General Clearance 68
Removal of Trees 24
Removal of Palm Trees 40
Demolition of kerbs 6,140
Removal of existing interlock tile paving 4,900
Removal of existing guide sign structure 6
Removal of existing Concrete Barrier 400
Removal of Guard Rail 12,100
Removal of signs 31
Removal of advertisement board 80
Removal of Fences 13,750
Removal of Fences gate 14
Removal of survey monuments 20
Removal of Grass 1,000
Removal of flag post 2
Removal of stone pitching 200
Removal of existing foundations 8
Removal of existing camera 7
Removal of Brickwall 100
Removal of Signal System Removal 42
Removal of existing Ducts & Fittings 700
5 Part 4 - Earthworks
REV-03
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK LIST OF PRINCIPAL QUANTITIES
a
Concrete 72,716
Reinforcement 15,608
Form Work 92,010
Excavation 23,939
Filling 7,803
Replaceble pot bearings 244
Voids in Bridge Decks 9,564
Pile 1200mm 829
Pile 2000mm 16
Bridge Barrier (Single Face) 8,547
Tanking self adhesive waterproofing membrane to buried concrete 25,610
Rev - 01 NTT - 04
Protection to waterproofing membrane not less than 6mm thick 21,538
Sheet linings membrane 6,803
Bituminous Asphaltic concrete wearing course 50mm thick 54,702
Access Doors 900x900mm 544
Access Doors 1200x1200mm 20
REV-02
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK LIST OF PRINCIPAL QUANTITIES
a
Excavation 4,050
Filling 3,812
Concrete In-situ 2,987
Reinforced soil wall 30,626
Bridge Barrier (Single Face) 6,979
Reinforcement 395
Tanking self adhesive waterproofing membrane to buried concrete 18,253
Protection to waterproofing membrane not less than 6mm thick 9,709
Form Work 10,943
Concrete 3,636
Reinforcement 724
Form Work 4,834
Excavation 376
Filling 18
Pile 1200mm 36
Bridge Barrier (Single Face) 177
Tanking self adhesive waterproofing membrane to buried concrete 4,068
Protection to waterproofing membrane not less than 6mm thick 1,976
Sheet linings membrane 1,781
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK LIST OF PRINCIPAL QUANTITIES
a
Rev - 01 NTT - 04
Supply and lay GRP Pipes 685
Fittings 29
Valves 7
uPVC Duct 2305
Extension of existing uPVC ducts (in trench) 390
Connection to Manhole and Ducts 11
NDRC 50
Concrete Thurst Blocks 29
Rev - 01 NTT - 04
PAGE Nr.
a/1
UNIT
nr
nr
ha
nr
nr
m
m2
nr
m
m
nr
m
m
nr
nr
m2
nr
m2
nr
nr
m
nr
m
m3
m3
m3
m3
m2
m2
m3
m3
m2
m3
Rev - 01 NTT - 04
nr
m3
NTT-06
PAGE Nr.
a/2
UNIT
nr
nr
nr
m²
m²
m²
m²
m²
m
m²
nr
m²
nr
m²
m
m
m
m²
m²
m
m³
t
m²
m³
m³
nr
m
nr
nr
m
m²
Rev - 01 NTT - 04
m²
m²
m²
nr
nr
NTT-05
PAGE Nr.
a/3
UNIT
m³
m³
m³
m²
m
t
m²
m²
m²
m³
t
m²
m³
m³
nr
m
m²
m²
m²
m
nr
m
m
nr
nr
m
nr
nr
m
m
Rev - 01 NTT - 04
nr
nr
PAGE Nr.
a/4
UNIT
m
m
m
m
m
m
m
m
nr
m
m
m
nr
m
nr
m
m
nr
nr
m
m
nr
nr
Rev - 01 NTT - 04
m
nr
nr
m
m
nr
m
nr
m
m
m
nr
m
nr
m
m
nr
nr
m
nr
PAGE Nr.
a/5
UNIT
nr
nr
m
nr
m
nr
m
m
m
m
nr
nr
nr
nr
nr
nr
m
m
nr
nr
nr
Rev - 01 NTT - 04
nr
m
m
m
m
nr
m
m
nr
nr
m
m
m
m
Rev - 01 NTT - 04
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION
A Generally
Daywork will be administered strictly in accordance with the Conditions of Contract, Clause 13.6
The Contractor will be paid for Daywork carried out during the course of the contract while other operations are in
progress at the rates set down in this schedule. Profit and overheads are not to be included in the actual rates but
stated as percentage addition in the item provided for same at the end of the labour, Material and Plant Sections of
this Schedule of Rates. The percentage addition should not only be for "Profit and Overheads" but also for specific
procurement for Daywork requirements.
Time engaged in the actual works only will be allowed. In the event of labour or plant having to be brought
to site especially for the item of Daywork then a reasonable allowance may be made for travelling time, but
the allowance for travelling time is to be agreed before the Daywork item is executed.
The Quantities stated in the daywork schedule 1, 2 and 3 are estimated and may be encountered totally, or part or
not at all as Engineer may direct.
No work carried out on a Daywork basis will be measured unless, before starting work, the Contractor has obtained
the written approval of the Engineer.
The Daywork rates quoted for labour are to be the inclusive NETT amounts payable including for use and
waste of hand tools and of all ordinary non-mechanical plant, stagings, scaffolding, tarpaulin, use of
electrical light and water for the works, etc. and all special inducements for working in Dubai. The rates shall also
be deemed to include the extra cost of public holidays other holidays with pay, medical costs, bonus, sick leave,
termination indemnity pay and the like. Unless specifically authorised in writing by the Engineer,
non-productive overtime or special rates for overtime will not be admissible. The cost of all supervisory staff
including engineers, foremen, charge hands, clerks, storemen and other supportive staff etc., is to be included
in percentage addition for Labour
Materials used on Daywork shall be as specified for the Work. The rates are to include delivery to the site. Should
materials be required for use on Daywork which are not included in the Schedule, the lowest current Nett
market prices shall apply, plus a reasonable allowance for collecting, loading and off loading and transporting to
the Work.
Plant hire rates shall include for the cost of maintaining in proper working order, attendance in starting up and
shutting down, refueling and all fuel power, oils grease and cleaning materials, replacement and/or sharpening
of tools, provision of tools and all other ancillary items including consumable spares. Idle time in maintenance or
travelling to the Site will not be allowed.
Drivers and attendants shall be charged for at the rates as laid down for Labour.
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION
1. Dayworks carried out based on Hourly; the hourly rate priced in Tender shall be applicable maximum upto 8 hours
per day
2. Dayworks continued beyond 8 hours the hourly rate to be 80% of the hourly rate priced in Tender shall be applicable
maximum upto 6 days
3. Dayworks continued beyond 6 hours the hourly rate to be 60% of the hourly rate priced in Tender shall be applicable
maximum upto One Month
4. Dayworks record for labour, plant & material to be recorded on the same day and obtain the signature by the
concerned RMS Engineer
5. Any adjustment item % in Grand Summary of the BOQ will be applicable to the priced Day Work rates in the
Tender at the execution stage.
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE
Schedule 1: Labour
A Labourer h 640
B Banksman/Greaser h 320
C Carpenter h 160
L Welder h 160
M Jointer h 180
N Painter h 160
P Electrician h 240
Q Plumber h 160
Carried to Part Summary Dhs.
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE
Schedule 2: Materials
S Softwood, treated m3 4
T Bitumen 60/70 t 20
U Bitumen 40/50 t 20
AA O.P. Cement t 10
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE
A M.S.R. Cement t 10
B S.R. Cement t 10
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE
E Geotextile m2 20
M Mooring rings nr 10
N Bollards; capacity : 5t nr 5
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE
Schedule 3: Plant
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE
N Dumper up to 1m3 h 60
P Asphalt paver h 40
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION UNIT QUANTITY RATE
A Welding plant h 50
B Sand blasting unit (with operator) h 30
C Asphalt/concrete saw h 40
D Pneumatic breaker h 80
BILL
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION
EXPO 2020 ROADS NETWORK DAYWORKS
c
ITEM ITEM DESCRIPTION RATE
Section (c) - Dayworks (Cont'd...)
PART SUMMARY
Schedule 1: Labour
Page c/3
Schedule 2: Material
Page c/4
Page c/5
Page c/6
Schedule 3: Plant
Page c/7
Page c/8
Page c/9
c/1
having to be brought
r travelling time, but
e in starting up and
nt and/or sharpening
e in maintenance or
PAGE Nr.
c/2
e signature by the
c/3
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
c/4
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
c/5
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
c/6
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
c/7
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
c/8
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
c/9
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
c/10
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GENERAL ITEMS SECTION Nr.
EXPO 2020 ROADS NETWORK d 1
Contractual requirements
Specified requirements
REV-01
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
Testing of Materials
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
E
Testing of material finer than 0.075 mm BS 1377
Pt 2 CI 9.2. A250.5 nr 90
K
Organic Impurities Test; BS 1377 Pt 3
Method 3-1990. A250.10 nr 70
Rock fill
M
Bulk Density of sand (for E/W Material testing) BS
1377 Pt 9 2.2-1990. A250.12 nr 50
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
C
Clay, Silt & Dust BS 812 Pt 1 Test 7.2 & AMD 487. A250.3 nr 15
D
Soaked & Unsoaked 10% fines and Rotation
Tests BS 182 Pt 111. A250.4 nr 10
E
Clay, Slit & Dust BS 812 Pt 1 Test 7.2 & AMD
487. A250.5 nr 10
Hardened Concrete
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
REV-01
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
Temporary Works
Traffic Diversion
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
REV-01
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
Note:
The Tenderer shall specify "Fixed" or
"Time Related" next to the item description
of each Method Related Charge, inserted
by him.
REV-01
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
Note:
The Tenderer shall specify "Fixed" or
"Time Related" next to the item description
of each Method Related Charge, inserted
by him.
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
PART 1 - GENERAL ITEMS (Cont'd...)
A Plant A33*
Note:
The Tenderer shall specify "Fixed" or
"Time Related" next to the item description
of each Method Related Charge, inserted
by him.
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
A Plant A34*
Note:
The Tenderer shall specify "Fixed" or
"Time Related" next to the item description
of each Method Related Charge, inserted
by him.
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
Ref.
BILL PART
PROJECT:R1048/1 BILL OF QUANTITIES
IMPROVEMENTS OF SECTION Nr.
EXPO 2020 ROADS NETWORK GENERAL ITEMS 1
d
ITEM ITEM DESCRIPTION
PART SUMMARY
Page d/1/1
Page d/1/2
Page d/1/3
Page d/1/4
Page d/1/5
Page d/1/6
Page d/1/7
Page d/1/8
Page d/1/9
Page d/1/10
Page d/1/11
Page d/1/12
Page d/1/13
Page d/1/14
Page d/1/15
d/1/1
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-04
PAGE Nr.
d/1/2
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/1/3
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/1/4
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/1/5
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-06
PAGE Nr.
d/1/6
AMOUNT
U.A.E. Dhs.
0.00
PAGE Nr.
d/1/7
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-06
PAGE Nr.
d/1/8
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-06
PAGE Nr.
d/1/9
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
PAGE Nr.
d/1/10
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
PAGE Nr.
d/1/11
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
PAGE Nr.
d/1/12
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
PAGE Nr.
d/1/13
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
PAGE Nr.
d/1/14
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
PAGE Nr.
d/1/15
AMOUNT
U.A.E. Dhs.
0.00
0.00
PAGE Nr.
d/1/16
AMOUNT
U.A.E. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/71
EXPO 2020 ROADS NETWORK d 2
0
0 Number in material other than rock
0
H Depth not exceeding 1.0m B111.2 nr 30
0
J Max. depth 1-2m B112.2 nr 20
0
K Max. depth 2-3 m B113.2 nr 20
0
L Max. depth 3-5 m B114.2 nr 20
0
0 Depth in meter
0
M Depth in material other than rock B130.2 m 230
0
N Depth supported B150.2 m 160
0
P Depth backfilled with excavated material for
reinstatement B160.2 m 230
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/72
EXPO 2020 ROADS NETWORK d 2
0
0
0
0
0
0
0 Trial pits and trenches to ascertain/ verify/
locate existing services : maximum length 6-
12m, excavation by hand
0
0 Number in material other than rock
0
0 Number in material other than rock
0
H Depth not exceeding 1.0m B111.2 nr 20
0
J Max. depth 1-2m B112.2 nr 20
0
K Max. depth 2-3 m B113.2 nr 15
0
L Max. depth 3-5 m B114.2 nr 15
0
0 Depth in meter
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/73
EXPO 2020 ROADS NETWORK d 2
0
M Depth in material other than rock B130.2 m 180
0
N Depth supported B150.2 m 120
0
P Depth backfilled with excavated material for
reinstatement B160.2 m 180
0
0
0
0
0
0
0
0
0 Trial pits and trenches to ascertain/ verify/
locate existing services : maximum length 18-
24m, excavation by hand
0
Number in material other than rock
0
0 Number in material other than rock
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/74
EXPO 2020 ROADS NETWORK d 2
0
H Depth not exceeding 1.0m B111.2 nr 20
0
J Max. depth 1-2m B112.2 nr 20
0
K Max. depth 2-3 m B113.2 nr 15
0
L Max. depth 3-5 m B114.2 nr 15
0
0 Depth in meter
0
M Depth in material other than rock B130.2 m 180
0
N Depth supported B150.2 m 120
0
P Depth backfilled with excavated material for
reinstatement B160.2 m 180
0
0
0
0
0
0
0
0 Trial pits and trenches to ascertain/ verify/
locate existing services : maximum length 30-
36m, excavation by hand
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 Rotary drilled boreholes
0
0 Nominal diameter at base 150mm
0
A Number of boreholes; sub-surface site
investigation for overhead road sign structures
and bridge foundations B310 nr 10
0
B Depth without core recovery in holes of maximum
depth not exceeding 5m B331 m 10
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/76
EXPO 2020 ROADS NETWORK d 2
0 Samples
PART SUMMARY
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/77
EXPO 2020 ROADS NETWORK d 2
Page d/2/1
Page d/2/2
Page d/2/3
Page d/2/4
Page d/2/5
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF GROUND INVESTIGATION SECTION Nr. d/2/78
EXPO 2020 ROADS NETWORK d 2
d/2/79
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/2/80
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/2/81
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/2/82
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/2/83
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
PAGE Nr.
d/2/84
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/2/85
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/2/86
AMOUNT
UAE. Dhs.
0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/87
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
B Girth 0.5-2.0m D210.1 nr 20
0
C Girth exceeding 2.0m D220.1 nr 20
0
0 Removal of Existing trees and deliver to DM
designated location area for planting Including
trimming,watering prior to root ball
preparation, excavation to make root ball,
shifting to the new location, disposal of
excavated materials and making good of the
area.
0
D Girth 0.5-2.0m D210.2 nr 2
0
E Girth exceeding 2.0m D220.2 nr 2
0
0 Removal of trees and disposal to tip.
0 Demolition
0
0 Break out and remove existing kerbs including
concrete base, backing and haul to approved
dump site
0
A Existing upstand kerbs D900.1 m 4,300
0
B Existing drop kerbs D900.2 m 940
0
C Existing heel kerbs D900.3 m 800
0
D Existing flush kerbs D900.4 m 100
0
0 Break out and remove existing interlock tile
paving including under layers and haul to
approved dump site
0
E 60 mm thick interlock tiles D900.5 m2 1,200
0
F 80 mm thick interlock tiles D900.6 m2 500
0
0 Break out and carefully remove existing
interlock tile paving including under layers,
tiles palette and deliver to RTA stores, sand
bed and sub base cart to tip
0 Demolition (Cont'd….)
0
0 Store at site for future re-use
0
A Post Mounted Type D900.1 nr 1
0
B Cantilever Type D900.2 nr 1
0
C Gantry Type D900.3 nr 1
0
0
0 Clean and deliver to RTA stores.
0
D Post Mounted Type D900.4 nr 1
0
E Cantilever Type D900.5 nr 1
0
F Gantry Type D900.6 nr 1
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/90
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0 Demolition (Cont'd….)
0
0 Removal of Existing Concrete Barrier
0
0 Break out and remove existing concrete
barrier of any specified type, including
concrete foundation, cart to tip to approved
dump site as directed by the Engineer.
0
A Single face concrete barrier D900.1 m 100
0
B Double face concrete barrier D900.2 m 100
0
0 Carefully and remove existing precast
concrete barrier of any specified type, set
aside in Contractor's store for reuse, including
foundation haul to approved dump site as
directed by the Engineer.
0
C Single face concrete barrier D900.3 m 100
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/91
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
E Single face metal beam guard rail D900.5 m 1,000
0
F Double face metal beam guard rail D900.6 m 1,000
0
0 Carefully remove existing metal beam guard
rail, including posts, plates etc. and deliver to
RTA stores, including removal of foundation
and cart to tip to approved dump site and
backfill of voids.
0
G Single face metal beam guard rail D900.7 m 2,000
0
H Double face metal beam guard rail D900.8 m 8,100
0
0
0
0
0
0
0
0
0
0 Demolition (Cont'd….)
0
0 Carefully remove existing non illuminated
warning and regulatory signs, including posts
0
A Store at site for future re-use D900.1 nr 1
0
B Clean and deliver to RTA stores D900.2 nr 15
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/92
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
C Store at site for future re-use D900.3 nr 1
0
D Clean and deliver to RTA stores D900.4 nr 12
0
E Carefully remove existing GR-FET type and
deliver to RTA Stores. D900.5 nr 2
0
0 Carefully remove existing Advertisment Board
including posts.
0
F Store at site for future re-use D900.6 m 400
0
G Clean and deliver to Owner stores D900.7 m 400
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 Demolition (Cont'd….)
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/93
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
A Existing chainlink fence D900.1 m 2,000
0
B Existing right of way fence D900.2 m 3,000
0
C Existing DUSUP fence D900.3 m 250
0
D Existing fence gate - single leaf D900.4 nr 1
0
E Existing fence gate - double leaf D900.5 nr 1
0
0 Carefully remove existing fence and post,
deliver to RTA stores including removal of
foundation and cart to tip to the approved
dump site and backfill of voids.
0
F Existing chainlink fence D900.6 m 2,000
0
G Existing right of way fence D900.7 m 2,000
0
H Existing DUSUP fence D900.8 m 250
0
J Existing fence gate - single leaf D900.9 nr 3
0
K Existing fence gate - double leaf D900.10 nr 3
0
0 Breakout and remove existing fence and post,
including concrete foundation, cart to tip to
approved dump site as directed by the
Engineer.
0
L Existing chainlink fence D900.11 m 2,000
0
M Existing right of way fence D900.12 m 2,000
0
N Existing DUSUP fence D900.13 m 250
0
P Existing fence gate - single leaf D900.14 nr 3
0
Q Existing fence gate - double leaf D900.15 nr 3
0
0 Removal of existing survey monuments
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/94
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0 Demolition (Cont'd….)
0
0 Removal of existing grass
0
A Removal of existing grass and disposal to tip D900.1 m² 500
0
B Carefully remove existing grass and hand over to
DM Horticulture Dept. D900.2 m² 500
0
0
0 Removal of existing flag post
0
C Carefully remove existing flag post and hand over
to client/owner D900.3 nr 2
0
0
0 Removal of existing stone pitching
0
D Break out and remove existing stone pitching
including concrete bedding, sub base etc and cart
to approved tip D900.4 m² 200
0
0
0 Removal of existing foundations
0
0 Break out and remove existing concrete
beams, slabs, foundations or other isolated
volumes including all related earthworks.
