S
1 5
D D
TACK WELD
CONT. ON
6P1-14-WI-K5DN-156113
E 121.343M
N 9.658M
EL +52.164M
TOTAL ERECTION WEIGHT 11.9
LIST OF SPOOLS
I-SP-6P1-WI-156131-01-011
HOLDS:
1.
2.
3.
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.
CLASS P.W.H.T.
10-STRESS ANALYSIS REPORT REFER 0468-SID20-9204-1001.
11-MTO FOR HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE AS PER PIPING STANDARD
NA NO
CONTRACT Nº: WT468-SCON-008 I-SM-6P1-WI-156131-01 1 5
0468-MI20-92S1-1500 AND RESPECTIVE PMS. 1 PART LIST NO THK (mm) _ STRESS CRITICAL 6P-WI-02
12-HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE SEAL WELDED AFTER HYDRO-TEST. ELECTRONIC FILE *.DWG:
13-REFER RESPECTIVE PIPE SUPPORT DRAWING FOR SPECIAL/SECONDARY SUPPORT. <1> PIPE SPOOL NO HEAT TRACED NO CHEMICAL CLEANING NO 0468-EBR20-92DL-0048=4 0468-EBR20-92DL-0048 4
A3-FORMAT
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FABRICATION MATERIALS
PIPE
41 1 PIPE, SEAMLESS ASTM A106 GR B, ASME B36.10, BE, CS01N 3/4 PAC11ABEN0CXS 20.05 M 44.11
18
NACE, XS
A FITTINGS A
2 ELBOW 90, SEAMLESS ASTM A234 GR WPB-S, ASME B16.9, 3/4 E9C41EBWN0CXS 7 1.40
FR R=1.5D, BW, CS01N NACE, XS
74 TP No. c 2
b 3 ELBOW 45, SEAMLESS ASTM A234 GR WPB-S, ASME B16.9, 3/4 E4C41EBWN0CXS 3 0.24
- 25 3 88.4°
TTP-6P1-15-03-04-WI-004---Test
36 Press 10.35bar
P R=1.5D, BW, CS01N NACE, XS
S5 14 EL +48486
ORI = W 88.4089 D EBR: FLANGES
CONT. ON
PS-6P1-158822-01 1 no of weld overlay 1" Flange can not be available
6P1-0.75-WI-G5DFN-158807
1 welding type of test blind
to provide the (Stainless Steel) for Hydro-Test
4 WELD OVERLAY FLANGE WN RF 2500# [TEMP.DATA] 3/4 SPF-158839 1 0.00
UB1B-0.75" E 122116 SPF-158839
FW
B1A-A-346 N 21031
DSIC:
686
15
I-SP-6P1-WI-158822-01-003 1 no of weld overlay 1" Flange shouldEL +51997at DSIC
be installed
to raise TQ to waive the hydro-test on this joint at DSIC with 100% NDT to
I-SP-6P1-WI-158822-01-004
68 the hydro-test (Joint No. 1 golden joint)--Test Press 24bar)
waive
10
1223
F4 :36
L1 68
2
SPF-158839 FAL PENETRATION AT TOS EL +47800mm
13
339
B 3 MATL
B
14
45° 12 9 SP-2500 S6
210
EL +48516 ORI = E
1
<6>1 1 3/4"NB SPS-6P1-158822-14
11 16
3 UB1B-0.75"
2 45° FW SPECIAL SECONDARY
89.4° EL +48522 1
273
2
EL +51708 2 89.4°
FALL 1:36 1 9
FW 14 EL +47262 13
TOTAL FABRICATION WEIGHT 45.42
10 17 8
I-SP-6P1-WI-158822-01-002 3
196
10
6 1 3 4 1
1
9 2 18 ERECTION MATERIALS
7 94
1
3161
20 1 S5
2 ORI = E 89.4271 D
I-SP-6P1-WI-158822-01-001 89.4° PS-6P1-158822-02
1730
EL +47239 UB1B-0.75"
B1A-A-482
21
I-SP-6P1-WI-158822-01-005
S5
ORI = S
PS-6P1-158822-03
3233
UB1B-0.75"
B1A-A-390
D D
I-SP-6P1-WI-158822-01-006
6038
S6
ORI = S
SPS-6P1-158822-04
3150
FW UB1B-0.75"
22 SPECIAL SECONDARY
3752+150
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.
