KEY PLAN

THIS DRAWING AND THE INFORMATION CONAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
NOTES
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE NOTED.
2. THE CONSTRUCTION CONTRACTOR SHALL ADHERE THE FOLLOWING REQUIREMENTS
OF SEC STANDARDS DURING THE INSTALLATION OF UNIT SUBSTATION.
A. CONCRETE SHALL BE MIXED, PLACED AND CURED TO ATTAIN THE MINIMUM
COMPRESSIVE STRENGTH OF 38 MPA AT 28 DAYS. USE SEVERE EXPOSURE CONCRETE
AS PER SEC MATERIALS STANDARD SPECIFICATION TI-SMSS-5,REV.3.
B. REINFORCING STEEL SHALL BE DEFORMED STEEL BARS CONFIRMING WITH SASO SSA-2.
PROVIDE BARS WITH A MINIMUM YIELD STRENGTH OF 420 MPa. LAP SPLICE LENGTHS
SHALL COMPLY WITH ACI-318.
C. 300mm THICK SELECT FILL UNDER CABLE WELL FOUNDATION SHALL BE COMPACTED TO
95% MAXIMUM DRY DENSITY PER ASTM D-1557 FOR SOILS CONTAINING MORE THAN
15% MATERIAL PASSING #200 SIEVE OR 85% RELATIVE DENSITY PER ASTM D-4253
AND D-4254 FOR FREE DRAINING SOILS CONTAINING LESS THAN 15% WEIGHT FINER
THAN #200 SIEVE NON-PLASTIC MATERIAL.
D. BACKFILL AND FILL MATERIALS AROUND CABLE WELL SHALL COMPLY WITH COMPANY
CONSTRUCTION STANDARDS FOR EARTHWORK SEC-Q-002, SECTION 10.1.2, SELECT FILL.
E. ALLOWABLE SOIL BEARING PRESSURE OF FOUNDATION SOIL SHALL BE GREATER
THAN 0.75 KG./CM.
F. FILL LIFTING HOOK RECESSES WITH 1:6 CEMENT / SAND GROUT AFTER INSTALLING.
3. ALL REINFORCING BARS SHALL BE COATED WITH FUSION BONDED EPOXY
IN ACCORDANCE WITH 09-SAMSS-106.
4. UNIT SUBSTATION IDENTIFICATION NUMBER SHALL BE PAINTED ON FOUNDATION.
5. COMPLETE SCOPE OF CONCRETE FOUNDATION WORK IS SHOWN ON THIS VIEW READY
FOR INSTALLATION.
6. CONCRETE COVER TO REBAR SHALL BE 75mm MINIMUM.
UNIT SUBSTATION PLAN REINFORCEMENT PLAN
8. CONCRETE BELOW GRADE LEVEL TO BE APPLIED WITH TOW COATS BITUMINOUS PAINT.

LIFTING LUG

REFERENCES DRAWINGS
ELEVATION 1 1 SECTION A
- -

DATE DRAWN CHECKED REVIEWED APPROVED

10/2016 WSA ASA YZA MLB

SAUDI ARABIAN OIL COMPANY

CONTACTOR SUB-CONSULTANT

JOB ORDER/EWO NO. REVISION DESCRIPTION

BI-28-10005 ISSUED FOR CONSTRUCTION

ELECTRICAL DETAILS EDT

ELECTRICAL SUBSTATION FOUNDATION


ELEVATION 2 1 SECTION B DETAILS
- -
HOME OWNERSHIP DEVELOPMENT
SOUTH DHAHRAN, SAUDI ARABIA
PLANT. NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

A18 P HB-019315 002 01