0
E Volume not exceeding 50m³ D521 nr 1
0
F Volume 50 - 100m³ D522 nr 1
0
G Volume 100 - 250m³ D523 nr 1
0
H Volume 250 - 500m³ D524 nr 1
0
J Volume 500 - 1000m³ D525 nr 1
0
K Volume 1000 - 2500m³ D526 nr 1
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/95
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
REV-02
0 Demolition (Cont'd….)
0
0
0 Relocation of Automatic Irrigation system
0
A Relocation of Irrigation system for 7 Nrs trees
including loop of dripper line for trees, control
cables, uPVC lateral pipes, etc. D900.1 Sum
0
0 Speed Radar Cameras
0
B Demolition of Foundation of Speed Radar
Cameras including all civil works; coordination
with authorities.etc D900.2 nr 2
0
0 Cameras
0
C Demolition of Foundation of security Cameras
including all civil works; coordination with
authorities.etc D900.3 nr 5
0
0 Electrical Control Cabinets
0
D Careful removal of electrical cabinets including all
civil works; coordination with authorities.etc D900.4 nr 16
0
0 Brickwall
0
E Demolition of existing Brickwall D900.5 m 35
0
0
0 Removal of existing fence
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/96
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0 Demolition (Cont'd….)
0
0 TRAFFIC SIGNAL SYSTEM REMOVAL
0
0 Carefully remove existing signal posts,
fittings, precast/reinforsed conc. foundations,
dismantle completely and set aside in
Contractor's store for later deliver to RTA
stores, including disposal of precast
foundations to approved tip, cable
disconnections and backfilling
0
A Cantilever Signal post with arms of length 3-6m.
X900.1 nr 4
0
B Cantilever Signal post with arms of length 6-9m.
X900.2 nr 4
0
C Cantilever Signal post with arms of length 12m
and 9m. X900.3 nr 1
0
D Post mounted 1 nrs Pedestrian signal only. X900.4 nr 20
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/97
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
F Traffic Signal Never Fail Loop Detector.
X900.6 m 100
0
0 Carefully remove existing UPS and Change
Over Switch, fittings, precast foundations,
dismantle completely and set aside in
Contractor's enclosed store for reuse/return,
0
G Uninterrupted Power Supply (UPS). X900.7 nr 1
0
0 Carefully remove existing Traffic controllers
and fittings, dismantle completely and set
aside in Contractor's store for later deliver to
RTA stores, including disposal of precast
foundations to approved tip, cable
disconnections and backfilling
0
H Traffic Signal Controller. X900.8 nr 2
0
0
0
0
0
0 Demolition (Cont'd….)
0
0 Carefully remove existing cover and frame and
deliver to RTA stores including excavation,
breakout chambers, backfilling and remove to
tip and reinstatement of existing surfaces
0
A Traffic Signal manholes. X900.1 nr 16
0
B Traffic Signal bypass chambers. X900.2 nr 20
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/98
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
C 1-Way 100 mm Duct. X900.3 m 200
0
D 2-Way 100 mm Duct. X900.4 m 100
0
E 3-Way 100 mm Duct. X900.5 m 100
0
F 4-Way 100 mm Duct. X900.6 m 100
0
G 5-Way 100 mm Duct. X900.7 m 100
0
H 6-Way 100 mm Duct. X900.8 m 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PART SUMMARY
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/99
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Page d/3/1
Page d/3/2
Page d/3/3
Page d/3/4
Page d/3/5
Page d/3/6
Page d/3/7
Page d/3/8
Page d/3/9
Page d/3/10
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DEMOLITION AND SECTION Nr. d/3/100
EXPO 2020 ROADS NETWORK SITE CLEARANCE d 3
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
d/3/101
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/102
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/103
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/104
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/105
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/106
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/107
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/108
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/109
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
NTT-05
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/110
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/111
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/112
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/113
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/3/114
AMOUNT
UAE. Dhs.
0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/115
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Part 4 - Earthworks
0
0 Excavation
0
A Excavation for cuttings; material other than top
5 soil, rock or artificial hard material E22* m³ 123,560
0
B Excavation for cuttings rock E23* m3 500
0
C Excavation for cutting; artificial hard material;
existing road pavement; max. depth not
exceeding 0.25m comprising of AC wearing
course and/or AC base course E241 m3 20,119
0
D Excavation for cutting; artificial hard material;
existing road pavement; depth 0.25-0.5m
comprising of wet-mix macadam and/or granular
subbase E242.1 m3 10,200
0
E Excavation for cutting; artificial hard material;
existing road pavement; depth 0.25-0.5m
comprising of wet-mix macadam and/or granular
subbase and stockpile at approved location at site
for future reuse.
E242.2 m3 10,200
0
F Excavation of reinforced concrete foundation;
depth 1 -2m E454 m3 100
0
G Excavation of reinforced concrete foundation;
depth 2 -5m E455 m3 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/116
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Part 4 - Earthworks
0
0
0
0
0
0
0
REV-01
0
0 Excavation ancillaries
0
A Trimming of excavated surfaces not to receive
permanent works; material other than topsoil rock
or artificial hard material E512 m2 424,354
0
B Preparation of excavated surfaces to receive
permanent works; material other than topsoil, rock
or artificial hard material E522 m2 395,700
0
C Preparation of excavated surfaces to receive
permanent works ; rock E523 m2 500
0
D Disposal of surplus excavated material; material
6 other than top soil, rock or artificial
hard material E532.1 m3 52,127
0
E Disposal of surplus excavated material; material
5 other than top soil, rock or artificial hard material
within R1048 contracts 1 thru 5
boundary E532.2 m3 1,000
0
F Disposal of excavated material, rock to tip E533 m3 100
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/117
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Part 4 - Earthworks
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-02
0
0 Excavation ancillaries (Cont'd…)
0
A Disposal of excavated artificial hard material; AC
wearing course and/or base course E534.1 m3 20,119
0
B Disposal of excavated artificial hard material; wet-
mix macadam and/or granular subbase E534.2 m3 10,200
0
C Disposal of excavated concrete or reinforced
concrete E534.3 m3 200
0
D Double-handling of excavated material other than
E542 m3
top soil, rock or artificial hard material 500
0
E Double-handling of excavated artificial hard
material; wet-mix macadam and/or granular
subbase to be reused E544 m3 1,000
0
F Excavation of material below the final surface and
replacement with stabilizing crushed materials,
including disposal of excavated material to tip
(Replacement measured separately) E560 m3
100
0
0 Filling
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/118
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Part 4 - Earthworks
0
G Filling to embankments, suitable excavated
6 material other than top soil or rock @ 250mm
each layer E624.1 m3 169,567
0
H Filling to embankments, suitable excavated road
foundation material E624.2 m3 10,200
0
J Filling to embankments; imported material other
5 than top soil or rock @ 250mm each
layer. E625.1 m3 139,450
0
K Filling to embankments; imported material (free
5 issued by RTA within R1048 project boundary)
other than top soil or rock @ 250mm each layer.
E625.2 m3 25,000
0
L Filling below subgrade with imported natural
material (Improved Subgrade, material other than
top soil or rock) in areas where CBR is less than
specified E625.3 m3 500
0
0
0
0
0
0
0
0
REV-02
0
0 Filling (Cont'd…)
0
A Filling general, rock boulders grading 150-300mm
end dumped and rolled until area stabilized as
2 Particular specification Section PS 2/21.6
E637 m³ 36,000
0
B Filling general, thickness 150mm, crushed
aggregate material, as Particular specification
Section PS 2/21.6 E649.1 m3 10,800
0
C Filling below final surface at subkha area with 10-
70 mm crushed stones, average depth up to
300mm all in accordance with the Drawings and
Specifications E649.2 m3 10,800
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/119
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Part 4 - Earthworks
0
D Filling 50mm thick sand layer over geotextile E645 m2 72,000
0
06
0 Filling ancillaries
0
E Trimming of filled surfaces not to receive
permanent works. E712 m2 424,354
0
F Preparation of filled surfaces to receive
permanent work E722 m2 264,600
0
G Geotextile filter fabric membrane surround to rock
boulders and crushed stones at subkha area.
E730.1 m2 72,000
0
06
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-02
0
0 Trans Plantation of Trees
0
A Re-planting of Existing trees as per DM
designated location area for planting including pit
preparation, excavation, disposal of excavated
materials, compost and sweet soil E860 nr 7
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/120
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Part 4 - Earthworks
0
0
B Tanker - Watering for trees for one month (30
days) X900.1 nr 7
0
C Extra and above item of re-planting of trees for
supply and installation of root barriers for trees re-
planted at the vicinity of Services Corridor
including hand excavation and disposal. X900.2 nr 10
0
0 Slope Protection
0
0 Slope protection including compacting the slope
surface, excavating and backfill for the foundation,
preparing the foundation, surnishing and applying
materials to protect slope,supply and laying
geotextile fabric and bedding materials, in
accordance with drawings and requirements of
specification.
0
D Stone Rip-rap;loose X900.3 m³ 50
0
E Stone Rip-rap;hand placed X900.4 m³ 50
0
F Stone Rip-rap;keyed X900.5 m³ 50
0
G Stone Rip-rap;grouted X900.6 m³ 50
0
06
0
0
0
0
0
H Coarse aggregate for surface covering including
preparing surface,shaping to finished grade X900.10 m³ 50
0
0
0
0
0
0
0
0
0
0
0
0
Part 4 - Earthworks
0
REV-02
0
06 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES
0
0 Supply and lay uPVC slotted carrier Pipe and
fittings and connections, layed along with the
road complete as shown indrawings C1525 &
1531
0
D Clean out Box, Depth not exceeding 1.50m K231 nr 130
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/122
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Part 4 - Earthworks
0
0
0
0
0
0
0
0
0
REV-01
PART SUMMARY
Page d/4/1
Page d/4/2
Page d/4/3
Page d/4/4
Page d/4/5
Page d/4/6
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EARTHWORKS SECTION Nr. d/4/123
EXPO 2020 ROADS NETWORK d 4
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Part 4 - Earthworks
0
d/4/124
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/4/125
AMOUNT
UAE. Dhs.
0.00
NTT-05
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/4/126
AMOUNT
UAE. Dhs.
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/4/127
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
NTT-06
0.00
0.00
0.00
PAGE Nr.
d/4/128
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
NTT-06
0.00
PAGE Nr.
d/4/129
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/4/130
AMOUNT
UAE. Dhs.
NTT-06
PAGE Nr.
d/4/131
AMOUNT
UAE. Dhs.
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/4/132
AMOUNT
UAE. Dhs.
0.00
NTT-06
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/133
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Steelwork supporting monotube structure
complete as detailed in Dubai Traffic Control
Devices Manual including all supports,
bracings, catwalk assembly and anchoring
system to concrete foundations
0
0 Overhead Gantries and Cantilevers on ground
(foundation measured separately)
0
A Type C I M900.1 nr 1
0
B Type C II M900.2 nr 3
0
C Type C III M900.3 nr 1
0
D Type C IV M900.4 nr 10
0
E Type C V M900.5 nr 1
0
F Type G I M900.6 nr 4
0
G Type G II M900.7 nr 4
0
H Type G III M900.8 nr 8
0
J Type G IV M900.9 nr 1
0
K Type G V M900.10 nr 1
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/134
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Monotube Sign Structures (Cont'd...)
0
0 Cantilever structures (Foundation measured
separately)
0
C Type C I M900.1 nr 1
0
D Type C II M900.2 nr 1
0
E Type C III M900.3 nr 1
0
F Type C IV M900.4 nr 1
0
G Type C V M900.5 nr 1
0
0 Overhead Gantries (Foundation measured
separately)
0
H Type G I M900.6 nr 1
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/135
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Monotube Sign Structures (Cont'd...)
A Type C I M900.1 nr 1
0
B Type C II M900.2 nr 1
0
C Type C III M900.3 nr 1
0
D Type C IV M900.4 nr 1
0
E Type C V M900.5 nr 1
0
0
0 Overhead Gantries (Foundation measured
separately)
0
F Type G I M900.6 nr 1
0
G Type G II M900.7 nr 1
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/136
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Ground Mounted Sign Structures
0 On Ground
A Type P I M900.1 nr 2
0
B Type P II M900.2 nr 2
0
C Type P III M900.3 nr 2
0
D Type P IV M900.4 nr 2
0
E Type P V M900.5 nr 2
0
F Type P VI M900.6 nr 1
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/137
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
J Type P I M900.8 nr 1
0
K Type P II M900.9 nr 1
0
L Type P III M900.10 nr 1
0
M Type P IV M900.11 nr 1
0
N Type P V M900.12 nr 1
0
P Type P VI M900.13 nr 1
0
Q Type P VII M900.14 nr 1
0
0
0
0
0
0
0 Take from Contractor's stores set aside,
Rectangular posts for ground mounted signs
and install at new location, etc. complete as
detailed in Dubai Traffic Control Devices
Manual (foundation measured seperately)
A Type P I M900.1 nr 1
0
B Type P II M900.2 nr 1
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/138
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/139
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0 Diameter 1100mm
0
0 PILING ANCILLARIES (Cont'd...)
0
0
0
PART SUMMARY
Page d/5/1
Page d/5/2
Page d/5/3
Page d/5/4
Page d/5/5
Page d/5/6
Page d/5/7
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF STRUCTURAL METALWORK SECTION Nr. d/5/142
EXPO 2020 ROADS NETWORK d 5
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
d/5/143
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/5/144
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/5/145
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/5/146
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/5/147
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/5/148
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/5/149
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/5/150
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/5/151
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/5/152
AMOUNT
UAE. Dhs.
0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/153
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0
REV-02
0
0 Sub-bases, flexible road bases and surfacing
(Cont'd…)
0
A Bituminous Asphaltic concrete wearing course
depth 50mm R322.1 m2 525,300
0
B Bituminous Asphaltic concrete wearing course
depth 60mm R322.2 m2 2,000
0
C Bituminous Asphaltic concrete base course depth
60mm R322.3 m2 2,000
0
D Bituminous Asphaltic concrete base course depth
65mm R323.1 m2 2,000
0
E Bituminous Asphaltic concrete base course depth
70mm R323.2 m2 37,900
0
F Bituminous Asphaltic concrete base course depth
80mm R323.3 m2 177,200
0
G Bituminous Asphaltic concrete base course depth
90mm R323.4 m2 33,700
0
H Bituminous Asphaltic concrete base course depth
100mm R323.5 m2 104,300
0
J Bituminous Asphaltic concrete base course depth
120mm R323.5 m2 2,500
0
K Bituminous Asphaltic concrete base course depth
130mm R324.1 m2 2,500
0
L Bituminous Asphaltic concrete base course depth
140mm R324.2 m2 111,300
0
M 50mm bituminous Asphaltic concrete wearing
course overlay of existing pavement R322 m2 20,000
0
N Prime Coat - MC 70 R359.1 m2 544,800
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/155
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
REV-02
0
0 Sub-bases, flexible road bases and surfacing
(Cont'd…)
0
A Preparation of existing pavement to receive
50mm overlay including removal of existing
pavement marking, lightly milling the existing
surface to roughen complete R390.1 m2 20,000
0
B Fill in 40-50mm gap between existing road and
new kerb with concrete and AC wearing course
including saw cutting, tack coat etc complete. R390.2 m 1,000
0
C Cold planning (milling) and remove existing road
surfaces up to 50mm depth; milled material to be
removed to dump site R390.3 m2 20,000
0
0
0 Adjustment for 0.1% binder content
0
D For item A page d/6/2 R390.4 m2
0
E For item B page d/6/2 R390.5 m2
0
F For item C page d/6/2 R390.6 m2
0
G For item D page d/6/2 R390.7 m2
0
H For item E page d/6/2 R390.8 m2
0
J For item F page d/6/2 R390.9 m2
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/156
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
REV-01
0
0
0 Kerb, channels , edgings; footway and paved
areas; straight or curved complete including
earthworks, concrete bed and backing,
backfilling and transitions.
0
A Precast concrete upstand kerb 150 x 305mm R711.1 m 1,000
0
B Precast concrete heel kerb 75 x 150mm R711.2 m 500
0
C Precast concrete Flush kerb;225 x 150mm R711.3 m 500
0
D Precast concrete Drop kerb;305 x 150mm R711.4 m 500
0
0 Light duty pavement
0
E Aggregate subbase; 30% CBR; depth 150mm. R195.1 m2 4,500
0
F Aggregate road base; depth 150mm. R195.2 m2 2,250
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/157
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
REV-01
0
0 Ancillaries - Traffic signs
0 Non-illuminated
0
0 Warning and regulatory signs including posts
6 embedded in ground/pavement with selected
fill surround
REV-02
0
0 Ancillaries - Traffic signs (Cont'd….)
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/159
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
REV-02
0
0 Ancillaries - Traffic signs (Cont'd….)
REV-02
0
0 Ancillaries - Traffic signs (Cont'd….)
0 Guide signs
REV-01
0
0 Ancillaries - Surface markings (Cont'd…)
REV-01
0
0 MISCELLANEOUS WORK
0 Fences
REV-02
0
0 MISCELLANEOUS WORK (Cont'd….)
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/165
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
REV-03
0
0 MISCELLANEOUS WORK (Cont'd….)
0 Fences (Cont'd….)
REV-01
0
0 MISCELLANEOUS WORK (Cont'd….)
0
A New pavement with existing pavement (Jebel Ali
Lehbab Road) ; transverse joints X900.1 m 1,000
0
B New pavement with existing pavement (Jebel Ali
Lehbab Road); longitudinal joints X900.2 m 5,420
0
C New pavement with existing pavement (Sheikh
Mohamed Bin Zayed Road) ; transverse joints X900.3 m 1,000
0
D New pavement with existing pavement (Sheikh
Mohamed Bin Zayed Road); longitudinal joints X900.4 m 5,750
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/168
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
REV-01
PART SUMMARY
Page d/6/1
Page d/6/2
Page d/6/3
Page d/6/4
Page d/6/5
Page d/6/6
Page d/6/7
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF 3 ROADS AND PAVINGS SECTION Nr. d/6/169
EXPO 2020 ROADS NETWORK d 6
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Page d/6/8
Page d/6/9
Page d/6/10
Page d/6/11
Page d/6/12
Page d/6/13
d/6/170
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/6/171
AMOUNT
UAE. Dhs.
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/6/172
AMOUNT
UAE. Dhs.
0.00
0.00
NTT-06
0.00
0.00
0.00
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
PAGE Nr.
d/6/173
AMOUNT
UAE. Dhs.
Rate only
Rate only
Rate only
Rate only
Rate only
Rate only
0.00
NTT-03
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/6/174
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
NTT-03
0.00
PAGE Nr.
d/6/175
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-06
PAGE Nr.
d/6/176
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/6/177
AMOUNT
UAE. Dhs.
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/6/178
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/6/179
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
NTT-03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/6/180
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
NTT-03
0.00
0.00
PAGE Nr.
d/6/181
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-06
PAGE Nr.
d/6/182
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/6/183
AMOUNT
UAE. Dhs.
0.00
0.00
NTT-05
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/6/184
AMOUNT
UAE. Dhs.
0.00
NTT-03
0.00
0.00
0.00
0.00
PAGE Nr.
d/6/185
AMOUNT
UAE. Dhs.
