All India Council for Technical Education

(A Statutory body under Ministry of HRD, Govt. of India)

Proforma for submission of proposal under the scheme

MODERNISATION & REMOVAL OF OBSOLESCENCE

The scheme aims to modernize and remove obsolescence in the Laboratories / Workshops/ Computing facilities
(Libraries are excluded), so as to enhance the functional efficiency of Technical Institutions for Teaching, Training
and experimenting purposes.

It also supports new innovations in Class Room and Laboratory / Teaching Technology, development of Lab
Instructional Material and appropriate Technology to ensure that the practical work and project work to be carried
out by students is contemporary and suited to the needs of the Industry.

The equipment financed under the scheme up to a limit of Rs 20 lakhs /- could be ideally used for upgradation of
equipment in existing laboratories, enhancement of performance parameter specification of existing equipment,
incorporation of latest development in the field and replacement of old depreciated equipment by modern
equipment.

In addition to above major objectives, the equipment installed through MODROBS can be used for indirect benefit
to Faculty / Students through Continuing Education programs, Training programs for local industry and consultancy
work.

Name of the Institute Guntur Engineering College

Address NH-5, YENAMADALA, Guntur-522019


Email:principalgec@gmail.com FAX : 0863- Telephone :0863-
Contact details
2288886 2288888
Permanent Id of the Institute 1-4418451

Application Id 1-1484655212

Department Electrical & Electronics Engineering

Lab to be funded Power Electronics & Drives lab


The Department is started in the year 2008. The lab is established in the year
Current lab utilization
of2009. Current Utilization Level of Lab is 06 Hrs/week with batch size is 03
members. Total number of batches is 10. The total number of hrs per year the
utilization of the lab is 96hrs.
Strength & Weakness of lab According to JNTUK syllabus all the power electronics and drives lab
experiments are performing in our college lab.
For R/D work, there is no further extension of devices in PE&D lab.

Total cost of equipment in lab Rs 9,55,292/-

Application Id - Page x/y


All India Council for Technical Education
(A Statutory body under Ministry of HRD, Govt. of India)

Major equipment available in the lab

Name of equipment Make and model Cost in Rs. Year purchased

Add rows as required

Technical Field of proposal


The latest trends of operating the power electronic circuits with the application of appropriate software
are studied and are confirmed with the results obtained.
Also the various units such as UJT, MOSFET, IGBT& SCR are subjected to actual characteristics and their
performance are verified & tested.

Title of proposal
Modernization of Power Electronics & Drives Laboratory
Add rows as required

Abstract
To develop the Lab Instructional Material and appropriate Technology to ensure that the practical work
and project work to be carried out by students is contemporary and suited to the needs of the Industry. To
enhance the performance parameter specification of existing equipment incorporation of latest development in
the field and replacement of old depreciated equipment by modern equipment, Used for indirect benefit to
Faculty or Students through Continuing Education programs. To organize training programs for local industry and
consultancy work.
Add rows as required

Objective
In field of Power Electronics & Drives, to keep pace with the latest state of the art, it is necessary to
update and upgrade current level of power electronic devices. For engineering fields, advances in power
electronics offers rich possibilities of research.

To analyze the performance of full bridge converter.


To analyze the performance of PWM Inverter.
To analyze the performance& Operation of a four quadrant Chopper on D.C. Drive.
To control the speed of DC motor drive using thyristor circuit.
To control the speed of slip ring Induction motor by Static Rotor Resistance controller.
Add rows as required

Project Impact -Expected outcome

To enhance the performance parameter specification of existing equipment incorporation of latest


development in the field and replacement of old depreciated equipment by modern equipment.
Used for indirect benefit to Faculty / Students through Continuing Education programme.
Add rows as required

Application Id - Page x/y


All India Council for Technical Education
(A Statutory body under Ministry of HRD, Govt. of India)

Technical Consultancy / Revenue generation


To develop the Lab Instructional Material and appropriate Technology to ensure that the practical work
and project work to be carried out by students is contemporary and suited to the needs of the Industry.
To enhance the performance parameter specification of existing equipment incorporation of latest
development in the field and replacement of old depreciated equipment by modern equipment.
Used for indirect benefit to Faculty / Students through Continuing Education programmes.
To organize training programmes for local industry and consultancy work.
Add rows as required

