Sanitary Check List
Sanitary Check List
Sanitary Check List
MEP
Sanitary Ware Installation
Project:
(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No. Remarks
1 2 3 4
Type of sanitary ware installation
Installed positioning (Height,
distance , Orientation)
Stability & regidibility
Check for defects
Check for damage
Protection
Fuctional.
oor Name:
ot OK' work)
Remarks
Remarks/ Comments
Check List
MEP
Sanitary Fixtures
Project:
(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No. Remarks
1 2 3 4
Gyser angle valve height
Wash basin angle valve height
Washing machine tap height
RO tap height
Concealed valve height
Helalth faucet height
Wall hung WC height
Floor Mounted WC Point distance
Flush height
Head shower height
Wall Mixer height
Bottle Trap Height
Waste Trap Sizes
Pipe testing at 10 kg/cm2
Pipe testing at 4 kg/cm2
Mirror
C P fittings
Floor Name:
Project:
(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No. Remarks
1 2 3 4
Used Pipe materials
Proper glue Used
Pipe joints
Line , Alignment & position
Ball Valves & fitting connections
Support bracket, horizontal &
vertical
Waste pipe for required size and
type
Soil pipe for required size and
type
Vent pipe for required size and
type
Traps installed properly
Ceiling drain pipes are supported
Check slope 1:100 where water
pipe escaped
Incoming supply pipes connected
Water Charged
Drainage and vent water test,
filling stack with water
Inspected system for leaks and
workmanship
PRV installed with Pressure Gauge
PRV & Valves to be located and
installed as to provide access for
observation, maintenance,
servicing and replacement
Check water pressure with a
gauge
Kudda Packing
Debris Removal
Protection of system from others
Floor Name:
Project:
(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Check points Flat No.
1 2 3
T1 T2 T3+K T4 T1 T2 T3+K T4 T1 T2 T3+K
Used Pipe materials
Proper glue Used
Pipe joints
Line , Alignment & position
Ball Valves & fitting connections
Support bracket, horizontal &
vertical
Waste pipe for required size and
type
Soil pipe for required size and type
Vent pipe for required size and
type
Traps installed properly
Check slope 1:100 where water
pipe escaped
Drainage and vent water test,
filling stack with water
Inspected system for leaks and
workmanship
Kudda Packing
Debris Removal
Protection of system from others
Remarks
3 4
T4 T1 T2 T3+K T4
Consultant Remarks/ Comments
Check List
MEP
Flats Water Charging
Project:
Name of Tower :
Reference Drawing no:
(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Floor Details. Flat No. Remarks
1 2 3 4
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
Project:
Name of Tower :
Reference Drawing no:
(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Floor No. F
1 2
T1 T2 T3 T4 K T1 T2 T3
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
ork)
Flat No.
2 3 4
T4 K T1 T2 T3 T4 K T1 T2 T3 T4 K
Site Engineer Consultant
Dated
Remarks
Remarks/ Comments
Project:
Name of Tower :
Reference Drawing no:
Time Period
Signature
Checked By
Date
PROGRESS REPORT
MEP
PLUMBING WORK
Tower :
e Drawing no:
Progress Status
Site Engineer
Dated
Remarks
Check List
MEP
Tower Rain Water
Project:
Name of Tower :
Reference Drawing no:
(Please tick mark in appropriate column i.e. mark for 'OK' & for 'Not OK' work)
Floor No. Flat No.
1 2 3
B-1 B-2 B-3 B-4 B-1 B-2 B-3 B-4 B-1 B-2 B-3 B-4
Connected with Main Sewer
Leakage observed in
Basement
Leakage Rectified
Remarks
4
B-1 B-2 B-3 B-4