0.00
NTT-03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/6/186
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/187
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0
0
0
0
REV-01
0
0 DIVERSION WORKS (Cont'd…)
0
0 DIVERSION WORKS (Cont'd….)
0 PRECAST CONCRETE
0
0
0
0 DIVERSION WORKS (Cont'd…)
0
0 DIVERSION WORKS (Cont'd…)
0
0 DIVERSION WORKS (Cont'd…)
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/193
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 DIVERSION WORKS (Cont'd…)
0
0 Supply, lay and joint Fully Laminated GRE
pipe 10,000 Stiffness with couplings (concrete
surrround measured seperately) (Cont'd…)
0
0 DIVERSION WORKS (Cont'd…)
0 Bends
0
0 DIVERSION WORKS (Cont'd…)
0
Supply, lay and joint GRE pipe fitting in trench
in accordance with specification. (Cont'd…)
REV-01
0
0 DIVERSION WORKS (Cont'd…)
0 Gate Valve
0
0
0
0
REV-01
0
0 DIVERSION WORKS (Cont'd…)
0 Valves (Cont'd….)
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/199
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
A 150mm dia duct; depth not exceeding 1.5m K512 m 160 0.00
0
0
0 Valve chambers
0
B 100mm dia. depth 1.5 -2.0m m. K232.1 nr 1 0.00
0
C 300mm dia. depth 1.5 -2.0m m. K232.2 nr 5 0.00
0
D 450mm dia. depth 1.5 -2.0m m. K232.3 nr 4 0.00
0
E 600mm dia. depth not exceeding 1.5 m. K231.1 nr 1 0.00
0
F 1200mm dia. depth 2.0m -2.5. K233.1 nr 2 0.00
0
G 1200mm dia. depth 2.5m -3.0. K234.1 nr 2 0.00
0
H 1200mm dia. depth 2.5m -3.0. (On existing pipe) K234.2 nr 1 0.00
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/201
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
REV-01
0
0 DIVERSION WORKS (Cont'd….)
REV-01
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (cont'd…)
REV-01
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (cont'd…)
0
0 Reinstatement
REV-01
0
0 PIPE WORK MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd…)
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION.
F
Steel sleeve for 450mm dia. GRE pipe, including
excavation, spacers, brackets, grouting, protective
coating, backfilling etc complete as per drawings.
L900.3 m 50 0.00
0
G
Steel sleeve for 600mm dia. GRE pipe, including
excavation, spacers, brackets, grouting, protective
coating, backfilling etc complete as per drawings.
L900.4 m 48 0.00
0
H
Steel sleeve for 1200mm dia. GRE pipe, including
excavation, spacers, brackets, grouting, protective
coating, backfilling etc complete as per drawings.
L900.5 m 485 0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 DIVERSION WORKS (Cont'd….)
REV-01
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/209
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 DIVERSION WORKS (Cont'd….)
REV-01
PART SUMMARY
Page d/9/1
Page d/9/2
Page d/9/3
Page d/9/4
Page d/9/5
Page d/9/6
Page d/9/7
Page d/9/8
Page d/9/9
Page d/9/10
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/212
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Page d/9/12
Page d/9/13
Page d/9/14
Page d/9/15
Page d/9/16
Page d/9/17
Page d/9/18
PART SUMMARY
Page d/9/19
Page d/9/20
Page d/9/21
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR DEWA - SECTION Nr. d/9/213
EXPO 2020 ROADS NETWORK WATER DIVISION d 9
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
d/9/214
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/215
AMOUNT
UAE. Dhs.
0.00
NTT-03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/216
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/217
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/218
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/219
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/220
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/221
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/222
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/223
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/224
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-03
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/225
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-03
PAGE Nr.
d/9/226
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/227
AMOUNT
UAE. Dhs.
NTT-03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/228
AMOUNT
UAE. Dhs.
0.00
NTT-03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/229
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
NTT-03
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/230
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
NTT-03
PAGE Nr.
d/9/231
AMOUNT
UAE. Dhs.
282,495.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
414,583.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/232
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
697,078.00
NTT-03
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/233
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/234
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/235
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-03
PAGE Nr.
d/9/236
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/237
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
462,614.00
0.00
PAGE Nr.
d/9/238
AMOUNT
UAE. Dhs.
462,614.00
NTT-03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/9/239
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
697,078.00
0.00
0.00
0.00
697,078.00
0.00
462,614.00
697,078.00
PAGE Nr.
d/9/240
AMOUNT
UAE. Dhs.
1,159,692.00
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/241
EXPO 2020 ROADS NETWORK d 11
0
0 Notes:
0
0 ETISALAT will provide all cable ducts, end
caps, draw ropes, spacers and furniture for
manholes and joint boxes. The Tenderer shall
include in his rates for collection and storage
of these materials from Etisalat stores in
Dubai
0 DIVERSION WORKS
0 DEMOLITION
0
0
0
0
0
0
0
0 REV-01
0
0 DIVERSION WORKS (Cont'd…)
0
M Type JRC 04 on existing duct. K231.4 nr 1
0
N Type JRC 12 on existing duct. K231.5 nr 1
0
P Type JRC 14 on existing duct. K231.6 nr 1
0
0
0
0
0
0
0 REV-01
0
0 DIVERSION WORKS (Cont'd…)
0 Ducts
0
L 12-way, depth not exceeding 1.5m. K542.4 m 325
0
M 12-way, depth 1.5m - 2.0m. K543.4 m 155
0
N 12-way, depth 2.0m - 2.5m. K544.4 m 85
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-01
0
0 DIVERSION WORKS (Cont'd…)
0 Ducts (Cont'd…)
0
0
C 4-way, depth 1.5m - 2.0m. K543.1 m 140
0
D 4-way, depth 2.0m - 2.5m. K544.1 m 85
0
E 6-way, depth not exceeding 1.5m. K542.2 m 65
0
F 6-way, depth 1.5m - 2.0m. K543.2 m 10
0
G 6-way, depth 2.0m - 2.5m. K544.2 m 20
0
H 9-way, depth not exceeding 1.5m. K542.3 m 51
0
J 9-way, depth 1.5m - 2.0m. K543.3 m 32
0
K 9-way, depth 2.0m - 2.5m. K544.3 m 16
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-01
0
0 DIVERSION WORKS (Cont'd…)
0 Ducts (Cont'd…)
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/246
EXPO 2020 ROADS NETWORK d 11
0
0 Extend existing uPVC ducts including collect,
lay & joint with existing ducts in trench
beneath carriageways, provide end caps, duct
markers, draw ropes and warning tapes etc.
(Cont'd…)
REV-01
0
0 DIVERSION WORKS (Cont'd…)
0
0
0
0
0
0
0
0
0
0 REV-01
0
0 DIVERSION WORKS (Cont'd…)
0
C For 2-way L291.1 m 10
0
D For 4-way L291.2 m 15
0
E For 6-way L291.3 m 20
0
F For 9-way L291.4 m 20
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/249
EXPO 2020 ROADS NETWORK d 11
0
0
G For 12-way L291.5 m 160
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-01
0
0 DIVERSION WORKS (Cont'd..)
0
F 2-way duct. L521.1 m 35
0
G 4-way duct. L521.1 m 2,125
0
H 6-way duct. L521.3 m 335
0
J 9-way duct. L521.4 m 1,409
0
K 12-way duct. L521.5 m 435
0
0 Mass concrete class 30/20 surround to 90mm
dia duct including formwork, polythene sheet
and bituminous paint
0 REV-01
0
0 DIVERSION WORKS (Cont'd..)
0
0 ANCILLARY WORKS
0 REV-01
0
0 DIVERSION WORKS (Cont'd..)
0 MISCELLANEOUS WORKS
0
0
B Adjust cover levels of existing manholes to suit
proposed levels, maximum level adjustment up to
0.5m X900.2 nr 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-01
PART SUMMARY
Page d/11/1
Page d/11/2
Page d/11/3
Page d/11/4
Page d/11/5
Page d/11/6
Page d/11/7
Page d/11/8
Page d/11/9
Page d/11/10
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF WORKS FOR ETISALAT SECTION Nr. d/11/254
EXPO 2020 ROADS NETWORK d 11
REV-01
PAGE Nr.
4 d/11/255
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
PAGE Nr.
4 d/11/256
AMOUNT
UAE. Dhs.
0.00
NTT-04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
4 d/11/257
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
NTT-04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
4 d/11/258
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
NTT-04
0.00
0.00
PAGE Nr.
4 d/11/259
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-04
PAGE Nr.
4 d/11/260
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
4 d/11/261
AMOUNT
UAE. Dhs.
NTT-04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
4 d/11/262
AMOUNT
UAE. Dhs.
0.00
NTT-04
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
4 d/11/263
AMOUNT
UAE. Dhs.
0.00
0.00
NTT-04
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
4 d/11/264
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-04
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
4 d/11/265
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-04
0.00
PAGE Nr.
4 d/11/266
AMOUNT
UAE. Dhs.
0.00
0.00
PAGE Nr.
4 d/11/267
AMOUNT
UAE. Dhs.
NTT-04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
4 d/11/268
AMOUNT
UAE. Dhs.
0.00
NTT-04
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/269
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0 DIVERSION WORKS
0
0 DIVERSION WORKS (Cont'd…)
0
G 1600 x 500 x 150mm thick. H512.1 nr 50
0
H 1600 x 500 x 200mm thick. H512.2 nr 2,750
0
J 1800 x 500 x 200mm thick. H512.3 nr 25
0
K 3600 x 1000 x 250mm thick. H525 nr 20
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/271
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 DIVERSION WORKS (Cont'd….)
0
0 DIVERSION WORKS (Cont'd….)
0 Bends
0
A 200mm dia 11.25 degree bend J512.1 nr 1
0
B 200mm dia 22.25 degree bend J512.2 nr 1
0
C 200mm dia 45 degree bend J512.3 nr 1
0
D 200mm dia 90 degree J512.4 nr 1
0
E 500mm dia 11.25 degree J513.1 nr 1
0
F 500mm dia 22.25 degree J513.2 nr 1
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/273
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
PIPE WORK - FITTINGS AND VALVES
(Cont'd…)
0
0 Supply, lay and joint GRP pipe fitting in trench
in accordance with specification clause PS
6/62
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/275
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
Chambers complete including supply of all
ladders, pipe work, pipe pieces, stub pipe,
pipe fittings, ductile manhole covers, extra
joints, extra excavation, extra backfilling, extra
reinforcement, protective coating and lining
metal work
0
0 Valve chambers
0
A Gate valve chamber (FC Connection) on 200mm
dia GRP pipe line; depth 1.5 -2.0 m. K232.1 nr 1
0
B Gate valve chamber (FC Connection) on 500mm
dia GRP pipe line; depth 1.5 -2.0 m. K232.2 nr 1
0
C Gate valve chamber (FC Connection) on 500mm
dia GRP pipe line; depth 2.0 -2.5 m. K233.1 nr 1
0
D Washout valve chamber on 800mm dia GRP pipe
line; depth 2.50 -3.0 m. K234.1 nr 1
0
E Air release valve chamber on 800mm dia GRP
pipe line; depth 2.00 -2.5 m. (on existing pipe) K233.2 nr 1
0
F Air release valve chamber on 800mm dia GRP
pipe line; depth 2.50 -3.0 m. K234.2 nr 1
0
G Inlet valve chamber on 1800mm dia GRP pipe
line; depth 3.0 -3.5 m. (on existing pipe) K235 nr 1
0
H Inlet valve chamber on 1800mm dia GRP pipe
line; depth 3.5 -4.0 m. (on existing pipe) K236 nr 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/276
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)
0 Ducts
0
0 Supply and lay in trench uPVC ducts including
end caps, draw ropes and duct markers
0
0
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)
0 Connection to pipes
0
0 Connections to existing pipe including
excavation, necessary fittings, couplers, short
pipes, thrust blocks, shutdown, water losses,
dewatering, backfilling, etc complete
0
E For 800mm dia pipe L294 m 50
0
0 Access and reciving Pits for NDM
0
F Access Pit L900.1 nr 1
0
G Receiving Pit L900.2 nr 1
0
0
0
0
0
0
0
0
0
0
0
0 PIPE WORK - SUPPORTS AND PROTECTION
ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd…)
PART SUMMARY
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/281
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Page d/12/1
Page d/12/2
Page d/12/3
Page d/12/4
Page d/12/5
Page d/12/6
Page d/12/7
Page d/12/8
Page d/12/9
Page d/12/10
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/12/282
EXPO 2020 ROADS NETWORK IRRIGATION WORKS d 12
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
d/12/283
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/284
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/285
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/286
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/287
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/288
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/289
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/290
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/291
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/292
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/293
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/294
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/295
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/12/296
AMOUNT
UAE. Dhs.
0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/297
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0
0 DEMOLITION
0
0 Carefully excavate, expose and remove
existing drainage pipe lines and cart to
approved tip including fittings, surrounds,
backfilling of voids etc.
0
A 160mm dia. uPVC gully pipe. D610.1 m 135
0
B 200mm dia. uPVC pipe. D610.2 m 250
0
C 200mm dia. Slotted uPVC pipe. D610.3 m 360
0
D 250mm dia. uPVC pipe. D610.4 m 85
0
E 315mm dia. uPVC pipe. D610.5 m 252
0
F 400mm dia. uPVC pipe. D610.6 m 235
0
0
0
0 PRECAST CONCRETE
0
0 Precast reinforced concrete protection slabs
placed over existing pipe lines as detailed on
Dwg. U2.1.9 including excavation, backfilling,
bitumen paint and 50mm polystyrene board
0
G 1200 x 500 x 150mm thick. H511.1 nr 40
0
H 1600 x 500 x 150mm thick. H511.2 nr 75
0
J 2500 x 500 x 150mm thick. H521 nr 30
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/298
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0
0
0
0
0
0
0
0 PIPE WORK - PIPES
0
0 Supply and lay uPVC pipes to BS 4660 & 5481
storm water drain laid and jointed in trenches
including excavation, backfilling, etc.
0
0
M Depth 3.0 - 3.5m. I526 m 150
0
N Depth 3.5 - 4.0m. I527 m 37
0
P Depth 4.0 - 4.5m. I528 m 50
0
0
0
0
0
0
REV-02
0
0 PIPE WORK - PIPES (Cont'd…)
0
0 Supply, lay and joint pipeline Not in trench
through microtunnelled sleeve including
special joints and connections, testing and
complete as specified. (micro tunnelling
measured separately)
0
H 400mm dia depth 4.0-4.5 m. I638.1 m 50
0
J 400mm dia depth 4.0-4.5 m. I638.2 m 50
0
K 400mm dia depth 5.0-5.5 m. I638.3 m 100
0
L 400mm dia depth 5.5-6.0 m. I638.4 m 100
0
M 400mm dia depth 6.0-6.5 m. I638.5 m 100
0
N 500mm dia depth 1.5-2.0m. I633.2 m 75
0
P 500mm dia depth 2.0-2.5m. I634 m 400
0
Q 500mm dia depth 2.5-3.0m. I635.2 m 1,037
0
R 500mm dia depth 3.0-3.5 m. I636.2 m 533
0
S 500mm dia depth 3.5-4.0 m. I637.2 m 420
0
T 500mm dia depth 4.0-4.5 m. I638.2 m 251
0
U 500mm dia depth 4.5-5.0 m. I638.3 m 300
0
REV-02
0
0 PIPE WORK - PIPES (Cont'd…)
0
0 Supply, lay and joint GRP pipline in trenches
including excavation, backfilling, special joints
6 and connections, detectable waring tape, etc.
complete as specified. (Cont'd…)
0
F 600mm dia depth 4.0-4.5 m. I638.1 m 154
0
G 600mm dia depth 4.5-5.0 m. I638.2 m 479
0
H 600mm dia depth 5.0-5.5 m. I638.3 m 100
0
J 600mm dia depth 5.5-6.0 m. I638.4 m 95
0
K 600mm dia depth 6.0-6.5 m. I638.5 m 25
0
0 Nominal bore 600 - 900 mm
0
L 800mm dia depth 2.0-2.5m. I644.2 m 10
0
M 800mm dia depth 3.5-4.0m. I647 m 10
0
N 800mm dia depth 4.0-4.5m. I637 m 105
0
P 800mm dia depth 6.5-7.0m. I648 m 72
0
Q 800mm dia depth 7.0-7.5m. I648.6 m 15
0
0
0
0
0
0
0
0
0
0
0
0
REV-02
0
0 PIPE WORK - PIPES (Cont'd…)
0
0 Supply, lay and joint GRP pipline in trenches
including excavation, backfilling, special joints
6
and connections, detectable waring tape, etc.
complete as specified. (Cont'd…)
0
A 1000mm dia depth 3.5-4.0m. I657 m 10
0
B 1000mm dia depth 5.5-6.0m. I658.1 m 40
0
C 1000mm dia depth 6.0-6.5m. I658.2 m 100
0
D 1000mm dia depth 6.5-7.0m. I658.3 m 150
0
E 1000mm dia depth 7.0-7.5m. I658.4 m 428
0
F 1000mm dia depth 7.5-8.0m. I658.5 m 170
0
G 1000mm dia depth 8.5-9.0m. I658.6 m 30
0
H 1200mm dia depth 6.0-6.5m. I658.7 m 12
0
J 1200mm dia depth 6.5-7.0m. I658.8 m 16
0
K 1200mm dia depth 7.5-8.0m. I658.10 m 30
0
L 1200mm dia depth 8.0-8.5m. I658.11 m 60
0
M 1200mm dia depth 8.5-9.0m. I658.12 m 270
0
N 1200mm dia depth 9.0-9.5m. I658.13 m 100
0
P 1200mm dia depth 9.5-10.0m. I658.14 m 70
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-02
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/303
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 PIPE WORK - PIPES (Cont'd…)
0
0
0
0
0 Supply, lay and joint GRP pipline not in
trenches including excavation, backfilling,
special joints and connections, detectable
waring tape, etc. complete as specified.
