PART IV
PREAMBLES TO THE BILL OF QUANTITIES
[Applicable to Options B and D]
GENERAL PREAMBLES
Method of
Measurement
1.
This bill of quantities has been prepared in accordance with the procedures
set forth in the Standard Method of Measurement for Civil Engineering
Works, 1992 Edition (The Government of the Hong Kong Special
Administrative Region), hereinafter referred to as the Method of
Measurement. [For building and E&M contracts, please amend to suit.]
General directions
2.
Items shown in the bills of the bill of quantities are items of work. In this bill
of quantities and the Method of Measurement, the headings, sub-headings,
item descriptions and the matters listed against the relevant marginal
headings Item coverage in Part V of the Method of Measurement and the
Particular Preambles identify the work covered by the respective items, but
such descriptions or identifications may not be exhaustive. The exact
nature and extent of an item of work must be ascertained by reference to
the Drawings, Specification and conditions of contract, as not all
requirements may be stated in the item description or its item coverage.
Furthermore, whilst the item description and item coverage may make
specific reference to certain Drawings and/or Specification, the item of work
described is deemed to include for all requirements shown on all Drawings
and/or Specification pertaining to that item of work irrespective of whether
or not the Drawing and/or Specification is stated in the item description or
item coverage. The item description of an item of work shall be deemed to
include an item coverage for the carrying out of all work and services
necessary or desirable for the satisfactory completion of such item of work
in accordance with this contract.
The rate inserted against an item of work in the bills within the bill of
quantities shall be deemed to be the full inclusive value of executing,
completing, maintaining and/or supplying such item of work including any
incidental work, services and actions thereto, unless expressly stated
otherwise elsewhere in the bill of quantities. The expression incidental
work, services and actions includes, but is not limited to, the carrying out of
all work, services and actions and complying with all obligations which are
specified or reasonably implied in this contract and which are related to,
arise out of or are connected with the item of work as described in its
headings, sub-headings, item description and item coverage. The rates
inserted against the items of work in the bills within the bill of quantities
shall include, but are not limited to, the following :
(i)
(ii)
(iii)
-1-
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
(xi)
(xii)
(xiii)
(xiv)
(xv)
carrying out trial mixes, trial runs and all other trials,
demonstrations and mock-ups;
(xvi)
(xvii)
(xviii)
(xix)
(xx)
-2-
Measurement
3.
The measurement of work shall be computed net from the Drawings unless
stated otherwise in the Method of Measurement.
Item coverage
4.
If any item coverage includes reference to work which is the subject of item
coverages elsewhere in the Method of Measurement, then the combined
item coverages shall apply.
Use of alternative 5.
Plant and Materials
or designs
Unpriced items
6.
7.
Not used
8.
Not used
9.
Not used
10.
Not used
Except for those tests provided for as separate items of work in the bills
within the bill of quantities, the rates contained in this contract shall be
deemed to include for the cost, overheads and profit of carrying out all tests
on Plant and Materials and workmanship specified in this contract,
including but not limited to, the cost, overheads and profit of packing and
transport required for delivering samples to and collecting from the place of
testing.
Discrepancy
12.
between the units
of measurement
given in the
Method of
Measurement and
the bills
-3-
PARTICULAR PREAMBLES
Amendments
to the Method
of Measurement
1.
Part I:
Definitions
2.
Paragraphs 1(b) and 1(c) of Part I is deleted in its entirety and is replaced
by NOT USED.
Part III:
3.
Rules for Preparing
bill of quantities
4.
Abbreviation
nr-wk
nr-mth
-4-
Part IV:
Preambles to the
bill of quantities
5.
The following is added after paragraph 2(i) and before paragraph 2(ii) of
Part IV :
(i)A
6.
8.
7.
The following are added after paragraph 2(xxii) of Part IV: [Please
amend as appropriate.]
(xxiii) use of mechanical covers for dump trucks as specified in Clause
[Insert appropriate reference] of the Particular Specification (PS);
(xxiv) testing of the works including site acceptance tests, factory
acceptance tests, tests of individual systems of the works and
completion tests of the works, and the associated cost for the
Supervisors inspection of all such tests;
(xxv)
9.
10.
Precedence of
Particular
Preambles and
Part V of the
Method of
Measurement
13.
Standard drawings
14.
Terminology
reference
15.
Part V:
Units and Method
of Measurement
11.
Materials
Equipment
Defect