CLASS NA P.W.H.T. NO
10-STRESS ANALYSIS REPORT REFER 0468-SID20-9204-1001.
11-MTO FOR HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE AS PER PIPING STANDARD CONTRACT Nº: WT468-SCON-008 I-SM-6P1-WI-158822-01 1 1
0468-MI20-92S1-1500 AND RESPECTIVE PMS. 1 PART LIST NO THK (mm) _ STRESS CRITICAL NA
12-HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE SEAL WELDED AFTER HYDRO-TEST. ELECTRONIC FILE *.DWG:
13-REFER RESPECTIVE PIPE SUPPORT DRAWING FOR SPECIAL/SECONDARY SUPPORT. <1> PIPE SPOOL NO HEAT TRACED NO CHEMICAL CLEANING NO 0468-EBR20-92DL-0177=0 0468-EBR20-92DL-0177 0
A3-FORMAT
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FABRICATION MATERIALS
1 PIPE, EFSW ASTM A928 UNS S31803 CL.1 + 100% RT, 14 PAX13ABEN1402 0.6 M 40.8
ASME B36.10, BE, DS01 NACE, S20
TP No. 2 PIPE, EFSW ASTM A928 UNS S31803 CL.1 + 100% RT, 8 PAX13BBEN081S 1.2 M 23.2
A TTP-6P1-15-03-02-WI-004---Test Press 24bar ASME B36.19, BE, DS01 NACE, 10S A
3 TEE EQUAL, WELDED ASTM A815 UNS S31803 WP-W + 14X14 TEX42DBWN1402 1 90.0
100% RT, ASME B16.9, BW, DS01 NACE, S20
EBR:
4 REDUCER CONC, WELDED ASTM A815 UNS S31803 WP-W 14X8 RCX42DBWN1402081S 1 22.6
1 no of DSS 8" CF (C6X31CHTKKN081S0836) can not be available
+ 100% RT, ASME B16.9, BW, DS01 NACE, S20 x 10S
to provide the welding type of test blind (Stainless Steel) for Hydro-Test
5 FLANGOLET, ASTM A182 GR F51, MSS SP-97, ASME 14X2 OFX31BRFBBN1402024S 1 6.0
B16.5, RF, CL 300, DS01 NACE, S20 x 40S
DSIC:
CONT. ON 6 FLANGE WN, ASTM A182 GR F51, ASME B16.5, RF, CL 14 FWX31ARFBBN1402 2 175.1
1 no of DSS 8" CF (C6X31CHTKKN081S0836) should be installed at DSIC
6P1-14-WI-K5DN-156506 300, DS01 NACE, S20
to raise TQ to waive the hydro-test on this joint at DSIC with 100% NDT to
E 124.554M 7 COMPACT FLANGE, ASTM A182 GR F51, MANUF STD, 8 C6X31CHTKKN081S0836 1 98.0
N 11.699M
waive the hydro-test (Joint No. 1 golden joint)--Test Press 24bar)
ORI = D HUB-TYPE, CL API 10000, , 10S
EL +52.164M SPS-6P1-156515-01
BP-8"-120x120 2 8 TEE RED, WELDED ASTM A815 UNS S31803 WP-W + 14X12 TRX42DBWN14021202 1 95.0
RP2-410-DS-3.8 100% RT, ASME B16.9, BW, DS01 NACE, S20 x S20
B TACK WELD S3-8"-370-DS B
G2-8"
GUI GAP=3
8"N 10 LS2A-8"
1 S 76 19
45 AXL GAP=3
SPECIAL SECONDARY 279
TOTAL FABRICATION WEIGHT 550.7
7
270 2