0
0
0
0
0
0
REV-01
0
04 PIPE WORK - PIPES (Cont'd…)
0
0 Slotted drain with gravel trench as shown on
Volume 2, Part IV Appendix 4 detail nr 402
including excavation, uPVC slotted pipe and
fittings, natural gravel bed and surround,
natural gravel fill, sand back fill, geotextile
membrane and romoval surplus excavated
material
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-02
0
0 PIPE WORK - FITTINGS AND VALVES
0
0 uPVC pipe fittings to BS 4660 & 5481
0
A 160 mm dia 15 degree bend. J411.1 nr 10
0
B 160 mm dia 30 degree bend. J411.2 nr 15
0
C 160 mm dia 45 degree bend. J411.3 nr 9
0
D 160 mm dia 60 degree bend. J411.4 nr 8
0
E 160 mm dia 90 degree bend. J411.5 nr 7
0
F 200 mm dia 30 degree bend. J411.6 nr 8
0
G 200 mm dia 45 degree bend. J411.7 nr 6
0
H 200 mm dia 60 degree bend. J411.8 nr 8
0
J 200 mm dia 90 degree bend. J411.9 nr 7
0
K 160 x 200 x 200mm junction. J421 nr 15
0
L 250 x 250 x 160mm junction. J422.1 nr 14
0
M 250 x 250 x 200mm junction. J422.2 nr 8
0
N 160 x 200 reducer. J431 nr 6
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/306
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0
P 250 mm dia end cap. J492.1 nr 1
0
0
0
0 Pipe stubs for future connection including end
cap, additional excavation, backfill, bedding
4
etc complete
REV-01
0
0 PIPE WORK - FITTINGS AND VALVES
(Cont'd…)
0
4 0 Straight Specials Pipes
0
A uPVC Pipe Fittings Straight Specials as Rocker
Pipes-200 mm dia 600 long J481 nr 20
0
B uPVC Pipe Fittings Straight Specials as Rocker
Pipes-250 mm dia 600 long J482 nr 48
0
C uPVC Pipe Fittings Straight Specials as Rocker
Pipes-315 mm dia 600 long J483.1 nr 8
0
D GRP Pipe Fittings Straight Specials as Rocker
Pipes-400 mm dia 1000 long J483.2 nr 2
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/307
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
E GRP Pipe Fittings Straight Specials as Rocker
Pipes-500 mm dia 1000 long J483.3 nr 4
0
F GRP Pipe Fittings Straight Specials as Rocker
Pipes-600 mm dia 1000 long J483.4 nr 8
0
G GRP Pipe Fittings Straight Specials as Rocker
Pipes-800 mm dia 1000 long J484.2 nr 6
0
H GRP Pipe Fittings Straight Specials as Rocker
Pipes-1000 mm dia 1000 long J485 nr 2
0
0
J GRP Pipe Fittings Straight Specials as Rocker
Pipes-1200 mm dia 1000 long J484.1 nr 26
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-01
0
0 PIPE WORK - MANHOLES AND PIPE WORK
4
ANCILLARIES
0 Manholes
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/308
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Manhole complete as detailed in Volume 2 Part
IV Appendix 4; including frame and cover
06 Type G
0
A Depth not exceeding 1.5m. K131.1 nr 1
0
B Depth 1.5 - 2.0m. K132.1 nr 1
6
0 Type H
0
E Depth not exceeding 1.5m. K131.2 nr 1
0
F Depth 1.5 - 2.0m. K132.2 nr 1
0
G Depth 2.0 - 2.5m. K133.2 nr 16
0
H Depth 2.5 - 3.0m. K134.2 nr 18
0
J Depth 3.0 - 3.5m. K135 nr 13
0
K Depth 3.5 - 4.0m. K136.1 nr 2
0
L Depth 4.0 - 4.5m. K137.1 nr 1
0
6
0 Type I
0
M Depth 3.5 - 4.0m. K136.2 nr 8
0
N Depth 4.0 - 4.5m. K137.2 nr 10
0
P Depth 4.5 - 5.0m. K137.3 nr 6
0
Q Depth 5.0 - 5.5m. K137.4 nr 1
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/309
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
REV-03
0
04 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd…)
0
0 Manhole complete as detailed in Volume 2 Part
IV Appendix 4; including frame and cover
(Cont'd…)
05 Type I (Cont'd...)
0
0
A Depth 5.5 - 6.0m. K137.1 nr 1
0
B Depth 6.0 - 6.5m. K137.2 nr 1
0
0 Type J
0
5
C Depth 3.5 - 4.0m. K136 nr 1
6
0
D Depth 4.5 - 5.0m. K137.3 nr 1
0
E Depth 5.5 - 6.0m. K137.4 nr 1
0
F Depth 6.0 - 6.5m. K137.5 nr 1
0
G Depth 6.5 - 7.0m. K137.6 nr 1
0
H Depth 7.0 - 7.5m. K137.7 nr 1
0
J Depth 7.5 - 8.0m. K137.8 nr 1
0
0
6 Type K
0
0
K Depth 5.5 - 6.0m. K137.9 nr 1
0
L Depth 6.0 - 6.5m. K137.10 nr 2
0
M Depth 6.5 - 7.0m. K137.11 nr 3
0
N Depth 7.0 - 7.5m. K137.12 nr 3
0
P Depth 7.5 - 8.0m. K137.13 nr 3
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/310
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
Q Depth 8.0 - 8.5m. K137.14 nr 1
0
R Depth 8.5 - 9.0m. K137.15 nr 1
0
0
0
0
0
0
0
REV-03
0
0 PIPE WORK - MANHOLES AND PIPE WORK
4 ANCILLARIES (Cont'd…)
0
0 Manhole complete as detailed in Volume 2 Part
IV Appendix 4; including frame and cover
(Cont'd…)
6
0 Type L
0
A Depth 6.0 - 6.5m. K137.7 nr 1
0
B Depth 6.5 - 7.0m. K137.8 nr 2
0
C Depth 7.0 - 7.5m. K137.9 nr 1
0
D Depth 7.5 - 8.0m. K137.10 nr 1
0
E Depth 8.0 - 8.5m. K137.11 nr 1
0
F Depth 8.5 - 9.0m. K137.11 nr 4
0
G Depth 9.5 - 10.0m. K137.11 nr 1
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/311
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-02
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd…)
0
0 Other stated chambers
0
A Insitu concrete Gully Chamber with grates
complete as detailed on drawings and as per
specification ; maximum depth not exceeding
2.0m. K232 nr 34
0
B Insitu concrete Gully Chamber with grates
complete as detailed on drawings and as per
specification ; depth 2.0 - 2.5m. K233 nr 16
0
0
06 Gullies
0
C Side entry gully complete as per DM standard
detail no. 604 , including removable basket,
concrete surround, gully frame and cover,
excavation, backfilling, compaction and removal
of surplus material to tip.
K370.1 nr 105
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/312
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
D Side entry gully complete as per DM standard
detail no. 605, including removable basket,
concrete surround, gully frame and cover,
excavation, backfilling, compaction and removal
of surplus material to tip.
K370.2 nr 55
0
E Top entry gully complete as per DM standards
including removable basket, concrete surround,
gully frame and cover, excavation, backfilling,
compaction and removal of surplus material to tip.
K370.3 nr 165
0
F Reinstall set aside gully in new location including
connection to gulley pipes, excavation, backfilling,
compaction and removal of surplus material to tip.
K370.4 nr 5
0
G Special detail (Bridge deck-Scupper drain) gully
including removable basket, gully frame, cover,
4 150mm dia uPVC pipe, fittings, etc complete as
shown in drawing U-2935. K370.5 nr 6
0
0
0
0
0
0
0
0
0
REV-03
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd…)
0
04 Drain Chute
0
0 Drain Chute complete including earthwork,
concrete, concrete ancillaries, stone pitching
and subgrade as detailed in drawing U-2931.
0
0
C Drain Chute for elevation 5.0 - 7.0 m K490.3 nr 4
0
0 Reinstatement
0
D Breaking of existing pavement of main roads and
reinstate including saw cutting; pipe bore not
exceeding 300mm. K731.1 m 50
0
E Breaking of existing pavement of service roads
and reinstate including saw cutting; pipe bore not
exceeding 300mm. K731.2 m 50
0
F Breaking of existing pavement of main roads and
reinstate including saw cutting; pipe bore 300-
900mm. K732.1 m 25
0
G Breaking of existing pavement of service roads
and reinstate including saw cutting; pipe bore
300-900mm. K732.2 m 25
0
H Breaking of existing pavement of main roads and
reinstate including saw cutting; pipe bore 900-
1800mm. K733.1 m 25
0
J Breaking of existing pavement of service roads
and reinstate including saw cutting; pipe bore
900-1800mm. K733.2 m 25
0
0
0
0
0
0
0
0
0
0
0
0
REV-01
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd…)
0
0
0 Connection to existing pipes / manholes
including excavation, necessary fittings,
couplers, short pipes, over pumping,
diversion, dewatering, backfilling, etc
complete
0
0
REV-01
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
6 ANCILLARIES TO LAYING AND EXCAVATION
0
0 Beds and Surrounds
0
0 Imported granular material bed and surround
0
A For 160mm dia uPVC gully pipe L531.1 m 6,110
0
B For 200mm dia uPVC gully pipe L531.2 m 306
0
C For 250mm dia uPVC L532.1 m 617
0
D For 315mm dia L533.2 m 599
0
E For 400mm dia L533.2 m 1,664
0
F For 500mm dia L533.3 m 2,835
0
G For 600mm dia L533.4 m 1,165
0
H For 800mm dia L534.3 m 199
0
J For 1000mm dia L535.1 m 872
0
K For 1200mm dia L535.3 m 525
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/316
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0
0
0
0
0
0
0
0
0
0
0
REV-02
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION
6
(Cont'd…)
0
0 Mass Concrete surround class 25/20 including
polythene sheet, bitumen paint and detectable
warning tape as applicable
0
0 Mass concrete class 25/20 surround
0
A For 160mm dia uPVC gully pipe L541.1 m 390
0
B For 200mm dia uPVC gully pipe L541.2 m 20
0
C For 250mm dia uPVC L542.1 m 39
0
D For 315mm dia uPVC L543.1 m 38
0
0
0
0 Reinforced concrete class 40/20 surround
0
E For 400mm dia L543.2 m 106
0
F For 500mm dia L543.3 m 181
0
G For 600mm dia L543.4 m 74
0
H For 800mm dia L544.2 m 13
0
J For 1000mm dia L545.1 m 56
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/317
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0
K For 1200mm dia L545.3 m 33
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-02
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
6 ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd…)
0
0 Geotextile Filter Fabric Membrane as per
Specifications to granular bed and surround
(granular bed and surround measured
separately)
0
A For 160mm dia uPVC gully pipe L900.1 m 6,500
0
B For 200mm dia uPVC gully pipe L900.2 m 325
0
C For 250mm dia uPVC L900.3 m 656
0
D For 315mm dia uPVC L900.4 m 637
0
E For 400mm dia L900.5 m 1,770
0
F For 500mm dia L900.6 m 3,016
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/318
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
G For 600mm dia L900.7 m 1,279
0
H For 800mm dia L900.8 m 212
0
J For 1000mm dia L900.10 m 928
0
K For 1200mm dia L900.12 m 558
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-02
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd…)
0
0
PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION.
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/319
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Non disruptive special pipe laying using micro
tunnelling methods for installing pipes. (The
rate shall include for all service diversions,
reinstatements, sleeve pipes/ caisson pipes,
concrete encasement, surplus material
removals, grouting etc. complete)
0
A For 200mm dia pipe L291 m 50
0
B For 250mm dia pipe L292 m 90
0
C For 315mm dia pipe L293 m 90
0
D For 800mm dia pipe L294 m 115
0
E For 1000mm dia pipe L295 m 190
0
F For 1200mm dia pipe L296 m 75
4
0
0 Access and reciving Pits for NDM
0
G Access Pit L900.1 nr 8
0
H Receiving Pit L900.2 nr 8
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-02
0
0 MISCELLANEOUS WORKS
0
A Adjust cover levels of existing gullies to suit
proposed levels, maximum level adjustment upto
0.25m. X900.1 nr 2
0
B Adjust cover levels of existing gullies to suit
proposed levels, level adjustment 0.25 - 0.5m. X900.2 nr 2
0
C Adjust cover levels of existing drainage manholes
to suit proposed levels, level adjustment upto
0.25m. X900.4 nr 2
0
D Adjust cover levels of existing drainage manholes
to suit proposed levels, level adjustment 0.25 -
0.5m. X900.5 nr 2
0
E Adjust cover levels of existing drainage manholes
to suit proposed levels, level adjustment 0.5 -
0.75m. X900.6 nr 2
0
0
05
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/321
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0
0
0
0
0
0
REV-02
0
0 Works on existing manholes
0
A Demolish existing drainage chambers and cart to
tip including backfilling and reinstatement. Y790.1 nr 1
0
B Demolish existing drainage manholes and cart to
tip including backfilling and reinstatement. Y790.2 nr 2
0
C Demolish and dispose existing gullies including
reinstatement, hand over cover and frame to the
client store etc complete as instructed by the
Engineer. Y790.3 nr 3
0
0
0
0 Works on existing utility culvert
0
0 Allow for extending existing utility culvert
including demolition of existing wingwall and
construction of new wingwall to suit the
proposed grading.
0
D for 600Ø SWD pipe X900.1 m 45
0
E for 1000Ø SWD pipe X900.2 m 180
0
F for 1500Ø SWD pipe X900.3 m 25
0
0
60 Ditches and Swales
0 Note: Disposal of excess excavated material shall
be measured under Bill 4 - Earthworks
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/322
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
G Excavation for Ditches and Swales including
earthwork ancillaries etc. complete to the
dimensions and details on drawings U-2937, U-
2938 & U-2939. E299 m³ 101,634
0
H Filling to Ditches & Swales with suitable
excavated material, incluidng filling ancillaries etc.
complete to the dimensions and details on
drawings. E624 m3 2,500
0
J Cement Stabilized sand on cross slopes as
detailed on drawings R194 m2 88,601
0
0
0
0
0
0
0
0
REV-02
PART SUMMARY
Page d/13/1
Page d/13/2
Page d/13/3
Page d/13/4
Page d/13/5
Page d/13/6
Page d/13/7
Page d/13/8
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/323
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Page d/13/9
Page d/13/10
Page d/13/11
Page d/13/12
Page d/13/13
Page d/13/14
Page d/13/15
Page d/13/16
Page d/13/17
Page d/13/19
Page d/13/20
Page d/13/21
Page d/13/22
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUBAI MUNICIPALITY - SECTION Nr. d/13/324
EXPO 2020 ROADS NETWORK DRAINAGE WORKS d 13
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
d/13/325
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/326
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/327
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/328
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/329
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-06
PAGE Nr.
d/13/330
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-06
PAGE Nr.
d/13/331
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/332
AMOUNT
UAE. Dhs.
0.00
NTT-04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/333
AMOUNT
UAE. Dhs.
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/334
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
NTT-04
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/335
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
NTT-04
PAGE Nr.
d/13/336
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/337
AMOUNT
UAE. Dhs.
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/338
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/339
AMOUNT
UAE. Dhs.
0.00
NTT-06
0.00
0.00
0.00
PAGE Nr.
d/13/340
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
NTT-06
0.00
0.00
PAGE Nr.
d/13/341
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-04
PAGE Nr.
d/13/342
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
PAGE Nr.
d/13/343
AMOUNT
UAE. Dhs.
0.00
NTT-04
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/344
AMOUNT
UAE. Dhs.
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/345
AMOUNT
UAE. Dhs.
0.00
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/346
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
NTT-06
PAGE Nr.
d/13/347
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/348
AMOUNT
UAE. Dhs.
NTT-04
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/349
AMOUNT
UAE. Dhs.
0.00
NTT-05
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/350
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/351
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-04
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/13/352
AMOUNT
UAE. Dhs.
0.00
NTT-04
BILL OF QUANTITIES BILL PART
PROJECT:R1048
IMPROVEMENTS OF WORKS FOR DM - SECTION Nr. d/14/353
EXPO 2020 ROADS NETWORK SEWERAGE SECTION d 14
0
0
0
0
0
0
NOT USE
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048
IMPROVEMENTS OF WORKS FOR DM - SECTION Nr. d/14/354
EXPO 2020 ROADS NETWORK SEWERAGE SECTION d 14
0
0
0
0
0
0
0
Dhs.
PAGE Nr.
d/14/355
AMOUNT
UAE. Dhs.
NOT USED
PAGE Nr.
d/14/356
AMOUNT
UAE. Dhs.
0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF RTA - SPARE DUCTS SECTION Nr. d/16/357
EXPO 2020 ROADS NETWORK d 16
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Ducts
0
0 Supply and install uPVC ducts to BS 3506
class C, 200mm dia. Laid and jointed in
trenches beneath carriage way including end
caps, draw ropes and duct markers for using
as spare ducts.
0
A 2-way, 200mm dia, depth not exceeding 1.5m. K522.1 m 1,090
0
0 Reinstatement
0
B Breaking of existing cross road pavement
including saw cutting and reinstatement for laying
2 to 4 way ducts. K731 m 100
0
0 Extend existing uPVC Spare Ducts 200mm dia,
in trench including, end caps, draw ropes and
duct markers
0
C 2-way, 200mm dia, depth not exceeding 1.5m. K522.2 m 210
5
0
0
0 PIPE WORK - SUPPORTS AND PROTECTION
ANCILLARIES TO LAYING AND EXCAVATION
0
0 Bed & surrounds including warning tape as
applicable
0
F Mass concrete surround to 200mm dia 2 way
duct. L541 m 120
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF RTA - SPARE DUCTS SECTION Nr. d/16/358
EXPO 2020 ROADS NETWORK d 16
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0
0
0 REV-01
0
MISCELLANEOUS WORKS
0
0
0 ABANDONMENT
0
0 Existing spare ducts to abandoned as per
standards including grouting etc. complete.
200 mm dia Upvc pipe line
0
A 1-way, 200mm dia, depth not exceeding 1.5m. X900.1 m 10
0
B 2-way, 200mm dia, depth not exceeding 1.5m. X900.2 m 295
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF RTA - SPARE DUCTS SECTION Nr. d/16/359
EXPO 2020 ROADS NETWORK d 16
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
PART SUMMARY
Page d/16/1
Page d/16/2
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF RTA - SPARE DUCTS SECTION Nr. d/16/360
EXPO 2020 ROADS NETWORK d 16
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
d/16/361
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/16/362
AMOUNT
UAE. Dhs.
0.00
NTT-05
0.00
0.00
PAGE Nr.
d/16/363
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
PAGE Nr.
d/16/364
AMOUNT
UAE. Dhs.
0.00
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/365
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0 REMOVAL OF EXISTING DU/ITS DUCTS
0
0 Carefully remove existing pipe /duct, fittings
and store temporarily in contractor's stores
and later deliver to RTA stores or dispose to
tip as required including excavation, break out
pipe protection and thrust blocks, backfilling
and remove to tip and reinstatement of
existing surfaces
0
F DU/ITS-Manhole D900.6 nr 1
0
G DU/ITS-Chamber D900.7 nr 15
0
0 Carefully remove existing RVD, fittings,
precast foundations, dismantle completely
and set a side in Contractor's store or hand
over to RTA stores as instructed by the
Engineer including disposal of precast
foundations to approved tip, cable
disconnections and backfilling of voids
0
H Existing RVD D900.8 nr 1
0
0
0
0
0
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/366
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0 REV-01
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES
0 Ducts
0
0 Supply, Lay & Joint uPVC Cable Ducts 100mm
dia. in trench
0
0
0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0 REV-01
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)
0
0 Ducts (Cont'd....)
0
0 Supply, Lay & Joint uPVC Cable Ducts 100mm
dia. in trench
0
A 6-way + 2-way, DU/ITS duct, depth not exceeding
1.5m. K542.1 m 80
0
B 6-way + 2-way,DU/ITS duct, depth 1.5-2.0m. K543.1 m 15
0
C 6-way + 2-way, DU/ITS duct, depth 2.0-2.5m. K544.1 m 15
0
D 6-way + 4-Way DU/ITS duct, depth not exceeding
1.5m. K542.2 m 25
0
E 6-way + 4-Way DU/ITS duct, depth 1.5-2.0m. K543.2 m 20
0
F 6-way ITS + 4 Way Du duct, depth 2.0-2.5m. K544.2 m 15
0
0 Extension of Existing Ducts
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/368
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0 Extend existing uPVC ducts including supply,
lay & joint with existing ducts in trench
beneath carriageways, provide end caps, duct
markers, draw ropes and warning tapes etc.
0
0
G 2-way DU/ITS duct, depth not exceeding 1.5m. K522.1 m 20
0
H 2-way DU/ITS duct, depth 1.5-2.0m. K523.1 m 15
0
J 4-way DU/ITS duct, depth not exceeding 1.5m. K542.3 m 25
0
K 4-way DU/ITS duct, depth 1.5-2.0m. K543.3 m 10
0
L 4-way duct, depth 2.0-2.5m. K544.3 m 5
0
0
0
0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)
0 Ducts (Cont'd....)
0
0 Extension of Existing Ducts
0
0 Extend existing 100mm uPVC ducts including
supply, lay & joint with existing ducts in trench
beneath carriageways, provide end caps, duct
markers, draw ropes and warning tapes etc.
