374-XV-1031 (374-PID-1006)
374-XV-1039 (374-PID-1006)
39 Select Caustic Displacement Rinse Sequence Button.
Press the Start button.
40 374-BAF-8033 shall open.
41 Ensure level at Demin Water Storage Tank (374-TK-
1002) is sufficient.
42 Regeneration Pump for Demin (374-P-1017A/B) shall
start running for about 128 minutes and then it shall stop.
43 After delay 5 seconds, ensure these valve are closed:
374-BUT-8117 (374-PID-1006)
374-BUT-8118 (374-PID-1006)
44 Select Filling Sequence Button. Press the Start button.
45 Ensure level at Demin Water Storage Tank (374-TK-
1002) is sufficient.
46 374-BAF-8033 shall open.
47 Regeneration Pump (374-P-1017A/B) shall start running
for about 5 minutes and then it shall stop.
48 After delay 5 seconds, ensure these valve are closed:
374-BUT-8117 (374-PID-1006)
374-BUT-8118 (374-PID-1006)
49 Select conductivity test sequence button. Press the start
button.
Ensure these valves are open:
374-XV-1039 (374-PID-1006)
374-XV-1052 (374-PID-1006)
50 Ensure level at Demin Water Storage Tank (374-TK-
1002) is sufficient.
51 Degasifier Pump (374-P-1013A/B) shall start while 374-
AT-1003 shall be monitored the conductivity, if the
conductivity already made the criteria then the Degasifier
Pump (374-P-1013A/B) shall stop, in case the
conductivity still does not made the criteria for 5 minutes it
shall triggered the alarm to stop the system.
52 After delay 5 seconds, ensure these valve are closed:
374-BUT-8037
53 Monitor conductivity (374-AT-1007) and pH water (374-
AT-1006). If the set conductivity exceed 5 S/cm Mixbed
Polisher should be isolated.
Page 4 of 8
MATINDOK GAS DEVELOPMENT PROJECT
(MGDP)
Page 5 of 8
MATINDOK GAS DEVELOPMENT PROJECT
(MGDP)
374-BAF-8006
374-BAF-8007
374-XV-1040
374-BUT-8119
374-BAF-8019
67 Select Download Displacement SBA Displacement SAC
sequence button. Press the start button.
68 Ensure level at Demin Water Storage Tank (374-TK-
1002).
Page 6 of 8
MATINDOK GAS DEVELOPMENT PROJECT
(MGDP)
No Parameter Quantity
1 pH 6.8 7.2
2 Conductivity @25C (after ion <5 S/cm
exchange)
3 Hardness (CaCO3) <0.1 ppm wt
Page 7 of 8