Budget Estimates Non Recurring

No of
Proposed equipment/s Specifications Cost in Rs. Justification
units
Three phase SCR power Circuit
Chopper/Inverter PWM 50,329.125
Controller
Three phase loading rheostat 1KW rating 30,980.25
Three phase inductive load 5Amp 55,314.00
3-, 415V, (0-5A each
3- Inductive load 61,938.45
phase) (variable type)
3-, 415V, (0-5A each
3- Resistive load 30,980.25
phase)
1 hp(0.75KW)
1Hp DC motor Spring 180VDC, 5.1Amp
55,314.00
Balance load setup 220VDC, 0.3Amp
1500 rpm
Three phase IGBT based
Power module
Four Quadrant chopper
1,00,661.25
PWM Control module
1Hp DC motor Spring
Balance load setup
Single phase IGBT module
Single phase PWM
33,912.90
Inverter control module
R, L Load
230vac / 300vdc @ 4amp
Suitable for 1HP Ac/Dc
Three phase IGBT based
motor.
Power module
6 Numbers of PWM
54,970.65
5VDC level
Chopper/Inverter PWM
6 number of PWMs for
Controller
Armature & Field

Application Id - Page x/y


All India Council for Technical Education
(A Statutory body under Ministry of HRD, Govt. of India)

Three phase loading rheostat 30,980.25


VISSIM software(latest 01 94,500.00
version)/PC
Three phase inductive load 55,314.00
3-Phase, 415V, 10A
3- Inductive load (each phase), 6KW, 77,450.625
star/Delta connection
3-Phase, 415V, 10A
3- Resistive load (each phase), star/Delta 43,360.825
connection
Speed control of Slip ring
Induction motor using IGBT 1,23,876.90
Chopper
dsPIC 30F4011 based
PWM Controller
Three phase IGBT module
1,01,424.45
1HP 3 AC Induction
Motor with Load setup
TMS320F2407A based
DSP controller
Three phase IGBT module 1,18,463.625
1HP 3 AC Induction
Motor with Load setup
NR
Total(NR)
11,19,771.55/-
Add rows as required

Budget Estimates Recurring

Estimate for Year 1 (R1)


Consumables & Contingencies
Other
Total
Add rows as required

Payment disbursement schedule

Advance installment Total (Max 20 Lakhs)

NR R1 R=NR+R1

Application Id - Page x/y


All India Council for Technical Education
(A Statutory body under Ministry of HRD, Govt. of India)

Details of Project Coordinator

Name Mr.V.JoshiManohar
Exact designation Associate Professor Date of joining 28-06-2011
Appointment Type 15,600-39,100-with AGP
Permanent Scale of Appointment
of Rs-8,000
Department Electrical and Electronics Engineering
Qualifications PhD pursuing under
B.Tech(EEE) M.Tech (Power Electronics)
JNTUA Anantapur
Experience in years Teaching- 12 Industry- Nil Research
Relevant experience 03
Other information Nil
Cell number +91-9912376009
Email geceeehod@gmail.com
Signature

Details of earlier grants awarded to the Institute (Give details of grants received in last three years)

UtilisationCertificate
Name of Amt sanctioned Sanctioned
Funds Utilisation details/ Reason for
Scheme the letter
NR R position as on today non- submission of
coordinator details
UtilisationCertificate
Nil
Add rows as required
By signing this certificate, I/We undertake to

Abide by all the rules / regulations regarding utilization of amount that may be granted to the Institute.
Submit timely progress reportsabout grant utilization.
Submit utilization certificate duly authenticated by CA on/before project period is over.
Return full/partial unutilized grant amount to the Council.

Project forwarded to AICTE Signature of Head of the Institution

Date :

Institute Seal

Application Id - Page x/y


All India Council for Technical Education
(A Statutory body under Ministry of HRD, Govt. of India)

Important :You need to apply on web portal using your Institute login and password. Select tab AQIS application. Press New to create
new application. Your application is assigned unique application Id. Fill all the details over there. Prepare application in this proforma also.
Attach PDF of it to the application on web portal. Now press submit on web portal to submit application. Pay processing fees on web portal
using appropriate payment option.

Application Id - Page x/y