Introduction
4. AP, RSE and RGE may wish to settle the design principles involved at an
early stage so that they can proceed with confidence and avoid abortive works. To
facilitate early clearance of basic design principles before formal submission of plans,
the BD will upon receipt of a written enquiry provide a determination on the matters
involved in the form of a letter of assurance normally within 45 days. The BD may
hold pre-submission conferences with AP/RSE/RGE and invite representatives of
concerned Government departments to discuss and examine the issues and principles
involved.
8. For superstructure plans 1, the BD will check the master framing plans, notes,
design loads, design methods, material standards, design codes and fire resistance
rating requirements of structural elements. The items to be checked are provided in
Appendix B.
9. For drainage plans, the BD will check 2 the disposal system, underground
drain layout and access for maintenance/repair as provided in Appendix C.
11. To facilitate the preparation of plan submissions for various types of building
works, specific checklists and sample tables/drawings are given in PNAP ADV-33.
12. Under the curtailed check system, non-fundamental issues will not be
checked and will not be raised as disapproval items. These relate generally to matters
that do not affect the basic design of the proposed building. It is the responsibility of
the AP/RSE/RGE to ensure that all such non-fundamental issues fully comply with the
relevant regulations and codes of practice before commencement of the works. After
commencement of works, any contravention of the BO and its subsidiary regulations
should be rectified as and when they are discovered and in any event, before
certification of completion of works.
Enquiry Service
14. To assist AP/RSE/RGE in ensuring that design details comply with BDs
requirements, the BD will also provide an enquiry service regarding compliance or
interpretation of building regulations and codes of practice throughout the entire
development process. The BD will give an answer to these enquiries normally within
four weeks.
/Concept..
1
Including curtain wall, window wall, cladding, space frame and similar superstructure elements.
2
Only a certain percentage of the proposed drainage works will be randomly selected for checking.
-3
Concept Drawings
16. AP adopting the use of computer for calculating floor areas of buildings in
the preparation of GBP are required to provide the BD with an electronic copy of the
plan submission with the calculations in an accepted format capable of being verified by
AutoCAD, MicroStation or other software accepted by the BD. In this regard, AP
should follow the guidelines in Appendix F.
Minor Amendments
17. With regard to building works for which consent has been given, the
requirement for prior approval and consent for all subsequent amendments may
affect the progress of construction.
21. A practice note covering the above guidelines on minor amendments has also
been issued to Registered Contractors.
/Concurrent..
-4
22. To streamline the approval process for building works, applications for
approval of plans and consent for the commencement of the building works specified in
the following paragraphs may be made concurrently.
(a) The works do not involve foundation works (other than spread
footing with excavation depth not exceeding 4.5m), nor works with
(b) The works do not entail precautionary works nor other safety
(c) All the plans and documents prescribed under regulation 8 of the
24. For simple A&A works, where AP/RSE confirm that the proposed works do
not involve the structure of the building and do not affect the fundamental issues
mentioned above (or if there are only minor changes and AP/RSE confirm that such
changes comply with the provisions of the BO) and referrals to the other Government
departments (except Fire Services Department) are not necessary, the concurrent
applications for fast track approval and consent will be processed within 30 days. A
sample of the AP/RSEs certification form is attached in Appendix H.
25. Procedures for fast track processing of submissions for building a two-storey
warehouse are given in Appendix I.
/(D)..
-5
26. When submitting concurrent applications for approval and consent, AP/RSE
should indicate the same in the covering letter and submit the consent application Form
BA8A. The Form BA8A submission is subject to the following rules:
gives his approval of the plans of the proposed building works or,
(c) In cases where the BA considers that the approval can be given but
stipulated under regulation 32(3) of the B(A)R would run from the
date of approval.