25
9
330 CONT. ON
2 3 ERECTION MATERIALS
2 6P1-12-WI-B5DN-156513
PT COMPONENT DESCRIPTION N.B. ITEM CODE QTY (m/no.) WEIGHT (kg)
E 124.824M NO (INS)
N 9.754M
4 EL +52.164M
4
C 14X8"NS 8 55 9 GASKET, UNS 31803 (ALL RINGS) WITH NON-ASBESTOS 14 GAX71PBB14 1 1.5
C
5 8
2 14X12"NS FILLER (E.G. GRAPHITE), SPIRAL WOUND ASME
B16.20, 4.5 MM THK (3.175 MM THK SOLID RINGS),
I-SP-6P1-WI-156515-01-001 32/33 FLEXITALLIC TYPE "CGI", CL 300
34/35 17
S12 10 185 MM LONG, STUDBOLT, ZERON 100 FG, WITH 2 HEX 1.1/8 BSZ61BG1B185 20 1.4
CONT. ON
PS-6P1-156515-100 6P1-14-WI-B5DN-156517 HEAVY NUTS, ASME B18.2.1/B18.2.2, DEGREASED +
CONT. ON GT1-2"-DS 22 60 WHITFORD XYLAN 1014-GRAY
0 422 E 124.976M
SHT 2 N 8.596M 11 WELDED SHOE WITH RPAD 14 MPL-PRIM-SUPP-DS 1 25.1
6
E 124.226M EL +52.164M AND GUIDE FOR SHOE (TYPE - I-BEAM)
N 9.196M 328 STRUCTURAL STEEL BRACKET B7A - BEAM
5
EL +52.164M 12 GUSSET FOR TWO DIRECTIONAL BRACING WITH RPAD 2 MPL-PRIM-SUPP-DS 1 1.1
14X2"NS 1
OLET DIR W 6
7
42
57 2
D S11 8 D
18
ORI = D
PS-6P1-156515-02
8
BP-14"-152x200 3
RP1-340-DS-7.9 14X14"NS 6 9 10
S3-14"-300-DS CONT. ON
G2-14" SHT 3
GUI GAP=3 E 124.554M
TOTAL ERECTION WEIGHT 29.1
B7A-D-600-483 N 8.171M
EL +52.164M TOTAL WEIGHT 579.8
2
LIST OF SPOOLS
HOLDS:
1.
2.
3.
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.
CLASS NA P.W.H.T. NO
10-STRESS ANALYSIS REPORT REFER 0468-SID20-9204-1001.
11-MTO FOR HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE AS PER PIPING STANDARD CONTRACT Nº: WT468-SCON-008 I-SM-6P1-WI-156515-01 1 3
0468-MI20-92S1-1500 AND RESPECTIVE PMS. 1 PART LIST NO THK (mm) _ STRESS CRITICAL 6P-WI-02
12-HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE SEAL WELDED AFTER HYDRO-TEST. ELECTRONIC FILE *.DWG:
13-REFER RESPECTIVE PIPE SUPPORT DRAWING FOR SPECIAL/SECONDARY SUPPORT. <1> PIPE SPOOL NO HEAT TRACED NO CHEMICAL CLEANING NO 0468-EBR20-92DL-0049=2 0468-EBR20-92DL-0049 2
A3-FORMAT
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FABRICATION MATERIALS
1 PIPE, EFSW ASTM A928 UNS S31803 CL.1 + 100% RT, 8 PAX13BBEN081S 1.3 M 24.6
ASME B36.19, BE, DS01 NACE, 10S
2 COMPACT FLANGE, ASTM A182 GR F51, MANUF STD, 8 C6X31CHTKKN081S0836 1 99.0
A HUB-TYPE, CL API 10000, , 10S A
TP No. 1
TTP-6P1-15-03-03-WI-004---Test Press 24bar
EBR:
1 no of DSS 8" CF (C6X31CHTKKN081S0836) can not be available
to provide the welding type of test blind (Stainless Steel) for Hydro-Test
DSIC:
1 no of DSS 8" CF (C6X31CHTKKN081S0836) should be installed at DSIC
to raise TQ to waive the hydro-test on this joint at DSIC with 100% NDT to
waive the hydro-test (Joint No. 1 golden joint)--Test Press 24bar)
I-SP-6P1-WI-157115-01-006
B B
CONT. ON
6P1-14-WI-K5DN-157106 1
TOTAL FABRICATION WEIGHT 123.6
E 128.287M
N 11.632M 2
EL +52.164M
8"N ERECTION MATERIALS
S
10 PT COMPONENT DESCRIPTION N.B. ITEM CODE QTY (m/no.) WEIGHT (kg)
09 NO (INS)
1
3 WELDED SHOE WITH RPAD 8 MPL-PRIM-SUPP-DS 1 10.6
C I-SP-6P1-WI-157115-01-001 WITH GUIDE FOR SHOE (TYPE - WT) C
AND LINE STOP FIG. LS2A FOR SHOE (TYPE - WT)
SPECIAL SECONDARY SUPPORT
S3 2
SPS-6P1-157115-01 38
BP-8"-100x120 8
RP1-390-DS-3.8
D S3-8"-350-DS 1 D
G2-8"
8"N
GUI GAP=3 S
LS2A-8"
AXL GAP=3
SPECIAL SECONDARY CONT. ON
SHT 2
E 128.287M
TOTAL ERECTION WEIGHT 10.6
N 10.235M
EL +52.164M TOTAL WEIGHT 134.2
LIST OF SPOOLS
HOLDS:
1.
2.
3.
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.
CLASS NA P.W.H.T. NO
10-STRESS ANALYSIS REPORT REFER 0468-SID20-9204-1001.
11-MTO FOR HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE AS PER PIPING STANDARD CONTRACT Nº: WT468-SCON-008 I-SM-6P1-WI-157115-01 1 4
0468-MI20-92S1-1500 AND RESPECTIVE PMS. 1 PART LIST NO THK (mm) _ STRESS CRITICAL 6P-WI-02
12-HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE SEAL WELDED AFTER HYDRO-TEST. ELECTRONIC FILE *.DWG:
13-REFER RESPECTIVE PIPE SUPPORT DRAWING FOR SPECIAL/SECONDARY SUPPORT. <1> PIPE SPOOL NO HEAT TRACED NO CHEMICAL CLEANING NO 0468-EBR20-92DL-0051=1 0468-EBR20-92DL-0051 1
A3-FORMAT
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FABRICATION MATERIALS
1 PIPE, SEAMLESS ASTM B466 C70600 ANNEALED, EEMUA 3 PAA11CBEA0372 2.5 M 14.7
PUB 144:1, BE, CUNI, 2.5MM
2 FLANGOLET, 90/10 CUNI UNS 7060X, MSS SP-97, 3X1 OFA31BFFAAA03720D72 1 1.7
A ASME B16.5, FF, CL 150, CUNI, 2.5MM x 2.5MM A
3 ELBOW 90, SEAMLESS 90/10 CUNI UNS 7060X, EEMUA 3 E9A41MBWA0372 2 2.5
PUB 146:1, R=1.5D, BW, CUNI, 2.5MM
P-18a
BUILDING CL
39
5
114
CONT. ON
3"NS
6P1-04-FW-N8-510010
B E 132.458M B
N 16.089M
EL +49.150M 14 3
37
8 2
TTP-6P1-51-01-06-FW-001 test pressure 24bar
