Boiler Preservation
Boiler Preservation
Boiler Preservation
b) Drying method with hot air from adjacent furnace(Boiler shutdown duration is longer
than two weeks but less than one month).
c) Slightly open gas damper after water discharged from hot boiler, send 200℃-300℃ hot
air from adjacent furnace to air duct of this furnace for drying and heating.
d) Nitrogen filling method(within 4 days of boiler shutdown)
1) When steam pressure is over 0.5MPa, maintain normal ammonia and hydrazine
degree to replace water.
2) Fill nitrogen into superheater and drum and keep 0.0343 Mpa gauge pressure.
3) Under the condition of keeping 0.0343 Mpa gauge pressure, discharge boiler
water. Maintain 0.0343 MPa for service.
4) Operation preparation period after hydraulic test: fill nitrogen fully into economizer,
water wall, superheater and reheater and boost pressure to 0.0343MPa gauge
pressure.