EVENT ANALYSIS REPORT
UNIT NO : 3 TPS: CSTPS Unit Capacity : 210 MW
1. "HO Code Station Code Tripping Date and time No. of days from last sync.
CSTPS U-3 T. 09/08/2015 19'.21
o
082015-2016
+. Name of First Up, Main Protections & protection on which GGB tripped:
First up : Boiler Trip
Main Protection: Turbine trip
GCB Opened on : Low fonvard power 86 GT
onitisobservedthatleakageisatfrontsidesteamcooledwallonRHStubeno2.
Secondary damage at LTSH coil no 57 tube no 12 at top bank.
one:.Damagedtubesreplaced.Radiographyofwweldingjointscarriedout.Air
preheater 3A and 38 patching done. 12 oil guns servicing done. Reheat spray line valve. Bonnet repaired and gasket
replaced. Burner tilt arrangement servicing done and ensured uniform opearation of of all BT's.
@:.Mainfailuerisduetofluegaserosion.Firsttimeleakageobservedatthislocation.
ortTerm):-PhysicalSurVeyofaccessibleareaoffrontsidesteamcooledwall
carried out and found okaY.
Sfreventlve action suggested (Long Term) :'First time leakage is observed at this location. Now this location is
added in thickness survey list. During next overhaul thickness survey of front side steam cooled wall RHS and LHS will
be carried out and tube replacement will carried out as per thikness Survey.
9. Similar event occurred last time: u# 3 210 MW Time: --- Date: -----
a Nit
1. ProcuremenUReplacement Plan:
2. Operational Error:
3. Delay in Maintenance:
5. Training of Staff:
CE/DyGE(Works)
*HO Code will be given by Works Section.
-
FO Changeover
Full Load/Max
Load (MW)
ach ieved at
Problems Faced
During Start UP