( HUI Siu-wai )
Building Authority
1. Density
2. Safety
(h) Road works - control under Section 22 of Roads (Works, Use and
Compensation), Cap 370
(Rev. 2/2016)
-2-
Appendix B
(PNAP ADM-19)
For superstructure plans, submissions are divided into two parts, viz. :
2. BDs check on the master framing will focus on the following aspects:
(iv) Materials.
(Rev. 2/2016)
-1-
Appendix B1
(PNAP ADM-19)
Loading
(6) Lateral Loads Wind loads comply with HK Wind Code 2004
Impact loads comply with B(C)R 17(3) & (4)
Design soil pressure and surcharge loads
Others:
-2-
Design Standard
Programme
Others:
Material Specification
__________
(17) Others
(Rev. 2/2016)
-3-
Appendix C
(PNAP ADM-19)
1. Method of disposal
(a) Public sewers (including nullah, culvert and streamcourse) available for
connection and acceptable to Drainage Services Department (DSD)
(b) Private sewers available for connection and acceptable to DSD
(c) Sewage treatment plant, septic tank and soakaway design acceptable to
Environmental Protection Department (EPD)
(d) Trade/industrial effluent discharge acceptable to EPD
(a) Common
underground drains and above-ground stacks located in common
areas (PNAP APP-93)
(b) No water-borne pipes embedded in structural elements (PNAP APP-105)
(PNAP APP-112)
(Rev. 2/2016)
- 1 -
Appendix D
(PNAP ADM-19)
(a) Precautionary measures particularly the hoarding, covered walkways and any
necessary propping and shoring
(b) The codes and standards proposed to be adopted
(c) Appraisal of the building to be demolished, method statement, sequence of
demolition and the safe use of any powered mechanical plant
(d) Stability of the framing system during demolition and of any remaining
structures after demolition
(e) Effects on all affected buildings, slopes structures, lands and services and the
provision of supports and protection, if necessary
(Rev. 2/2016)
-1-
Appendix E
(PNAP ADM-19)
Guidelines for Concept Drawings
2 Sample Drawings
3 Size
4 Colour Scheme
It is recommended that the signs and indicators for MOE, MOA and FRC
arrangements in the sample concept drawings be adopted.
(Rev. 2/2016)
Appendix F
(PNAP ADM-19)
Introduction
2. When the requirements set out in the following paragraphs are complied
with and clearly shown in the submitted CAD drawing files, diagrammatic breakdowns
and details on calculation of the gross floor area, usable floor area, site coverage, plot
ratio, refuge floor area and green feature area etc. would not be required to be included
in plan submission. For avoidance of doubt, annotation and dimension of the areas
concerned are required to be indicated on plans for checking purpose. Samples of the
dimensioned plans are in Annex 1 for reference.
- 1 -
(a) Each file shall contain one drawing only, default zoomed to full
drawing extent.
(c) In situation where the layering number and the system are limited
due to software constraint, limited referencing system might be
used provided that all information and model files which compose
the final drawings are clearly visible and intact when files are
open in the computer. A clear and systematic path trial in hard
copy format highlighting the list of file(s) for area checking
purpose should be provided to facilitate the verification exercise.
All drawing files and model files are to put into the same folder to
ensure coherent path recognition. Cross-referencing and
hyper-linking within folder should be kept to the minimum.
(d) Naming and numbering of drawing files in the hard copy should
be identical to those in the submitted soft copy.
- 2 -
(e) A completed hard and soft copy of the drawing index listing all
file names, drawing numbers with brief description on location
and contents of the submitted drawings shall be provided.
Drawings under different revision must carry a revision letter (e.g.
A to Z) for identification purpose. For large and complicated
project involving numerous drawing versions/amendments, a
revision legend should also be provided as well.
(a) CAD drawing files including floor plans, tables and calculations etc.
shall contain all information identical to the hard copy. Each file
shall accommodate different elements such as floor layout plans,
usable floor area, gross floor area and dimension etc. into the relevant
layers. The layering drafting technique isolates elements of a
drawing and places them into separate layers for easy reference and
manipulation. The same principle applies to level in MicroStation
files.
