Structures Details For Chakeri - Allahabad Section

This document provides structural details for the Chakeri-Allahabad section including details of viaducts, flyovers, elevated structures, bridges, culverts, and the total length of the section. It lists the number of spans, span lengths, clearance heights, and number of locations for various structure types on the section. The remarks section notes that the proposed widening locations are tentative and may vary based on site conditions, and will be finalized during detailed design.

Uploaded by

dik_g
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views

Structures Details For Chakeri - Allahabad Section

This document provides structural details for the Chakeri-Allahabad section including details of viaducts, flyovers, elevated structures, bridges, culverts, and the total length of the section. It lists the number of spans, span lengths, clearance heights, and number of locations for various structure types on the section. The remarks section notes that the proposed widening locations are tentative and may vary based on site conditions, and will be finalized during detailed design.

Uploaded by

dik_g
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Structures Details for Chakeri -Allahabad section

VUP
Sr.No Span Clearance No of Locations
1 1 x 12 5.5 14
2 1 x 12 5.5 2

PUP
Sr.No Span Clearance No of Locations
1 1x7 3 24
2 1 x5 6

Flyover
Sr.No Span Clearance No of Locations
1 3*30 5.5 1
2 1*30 5.5 2

Elevated Structure
Sr.No Span Clearance No of Locations
1 3*30 5.5 4
2 2*30 5.5 2

Minor Briges
Sr.No Span Clearance No of Locations

3*10.75 & 2*6.5 &, 1* 7.2


1 - 10
and 1*13

2 3*19 - 1

3*10.75 & 2*6.5 &, 1* 7.2


3 - 12
and 1*13
3*10.75 & 2*6.5 &, 1* 7.2
4 14
and 1*13

Major Bridges
Sr.No Span Clearance No of Locations
1 3 *25 - 1
2 3*25 2
Slab/Box Culvert
Sr.No Span Clearance No of Locations
1 1*7.1 & 1* 6.1 - 148
2

Pipe Culvert
Sr.No Span Clearance No of Locations
1 - 28
2

96.221 Km
Total SR length
20 km

51.332 km
Total Slip length
ri -Allahabad section

Status
New Construction
Repair/Rehabilitation

Status
New Construction
Repair/Rehabilitation

Status
New Construction
New Construction

Status
New Construction
New Construction

Status

New Construction on SR

Reconstruction on MCW

Widening to 6lanning

Repair/Rehabilitation

Status
New Construction
Repair/Rehabilitation
Remarks
Status
Widening
The proposed location and widening is
tentative, it may vary as per site condition.
The exact location and proposed widening
should be finalized during the detail design by
the concessionaire in consultation with NHAI
Status and Independent Engineer.
Widening

New construction (7m / 5.5m


Wide)
Widening/Rehabilitation

New construction (7m / 5.5m


Wide)