TOTAL FABRICATION WEIGHT 18.9
FR76b
EBR:
BUILDING CL
1 no of 1" Flangeoltet can not be available
to provide the welding type of test blind (Stainless Steel) for Hydro-Test ERECTION MATERIALS
1889
PT COMPONENT DESCRIPTION N.B. ITEM CODE QTY (m/no.) WEIGHT (kg)
I-SP-6P1-FW-523158-01-001 DSIC: NO (INS)
1 no of 1" Flangeoltet should be installed at DSIC
to raise TQ to waive the hydro-test on this joint at DSIC with 100% NDT to 4 GASKET, LEAKBLOK P200 OR EQUIVALENT, FULL FACE 1 GAQ78LAA0D 1 0.1
C 1 C
ASME B16.21, 3.0 MM THK, CL 150
waive the hydro-test (Joint No. 1 golden joint)--Test Press 24bar)
5 70 MM LONG, STUDBOLT, ASTM A320 GR B8M CL.2 / 1/2 BSL63BZ0E070 4 0.2
ASTM A 194 GR 8M, WITH 2 HEX HEAVY NUTS, ASME
71
4 B18.2.1/B18.2.2, DEGREASED + WHITFRD XYLAN
3
1014-RED
374 34 6 FLANGE BLIND COMPOSITE, 90/10 CUNI UNS 7060X, 1
HOLD-1
1 1.4
0
3 EEMUA PUB 145:3, FF, CL 150,
EL +47.261M 4 7 U-BOLT TICO NON-GRIP TYPE 3 MPL-PRIM-SUPP-CN 1 1.0
STRUCTURAL STEEL BRACKET CANTILEVER B1A - ANGLE
S7
16
ORI = D 8 8 CONT. ON
PS-6P1-523158-05 45 SHT 2
UB2B-3" E 132.458M
B1A-A-504 6 N 15.093M
D 1 EL +47.261M D
E 132.458M
N 15.261M 194 3"N
S
EL +47.064M
2
2
3X1"NS
OLET DIR D
TOTAL ERECTION WEIGHT 2.4
LIST OF SPOOLS
HOLDS:
1. ITEM CODE
2. ITEM CODE
3.
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.
CLASS P.W.H.T.
10-STRESS ANALYSIS REPORT REFER 0468-SID20-9204-1001.
11-MTO FOR HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE AS PER PIPING STANDARD
NA NO
CONTRACT Nº: WT468-SCON-008 I-SM-6P1-FW-523158-01 1 2
0468-MI20-92S1-1500 AND RESPECTIVE PMS. 1 PART LIST NO THK (mm) _ STRESS CRITICAL NA
12-HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE SEAL WELDED AFTER HYDRO-TEST. ELECTRONIC FILE *.DWG:
13-REFER RESPECTIVE PIPE SUPPORT DRAWING FOR SPECIAL/SECONDARY SUPPORT. <1> PIPE SPOOL NO HEAT TRACED NO CHEMICAL CLEANING NO 0468-EBR20-92DL-0155=2 0468-EBR20-92DL-0155 2
A3-FORMAT
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FABRICATION MATERIALS
1 PIPE, SEAMLESS ASTM A106 GR B, ASME B36.10, BE, 2 PAC11ABEN02XS 1.7 M 12.1
CS01N NACE, XS
2 ELBOW 90, SEAMLESS ASTM A234 GR WPB-S, ASME 2 E9C41EBWN02XS 2 1.9
A B16.9, R=1.5D, BW, CS01N NACE, XS A
3 WELD OVERLAY FLANGE WN RF 300# [TEMP.DATA] 2 SPF-157813 1 -
SPF-157813(GENERIC)
1
TP No.