0
A 6-way DU/ITS duct, depth not exceeding 1.5m. K542.1 m 20
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/369
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
B 6-way DU/ITS duct, depth 1.5-2.0m. K543.1 m 10
0
C 6-way DU/ITS duct, depth 2.0-2.5m. K544.1 m 5
0
D 9-way DU/ITS duct, depth not exceeding 1.5m. K542.2 m 15
0
E 9-way DU/ITS duct, depth 1.5-2.0m. K543.2 m 10
0
F 9-way DU/ITS duct, depth 2.0-2.5m. K544.2 m 5
0
G
12-way DU/ITS duct, depth not exceeding 1.5m. K542.3 m 10
0
H 12-way DU/ITS duct, depth 1.5-2.0m. K543.3 m 10
0
J 12-way DU/ITS duct, depth 2.0-2.5m. K544.3 m 5
0
K 6-way + 2-way, DU/ITS duct, depth not exceeding
1.5m. K542.3 m 80
0
L 6-way + 2-way,DU/ITS duct, depth 1.5-2.0m. K543.3 m 15
0
M 6-way + 2-way, DU/ITS duct, depth 2.0-2.5m. K544.3 m 10
0
N 6-way + 4-Way DU/ITS duct, depth not exceeding
1.5m. K542.4 m 25
0
P 6-way + 4-Way DU/ITS duct, depth 1.5-2.0m. K543.4 m 15
0
Q 6-way ITS + 4 Way Du duct, depth 2.0-2.5m. K544.4 m 10
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)
0 Ducts
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/370
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0 Supply, Lay & Joint uPVC Cable Ducts 150mm
dia. in trench
0
0
0
0
0
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/371
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)
0
0 Ducts (Cont'd....)
0
0 Supply Lay & Joint HDPE Cable Ducts 100mm
dia thru HDPE pipe NOT in trench including
end caps, draw ropes, duct markers and all
related work complete
0
0 Manholes
0
0 Reinforced concrete manholes complete in
accordance with drawings, specifications and
requirements
0
A DU MH; Ref. JRC -14. K134.1 nr 15
0
B DU MH; Ref. JRC -14 on existing duct K134.2 nr 1
0
C ITS-MH K134.3 nr 6
0
D ITS-Pull box K134.4 nr 12
0
0
0
0
0
0
0 Reinstatement
0
E Breaking of existing pavement of main roads and
reinstate including saw cutting; pipe bore 4-way
100mm. K731.1 m 20
0
F Breaking of existing pavement of cross roads and
reinstate including saw cutting; pipe bore 6-way
100mm. K731.2 m 30
0
0 Connection to Manholes / Ducts
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/373
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0
0 DU/ITS Network
0
G Connect existing 2 way 100mm duct to new
manhole, Including additional fittings, additional
excavation and backfill etc. K859.1 nr 1
0
H Connect existing 4 way 100mm duct to new
manhole, Including additional fittings, additional
excavation and backfill etc. K859.2 nr 1
0
0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - MANHOLES AND PIPE WORK
ANCILLARIES (Cont'd....)
0
0 Connection to Manholes / Ducts (cont'd…)
0
0 DU/ITS Network
0
0
A Connect existing 6 way 100mm duct to new
manhole, Including additional fittings, additional
excavation and backfill etc. K859.1 nr 3
0
B Connect existing 9 way 100mm duct to new
manhole, Including additional fittings, additional
excavation and backfill etc. K859.2 nr 1
0
C Connect existing 12 way 100mm duct to new
manhole, Including additional fittings, additional
excavation and backfill etc. K859.3 nr 1
0
D Connect new 2 way 100mm duct to existing
Ducts, Including additional fittings, additional
excavation and backfill etc. D861.1 nr 1
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/374
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0
E Connect new 4 way 100mm duct to existing
Ducts, Including additional fittings, additional
excavation and backfill etc. D861.2 nr 1
0
F Connect new 6 way 100mm duct to existing
Ducts, Including additional fittings, additional
excavation and backfill etc. D861.3 nr 3
0
G Connect new 9 way 100mm duct to existing
Ducts, Including additional fittings, additional
excavation and backfill etc. D861.4 nr 1
0
H Connect new 12 way 100mm duct to existing
Ducts, Including additional fittings, additional
excavation and backfill etc. D861.5 nr 1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd...)
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION
0
0 Non disruptive special pipe laying using
Directional drilling method for installing ducts
(The rate shall include for all service
diversions, reinstatements, etc) complete in all
respect as per dwg
0
0 Imported sand bed & surround
0
A 100mm dia 2-way uPVC duct. L511.1 m 640
0
B 100mm dia 4-way uPVC duct. L511.2 m 280
0
C 100mm dia 6-way uPVC duct. L511.3 m 2,500
0
D 100mm dia 9-way uPVC duct. L511.4 m 10
0
E 100mm dia 12-way uPVC duct. L511.5 m 5
0
F 100mm dia 6 + 2-way uPVC duct. L511.6 m 20
0
G 100mm dia 6 + 2-way uPVC duct. L511.7 m 10
0
H 150mm dia 2-way uPVC duct. L511.8 m 20
0
J 150mm dia 4-way uPVC duct. L511.9 m 10
0
0 Selected excavated material bed & surround
0
K 100mm dia 2-way uPVC duct. L521.1 m 527
0 0
L 100mm dia 4-way uPVC duct. L521.2 m 140
0 0
M 100mm dia 6-way uPVC duct. L521.3 m 3,030
0 0
N 100mm dia 9-way uPVC duct. L521.4 m 80
0 0
P 100mm dia 12-way uPVC duct. L521.5 m 45
0 0
Q 100mm dia 2 + 6-way uPVC duct. L521.6 m 175
0 0
R 100mm dia 4 + 6-way uPVC duct. L521.7 m 90
0
S 150mm dia 2-way uPVC duct. L521.8 m 175
0
T 150mm dia 4-way uPVC duct. L521.9 m 40
0
0
0
0
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/377
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION
(Cont'd....)
0
K 100mm dia 2-way uPVC duct. L541.10 m 35
0
L 100mm dia 4-way uPVC duct. L541.11 m 40
0
M 100mm dia 6-way uPVC duct. L541.12 m 35
0
N 100mm dia 9-way uPVC duct. L541.13 m 30
0
P 100mm dia 12-way uPVC duct. L541.14 m 25
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/378
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
Q 100mm dia 6 + 2-way uPVC duct. L541.15 m 105
0
R 100mm dia 6 + 4-way uPVC duct. L541.16 m 50
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd....)
0
0 MISCELLANEOUS WORKS
0
0 Foundations
0
0 Mass concrete foundation as per drawings
and Spacifications; including excavation,
backfilling, concrete, formwork; holding down
chemical anchor bolts, stainless steel cover
plate, protection of holding down bolts, nuts
and washers with denso tape, bitumen paint
etc.
0
A For CCTV Camera pole X900.1 nr 3
0
B For RVD pole X900.2 nr 1
0
C For Outstation Cabinet X900.3 nr 3
0
5
0
0
D For Bluetooth assembly pole X900.5 nr 1
0
E For RVD and Bluetooth assembly pole X900.6 nr 1
0
F For MDB X900.7 nr 2
0
05
0
G For feeder pillar X900.9 nr 2
0
H For Speed Radar X900.10 nr 3
0
5
0
0
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/379
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REV-01
PART SUMMARY
Page d/17/1
Page d/17/2
Page d/17/3
Page d/17/4
Page d/17/5
Page d/17/6
Page d/17/7
Page d/17/8
BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF EITC-DU / ITS SECTION Nr. d/17/380
EXPO 2020 ROADS NETWORK TELECOMMIUNICATION d 17
WORKS
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Part 17 - EITC - DU/ITS Utility Works
0
Page d/17/9
Page d/17/10
Page d/17/11
Page d/17/12
d/17/381
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/382
AMOUNT
UAE. Dhs.
0.00
NTT-05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/383
AMOUNT
UAE. Dhs.
0.00
NTT-05
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/384
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/385
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/386
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/387
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/388
AMOUNT
UAE. Dhs.
0.00
NTT-06
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/389
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/390
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/391
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/392
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/393
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/394
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/395
AMOUNT
UAE. Dhs.
0.00
NTT-05
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/17/396
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUSUP GAS PIPELINE SECTION Nr. d/18/397
EXPO 2020 ROADS NETWORK d 18
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
0 Precast Pedestal and Precast Slab protection
System to the Gas pipelines complete
including excavation, backfilling etc as per
Dwg. 900-08-003-001-RD (DUSUP)
0
A 2000x1000x250 mm thick precast Slab H522 m 6,015
0
0
0 PRECAST CONCRETE
0
B Protection to existing fuel pipeline including
precast slab 4500x1000x350, pedestals,
additional excavation, bedding layer and backfill
etc. complete as detailed in drawings H500.1 m 500
0
C Protection to existing fuel pipeline including
precast slab 6000x2000x450, pedestals,
additional excavation, bedding layer and backfill
etc. complete as detailed in drawings H500.2 m 500
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUSUP GAS PIPELINE SECTION Nr. d/18/398
EXPO 2020 ROADS NETWORK d 18
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
A 16" dia DUSUP pipe D930 m 725
0
0
0
0
0 PIPE WORK - PIPES
0
0 Supply, lay and joint internally and externally
DUSUP pipeline in trench ; complete as
specified and directed by the Engineer
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd…)
0
0 Connections to existing pipe
0
0 Make Connections to Existing Pipes including
all necessary shut down, thrust blocks,
additional excavation, backfill etc. complete
0
A Connect new 16" mm dia DUSUP pipeline to
existing 16"dia. DUSUP pipeline (not in the same
direction) including necessary fittings. K861.1 nr 2
0
B Connect new 16" DUSUP pipeline to existing 16"
dia. DUSUP pipeline (in the same direction)
including necessary fittings. K861.2 nr 1
0
0
0 Sleeves
0
0 Protection by Spilt Steel sleeves X 46 class B
type in trench including bed&Surround,
backfilling, endcap, warning tape and all
related work complete
0
C Split Steel Sleeve X 46 class B type for 16"
DUSUP pipe L900 m 75
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUSUP GAS PIPELINE SECTION Nr. d/18/400
EXPO 2020 ROADS NETWORK d 18
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
0
D Connect new 16" mm dia DUSUP pipeline to
existing 16"dia. DUSUP pipeline (not in the same
direction) including necessary fittings. K861.3 nr 2
0
E Connect new 16" DUSUP pipeline to existing 16"
dia. DUSUP pipeline (in the same direction)
including necessary fittings. K861.4 nr 1
0
0
0
0
0
0
0
0
0
0 To Part Summary Dhs.
0
0
0
0 DIVERSION WORKS (Cont'd…)
0
0
PIPE WORK - SUPPORTS AND PROTECTION,
ANCILLARIES TO LAYING AND EXCAVATION
0
0 Beds & Surrounds including warning tape
0
A Imported sand bed & surround to 16"dia. pipe L511 m 1,466
0
B Selected excavated material bed & surround to
16" dia. pipe L521 m 259
0
0
0
0 Support to existing DUSUP pipes for utility
crossings
REV-01
PART SUMMARY
Page d/18/1
Page d/18/2
Page d/18/3
0 BILL OF QUANTITIES BILL PART
PROJECT:R1048/1
IMPROVEMENTS OF DUSUP GAS PIPELINE SECTION Nr. d/18/402
EXPO 2020 ROADS NETWORK d 18
0
ITEM ITEM DESCRIPTION CESMM4 UNIT QUANTITY RATE
REF.
Page d/18/4
d/18/403
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
PAGE Nr.
d/18/404
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/18/405
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/18/406
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
PAGE Nr.
d/18/407
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
NTT-06
0.00
0.00
0.00
PAGE Nr.
d/18/408
AMOUNT
UAE. Dhs.
0.00
0.00
0
d/15/409
Ducts
0
0
0
0 MISCELLANEOUS WORKS
0
0
d/15/410
d/15/411
0 MISCELLANEOUS WORKS
0
Mass concrete high lighting column bases
complete as detailed on drawing including
excavation backfilling, compaction formwork,
0 concete, holding down with 12mm rebar link
protection of holdng down bolts nuts and washer
with densotape (before casting and after
erection) bitumen paint etc.
0
0
d/15/412
0
BILL NO. 9 STREET LIGHTING WORKS
(Cont'd…)
0
0 MISCELLANEOUS WORKS (Cont'd)
0
0
A Existing Lighting pole retained with 1 new Luminary nr 88 63.00
0
B Existing Lighting pole retained with 1 new Luminary nr 44 63.00
0
C Existing Lighting pole retained with 2 new Luminary nr 177 125.00
0
D Existing Lighting pole replacing with 1 new Luminary nr 6 63.00
0
0
0
G 10m high lighting column with 1 luminary nr 306 563.00
0
H 10m high lighting column with 2 luminary nr 42 625.00
0
J 14m high lighting column with 1 luminary nr 43 563.00
0
K 14m high lighting column with 2 luminary nr 270 625.00
0
L 14m high lighting column with 3 luminary nr 8 688.00
0
Relocation of existing set aside lighting pole as
M nr 6 563.00
detailed on drawing and specification
0
0
0
d/15/413
0
0
0
0
0
0
0
0
0
BILL NO. 9 STREET LIGHTING WORKS
(Cont'd…)
0
0 MISCELLANEOUS WORKS (Cont'd)
0
0 Feeder Pillar
d/15/414
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
BILL NO. 9 STREET LIGHTING WORKS
0
(Cont'd…)
d/15/415
0
BILL NO. 9 STREET LIGHTING WORKS
0
(Cont'd…)
0
0 MISCELLANEOUS WORKS (Cont'd)
0
Supply and Install the following power supply cabling
not in trech as shown on the drawings and
specification
0
A 4C 50mm2 cable + 1C 25mm2 earth cable 1 way m 50 79.00
0
B 4C 75mm2 cable + 1C 50mm2 earth cable 1 way m 50 113.00
0
0
0 Earthing System
d/15/416
0
0
0
0
BILL NO. 9 STREET LIGHTING WORKS
0
(Cont'd…)
0
0 MISCELLANEOUS WORKS (Cont'd)
d/15/417
0
0
0
BILL NO. 9 STREET LIGHTING WORKS
0
(Cont'd…)
0
d/15/418
0
Drawings, O&M Manuals (Hard & Soft copies in PDF
Format, approvals and nstruction books for central
A lighting amanagement system supplied as specified sum 1
and as per client's / Engineers Approval.
d/15/419
0
0
0
BILL NO. 9 STREET LIGHTING WORKS
0
(Cont'd…)
0
0 Additional Items
0
0
d/15/420
0
0
PART SUMMARY
Page
0
d/15/421
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
d/15/422
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
d/15/424
AMOUNT
UAE. Dhs.
14,075.00
400.00
1,275.00
800.00
700.00
d/15/425
AMOUNT
UAE. Dhs.
17,250.00
0.00
0.00
0.00
0.00
d/15/426
AMOUNT
UAE. Dhs.
0.00
5,544.00
2,772.00
22,125.00
378.00
172,278.00
26,250.00
24,209.00
168,750.00
5,504.00
3,378.00
d/15/427
AMOUNT
UAE. Dhs.
431,188.00
5,000.00
5,000.00
4,000.00
1,000.00
d/15/428
AMOUNT
UAE. Dhs.
2,500.00
17,500.00
0.00
d/15/429
AMOUNT
UAE. Dhs.
574,218.00
595,023.00
870,000.00
58,476.00
2,097,717.00
3,950.00
5,650.00
0.00
d/15/430
AMOUNT
UAE. Dhs.
9,600.00
0.00
0.00
0.00
0.00
0.00
d/15/431
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
d/15/432
AMOUNT
UAE. Dhs.
0.00
0.00
0.00
0.00
0.00
d/15/433
AMOUNT
UAE. Dhs.
0.00
d/15/434
AMOUNT
UAE. Dhs.
0.00
0.00
d/15/435
AMOUNT
UAE. Dhs.
17,250.00
0.00
431,188.00
17,500.00
2,097,717.00
9,600.00
d/15/436
AMOUNT
UAE. Dhs.