ARC 082 4 0
Field 3 - Addition/Deduction Type
Field 2 - Building Plan Area Type (Sub-class)
Field 2 - CSWP Element Code assigned for
Building Plan Area Calculation (Class)
Field 1 - Agent Responsible Code (ARC) e.g. ADA
- 3 -
Diagram B
Diagram C
Diagram D: Layer Names generated from the above rules for this PNAP
- 4 -
(c) The layer names required by LandsD are not listed in this
PNAP and AP should make reference to the Practice Note
issued by LandsD. AP should also refer to CSWP of
Environment, Transport and Works Bureau (at
www.etwb.gov.hk/cswp) for other layer name convention.
- 5 -
Layerr contents
(e) CAD file for the floor plan n shall contain all eleements and
informaation that haave to be sh
hown on thee drawings t o facilitate
approvaal, includinng, inter allia, the areea and the dimension n
layers. Elementss such as lig ghting, electtric applianc
nces and the
like whhere approoval from the Buildiing Authorrity is not
required should noot be shown n in the submmitted drawwings.
Draw
wing Scale
Draw
wing Object within areaa diagram
Polyliine
(c) All line drawings inntended forr area calcullations in arrea layer(s)
shall bee in closed polyline diagram (or in compleex shape in n
MicroSttation files) .
Dimeension
Decim
mal places of areas an
nd volumes
(f) Text styyle is not compulsorry. Conven ntional textt fonts are
suggesteed. Comm mon type such as Romans font is
recomm
mended forr use in the text. For MiicroStation,
Engineeering fontt could be adopted.
-6-
Review
(Rev. 2/2016)
- 7 -
Annex 1
The following part diagrams shown with dimensions and annotations are for reference
only. They are intended to illustrate the minimum information required to facilitate
electronic verification of the area calculations more effectively. Illustrations shown are
by no means exhaustive.
-1-
Sample 3 GFA diagram (part) with dimension and annotation
Revision Column
CHECKED
Officers Concern
DRAWN
PROJECT
Site/Project Title
DRAWING TITLE
Drawing Title
SCALE Scale
DRAWING NO
Drawing Number (with revision)
SOURCE Original Drawing No. (if any)
AP/RSE/RGEs
BDs OFFICIAL USE
signature/and stamp chop
90mm(W)x150mm(H) space
for BDs approval stamp/
certification of copies of
approved plans (PNAP
ADM-10 App A)
1
* Information box shown in bold letter is compulsory for BD submission.
(Rev.2/2016)
Appendix G
(PNAP ADM-19)
(e) not in compliance with the relevant Outline Zoning Plan or deviating from a
scheme approved by the Town Planning Board; or
(f) involving works outside the lot boundary.
(Rev. 2/2016)
- 1 -
Appendix H
(PNAP ADM-19)
In accordance with paragraph 24 of PNAP ADM-19, I hereby request for fast track
processing of the plans submitted for the proposed A & A works to be carried out at
.
2. I confirm that the A & A works as shown on the enclosed drawings (dwg. no.
___________ _ to ___________ __) do not involve the structure of the building and do
not involve changes to the latest approved plans of the affected areas in the following
aspects :
3. I also confirm that the A & A works as shown on the enclosed drawings (dwg. no.
________ to ) involve changes to the latest approved plans of the
affected areas in the following aspects :
and that such changes as shown on the said drawings comply with the provisions of the
Buildings Ordinance.
4. A Form BA 8A applying for your consent to the commencement and carrying out
of the A & A works mentioned in paragraph 1 above is enclosed.
(Name in full)
The Efficiency Unit (EU) operates a One Stop Centre for receiving
submissions and coordinating joint inspections for two-storey warehouse proposals on
behalf of relevant Government departments (including BD) and utility companies.
Details of the scheme are available from EU's website: (www.eu.gov.hk).
(2/2016)