Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

File 45 - Electrical

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Division 16 ELECTRICAL WORKS

Section 16730 Clock and Program Systems

Division 16 Electrical works

Section 16730 - Clock and Program Systems

1 Part 1: General

1 01 Summary

The work covered by this section consists of providing


all tools, labour, equipment and materials, and
performing all operations in connection with the
fabrication and installation and operation of clock and
program systems.

1 01 01 Section contents

Clock and program systems

1 01 02 Products Delivered but not Installed under this Section

1 01 03 Products Installed but not Delivered under this Section

1 01 04 Related Sections

16050 Basic Electrical Materials and Methods


16400 Services and Distribution of low voltage

16600 special systems


16900 Controls
16950 Testing

1 02 References

1 02 01 Applicable Standards

General specifications for building construction


Ministry of rural and municipal affairs
Kingdom of Saudi Arabia
Division 16 ELECTRICAL WORKS
Section 16730 Clock and Program Systems

Saudi Standards take precedence over other standards.


When a new Saudi Standard is issued it automatically
takes precedence over any other standard or
specification mentioned. Since Saudi Standards
Organization adopts IEC standards with suitable
modifications for Saudi climatic conditions, IEC
standards will normally remain applicable, so special
care should be taken regarding environmental
conditions and temperature in the kingdom.

1 02 01 01 Saudi Arabian Standards

SASO 1320: 97 Polyvinyl Chloride Insulated Cables of


Rated Voltages up to and Including 450/750 V Part 3:
Non Sheathed Cables for Fixed Wiring.

1 02 01 02 Gulf Standards

1 02 01 03 International Standards

1 02 01 04 USA Standards

1 02 01 05 European Standards

CEN 54-3: 01 Fire Detection and Fire Alarm Systems


Part 3: Sounders

1 02 01 06 British Standards

1 02 01 07 German Standards

1 02 02 Codes

1 02 03 Other References

General specifications for building construction


Ministry of rural and municipal affairs
Kingdom of Saudi Arabia
Division 16 ELECTRICAL WORKS
Section 16730 Clock and Program Systems

1 03 Definitions

1 03 01 Technical Terms

1 03 02 Abbreviations

1 04 System Description

1 04 01 Design Requirements

Note: this paragraph is specialized for describing design requirements


and operational properties of a complete system (e.g. A/C system, lifts
etc.) to be designed by the contractor

1 04 02 Performance Requirements

Note: this paragraph is specialized for describing performance requirements


and operational properties of a complete system (e.g. A/C system,
lifts etc.) to be designed by the contractor

1 05 Submittals

The following are submitted in accordance with


Conditions of Contract and Section 01300

1 05 01 Product Data

1 05 02 Shop Drawings

Shop drawings shall contain location of equipment


installation, accessory and cabling details.

1 05 03 Samples

1 05 04 Quality Control Submittals

General specifications for building construction


Ministry of rural and municipal affairs
Kingdom of Saudi Arabia
Division 16 ELECTRICAL WORKS
Section 16730 Clock and Program Systems

1 05 04 01 Test Reports and Certificates

Test reports and certificates shall be submitted before


equipment is delivered to site

1 05 05 Handing-Over Submittals

1 05 05 01 Project Records

1 05 05 02 Operation and Maintenance Data

1 05 06 Other Submittals

1 06 Quality Assurance

1 06 01 Qualifications

1 06 02 Regulatory Requirements

Note: Specify obligations to comply the codes designed by the contractor


with specific code requirements and other requirements of public
authorities if any!

1 06 03 Certifications

Note: Specify if a third party (an authorised, independent Agency/Laboratory)


should certify product or work compliance certification with
certain requirements.

1 06 04 Quality Control

1 06 04 01 Internal Quality Control

Contractors internal quality control shall include but


not limited to:

General specifications for building construction


Ministry of rural and municipal affairs
Kingdom of Saudi Arabia
Division 16 ELECTRICAL WORKS
Section 16730 Clock and Program Systems

Checking test certificates attached by the supplier,


also certificates of compliance of general and
referenced standards before assembly or installation.

Checking delivery tickets of each delivery for


completeness and compliance with supply order and
required specifications.

1 06 04 02 External Quality Control

1 06 04 03 Source Quality Control

1 07 Delivery, Storage and Handling

1 07 01 Packing and Shipping

1 07 02 Storage and Protection

1 07 03 Acceptance at Site

Note: Applies on products provided by the owner only, for which


conditions of acceptance at site should be specified here!

1 08 Project and Site Conditions

1 08 01 Existing Conditions

Note: Should determine referenced documents where information can


be obtained pertaining to such items as existing structures,
public utility lines, geophysical reports etc

1 08 02 Environmental Requirements

General specifications for building construction


Ministry of rural and municipal affairs
Kingdom of Saudi Arabia
Division 16 ELECTRICAL WORKS
Section 16730 Clock and Program Systems

Refer to Section 01060 Regulatory Requirements, 1 01


02.