2,573,255.00
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 437
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/1/1-A
d/1/1-B
d/1/1-C
d/1/1-D
d/1/1-E
d/1/1-F
d/1/1-G
d/1/1-H
d/1/1-J
d/1/1-K
d/1/1-L
d/1/1-M
d/1/1-N
d/1/1-P
d/1/1-Q
d/1/1-R
d/1/2-A
d/1/2-B
d/1/2-C
d/1/2-D
d/1/2-E
d/1/2-F
d/1/2-G
d/1/2-H
d/1/2-J
d/1/2-K
d/1/2-L
d/1/2-M
d/1/2-N
d/1/2-P
d/1/2-Q
d/1/3-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 438
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/1/3-B
d/1/3-C
d/1/3-D
d/1/3-E
d/1/3-F
d/1/3-G
d/1/3-H
d/1/3-J
d/1/3-K
d/1/3-L
d/1/3-M
d/1/4-A
d/1/4-B
d/1/4-C
d/1/4-D
d/1/4-E
d/1/4-F
d/1/4-G
d/1/4-H
d/1/4-J
d/1/4-K
d/1/4-L
d/1/5-A
d/1/5-B
d/1/5-C
d/1/5-D
d/1/5-E
d/1/5-F
d/1/5-G
d/1/5-H
d/1/5-J
d/1/5-K
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 439
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/1/5-L
d/1/5-M
d/1/6-A
d/1/6-B
d/1/7-A
d/1/7-B
d/1/7-C
d/1/7-D
d/1/7-E
d/1/7-F
d/1/7-G
d/1/7-H
d/1/7-J
d/1/7-K
d/1/8-A
d/1/8-B
d/1/8-C
d/1/8-D
d/1/8-E
d/1/8-F
d/1/9-A
d/1/9-B
d/1/9-C
d/1/10-A
d/1/11-A
d/1/12-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 440
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/1/13-A
d/1/14-A
d/1/15-A
d/2/1-A
d/2/1-B
d/2/1-C
d/2/1-D
d/2/1-E
d/2/1-F
d/2/1-G
d/2/1-H
d/2/1-J
d/2/1-K
d/2/1-L
d/2/1-M
d/2/1-N
d/2/1-P
d/2/2-A
d/2/2-B
d/2/2-C
d/2/2-D
d/2/2-E
d/2/2-F
d/2/2-G
d/2/2-H
d/2/2-J
d/2/2-K
d/2/2-L
d/2/2-M
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 441
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/2/2-N
d/2/2-P
d/2/3-A
d/2/3-B
d/2/3-C
d/2/3-D
d/2/3-E
d/2/3-F
d/2/3-G
d/2/3-H
d/2/3-J
d/2/3-K
d/2/3-L
d/2/3-M
d/2/3-N
d/2/3-P
d/2/4-A
d/2/4-B
d/2/4-C
d/2/4-D
d/2/4-E
d/2/4-F
d/2/4-G
d/2/5-A
d/2/5-B
d/2/5-C
d/2/5-D
d/2/5-E
d/2/5-F
d/2/5-G
d/2/5-H
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 442
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/2/5-J
d/2/5-K
d/2/5-L
d/2/5-M
d/2/5-N
d/2/5-P
d/3/1-A
d/3/1-B
d/3/1-C
d/3/1-D
d/3/1-E
d/3/1-F
d/3/1-G
d/3/2-A
d/3/2-B
d/3/2-C
d/3/2-D
d/3/2-E
d/3/2-F
d/3/2-G
d/3/2-H
d/3/2-J
d/3/2-K
d/3/2-L
d/3/3-A
d/3/3-B
d/3/3-C
d/3/3-D
d/3/3-E
d/3/3-F
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 443
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/3/4-A
d/3/4-B
d/3/4-C
d/3/4-D
d/3/4-E
d/3/4-F
d/3/4-G
d/3/4-H
d/3/5-A
d/3/5-B
d/3/5-C
d/3/5-D
d/3/5-E
d/3/5-F
d/3/5-G
d/3/6-A
d/3/6-B
d/3/6-C
d/3/6-D
d/3/6-E
d/3/6-F
d/3/6-G
d/3/6-H
d/3/6-J
d/3/6-K
d/3/6-L
d/3/6-M
d/3/6-N
d/3/6-P
d/3/6-Q
d/3/6-R
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 444
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/3/7-A
d/3/7-B
d/3/7-C
d/3/7-D
d/3/7-E
d/3/7-F
d/3/7-G
d/3/7-H
d/3/7-J
d/3/7-K
d/3/7-L
d/3/7-M
d/3/8-A
d/3/8-B
d/3/8-C
d/3/8-D
d/3/8-E
d/3/8-F
d/3/8-G
d/3/9-A
d/3/9-B
d/3/9-C
d/3/9-D
d/3/9-E
d/3/9-F
d/3/9-G
d/3/9-H
d/3/10-A
d/3/10-B
d/3/10-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 445
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/3/10-D
d/3/10-E
d/3/10-F
d/3/10-G
d/3/10-H
d/4/1-A
d/4/1-B
d/4/1-C
d/4/1-D
d/4/1-E
d/4/1-F
d/4/1-G
d/4/2-A
d/4/2-B
d/4/2-C
d/4/2-D
d/4/2-E
d/4/2-F
d/4/3-A
d/4/3-B
d/4/3-C
d/4/3-D
d/4/3-E
d/4/3-F
d/4/3-G
d/4/3-H
d/4/3-J
d/4/3-K
d/4/3-L
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 446
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/4/4-A
d/4/4-B
d/4/4-C
d/4/4-D
d/4/4-E
d/4/4-F
d/4/4-G
d/4/5-A
d/4/5-B
d/4/5-C
d/4/5-D
d/4/5-E
d/4/5-F
d/4/5-G
d/4/5-H
d/4/6-A
d/4/6-B
d/4/6-C
d/4/6-D
d/5/1-A
d/5/1-B
d/5/1-C
d/5/1-D
d/5/1-E
d/5/1-F
d/5/1-G
d/5/1-H
d/5/1-J
d/5/1-K
d/5/1-L
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 447
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/5/1-M
d/5/2-A
d/5/2-B
d/5/2-C
d/5/2-D
d/5/2-E
d/5/2-F
d/5/2-G
d/5/2-H
d/5/2-J
d/5/2-K
d/5/2-L
d/5/2-M
d/5/2-N
d/5/2-P
d/5/3-A
d/5/3-B
d/5/3-C
d/5/3-D
d/5/3-E
d/5/3-F
d/5/3-G
d/5/3-H
d/5/3-J
d/5/3-K
d/5/3-L
d/5/3-M
d/5/4-A
d/5/4-B
d/5/4-C
d/5/4-D
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 448
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/5/4-E
d/5/4-F
d/5/4-G
d/5/4-H
d/5/4-J
d/5/4-K
d/5/4-L
d/5/4-M
d/5/4-N
d/5/4-P
d/5/4-Q
d/5/5-A
d/5/5-B
d/5/5-C
d/5/5-D
d/5/5-E
d/5/5-F
d/5/5-G
d/5/5-H
d/5/5-J
d/5/5-K
d/5/5-L
d/5/5-M
d/5/5-N
d/5/5-P
d/5/6-A
d/5/6-B
d/5/6-C
d/5/6-D
d/5/6-E
d/5/6-F
d/5/6-G
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 449
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/5/6-H
d/5/6-J
d/5/6-K
d/5/6-L
d/5/6-M
d/5/7-A
d/5/7-B
d/5/7-C
d/5/7-D
d/5/7-E
d/5/7-F
d/5/7-G
d/5/7-H
d/5/7-J
d/5/7-K
d/5/7-L
d/5/7-M
d/5/7-N
d/5/7-P
d/5/7-Q
d/6/1-A
d/6/1-B
d/6/1-C
d/6/1-D
d/6/1-E
d/6/1-F
d/6/1-G
d/6/1-H
d/6/1-J
d/6/1-K
d/6/1-L
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 450
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/6/1-M
d/6/1-N
d/6/1-P
d/6/2-A
d/6/2-B
d/6/2-C
d/6/2-D
d/6/2-E
d/6/2-F
d/6/2-G
d/6/2-H
d/6/2-J
d/6/2-K
d/6/2-L
d/6/2-M
d/6/2-N
d/6/2-P
d/6/3-A
d/6/3-B
d/6/3-C
d/6/3-D
d/6/3-E
d/6/3-F
d/6/3-G
d/6/3-H
d/6/3-J
d/6/3-K
d/6/3-L
d/6/3-M
d/6/3-N
d/6/3-P
d/6/3-Q
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 451
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/6/4-A
d/6/4-B
d/6/4-C
d/6/4-D
d/6/4-E
d/6/4-F
d/6/4-G
d/6/4-H
d/6/4-J
d/6/4-K
d/6/4-L
d/6/5-A
d/6/5-B
d/6/5-C
d/6/5-D
d/6/5-E
d/6/5-F
d/6/5-G
d/6/5-H
d/6/5-J
d/6/5-K
d/6/5-L
d/6/5-M
d/6/5-N
d/6/5-P
d/6/6-A
d/6/6-B
d/6/6-C
d/6/6-D
d/6/6-E
d/6/6-F
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 452
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/6/6-G
d/6/6-H
d/6/6-J
d/6/6-K
d/6/6-L
d/6/6-M
d/6/6-N
d/6/6-P
d/6/6-Q
d/6/6-R
d/6/6-S
d/6/6-T
d/6/7-A
d/6/7-B
d/6/7-C
d/6/7-D
d/6/7-E
d/6/7-F
d/6/7-G
d/6/7-H
d/6/7-J
d/6/7-K
d/6/7-L
d/6/7-M
d/6/7-N
d/6/7-P
d/6/7-Q
d/6/7-R
d/6/7-S
d/6/7-T
d/6/7-U
d/6/7-V
d/6/7-W
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 453
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/6/8-A
d/6/8-B
d/6/8-C
d/6/8-D
d/6/8-E
d/6/8-F
d/6/8-G
d/6/8-H
d/6/8-J
d/6/8-K
d/6/9-A
d/6/9-B
d/6/9-C
d/6/9-D
d/6/9-E
d/6/9-F
d/6/9-G
d/6/9-H
d/6/9-J
d/6/9-K
d/6/9-L
d/6/10-A
d/6/10-B
d/6/10-C
d/6/10-D
d/6/10-E
d/6/10-F
d/6/10-G
d/6/10-H
d/6/10-J
d/6/10-K
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 454
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/6/10-L
d/6/10-M
d/6/10-N
d/6/10-P
d/6/10-Q
d/6/11-A
d/6/11-B
d/6/11-C
d/6/11-D
d/6/11-E
d/6/11-F
d/6/11-G
d/6/11-H
d/6/11-J
d/6/11-K
d/6/11-L
d/6/11-M
d/6/11-N
d/6/11-P
d/6/12-A
d/6/12-B
d/6/12-C
d/6/12-D
d/6/12-E
d/6/12-F
d/6/13-A
d/6/13-B
d/6/13-C
d/6/13-D
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 455
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/1-A
d/7a/1-B
d/7a/1-C
d/7a/1-D
d/7a/1-E
d/7a/1-F
d/7a/1-G
d/7a/1-H
d/7a/1-J
d/7a/1-K
d/7a/2-A
d/7a/2-B
d/7a/2-C
d/7a/2-D
d/7a/3-A
d/7a/3-B
d/7a/3-C
d/7a/3-D
d/7a/3-E
d/7a/3-F
d/7a/3-G
d/7a/3-H
d/7a/3-J
d/7a/3-K
d/7a/3-L
d/7a/4-A
d/7a/4-B
d/7a/4-C
d/7a/4-D
d/7a/4-E
d/7a/4-F
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 456
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/4-G
d/7a/4-H
d/7a/4-J
d/7a/5-A
d/7a/5-B
d/7a/5-C
d/7a/5-D
d/7a/5-E
d/7a/5-F
d/7a/5-G
d/7a/5-H
d/7a/5-J
d/7a/5-K
d/7a/5-L
d/7a/5-M
d/7a/5-N
d/7a/5-P
d/7a/6-A
d/7a/6-B
d/7a/6-C
d/7a/6-D
d/7a/6-E
d/7a/6-F
d/7a/6-G
d/7a/6-H
d/7a/6-J
d/7a/6-K
d/7a/6-L
d/7a/7-A
d/7a/7-B
d/7a/7-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 457
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/7-D
d/7a/7-E
d/7a/7-F
d/7a/7-G
d/7a/7-H
d/7a/8-A
d/7a/8-B
d/7a/8-C
d/7a/8-D
d/7a/8-E
d/7a/8-F
d/7a/8-G
d/7a/8-H
d/7a/9-A
d/7a/9-B
d/7a/9-C
d/7a/9-D
d/7a/9-E
d/7a/9-F
d/7a/10-A
d/7a/10-B
d/7a/10-C
d/7a/10-D
d/7a/10-E
d/7a/10-F
d/7a/10-G
d/7a/10-H
d/7a/10-J
d/7a/10-K
d/7a/10-L
d/7a/10-M
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 458
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/10-N
d/7a/11-A
d/7a/11-B
d/7a/11-C
d/7a/11-D
d/7a/11-E
d/7a/11-F
d/7a/11-G
d/7a/11-H
d/7a/11-J
d/7a/11-K
d/7a/11-L
d/7a/11-M
d/7a/12-A
d/7a/12-B
d/7a/12-C
d/7a/12-D
d/7a/12-E
d/7a/12-F
d/7a/12-G
d/7a/12-H
d/7a/12-J
d/7a/12-K
d/7a/12-L
d/7a/12-M
d/7a/12-N
d/7a/12-P
d/7a/12-Q
d/7a/12-R
d/7a/13-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 459
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/14-A
d/7a/14-B
d/7a/14-C
d/7a/14-D
d/7a/14-E
d/7a/14-F
d/7a/15-A
d/7a/15-B
d/7a/15-C
d/7a/15-D
d/7a/15-E
d/7a/15-F
d/7a/15-G
d/7a/16-A
d/7a/16-B
d/7a/16-C
d/7a/16-D
d/7a/16-E
d/7a/17-A
d/7a/17-B
d/7a/17-C
d/7a/17-D
d/7a/17-E
d/7a/17-F
d/7a/17-G
d/7a/17-H
d/7a/17-J
d/7a/17-K
d/7a/17-L
d/7a/18-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 460
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7a/18-B
d/7a/18-C
d/7b/1-A
d/7b/1-B
d/7b/1-C
d/7b/1-D
d/7b/1-E
d/7b/1-F
d/7b/1-G
d/7b/1-H
d/7b/1-J
d/7b/1-K
d/7b/2-A
d/7b/2-B
d/7b/2-C
d/7b/2-D
d/7b/3-A
d/7b/3-B
d/7b/3-C
d/7b/3-D
d/7b/3-E
d/7b/3-F
d/7b/3-G
d/7b/3-H
d/7b/4-A
d/7b/4-B
d/7b/4-C
d/7b/4-D
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 461
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7b/5-A
d/7b/5-B
d/7b/5-C
d/7b/5-D
d/7b/5-E
d/7b/5-F
d/7b/5-G
d/7b/5-H
d/7b/5-J
d/7b/5-K
d/7b/6-A
d/7b/6-B
d/7b/6-C
d/7b/6-D
d/7b/6-E
d/7b/6-F
d/7b/6-G
d/7b/7-A
d/7b/7-B
d/7b/7-C
d/7b/7-D
d/7b/7-E
d/7b/7-F
d/7b/7-G
d/7b/7-H
d/7b/8-A
d/7b/8-B
d/7b/8-C
d/7b/8-D
d/7b/8-E
d/7b/8-F
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 462
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7b/8-G
d/7b/8-H
d/7b/9-A
d/7b/9-B
d/7b/9-C
d/7b/9-D
d/7b/9-E
d/7b/9-F
d/7b/9-G
d/7b/10-A
d/7b/10-B
d/7b/10-C
d/7b/10-D
d/7b/10-E
d/7b/11-A
d/7b/11-B
d/7b/11-C
d/7b/11-D
d/7b/11-E
d/7b/11-F
d/7b/12-A
d/7b/12-B
d/7b/12-C
d/7b/12-D
d/7b/12-E
d/7b/12-F
d/7b/12-G
d/7b/12-H
d/7b/12-J
d/7b/12-K
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 463
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7b/12-L
d/7b/12-M
d/7b/12-N
d/7b/13-A
d/7b/13-B
d/7b/13-C
d/7b/13-D
d/7b/13-E
d/7b/13-F
d/7b/13-G
d/7b/13-H
d/7b/13-J
d/7b/14-
d/7b/15-A
d/7b/16-A
d/7b/16-B
d/7b/16-C
d/7b/16-D
d/7b/16-E
d/7b/16-F
d/7b/16-G
d/7b/17-A
d/7b/17-B
d/7b/17-C
d/7b/17-D
d/7b/17-E
d/7b/17-F
d/7b/17-G
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 464
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7b/18-A
d/7b/18-B
d/7b/18-C
d/7b/18-D
d/7b/18-E
d/7b/19-A
d/7b/19-B
d/7b/19-C
d/7b/19-D
d/7b/19-E
d/7b/19-F
d/7b/19-G
d/7b/19-H
d/7b/19-J
d/7b/19-K
d/7b/19-L
d/7b/20-A
d/7b/20-B
d/7b/20-C
d/7c/1-A
d/7c/1-B
d/7c/1-C
d/7c/1-D
d/7c/1-E
d/7c/1-F
d/7c/1-G
d/7c/1-H
d/7c/1-J
d/7c/1-K
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 465
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7c/2-A
d/7c/2-B
d/7c/2-C
d/7c/2-D
d/7c/3-A
d/7c/3-B
d/7c/3-C
d/7c/3-D
d/7c/3-E
d/7c/3-F
d/7c/3-G
d/7c/3-H
d/7c/3-J
d/7c/4-A
d/7c/4-B
d/7c/4-C
d/7c/4-D
d/7c/5-A
d/7c/5-B
d/7c/5-C
d/7c/5-D
d/7c/5-E
d/7c/5-F
d/7c/5-G
d/7c/5-H
d/7c/5-J
d/7c/5-K
d/7c/6-A
d/7c/6-B
d/7c/6-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 466
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7c/6-D
d/7c/6-E
d/7c/6-F
d/7c/6-G
d/7c/7-A
d/7c/7-B
d/7c/7-C
d/7c/7-D
d/7c/7-E
d/7c/7-F
d/7c/7-G
d/7c/7-H
d/7c/8-A
d/7c/8-B
d/7c/8-C
d/7c/8-D
d/7c/8-E
d/7c/8-F
d/7c/8-G
d/7c/8-H
d/7c/8-J
d/7c/9-A
d/7c/9-B
d/7c/9-C
d/7c/9-D
d/7c/9-E
d/7c/9-F
d/7c/9-G
d/7c/9-H
d/7c/9-J
d/7c/9-K
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 467
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7c/9-L
d/7c/10-A
d/7c/10-B
d/7c/10-C
d/7c/10-D
d/7c/10-E
d/7c/10-F
d/7c/10-G
d/7c/10-H
d/7c/10-J
d/7c/10-K
d/7c/10-L
d/7c/10-M
d/7c/10-N
d/7c/11-A
d/7c/11-B
d/7c/11-C
d/7c/11-D
d/7c/11-E
d/7c/11-F
d/7c/11-G
d/7c/11-H
d/7c/11-J
d/7c/11-K
d/7c/11-L
d/7c/11-M
d/7c/12-A
d/7c/13-A
d/7c/14-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 468
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7c/14-B
d/7c/14-C
d/7c/14-D
d/7c/14-E
d/7c/14-F
d/7c/14-G
d/7c/14-H
d/7c/14-J
d/7c/14-K
d/7c/15-A
d/7c/15-B
d/7c/15-C
d/7c/15-D
d/7c/15-E
d/7c/15-F
d/7c/15-G
d/7c/15-H
d/7c/15-J
d/7c/15-K
d/7c/16-A
d/7c/16-B
d/7c/16-C
d/7c/16-D
d/7c/16-E
d/7c/16-F
d/7c/16-G
d/7c/16-H
d/7c/16-J
d/7c/16-K
d/7c/17-A
d/7c/17-B
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 469
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7c/17-C
d/7c/17-D
d/7c/17-E
d/7c/17-F
d/7c/17-G
d/7c/17-H
d/7c/17-J
d/7c/17-K
d/7c/17-L
d/7c/18-A
d/7c/18-B
d/7c/18-C
d/7d/1-A
d/7d/1-B
d/7d/1-C
d/7d/1-D
d/7d/1-E
d/7d/1-F
d/7d/1-G
d/7d/1-H
d/7d/1-J
d/7d/1-K
d/7d/2-A
d/7d/2-B
d/7d/2-C
d/7d/2-D
d/7d/3-A
d/7d/3-B
d/7d/3-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 470
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7d/3-D
d/7d/3-E
d/7d/3-F
d/7d/3-G
d/7d/3-H
d/7d/4-A
d/7d/4-B
d/7d/4-C
d/7d/4-D
d/7d/5-A
d/7d/5-B
d/7d/5-C
d/7d/5-D
d/7d/5-E
d/7d/5-F
d/7d/5-G
d/7d/5-H
d/7d/5-J
d/7d/5-K
d/7d/6-A
d/7d/6-B
d/7d/6-C
d/7d/6-D
d/7d/6-E
d/7d/6-F
d/7d/7-A
d/7d/7-B
d/7d/7-C
d/7d/7-D
d/7d/7-E
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 471
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7d/7-F
d/7d/7-G
d/7d/7-H
d/7d/8-A
d/7d/8-B
d/7d/8-C
d/7d/8-D
d/7d/8-E
d/7d/8-F
d/7d/8-G
d/7d/8-H
d/7d/9-A
d/7d/9-B
d/7d/9-C
d/7d/9-D
d/7d/9-E
d/7d/9-F
d/7d/9-G
d/7d/9-H
d/7d/10-A
d/7d/10-B
d/7d/10-C
d/7d/10-D
d/7d/10-E
d/7d/10-F
d/7d/10-G
d/7d/10-H
d/7d/10-J
d/7d/10-K
d/7d/10-L
d/7d/10-M
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 472
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7d/10-N
d/7d/11-A
d/7d/11-B
d/7d/11-C
d/7d/11-D
d/7d/11-E
d/7d/11-F
d/7d/12-A
d/7d/13-A
d/7d/14-A
d/7d/14-B
d/7d/14-C
d/7d/14-D
d/7d/14-E
d/7d/14-F
d/7d/14-G
d/7d/15-A
d/7d/15-B
d/7d/15-C
d/7d/15-D
d/7d/15-E
d/7d/15-F
d/7d/15-G
d/7d/16-A
d/7d/16-B
d/7d/16-C
d/7d/16-D
d/7d/16-E
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 473
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7d/17-A
d/7d/17-B
d/7d/17-C
d/7d/17-D
d/7d/17-E
d/7d/17-F
d/7d/17-G
d/7d/17-H
d/7d/17-J
d/7d/17-K
d/7d/17-L
d/7d/18-A
d/7d/18-B
d/7d/18-C
d/7e/1-A
d/7e/1-B
d/7e/1-C
d/7e/1-D
d/7e/1-E
d/7e/1-F
d/7e/1-G
d/7e/1-H
d/7e/1-J
d/7e/1-K
d/7e/2-A
d/7e/2-B
d/7e/2-C
d/7e/2-D
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 474
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7e/3-A
d/7e/3-B
d/7e/3-C
d/7e/3-D
d/7e/3-E
d/7e/3-F
d/7e/3-G
d/7e/3-H
d/7e/4-A
d/7e/4-B
d/7e/4-C
d/7e/4-D
d/7e/4-E
d/7e/5-A
d/7e/5-B
d/7e/5-C
d/7e/5-D
d/7e/5-E
d/7e/5-F
d/7e/5-G
d/7e/5-H
d/7e/5-J
d/7e/5-K
d/7e/5-L
d/7e/5-M
d/7e/6-A
d/7e/6-B
d/7e/6-C
d/7e/6-D
d/7e/6-E
d/7e/6-F
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 475
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7e/7-A
d/7e/7-B
d/7e/7-C
d/7e/7-D
d/7e/7-E
d/7e/7-F
d/7e/7-G
d/7e/7-H
d/7e/8-A
d/7e/8-B
d/7e/8-C
d/7e/8-D
d/7e/8-E
d/7e/8-F
d/7e/8-G
d/7e/9-A
d/7e/9-B
d/7e/9-C
d/7e/9-D
d/7e/10-A
d/7e/10-B
d/7e/10-C
d/7e/10-D
d/7e/10-E
d/7e/10-F
d/7e/10-G
d/7e/10-H
d/7e/10-J
d/7e/10-K
d/7e/10-L
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 476
