Bailer Fill Calculation for Casing Size

The document provides information to determine the amount of fill and number of runs needed for a bailer to fill a 9.63 inch casing that is 12 feet long and weighs 43.5 pounds. It states that a 20 foot bailer of size 3 1/2 inches would fill 2.4 feet of the casing in one run, requiring 5 runs to fill the 12 feet. It also calculates that 536 pounds of sand would be needed to fill the 12 feet of 9.63 inch casing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
174 views1 page

Bailer Fill Calculation for Casing Size

The document provides information to determine the amount of fill and number of runs needed for a bailer to fill a 9.63 inch casing that is 12 feet long and weighs 43.5 pounds. It states that a 20 foot bailer of size 3 1/2 inches would fill 2.4 feet of the casing in one run, requiring 5 runs to fill the 12 feet. It also calculates that 536 pounds of sand would be needed to fill the 12 feet of 9.63 inch casing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
  • Intervention Services Overview

To determine the amount of fill given by a length of bailer enter

the casing size, weight and length of bailer used.

What is the size of casing ? 9.63 inch

What is the weight of casing ? 43.50 pound

To determine the amount of bailer needed enter


the casing size, weight and amount of fill needed. Note: Enter Blue Numbers
Answers in Red
How much fill is needed ? 12.00 feet

Length of bailer to be used? 20 feet

Casing ID ( inches ) = 8.748

Cement needed in Gallons = 37.5

Strength of 12.00 foot cement plug 3600 psi

Plug length for a 5000 psi cement plug is 17 feet FILL


PER
BAILER SIZE RUN
BAILER SIZE BAILER REQUIRED
FEET # RUNS
1 11/16" PDDB 20 feet long 0.5 feet of 9.6 " casing.
1 11/16 Positive Displacement 443 22.1 2" PDDB 20 feet long 0.8 feet of 9.6 " casing.
2 Positive Displacement 300 15.0 3" PDDB 20 feet long 1.8 feet of 9.6 " casing.
3 Positive Displacement 131 6.5 3 1/2" PDDB 20 feet long 2.4 feet of 9.6 " casing.
3 1/2 Positive Displacement 101 5.0 1 11/16" Glass 20 feet long 0.6 feet of 9.6 " casing.
1 11/16 Glass Bottom 408 20.4 2" Glass 20 feet long 0.8 feet of 9.6 " casing.
2 Glass Bottom 300 15.0 3" Glass 20 feet long 2.0 feet of 9.6 " casing.
3 Glass Bottom 121 6.1 3 1/2" Glass 20 feet long 2.8 feet of 9.6 " casing.
3 1/2 Glass Bottom 87 4.3 5" Glass 20 feet long 5.9 feet of 9.6 " casing.
5 Glass Bottom 41 2.0
536 # OF SAND NEEDED for 12 FEET OF 9.6 " CASING.