TTP-6P1-34-01-01-DC-001---Test Press 10.35bar
EBR:
1 no of weld overlay 2" Flange can not be available to provide the
welding type of test blind (Stainless Steel) for Hydro-Test
CONT. ON
DSIC:6P1-02-WI-B5DN-157816
1 no of weld overlay 2" Flange should be installed at DSIC
E 127.446M
to raise TQ to waive the hydro-test on this joint at DSIC with 100% NDT to
waiveNthe6.257M
hydro-test (Joint No. 1 golden joint )--Test Press 24bar)
EL +48.018M
B 0 3 B
34
11
2 1 70
7
I-SP-6P1-DC-157818-01-001
2
TOTAL FABRICATION WEIGHT 13.9
FR
75 146
BU b
ILD 14
IN 2"NS 7 ERECTION MATERIALS
G
CL
PT COMPONENT DESCRIPTION N.B. ITEM CODE QTY (m/no.) WEIGHT (kg)
1 S-06a NO (INS)
MATL MATL BUILDING CL
SP-300 4 U-BOLT TICO NON-GRIP TYPE 2 MPL-PRIM-SUPP-CS 1 0.6
C MPL-A2N C
11 3 SPECIAL SECONDARY SUPPORT
1
2
S4 25
8 FW
SPS-6P1-157818-01
UB1B-2" 4
SPECIAL SECONDARY
76
I-SP-6P1-DC-157818-01-002
143
PENETRATION AT TOS EL+47800
D D
1582
2"NS
1363
1
5 TOTAL ERECTION WEIGHT 0.5
FW CONT. ON
TOTAL WEIGHT 14.5
6P1-02-DC-A2N-157821
E 127.300M
N 5.999M
EL +46.437M LIST OF SPOOLS
E I-SP-6P1-DC-157818-01-001 I-SP-6P1-DC-157818-01-002 E
HOLDS:
1.
2.
3.
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.
CLASS NA P.W.H.T. NO
10-STRESS ANALYSIS REPORT REFER 0468-SID20-9204-1001.
11-MTO FOR HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE AS PER PIPING STANDARD CONTRACT Nº: WT468-SCON-008 I-SM-6P1-DC-157818-01 1 1
0468-MI20-92S1-1500 AND RESPECTIVE PMS. 1 PART LIST NO THK (mm) _ STRESS CRITICAL NA
12-HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE SEAL WELDED AFTER HYDRO-TEST. ELECTRONIC FILE *.DWG:
13-REFER RESPECTIVE PIPE SUPPORT DRAWING FOR SPECIAL/SECONDARY SUPPORT. <1> PIPE SPOOL NO HEAT TRACED NO CHEMICAL CLEANING NO 0468-EBR20-92DL-0160=1 0468-EBR20-92DL-0160 1
A3-FORMAT
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FABRICATION MATERIALS
191
B B
991
ORI = D
PS-6P1-157821-01
2
724
4 4 BP-2"-100x80
FW I-SP-6P1-DC-157821-01-002 S2A-2"-300-100-CS-100
ERECTION MATERIALS
89.4°
3
EL +47.016M G3-2" PT COMPONENT DESCRIPTION N.B. ITEM CODE QTY (m/no.) WEIGHT (kg)
GUI GAP=3 NO (INS)
20
0 HLD GAP=3
14 6 H=VAR; WELDED SHOE 4 MPL-PRIM-SUPP-CS 1 4.8
C 79 B8D-C-403-558 WITH GUIDE FOR SHOE (TYPE - ANGLE) C
76 STRUCTURAL STEEL BRACKET CANTILEVER B1A - ANGLE
12 7 H=VAR; WELDED SHOE 2 MPL-PRIM-SUPP-CS 1 4.2
5 79
2 I-SP-6P1-DC-157821-01-003 WITH HOLD DOWN FOR SHOE (TYPE - ANGLE)
FALL 0.6°
6 FW STRUCTURAL STEEL BRACKET B8D - ANGLE
CONT. ON 1
SHT 2
4 E 124.617M
7 89.4° 1 N 5.999M
3 EL +47.001M S EL +46.422M
4"N
4X2"NS
2
27MM OFFSET 11 99
° 27
FLAT E 88.41 U 1.6
443
L L
D 8
FA D
FW
0
10 96
4
88.4°
EL +46.558M 74
S6
ORI = D
102 PS-6P1-157821-02 TOTAL ERECTION WEIGHT 8.9
BP-4"-100x80
9 93.1
S2A-4"-300-100-CS-36 TOTAL WEIGHT
G2-4"
GUI GAP=3
B1A-B-459 LIST OF SPOOLS
HOLDS:
1.