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7e/10-M
d/7e/10-N
d/7e/11-A
d/7e/11-B
d/7e/11-C
d/7e/11-D
d/7e/11-E
d/7e/11-F
d/7e/11-G
d/7e/11-H
d/7e/12-A
d/7e/13-A
d/7e/14-A
d/7e/14-B
d/7e/14-C
d/7e/14-D
d/7e/14-E
d/7e/14-F
d/7e/14-G
d/7e/14-H
d/7e/14-J
d/7e/15-A
d/7e/15-B
d/7e/15-C
d/7e/15-D
d/7e/15-E
d/7e/15-F
d/7e/15-G
d/7e/15-H
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 477
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7e/15-J
d/7e/15-K
d/7e/16-A
d/7e/16-B
d/7e/16-C
d/7e/16-D
d/7e/16-E
d/7e/16-F
d/7e/16-G
d/7e/16-H
d/7e/16-J
d/7e/16-K
d/7e/17-A
d/7e/17-B
d/7e/17-C
d/7e/17-D
d/7e/17-E
d/7e/17-F
d/7e/17-G
d/7e/17-H
d/7e/17-J
d/7e/17-K
d/7e/17-L
d/7e/18-A
d/7e/18-B
d/7e/18-C
d/7f/1-A
d/7f/1-B
d/7f/1-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 478
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7f/1-D
d/7f/1-E
d/7f/1-F
d/7f/1-G
d/7f/1-H
d/7f/1-J
d/7f/1-K
d/7f/2-A
d/7f/2-B
d/7f/2-C
d/7f/2-D
d/7f/3-A
d/7f/3-B
d/7f/3-C
d/7f/3-D
d/7f/3-E
d/7f/3-F
d/7f/3-G
d/7f/3-H
d/7f/3-J
d/7f/4-A
d/7f/4-B
d/7f/4-C
d/7f/4-D
d/7f/4-E
d/7f/5-A
d/7f/5-B
d/7f/5-C
d/7f/5-D
d/7f/5-E
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 479
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7f/5-F
d/7f/5-G
d/7f/5-H
d/7f/5-J
d/7f/5-K
d/7f/5-L
d/7f/6-A
d/7f/6-B
d/7f/6-C
d/7f/6-D
d/7f/6-E
d/7f/6-F
d/7f/7-A
d/7f/7-B
d/7f/7-C
d/7f/7-D
d/7f/7-E
d/7f/7-F
d/7f/7-G
d/7f/7-H
d/7f/8-A
d/7f/8-B
d/7f/8-C
d/7f/8-D
d/7f/8-E
d/7f/8-F
d/7f/8-G
d/7f/9-A
d/7f/9-B
d/7f/9-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 480
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7f/9-D
d/7f/10-A
d/7f/10-B
d/7f/10-C
d/7f/10-D
d/7f/10-E
d/7f/10-F
d/7f/10-G
d/7f/10-H
d/7f/10-J
d/7f/10-K
d/7f/10-L
d/7f/10-M
d/7f/10-N
d/7f/11-A
d/7f/11-B
d/7f/11-C
d/7f/11-D
d/7f/11-E
d/7f/11-F
d/7f/12-A
d/7f/13-A
d/7f/14-A
d/7f/14-B
d/7f/14-C
d/7f/14-D
d/7f/14-E
d/7f/14-F
d/7f/14-G
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 481
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7f/14-H
d/7f/14-J
d/7f/15-A
d/7f/15-B
d/7f/15-C
d/7f/15-D
d/7f/15-E
d/7f/15-F
d/7f/15-G
d/7f/15-H
d/7f/15-J
d/7f/15-K
d/7f/16-A
d/7f/16-B
d/7f/16-C
d/7f/16-D
d/7f/16-E
d/7f/16-F
d/7f/16-G
d/7f/16-H
d/7f/16-J
d/7f/16-K
d/7f/17-A
d/7f/17-B
d/7f/17-C
d/7f/17-D
d/7f/17-E
d/7f/17-F
d/7f/17-G
d/7f/17-H
d/7f/17-J
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 482
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7f/17-K
d/7f/17-L
d/7f/18-A
d/7f/18-B
d/7f/18-C
d/7g/1-A
d/7g/1-B
d/7g/1-C
d/7g/1-D
d/7g/1-E
d/7g/1-F
d/7g/1-G
d/7g/1-H
d/7g/1-J
d/7g/1-K
d/7g/2-A
d/7g/2-B
d/7g/2-C
d/7g/2-D
d/7g/3-A
d/7g/3-B
d/7g/3-C
d/7g/3-D
d/7g/3-E
d/7g/3-F
d/7g/3-G
d/7g/3-H
d/7g/3-J
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 483
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7g/4-A
d/7g/4-B
d/7g/4-C
d/7g/4-D
d/7g/4-E
d/7g/5-A
d/7g/5-B
d/7g/5-C
d/7g/5-D
d/7g/5-E
d/7g/5-F
d/7g/5-G
d/7g/5-H
d/7g/5-J
d/7g/5-K
d/7g/5-L
d/7g/5-M
d/7g/6-A
d/7g/6-B
d/7g/6-C
d/7g/6-D
d/7g/6-E
d/7g/6-F
d/7g/7-A
d/7g/7-B
d/7g/7-C
d/7g/7-D
d/7g/7-E
d/7g/7-F
d/7g/7-G
d/7g/7-H
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 484
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7g/8-A
d/7g/8-B
d/7g/8-C
d/7g/8-D
d/7g/8-E
d/7g/8-F
d/7g/8-G
d/7g/9-A
d/7g/9-B
d/7g/9-C
d/7g/9-D
d/7g/10-A
d/7g/10-B
d/7g/10-C
d/7g/10-D
d/7g/10-E
d/7g/10-F
d/7g/10-G
d/7g/10-H
d/7g/10-J
d/7g/10-K
d/7g/10-L
d/7g/10-M
d/7g/10-N
d/7g/11-A
d/7g/11-B
d/7g/11-C
d/7g/11-D
d/7g/11-E
d/7g/11-F
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 485
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7g/11-G
d/7g/11-H
d/7g/12-A
d/7g/13-A
d/7g/14-A
d/7g/14-B
d/7g/14-C
d/7g/14-D
d/7g/14-E
d/7g/14-F
d/7g/14-G
d/7g/14-H
d/7g/14-J
d/7g/15-A
d/7g/15-B
d/7g/15-C
d/7g/15-D
d/7g/15-E
d/7g/15-F
d/7g/15-G
d/7g/15-H
d/7g/15-J
d/7g/15-K
d/7g/16-A
d/7g/16-B
d/7g/16-C
d/7g/16-D
d/7g/16-E
d/7g/16-F
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 486
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7g/16-G
d/7g/16-H
d/7g/16-J
d/7g/16-K
d/7g/17-A
d/7g/17-B
d/7g/17-C
d/7g/17-D
d/7g/17-E
d/7g/17-F
d/7g/17-G
d/7g/17-H
d/7g/17-J
d/7g/17-K
d/7g/17-L
d/7g/18-A
d/7g/18-B
d/7g/18-C
d/7h/1-A
d/7h/1-B
d/7h/1-C
d/7h/1-D
d/7h/1-E
d/7h/1-F
d/7h/1-G
d/7h/1-H
d/7h/1-J
d/7h/1-K
d/7h/2-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 487
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7h/2-B
d/7h/2-C
d/7h/2-D
d/7h/3-A
d/7h/3-B
d/7h/3-C
d/7h/3-D
d/7h/3-E
d/7h/3-F
d/7h/3-G
d/7h/3-H
d/7h/3-J
d/7h/3-K
d/7h/4-A
d/7h/4-B
d/7h/4-C
d/7h/4-D
d/7h/4-E
d/7h/5-A
d/7h/5-B
d/7h/5-C
d/7h/5-D
d/7h/5-E
d/7h/5-F
d/7h/5-G
d/7h/5-H
d/7h/5-J
d/7h/5-K
d/7h/5-L
d/7h/5-M
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 488
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7h/6-A
d/7h/6-B
d/7h/6-C
d/7h/6-D
d/7h/6-E
d/7h/6-F
d/7h/7-A
d/7h/7-B
d/7h/7-C
d/7h/7-D
d/7h/7-E
d/7h/7-F
d/7h/7-G
d/7h/7-H
d/7h/8-A
d/7h/8-B
d/7h/8-C
d/7h/8-D
d/7h/8-E
d/7h/8-F
d/7h/8-G
d/7h/9-A
d/7h/9-B
d/7h/9-C
d/7h/9-D
d/7h/10-A
d/7h/10-B
d/7h/10-C
d/7h/10-D
d/7h/10-E
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 489
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7h/10-F
d/7h/10-G
d/7h/10-H
d/7h/10-J
d/7h/10-K
d/7h/10-L
d/7h/10-M
d/7h/10-N
d/7h/11-A
d/7h/11-B
d/7h/11-C
d/7h/11-D
d/7h/11-E
d/7h/11-F
d/7h/12-A
d/7h/13-A
d/7h/14-A
d/7h/14-B
d/7h/14-C
d/7h/14-D
d/7h/14-E
d/7h/14-F
d/7h/14-G
d/7h/14-H
d/7h/14-J
d/7h/15-A
d/7h/15-B
d/7h/15-C
d/7h/15-D
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 490
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7h/15-E
d/7h/15-F
d/7h/15-G
d/7h/15-H
d/7h/15-J
d/7h/15-K
d/7h/16-A
d/7h/16-B
d/7h/16-C
d/7h/16-D
d/7h/16-E
d/7h/16-F
d/7h/16-G
d/7h/16-H
d/7h/16-J
d/7h/16-K
d/7h/17-A
d/7h/17-B
d/7h/17-C
d/7h/17-D
d/7h/17-E
d/7h/17-F
d/7h/17-G
d/7h/17-H
d/7h/17-J
d/7h/17-K
d/7h/17-L
d/7h/18-A
d/7h/18-B
d/7h/18-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 491
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7i/1-A
d/7i/1-B
d/7i/1-C
d/7i/1-D
d/7i/1-E
d/7i/1-F
d/7i/2-A
d/7i/2-B
d/7i/2-C
d/7i/2-D
d/7i/2-E
d/7i/2-F
d/7i/2-G
d/7i/3-A
d/7i/3-B
d/7i/3-C
d/7i/3-D
d/7i/3-E
d/7i/3-F
d/7i/4-A
d/7i/4-B
d/7i/4-C
d/7i/4-D
d/7i/4-E
d/7i/4-F
d/7i/4-G
d/7i/4-H
d/7i/4-J
d/7i/4-K
d/7i/4-L
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 492
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/7i/5-A
d/7i/5-B
d/7i/5-C
d/7i/5-D
d/7i/5-E
d/7i/6-A
d/7i/6-B
d/7i/6-C
d/7i/6-D
d/7i/6-E
d/7i/6-F
d/7i/7-A
d/7i/7-B
d/7i/7-C
d/7i/7-D
d/7i/7-E
d/7i/7-F
d/7i/7-G
d/7i/7-H
d/8/1-A
d/8/1-B
d/8/1-C
d/8/1-D
d/8/1-E
d/8/1-F
d/8/1-G
d/8/1-H
d/8/1-J
d/8/1-K
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 493
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/8/1-L
d/8/1-M
d/8/1-N
d/8/2-A
d/8/2-B
d/8/2-C
d/8/2-D
d/8/2-E
d/8/2-F
d/8/2-G
d/8/2-H
d/8/2-J
d/8/2-K
d/8/2-L
d/8/2-M
d/8/2-N
d/8/2-P
d/8/3-A
d/8/3-B
d/8/3-C
d/8/3-D
d/8/3-E
d/8/3-F
d/8/3-G
d/8/3-H
d/8/3-J
d/8/3-K
d/8/3-L
d/8/3-M
d/8/3-N
d/8/4-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 494
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/8/4-B
d/8/4-C
d/8/4-D
d/8/4-E
d/8/4-F
d/8/4-G
d/8/4-H
d/8/4-J
d/8/4-K
d/8/4-L
d/8/4-M
d/8/4-N
d/8/4-P
d/8/5-A
d/8/5-B
d/8/5-C
d/8/5-D
d/8/5-E
d/8/5-F
d/8/5-G
d/8/5-H
d/8/5-J
d/8/5-K
d/8/6-A
d/8/6-B
d/8/6-C
d/8/6-D
d/8/6-E
d/8/7-A
d/8/7-B
d/8/7-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 495
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/8/7-D
d/8/7-E
d/8/8-A
d/9/1-A
d/9/1-B
d/9/1-C
d/9/1-D
d/9/1-E
d/9/1-F
d/9/1-G
d/9/1-H
d/9/1-J
d/9/1-K
d/9/1-L
d/9/1-M
d/9/1-N
d/9/1-P
d/9/1-Q
d/9/1-R
d/9/2-A
d/9/2-B
d/9/2-C
d/9/2-D
d/9/2-E
d/9/2-F
d/9/2-G
d/9/2-H
d/9/2-J
d/9/2-K
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 496
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/3-A
d/9/3-B
d/9/3-C
d/9/3-D
d/9/4-A
d/9/4-B
d/9/4-C
d/9/4-D
d/9/4-E
d/9/4-F
d/9/4-G
d/9/4-H
d/9/4-J
d/9/4-K
d/9/4-L
d/9/4-M
d/9/4-N
d/9/4-P
d/9/4-Q
d/9/5-A
d/9/5-B
d/9/5-C
d/9/5-D
d/9/5-E
d/9/5-F
d/9/5-G
d/9/5-H
d/9/5-J
d/9/5-K
d/9/6-A
d/9/6-B
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 497
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/6-C
d/9/6-D
d/9/6-E
d/9/6-F
d/9/6-G
d/9/6-H
d/9/6-J
d/9/6-K
d/9/6-L
d/9/6-M
d/9/6-N
d/9/6-P
d/9/6-Q
d/9/7-A
d/9/7-B
d/9/7-C
d/9/7-D
d/9/7-E
d/9/7-F
d/9/7-G
d/9/8-A
d/9/8-B
d/9/8-C
d/9/8-D
d/9/8-E
d/9/8-F
d/9/8-G
d/9/8-H
d/9/8-J
d/9/8-K
d/9/8-L
d/9/8-M
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 498
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/8-N
d/9/8-P
d/9/8-Q
d/9/8-R
d/9/9-A
d/9/9-B
d/9/9-C
d/9/9-D
d/9/9-E
d/9/9-F
d/9/9-G
d/9/9-H
d/9/9-J
d/9/9-K
d/9/9-L
d/9/9-M
d/9/9-N
d/9/9-P
d/9/9-Q
d/9/9-R
d/9/9-S
d/9/9-T
d/9/9-U
d/9/9-V
d/9/10-A
d/9/10-B
d/9/10-C
d/9/10-D
d/9/10-E
d/9/10-F
d/9/10-G
d/9/10-H
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 499
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/10-J
d/9/10-K
d/9/10-L
d/9/10-M
d/9/10-N
d/9/10-P
d/9/10-Q
d/9/11-A
d/9/11-B
d/9/11-C
d/9/11-D
d/9/11-E
d/9/11-F
d/9/11-G
d/9/12-A
d/9/12-B
d/9/12-C
d/9/12-D
d/9/12-E
d/9/12-F
d/9/12-G
d/9/12-H
d/9/13-A
d/9/13-B
d/9/13-C
d/9/13-D
d/9/13-E
d/9/13-F
d/9/13-G
d/9/13-H
d/9/13-J
d/9/13-K
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 500
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/13-L
d/9/13-M
d/9/13-N
d/9/13-P
d/9/14-A
d/9/14-B
d/9/14-C
d/9/14-D
d/9/14-E
d/9/14-F
d/9/14-G
d/9/14-H
d/9/15-A
d/9/15-B
d/9/15-C
d/9/15-D
d/9/15-E
d/9/15-F
d/9/15-G
d/9/16-A
d/9/16-B
d/9/16-C
d/9/16-D
d/9/16-E
d/9/16-F
d/9/16-G
d/9/16-H
d/9/17-A
d/9/17-B
d/9/17-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 501
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/17-D
d/9/17-E
d/9/17-F
d/9/17-G
d/9/17-H
d/9/18-A
d/9/18-B
d/9/18-C
d/9/18-D
d/9/18-E
d/9/18-F
d/9/18-G
d/9/18-H
d/9/18-J
d/9/18-K
d/9/18-L
d/9/18-M
d/9/18-N
d/9/19-A
d/9/19-B
d/9/19-C
d/9/19-D
d/9/19-E
d/9/19-F
d/9/19-G
d/9/19-H
d/9/19-J
d/9/19-K
d/9/19-L
d/9/19-M
d/9/20-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 502
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/9/20-B
d/9/20-C
d/9/20-D
d/10/1-A
d/10/1-B
d/10/1-C
d/10/1-D
d/10/1-E
d/10/1-F
d/10/1-G
d/10/1-H
d/10/1-J
d/10/1-K
d/10/1-L
d/10/1-M
d/10/1-N
d/10/1-P
d/10/1-Q
d/10/1-R
d/10/1-S
d/10/2-A
d/10/2-B
d/10/2-C
d/10/2-D
d/10/2-E
d/10/2-F
d/10/2-G
d/10/2-H
d/10/2-J
d/10/2-K
d/10/2-L
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 503
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/2-M
d/10/2-N
d/10/2-P
d/10/2-Q
d/10/2-R
d/10/2-S
d/10/3-A
d/10/3-B
d/10/3-C
d/10/3-D
d/10/3-E
d/10/3-F
d/10/3-G
d/10/3-H
d/10/3-J
d/10/3-K
d/10/3-L
d/10/3-M
d/10/3-N
d/10/4-A
d/10/4-B
d/10/4-C
d/10/4-D
d/10/4-E
d/10/4-F
d/10/4-G
d/10/4-H
d/10/4-J
d/10/4-K
d/10/4-L
d/10/4-M
d/10/4-N
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 504
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/4-P
d/10/4-Q
d/10/4-R
d/10/5-A
d/10/5-B
d/10/5-C
d/10/5-D
d/10/5-E
d/10/5-F
d/10/5-G
d/10/6-A
d/10/6-B
d/10/6-C
d/10/6-D
d/10/6-E
d/10/6-F
d/10/6-G
d/10/6-H
d/10/6-J
d/10/6-K
d/10/6-L
d/10/6-M
d/10/6-N
d/10/6-P
d/10/6-Q
d/10/6-R
d/10/7-A
d/10/7-B
d/10/7-C
d/10/7-D
d/10/7-E
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 505
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/7-F
d/10/7-G
d/10/7-H
d/10/7-J
d/10/7-K
d/10/7-L
d/10/7-M
d/10/7-N
d/10/7-P
d/10/7-Q
d/10/7-R
d/10/8-A
d/10/8-B
d/10/8-C
d/10/8-D
d/10/8-E
d/10/8-F
d/10/8-G
d/10/8-H
d/10/8-J
d/10/8-K
d/10/8-L
d/10/8-M
d/10/8-N
d/10/9-A
d/10/9-B
d/10/9-C
d/10/9-D
d/10/9-E
d/10/9-F
d/10/9-G
d/10/9-H
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 506
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/9-J
d/10/9-K
d/10/9-L
d/10/9-M
d/10/9-N
d/10/10-A
d/10/10-B
d/10/10-C
d/10/10-D
d/10/10-E
d/10/10-F
d/10/10-G
d/10/10-H
d/10/10-J
d/10/10-K
d/10/10-L
d/10/10-M
d/10/10-N
d/10/11-A
d/10/11-B
d/10/11-C
d/10/11-D
d/10/11-E
d/10/11-F
d/10/12-A
d/10/12-B
d/10/12-C
d/10/12-D
d/10/12-E
d/10/12-F
d/10/12-G
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 507
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/12-H
d/10/12-J
d/10/12-K
d/10/12-L
d/10/12-M
d/10/12-N
d/10/12-P
d/10/12-Q
d/10/12-R
d/10/12-S
d/10/12-T
d/10/12-U
d/10/13-A
d/10/13-B
d/10/13-C
d/10/13-D
d/10/13-E
d/10/13-F
d/10/13-G
d/10/13-H
d/10/13-J
d/10/13-K
d/10/13-L
d/10/13-M
d/10/13-N
d/10/13-P
d/10/13-Q
d/10/13-R
d/10/13-S
d/10/13-T
d/10/13-U
d/10/13-V
d/10/13-W
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 508
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/13-X
d/10/14-A
d/10/14-B
d/10/14-C
d/10/14-D
d/10/14-E
d/10/14-F
d/10/14-G
d/10/14-H
d/10/14-J
d/10/14-K
d/10/14-L
d/10/14-M
d/10/14-N
d/10/14-P
d/10/14-Q
d/10/14-R
d/10/14-S
d/10/14-T
d/10/14-U
d/10/14-V
d/10/14-W
d/10/14-X
d/10/15-A
d/10/15-B
d/10/15-C
d/10/15-D
d/10/15-E
d/10/15-F
d/10/15-G
d/10/15-H
d/10/15-J
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 509
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/15-K
d/10/15-L
d/10/15-M
d/10/15-N
d/10/15-P
d/10/15-Q
d/10/15-R
d/10/15-S
d/10/15-T
d/10/15-U
d/10/15-V
d/10/15-W
d/10/16-A
d/10/16-B
d/10/16-C
d/10/16-D
d/10/16-E
d/10/16-F
d/10/16-G
d/10/16-H
d/10/16-J
d/10/16-K
d/10/16-L
d/10/16-M
d/10/16-N
d/10/16-P
d/10/16-Q
d/10/16-R
d/10/16-S
d/10/17-A
d/10/17-B
d/10/17-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 510
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/17-D
d/10/17-E
d/10/17-F
d/10/17-G
d/10/17-H
d/10/17-J
d/10/17-K
d/10/17-L
d/10/17-M
d/10/17-N
d/10/17-P
d/10/18-A
d/10/18-B
d/10/18-C
d/10/18-D
d/10/18-E
d/10/18-F
d/10/18-G
d/10/18-H
d/10/18-J
d/10/18-K
d/10/18-L
d/10/18-M
d/10/18-N
d/10/18-P
d/10/19-A
d/10/19-B
d/10/20-A
d/10/20-B
d/10/20-C
d/10/20-D
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 511
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/10/20-E
d/10/20-F
d/10/21-A
d/10/21-B
d/10/21-C
d/10/21-D
d/10/21-E
d/10/22-A
d/10/22-B
d/10/22-C
d/11/1-A
d/11/1-B
d/11/1-C
d/11/1-D
d/11/2-A
d/11/2-B
d/11/2-C
d/11/2-D
d/11/2-E
d/11/2-F
d/11/2-G
d/11/2-H
d/11/2-J
d/11/2-K
d/11/2-L
d/11/2-M
d/11/2-N
d/11/2-P
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 512
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/11/3-A
d/11/3-B
d/11/3-C
d/11/3-D
d/11/3-E
d/11/3-F
d/11/3-G
d/11/3-H
d/11/3-J
d/11/3-K
d/11/3-L
d/11/3-M
d/11/3-N
d/11/4-A
d/11/4-B
d/11/4-C
d/11/4-D
d/11/4-E
d/11/4-F
d/11/4-G
d/11/4-H
d/11/4-J
d/11/4-K
d/11/5-A
d/11/5-B
d/11/5-C
d/11/5-D
d/11/5-E
d/11/5-F
d/11/5-G
d/11/5-H
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 513
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/11/6-A
d/11/6-B
d/11/6-C
d/11/6-D
d/11/6-E
d/11/6-F
d/11/6-G
d/11/6-H
d/11/7-A
d/11/7-B
d/11/7-C
d/11/7-D
d/11/7-E
d/11/7-F
d/11/7-G
d/11/8-A
d/11/8-B
d/11/8-C
d/11/8-D
d/11/8-E
d/11/8-F
d/11/8-G
d/11/8-H
d/11/8-J
d/11/8-K
d/11/8-L
d/11/8-M
d/11/8-N
d/11/8-P
