FGDmax 2,440 km3N/H
SCRmax 1,620 km3N/H
Deane.
Water
KHI
Treatment
Unloadermax 2500 T/H
Stacker max 2600 T/H
Reclaimedmax 5300 T/H
Coal Conveyormax 3000 T/H
FW
Tank
Conde
nser
FW Heater
Deane.
FW
Pump
BFW Pump
Turbine
Gen.
Stack
DeNOx
Coal Bunker
ESP
Boiler
Unloader
Feeder
Loader
Stacker
Coal Carrier
Reclaimed
GAH
FDF
Coal Mill
EarthTechnica
BA Silo
FO Tank
FO Pump
IDF
Fine Bin
FGD
KHI
Coarse
Bin Heightmax. 230
KHI
Domestic share: 90%
SCCmax 1.9t/h
MACmax 23t/h
Ash Silo
Ship
Loader
Ship
Capacity Coverage
Type
Application
Max Capacity
One-through Boiler
Drum
Boiler
Hanging Type
STEAM DRUM
SCW
1SH
ECO
3ry air
2ry air
3ry air
2ry air
Dense PC
Lean PC
Swirler
Stable Ignition
Pri. air
+
Pulverized.coal
2ry air
3ry air
-High grindability
-Low abrasively
-Low running cost
-Stable operation at load
fluctuation
-Low noise and vibration
-Required small space
-Easy maintenance
Nos.
Of
Unit
Evaporation
t/h
Boiler Specification
Pressure
Temp.
MPaG
Turbine specification
Delivery
Year
Okayama
66
7.16
485
1985
Ishikawa
490
19.12
569/569
1986
Kushiro
380
13.63
553
1986
Aichi
200
12.75
540
1987
Fushiki
150
13.63
553
1989
Nichiha Corporation
Nagoya
100
9.81
528
1994
Gushikawa
520
17.26
569/541
1994
Kushiro
260
14.71
569/541
2004
Memuro
170
6.08
483
2004
Yokkaichi
200
12.74
540
2005
Bihoro
80
8.14
473
2005
Philippine
Mindanao
370
16.82/14.02
541/541
2006
Gotsu
105
6.86
465
2008
Hokuren Federation of
Agricultural Coop
PT. Semen Tonasa
Nakashari
145
8.53
503
2010
Indonesia
144
9.0
513
2013
Indonesia
240
5.5
487
2015
Installation (1)
Electric Power Development Corp./ Ishikawa
Steam Generation
490 t/h
Steam Pressure
205 / 195 kgf/cm2G
20.3/19 MPa
Steam Temperature 569/569
Fuel
Coal
Operation Start
1986
Coal Fired one-through sub-critical
pressure boiler installed in a small island
Installation (2)
Okinawa Electric Power Corp./ Gushikawa
Steam Generation 520t/h
Steam Pressure
176 kgf/cm2G
17.5 MPa
Steam Temperature 569 / 541
Unit Capacity
156 MW
Fuel
Coal
Operation Start
1994
10
Installation (4)
Ishihara Sangyo Kaisha / Yokkaichi
Steam Generation
Steam Pressure
Steam Temperature
Feed Water Temp.
Fuel
Emission regulation
NOx
SOx
Particulate
Operation Start
: 200 t/h
: 12.7 MPa ( 130 kg/cm2g)
: 540
: 195
: Coal ,Heavy Oil
:
: 30 ppm (with SCR)
: FGD Efficiency 97%
: 40 mg/m3N
: 2005
11
Installation (5)
Nippon Beet Sugar mfg. / Memuro
Steam Generation
Steam Pressure
Steam Temperature
Turbine
Operation Start
: 170 t/h
: 62 kgf/cm2G
: 483
: 15,000 kW
: October 2004
12
:
:
:
:
:
80 t/h
8.14 MPa (83 kg/cm2g)
473
Coal, Heavy Oil
October 2005
13
Installation (7)
STEAG-STATE Power Inc. /Mindanao, Philippine
Power output
Steam generation
Steam pressure
Steam temperature
Fuel
Operation start
:
:
:
:
:
:
210 MW
370 t/h2units
171.5 cg
541/541
Coal, FO
2006
14
Installation (8)
Nippon Paper Chemicals / Gotsu
Steam Generation 105 t/h
Steam Pressure
70 kgf/cm2G
6.86 MPa
Steam Temperature 465
Fuel
Coal, Heavy Oil
Operation Start
2008
Typical small sized PC Boiler for papermanufacturing company.
15
Installation (9)
16
Steam Pressure
Steam Temperature
Power Output
Fuel
Operation Start
17
18