2.
3.
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.
1 PIPE, SEAMLESS ASTM A106 GR B, ASME B36.10, BE, 2 PAC11ABEN02XS 2.8 M 20.5
CS01N NACE, XS
2 ELBOW 90, SEAMLESS ASTM A234 GR WPB-S, ASME 2 E9C41EBWN02XS 4 3.8
A TP No. B16.9, R=1.5D, BW, CS01N NACE, XS A
TTP-6P1-34-01-01-DC-001---Test Press 10.35bar
3 WELD OVERLAY FLANGE WN RF 300# [TEMP.DATA] 2 SPF-157907 1 -
EBR: SPF-157907(GENERIC)
1 no of weld overlay 2" Flange can not be available to provide the welding 1
type of test blind (Stainless Steel) for Hydro-Test
DSIC:
MATL 147 2"NS 1 no of weld overlay 2" Flange should be installed at DSIC
to raise TQ to waive the hydro-test on this joint at DSIC with 100% NDT to
MATL MPL-A2N waive the hydro-test (Joint No. 1 golden joint )--Test Press 24bar)
SP-300 2
FR
3 75
95 33 b
2 18 BU
ILD
IN
B CONT. ON G B
1 CL
6P1-02-WI-B5DN-157916
E 124.980M
N 7.365M
EL +48.006M P-08a
206
BUILDING CL
TOTAL FABRICATION WEIGHT 24.2
I-SP-6P1-DC-157918-01-001
643
ERECTION MATERIALS
PENETRATION AT TOS EL+47800
PT COMPONENT DESCRIPTION N.B. ITEM CODE QTY (m/no.) WEIGHT (kg)
NO (INS)
1
361
3 76
40 4
2
EL +47.363M
1
5
66
7
13
66
76
2 6
62
4
D D
1
FW
I-SP-6P1-DC-157918-01-002
7 2
S4 8
PS-6P1-157918-01
855
I-SP-6P1-DC-157918-01-003
CONT. ON LIST OF SPOOLS
9 FW 6P1-02-DC-A2N-157821
E I-SP-6P1-DC-157918-01-001 I-SP-6P1-DC-157918-01-002 I-SP-6P1-DC-157918-01-003 E
E 124.724M
N 5.999M
EL +46.508M
HOLDS:
1.
2.
3.
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.
CLASS NA P.W.H.T. NO
10-STRESS ANALYSIS REPORT REFER 0468-SID20-9204-1001.