d/11/8-Q
d/11/9-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 514
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/11/9-B
d/11/9-C
d/11/9-D
d/11/9-E
d/11/9-F
d/11/9-G
d/11/9-H
d/11/9-J
d/11/9-K
d/11/9-L
d/11/9-M
d/11/10-A
d/11/10-B
d/12/1-A
d/12/1-B
d/12/1-C
d/12/1-D
d/12/1-E
d/12/1-F
d/12/1-G
d/12/2-A
d/12/2-B
d/12/2-C
d/12/2-D
d/12/2-E
d/12/2-F
d/12/2-G
d/12/2-H
d/12/2-J
d/12/2-K
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 515
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/12/3-A
d/12/3-B
d/12/3-C
d/12/3-D
d/12/3-E
d/12/3-F
d/12/3-G
d/12/3-H
d/12/3-J
d/12/3-K
d/12/3-L
d/12/3-M
d/12/3-N
d/12/3-P
d/12/4-A
d/12/4-B
d/12/4-C
d/12/4-D
d/12/4-E
d/12/4-F
d/12/4-G
d/12/4-H
d/12/4-J
d/12/4-K
d/12/4-L
d/12/4-M
d/12/4-N
d/12/4-P
d/12/4-Q
d/12/4-R
d/12/5-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 516
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/12/5-B
d/12/5-C
d/12/5-D
d/12/5-E
d/12/5-F
d/12/5-G
d/12/5-H
d/12/5-J
d/12/5-K
d/12/5-L
d/12/5-M
d/12/5-N
d/12/5-P
d/12/6-A
d/12/6-B
d/12/6-C
d/12/6-D
d/12/6-E
d/12/6-F
d/12/6-G
d/12/6-H
d/12/7-A
d/12/7-B
d/12/7-C
d/12/7-D
d/12/7-E
d/12/7-F
d/12/7-G
d/12/7-H
d/12/7-J
d/12/8-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 517
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/12/8-B
d/12/8-C
d/12/8-D
d/12/8-E
d/12/8-F
d/12/8-G
d/12/9-A
d/12/9-B
d/12/9-C
d/12/9-D
d/12/9-E
d/12/9-F
d/12/9-G
d/12/9-H
d/12/9-J
d/12/9-K
d/12/9-L
d/12/9-M
d/12/9-N
d/12/9-P
d/12/10-A
d/12/10-B
d/12/10-C
d/12/10-D
d/12/10-E
d/12/10-F
d/12/10-G
d/12/10-H
d/12/10-J
d/12/10-K
d/12/10-L
d/12/10-M
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 518
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/12/10-N
d/12/10-P
d/12/10-Q
d/12/10-R
d/13/1-A
d/13/1-B
d/13/1-C
d/13/1-D
d/13/1-E
d/13/1-F
d/13/1-G
d/13/1-H
d/13/1-J
d/13/2-A
d/13/2-B
d/13/2-C
d/13/2-D
d/13/2-E
d/13/2-F
d/13/2-G
d/13/2-H
d/13/2-J
d/13/2-K
d/13/2-L
d/13/2-M
d/13/2-N
d/13/2-P
d/13/3-A
d/13/3-B
d/13/3-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 519
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/3-D
d/13/3-E
d/13/3-F
d/13/3-G
d/13/3-H
d/13/3-J
d/13/3-K
d/13/3-L
d/13/3-M
d/13/3-N
d/13/3-P
d/13/3-Q
d/13/3-R
d/13/3-S
d/13/3-T
d/13/3-U
d/13/4-A
d/13/4-B
d/13/4-C
d/13/4-D
d/13/4-E
d/13/4-F
d/13/4-G
d/13/4-H
d/13/4-J
d/13/4-K
d/13/4-L
d/13/4-M
d/13/4-N
d/13/4-P
d/13/4-Q
d/13/5-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 520
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/5-B
d/13/5-C
d/13/5-D
d/13/5-E
d/13/5-F
d/13/5-G
d/13/5-H
d/13/5-J
d/13/5-K
d/13/5-L
d/13/5-M
d/13/5-N
d/13/5-P
d/13/6-A
d/13/6-B
d/13/6-C
d/13/6-D
d/13/6-E
d/13/6-F
d/13/7-A
d/13/7-B
d/13/7-C
d/13/7-D
d/13/7-E
d/13/7-F
d/13/7-G
d/13/7-H
d/13/8-A
d/13/8-B
d/13/8-C
d/13/8-D
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 521
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/8-E
d/13/8-F
d/13/8-G
d/13/8-H
d/13/8-J
d/13/8-K
d/13/8-L
d/13/8-M
d/13/8-N
d/13/8-P
d/13/8-Q
d/13/8-R
d/13/8-S
d/13/9-A
d/13/9-B
d/13/9-C
d/13/9-D
d/13/9-E
d/13/9-F
d/13/9-G
d/13/9-H
d/13/9-J
d/13/10-A
d/13/10-B
d/13/10-C
d/13/10-D
d/13/10-E
d/13/10-F
d/13/10-G
d/13/10-H
d/13/10-J
d/13/10-K
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 522
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/10-L
d/13/10-M
d/13/10-N
d/13/10-P
d/13/10-Q
d/13/11-A
d/13/11-B
d/13/11-C
d/13/11-D
d/13/11-E
d/13/11-F
d/13/11-G
d/13/11-H
d/13/11-J
d/13/11-K
d/13/11-L
d/13/11-M
d/13/11-N
d/13/11-P
d/13/11-Q
d/13/11-R
d/13/12-A
d/13/12-B
d/13/12-C
d/13/12-D
d/13/12-E
d/13/12-F
d/13/12-G
d/13/13-A
d/13/13-B
d/13/13-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 523
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/13-D
d/13/13-E
d/13/13-F
d/13/13-G
d/13/14-A
d/13/14-B
d/13/14-C
d/13/14-D
d/13/14-E
d/13/14-F
d/13/14-G
d/13/14-H
d/13/14-J
d/13/15-A
d/13/15-B
d/13/15-C
d/13/16-A
d/13/16-B
d/13/16-C
d/13/16-D
d/13/16-E
d/13/16-F
d/13/16-G
d/13/16-H
d/13/16-J
d/13/16-K
d/13/17-A
d/13/17-B
d/13/17-C
d/13/17-D
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 524
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/17-E
d/13/17-F
d/13/17-G
d/13/17-H
d/13/17-J
d/13/17-K
d/13/18-A
d/13/18-B
d/13/18-C
d/13/18-D
d/13/18-E
d/13/18-F
d/13/18-G
d/13/18-H
d/13/18-J
d/13/18-K
d/13/19-A
d/13/19-B
d/13/19-C
d/13/19-D
d/13/19-E
d/13/19-F
d/13/19-G
d/13/19-H
d/13/20-A
d/13/20-B
d/13/20-C
d/13/20-D
d/13/20-E
d/13/21-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 525
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/13/21-B
d/13/21-C
d/13/21-D
d/13/21-E
d/13/21-F
d/13/21-G
d/13/21-H
d/13/21-J
d/15/1-A
d/15/1-B
d/15/1-C
d/15/1-D
d/15/1-E
d/15/1-F
d/15/1-G
d/15/1-H
d/15/1-J
d/15/2-A
d/15/2-B
d/15/2-C
d/15/2-D
d/15/2-E
d/15/2-F
d/15/2-G
d/15/2-H
d/15/2-J
d/15/2-K
d/15/2-L
d/15/2-M
d/15/3-A
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 526
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/15/3-B
d/15/3-C
d/15/3-D
d/15/3-E
d/15/3-F
d/15/3-G
d/15/3-H
d/15/3-J
d/15/3-K
d/15/4-A
d/15/4-B
d/15/4-C
d/15/4-D
d/15/4-E
d/15/4-F
d/15/4-G
d/15/4-H
d/15/4-J
d/15/4-K
d/15/4-L
d/15/4-M
d/15/5-A
d/15/5-B
d/15/5-C
d/15/5-D
d/15/5-E
d/15/5-F
d/15/6-A
d/15/6-B
d/15/6-C
d/15/6-D
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 527
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/15/6-E
d/15/6-F
d/15/6-G
d/15/6-H
d/15/7-A
d/15/7-B
d/15/7-C
d/15/8-A
d/15/8-B
d/15/8-C
d/15/8-D
d/15/8-E
d/15/8-F
d/15/8-G
d/15/8-H
d/15/8-J
d/15/8-K
d/15/8-L
d/15/8-M
d/15/8-N
d/15/8-P
d/15/9-A
d/15/9-B
d/15/9-C
d/15/9-D
d/15/9-E
d/15/9-F
d/15/9-G
d/15/10-A
d/15/10-B
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 528
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/15/10-C
d/15/10-D
d/15/10-E
d/15/10-F
d/15/10-G
d/15/10-H
d/15/10-J
d/15/10-K
d/15/11-A
d/15/11-B
d/15/11-C
d/15/11-D
d/15/11-E
d/15/11-F
d/15/11-G
d/15/12-A
d/15/12-B
d/15/12-C
d/15/12-D
d/15/12-E
d/15/12-F
d/15/12-G
d/15/12-H
d/15/12-J
d/15/12-K
d/15/12-L
d/15/12-M
d/15/12-N
d/15/13-A
d/15/13-B
d/15/13-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 529
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/15/13-D
d/15/13-E
d/15/13-F
d/15/13-G
d/15/13-H
d/15/13-J
d/15/13-K
d/15/13-L
d/15/14-A
d/15/14-B
d/15/14-C
d/15/14-D
d/15/14-E
d/15/14-F
d/15/15-A
d/15/15-B
d/15/16-A
d/15/16-B
d/15/16-C
d/15/16-D
d/15/17-A
d/15/17-B
d/15/17-C
d/15/17-D
d/15/17-E
d/15/17-F
d/15/17-G
d/15/17-H
d/15/17-J
d/15/17-K
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 530
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/15/17-L
d/15/17-M
d/15/17-N
d/15/17-P
d/15/17-Q
d/16/1-A
d/16/1-B
d/16/1-C
d/16/1-D
d/16/1-E
d/16/1-F
d/16/2-A
d/16/2-B
d/17/1-A
d/17/1-B
d/17/1-C
d/17/1-D
d/17/1-E
d/17/1-F
d/17/1-G
d/17/1-H
d/17/2-A
d/17/2-B
d/17/2-C
d/17/2-D
d/17/2-E
d/17/2-F
d/17/2-G
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 531
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/17/2-H
d/17/2-J
d/17/2-K
d/17/2-L
d/17/2-M
d/17/2-N
d/17/2-P
d/17/3-A
d/17/3-B
d/17/3-C
d/17/3-D
d/17/3-E
d/17/3-F
d/17/3-G
d/17/3-H
d/17/3-J
d/17/3-K
d/17/3-L
d/17/4-A
d/17/4-B
d/17/4-C
d/17/4-D
d/17/4-E
d/17/4-F
d/17/4-G
d/17/4-H
d/17/4-J
d/17/4-K
d/17/4-L
d/17/4-M
d/17/4-N
d/17/4-P
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 532
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/17/4-Q
d/17/5-A
d/17/5-B
d/17/5-C
d/17/5-D
d/17/5-E
d/17/6-A
d/17/6-B
d/17/6-C
d/17/6-D
d/17/6-E
d/17/6-F
d/17/6-G
d/17/7-A
d/17/7-B
d/17/7-C
d/17/7-D
d/17/7-E
d/17/7-F
d/17/7-G
d/17/7-H
d/17/8-A
d/17/8-B
d/17/8-C
d/17/8-D
d/17/8-E
d/17/8-F
d/17/8-G
d/17/8-H
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 533
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/17/9-A
d/17/9-B
d/17/9-C
d/17/9-D
d/17/9-E
d/17/9-F
d/17/9-G
d/17/10-A
d/17/10-B
d/17/10-C
d/17/10-D
d/17/10-E
d/17/10-F
d/17/10-G
d/17/10-H
d/17/10-J
d/17/10-K
d/17/10-L
d/17/10-M
d/17/10-N
d/17/10-P
d/17/10-Q
d/17/10-R
d/17/10-S
d/17/10-T
d/17/11-A
d/17/11-B
d/17/11-C
d/17/11-D
d/17/11-E
d/17/11-F
d/17/11-G
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 534
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/17/11-H
d/17/11-J
d/17/11-K
d/17/11-L
d/17/11-M
d/17/11-N
d/17/11-P
d/17/11-Q
d/17/11-R
d/17/12-A
d/17/12-B
d/17/12-C
d/17/12-D
d/17/12-E
d/17/12-F
d/17/12-G
d/17/12-H
d/18/1-A
d/18/1-B
d/18/1-C
d/18/2-A
d/18/2-B
d/18/2-C
d/18/2-D
d/18/2-E
d/18/2-F
d/18/3-A
d/18/3-B
d/18/3-C
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 535
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/18/3-D
d/18/3-E
d/18/4-A
d/18/4-B
d/18/4-C
d/18/4-D
d/18/4-E
d/18/4-F
d/18/4-G
d/18/4-H
d/18/4-J
d/18/4-K
d/18/4-L
d/18/4-M
d/18/4-N
d/18/4-P
d/18/4-Q
d/19/1-A
d/19/1-B
d/19/1-C
d/19/1-D
d/19/1-E
d/19/1-F
d/19/1-G
d/19/2-A
d/19/2-B
d/19/2-C
d/19/2-D
d/19/2-E
d/19/2-F
Rev - 02 NTT - 06
PROJECT: R1048/1 BILL PART
IMPROVEMENTS OF BILL OF QUANTITIES
EXPO 2020 ROADS SCHEDULE OF RATE BREAKDOWN SECTION Nr.
f 536
NETWORK FOR WORK ITEMS
f f
Item Nr. Labour Plant Material Overheads (%) Profit Total
% % % Main Office Site Office % %
d/19/2-G
Rev - 02 NTT - 06
PAGE Nr.
f 537
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 538
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 539
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 540
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 541
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 542
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 543
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 544
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 545
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 546
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 547
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 548
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 549
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 550
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 551
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 552
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 553
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 554
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 555
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 556
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 557
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 558
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 559
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 560
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 561
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 562
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 563
Total
%
Not Used
Rev - 02 NTT - 06
PAGE Nr.
f 564
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 565
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 566
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 567
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 568
Total
%
Not used
Rev - 02 NTT - 06
PAGE Nr.
f 569
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 570
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 571
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 572
Total
%
Not Used
Rev - 02 NTT - 06
PAGE Nr.
f 573
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 574
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 575
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 576
Total
%
Not Used
Rev - 02 NTT - 06
PAGE Nr.
f 577
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 578
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 579
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 580
Total
%
Not Used
Rev - 02 NTT - 06
PAGE Nr.
f 581
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 582
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 583
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 584
Total
%
Not Used
Rev - 02 NTT - 06
PAGE Nr.
f 585
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 586
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 587
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 588
Total
%
Not Used
Rev - 02 NTT - 06
PAGE Nr.
f 589
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 590
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 591
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 592
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 593
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 594
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 595
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 596
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 597
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 598
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 599
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 600
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 601
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 602
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 603
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 604
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 605
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 606
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 607
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 608
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 609
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 610
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 611
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 612
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 613
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 614
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 615
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 616
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 617
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 618
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 619
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 620
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 621
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 622
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 623
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 624
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 625
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 626
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 627
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 628
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 629
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 630
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 631
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 632
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 633
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 634
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 635
Total
%
Rev - 02 NTT - 06
PAGE Nr.
f 636
Total
%
Rev - 02 NTT - 06