1 09 Schedules and Programs

Note: Specify requirements for co-ordinating and organizing certain


works that must be done in special sequence with, or at the same
time of implementing works in other departments. The particular
sequence of events should be mentioned here.

1 10 Special Warranty

Note: Describe special or extended warranty only! (e.g. in landscaping


warranty depends on growing periods which may be exceeding
the normal warranty period)

1 11 Maintenance

1 11 01 Maintenance Service

1 11 02 Operation Services

1 11 03 additional Materials

Note: Specify products to be supplied by the Contractor for future


maintenance and repair and state to whom, when and where the
items are to be delivered!

Part 2: Products

Clock and programme systems shall consist of a central


master clock, secondary clocks and time circuits,
programming and signal system.

2 01 Master Clock (Central)

General specifications for building construction


Ministry of rural and municipal affairs
Kingdom of Saudi Arabia
Division 16 ELECTRICAL WORKS
Section 16730 Clock and Program Systems

The master clock shall be a quartz electronic clock with


quartz-crystal-controlled oscillator and digital display of
hours, minutes and seconds.

The quartz-crystal-controlled oscillator produces and


transmits pulses of 2 seconds duration per minute and
alternating polarity to the secondary clocks and
programming instruments.

Secondary voltage shall be either 12 or 24 Volt DC.


The accuracy shall be +/- 0.1 sec per day.

the clocks which give audible signals, such as the ones


used in educational establishment, shall be provided
with a solid state programme controller. (Includes four
signal circuits and seven day programme with one
minute signalling pattern)
The programme signals shall either be controlled by
computer software or with a seven-day cycle tape.

2 02 Secondary clocks

Secondary clocks shall be controlled by the master


central clock.

2 03 Time recorders

Time recorders shall be used to record the arrival and


departure times of personnel on punch cards recording
hours minutes and day or date. The casing shall be
sheet metal and the recorder shall include a monitoring
General specifications for building construction
Ministry of rural and municipal affairs
Kingdom of Saudi Arabia
Division 16 ELECTRICAL WORKS
Section 16730 Clock and Program Systems

clock.
They shall be designed either as a secondary clock
(where a master clock system is available) or as an
independent clock with synchron-gear.

2 04 Bells

Bells shall be mounted on surface without an enclosure.


The sound pressure of the signal shall be a minimum of
60 dB (A) at a distance of 1 m. Bells shall conform to
CEN EN 54 part 3

2 05 Horns

Horns shall produce a sound pressure signal of 60 dB


(A) minimum at a distance of 1 m. They shall consist of
the following fully electronic components: Tone
generator, wave form generator, amplifier and
loudspeaker. The frequency range shall be between 800
and 1100 Hz. The enclosure shall be plastic and
protection code IP 65. Horns shall conform to CEN EN
54 part 3

Part 3: Execution

3 01 General Examination

3 02 General Preparation

3 03 Installation and Execution

General specifications for building construction


Ministry of rural and municipal affairs
Kingdom of Saudi Arabia
Division 16 ELECTRICAL WORKS
Section 16730 Clock and Program Systems

Time circuits to slave clocks shall use PVC single-core


wires conforming to SASO 1320 with conductors at
least 1.5 mm2 .The master central clock station and
secondary clocks whether analogue and digital clocks
shall be installed according to the manufacturers
instructions.

3 04 Field Quality Control

3 05 Adjusting and Cleaning

3 06 Demonstration

Note: Determine requirements to demonstrate the operation and


maintenance of equipment to the Employers personnel,
including training if required.

3 07 Protection

3 08 Schedules

Note: Include schedules (e.g. door schedule) to indicate what to put


where, and provide other co-ordinating data if necessary!

Part 4: Method of Measurement

4 01 General

4 02 Units of Measurement

The master clock station and the analogue and digital


clocks in the building shall be measured by number.

General specifications for building construction


Ministry of rural and municipal affairs
Kingdom of Saudi Arabia
Division 16 ELECTRICAL WORKS
Section 16730 Clock and Program Systems

The Bill of Quantity may specify numbers of clocks


outlets. In this case, the unit shall include all
conductors, raceways, boxes and termination.

Alternatively, the Bill of Quantity may include all the


cables and raceways for installation of the slave clock
lines per metre as installed.

Part 5: Basis of Payment

5 01 General

5 02 Assisted Works to be included in the Unit price Rates

Complete instalment of all required accessories, to


finish the connection of wires, testing devices by the
manufacturers representative and in the presence of
the client.

6 Annex: Tables and Figures

6 01 Tables

6 02 Figures

7 Annex: Specifier Information

General specifications for building construction


Ministry of rural and municipal affairs
Kingdom of Saudi Arabia

You might also like