3D Model Centered Engineering Development

3D modeling is used throughout an engineering development project to aid key activities like modeling, documentation, and design. The process begins with creating a first 3D model using the plot plan, piping materials catalogues, and first-issue P&IDs showing main lines and manifolds. Subsequent models are developed as the project progresses, incorporating equipment vendor drawings, structural design, handling studies, cable routing design, and approved drawings. The final 3D model supports downstream deliverables like piping isometric drawings, material take-offs, and general arrangements.

Uploaded by

DANIEL
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
659 views

3D Model Centered Engineering Development

3D modeling is used throughout an engineering development project to aid key activities like modeling, documentation, and design. The process begins with creating a first 3D model using the plot plan, piping materials catalogues, and first-issue P&IDs showing main lines and manifolds. Subsequent models are developed as the project progresses, incorporating equipment vendor drawings, structural design, handling studies, cable routing design, and approved drawings. The final 3D model supports downstream deliverables like piping isometric drawings, material take-offs, and general arrangements.

Uploaded by

DANIEL
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

3D Model centered Engineering Development

Key
Project catalogues (Piping materials etc.)

3DMODEL
Activity

Equipment Engineering
drawings Modelling
Equipment
Plot Plan Document

Structures Structures outline

Main lines &


P&IDs 1st issue
manifolds

1st Model Plot Plan IFD

(c)TheOil&GasEngineeringGuide,HervBaron,EditionsTechnip,2015
Lines >=4" &
IFD P&IDs
manifolds

First equipment
Equipment
vendor drawings

Structural design Structures

Handling studies Handling area & equipment

E&I main cable routing Main E&I cable trenches 2nd Piping MTO (partial)
Fire fighting system
Fire water network &
design
Civil Area Drawings 1st issue
2nd Model (foundations)
IFC P&IDs All lines & manifolds
Civil Area Drawings 2nd issue
Approved vendor Equipment, in-line (piping and sewage headers, cable trenches)
drawings instruments
Piping isometric
Piping MTO
Stress analysis & drawings
Pipe supports
supports

3rd Model
Civil Area Drawings last issues (piping & sewer
branches, pipe supports, cable sleeves, paving)

last piping isometric Final Piping


drawings MTO

Piping General Arrangement