11-MTO FOR HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE AS PER PIPING STANDARD CONTRACT Nº: WT468-SCON-008 I-SM-6P1-DC-157918-01 1 1
0468-MI20-92S1-1500 AND RESPECTIVE PMS. 1 PART LIST NO THK (mm) _ STRESS CRITICAL NA
12-HYDROSTATIC DRAIN/VENT (NON VALVED) SHALL BE SEAL WELDED AFTER HYDRO-TEST. ELECTRONIC FILE *.DWG:
13-REFER RESPECTIVE PIPE SUPPORT DRAWING FOR SPECIAL/SECONDARY SUPPORT. <1> PIPE SPOOL NO HEAT TRACED NO CHEMICAL CLEANING NO 0468-EBR20-92DL-0162=1 0468-EBR20-92DL-0162 1
A3-FORMAT
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FABRICATION MATERIALS
1 PIPE, SEAMLESS ASTM B466 C70600 ANNEALED, EEMUA 4 PAA11CBEA0473 8.65 M 75.71
PUB 144:1, BE, CUNI, 3.0MM
2 PIPE, SEAMLESS ASTM B466 C70600 ANNEALED, EEMUA 3 PAA11CBEA0372 1.6 M 9.3
A PUB 144:1, BE, CUNI, 2.5MM A
3 TEE RED, SEAMLESS 90/10 CUNI UNS 7060X, EEMUA 4X3 TRA41LBWA04730372 3 6.4
PUB 146:1, BW, CUNI, 3.0MM x 2.5MM
4 REDUCER CONC, SEAMLESS 90/10 CUNI UNS 7060X, 4X3 RCA41LBWA04730372 1 0.8
EL +53.779M 5 ELBOW 90, SEAMLESS 90/10 CUNI UNS 7060X, EEMUA 4 E9A41MBWA0473 1 2.1
PUB 146:1, R=1.5D, BW, CUNI, 3.0MM
S7
152 6 ELBOW 90, SEAMLESS 90/10 CUNI UNS 7060X, EEMUA 3 E9A41MBWA0372 2 2.5
ORI = D
I-SP-6P1-FW-510010-01-003 SPS-6P1-510010-06
PUB 146:1, R=1.5D, BW, CUNI, 2.5MM
5 BP-4"-100x80
CP2-1-4"
4 6
S5-4"-300-CN
G3-4"
40
B FW 0 GUI GAP=3 B
HLD GAP=3
SPECIAL SECONDARY
S7 98
35
1
ORI = D 00 7
FW
SPS-6P1-510010-05 3
45 CONT. ON
3244
6P1-03-FW-N8-523160
CP2-1-4" 8 E 132.556M
S5-4"-300-CN 53 N 11.648M
4
G3-4" 9 EL +53.779M
4 ERECTION MATERIALS
GUI GAP=3
4X3"NS
HLD GAP=3 PT COMPONENT DESCRIPTION N.B. ITEM CODE QTY (m/no.) WEIGHT (kg)
105
SPECIAL SECONDARY I-SP-6P1-FW-510010-01-002 102 NO (INS)
10
7 CLAMP FIG. CP2 WITH SHOE 4 MPL-PRIM-SUPP-CN 2 21.3
C 98 C
AND HOLD DOWN FOR SHOE (TYPE - ANGLE)
105 SPECIAL SECONDARY SUPPORT
3
14 12 2 8 U-BOLT TICO NON-GRIP TYPE 3 MPL-PRIM-SUPP-CN 1 1.0
25 18
105
3 I-SP-6P1-FW-510010-01-004 11 STRUCTURAL STEEL BRACKET CANTILEVER B1A - ANGLE
4X3"NS 6
2 EL +50.536M
CONT. ON 12
1385+150
6P1-03-FW-N8-523159
FW 8
E 132.458M 37
1
1280+150
FW N 16.089M CONT. ON 2
14
EL +50.536M SHT 2 2
E 131.796M 114 66
N 10.223M
13
284
D EL +53.893M S8 D
ORI = D
PS-6P1-510010-04
6 3"NS UB2B-3"
I-SP-6P1-FW-510010-01-001
B1A-A-271
98 TP No.
TTP-6P1-51-01-06-FW-001---Test Press 24bar
1
9-ALL LOW POINT DRAIN AND HIGH POINT VENTS HAVE BEEN CONSIDERED IN PIPE ROUTING.
INSULATED PIPE SOP / SSOP: -
HOWEVER SOME EXTRA HYDRO TEST DRAIN/VENT(NON-VALVED) MAY BE REQUIRED AS PER HYDRO
TEST PACKAGE, THOSE SHALL BE PROVIDED AND MTO SHALL ALSO BE ARRANGED BY FABRICATOR
MEDIUM FRESH WATER DATA GENERAL SPOOLMAP
AS PER PIPING STANDARD 0468-MI20-92S1-1500 AND RESPECTIVE PMS. TRACED PIPE STH: -
INSUL.