Load Upgrading in Phase II
Load Upgrading in Phase II
Load Upgrading in Phase II
NOTE:
Delivery of purchased materials (by owner).
MATERIAL COST ------------------- PHP 330,530.00
LABOR COST ------------------------------- 82,132.00
PROFIT -------------------------------------- 16,426.00
PHP 429,088.00
SCOPE OF WORK
1. EXCAVATION / ERECTION / STRINGING OF 3 CONDUCTORS AS SHOWN IN DRAWING.
2. INSTALLATION OF 2 DRY- TYPE TRANSFORMER, 1 50 KVA , 1 30 KVA AND SUPPLY.
3. ENERGIZATION AND TESTING.
4. TRANSFORMER HOUSE (BY OTHERS)