designed as variable primary flow (VPF). [9.0 kPa]. Even if the differential pressure
As with anything in life, you can learn The bypass line (sized the same as the sensor is of high quality, it will be difficult to
HVAC design the hard way, from supply manifold) and valve that allow select one that has the required precision to
painful and costly mistakes, or the
minimum chiller flow rate are located in accurately measure such a small difference
easy way, from veteran engineers who
can help you avoid those mistakes. the mechanical room, as are the air between design flow and minimum flow
The purpose of this EN is to help new handlers. A differential pressure sensor pressure drops.
engineers with the latter. across the evaporator is used to
determine flow rate and to control the Solution 1: Select the proper flow
bypass valve.(Figure 1). sensing technology. Flow meters are
generally more expensive, require more
Background See any red flags? Lets take a look at the calibration, and must be installed per the
problems that occurred on the job and manufacturer's requirements with a specific
The following three cases are how to avoid making the same mistakes. amount of straight piping up- and down-
composite scenarios of various chilled- stream. Despite these limitations, they're
water system design issues we have Issue 1: Flow sensing device is not better suited to monitor flow for this
witnessed over the years. In each accurate enough at the minimum flow system.
scenario, the design issues are rate. As mentioned, the design
highlighted and followed by possible evaporator pressure drop is 5 ft of head Issue 2: Loop volume does not meet the
solutions. [15 kPa]. At the minimum flow rate of chiller unit control requirement. Chiller
1.2 gpm per ton [0.022 L/s per kWr], the unit controls often require a certain loop
By sharing the hard-earned HVAC pressure drop will be about 3 ft of head
design wisdom that comes from trial volume to maintain good chilled-water
and error, we hope to shorten the
learning curve for new engineers. Figure 1. Case 1: New variable primary flow (VPF)
2 min. x 300 gpm = 600 gal Solution 4: Put the chillers in series!
It may be beneficial to pipe the chillers in
[2 min. x 60 sec. per min. x 18.9 L/s = With chillers in series (Figure 2), the series if the system
2270 liters] design flow rate per chiller is about 3.0
is designed for variable primary flow,
gpm per ton [0.054 L/s per kWr],
Solution 2: Increase the loop volume allowing significant turndown. Design has a chilled-water design
to the required level. If the loop evaporator pressure drop increases temperature difference of 14F
volume is close to that required, since water must flow through both [7.8C] or larger,
increasing the piping manifolds may be evaporator bundles. This increases has two chillers, and
adequate. Otherwise add a buffer tank, design pump power. However, in many
preferably on the return side of the systems the flow rate is less than design is not likely to require a future
system, and on the chiller side of the flow much of the year, so the resulting expansion.
bypass line. Ensure the system volume pump energy increase may be small.
If the system T is 10F [5.6C], consider
with the tank meets the required loop
To allow for servicing, engineers often increasing it to 14F [7.8C] or larger.
volume. To attain smoother system
control, consider making the tank a design manual bypass lines into the
little larger than the absolute minimum system.
requirement. The additional cost and
space will likely be small.
Issue 3: Oversized bypass line and Figure 2. New variable primary flow (VPF) series chillers
valve do not provide adequate
56F (13.3C) 47.5F (8.6C) 40F (4.4C)
control. The bypass line is the same
size as the pipe manifold. Given this
fact, if a large valve is installed in this
Solution:
line, control at the minimum flow rate
may be a challenge, since initially install flow meter
opening the valve a little allows increase loop volume by
VSD adding a buffer tank
significant flow to be bypassed.
buffer manual bypass for servicing flow size the bypass line for the
tank meter
largest minimum flow rate
Solution 3: Size the bypass line and
valve properly. In a variable primary
flow system, size the bypass line for
the largest minimum flow rate. In this
case:
2 Trane Engineers Newsletter volume 432 providing insights for todays HVAC system designer
Case 2: Conversion from Figure 3. Case 2: After value-engineered conversion to VPF
Primary Secondary to
Variable Primary Flow 54F (12.2C)
DP
44F (6.7C)
VPF conversion plan:
additional 30-tons of heat
The system includes two 500-ton chillers recovery
in a primary-secondary configuration. The Value engineering:
owner wants to convert the system to pumps
variable primary flow (VPF) and add a
- use secondary pumps,
small (30-ton) heat recovery chiller. dont move them
DP
To convert to variable primary/variable 54F (12.2C) 44F (6.7C) Solution:
secondary: keep primary pumps and add VSDs
Contact the chiller provider to ensure VSD add DP and T sensors
that chiller unit controls can tolerate control primary pump VSD speed to
variable evaporator water flow. If not, maintain T of 1-2F
update the unit controls. VSD if necessary, override temperature
T
providing insights for todays HVAC system designer Trane Engineers Newsletter volume 432 3
Issue 3: Poor heat recovery chiller Figure 5. Value-engineered conversion heat recovery
location. Flow and control issues can DP Issues:
54F (12.2C) 44F (6.7C)
result when a smaller chiller is piped in
flow balance between
parallel with larger chillers. When dissimilar chillers
evaporators are piped in parallel, the
inability to fully load the heat
chillers are loaded to equal VSD
recovery chiller due to mixed
percentages. This does not allow the return water temperature
heat recovery chiller to be preferentially VSD Solution:
loaded or to deliver the desired hot
T
put heat recovery chiller in
water temperature and quantity. "sidestream position
load using either condenser-
Solution 3: Pipe the heat recovery leaving or chilled-water
chiller in the sidestream position. temperatures
VSD VSD
The sidestream configuration (Figure 5)
-allows the heat recovery chiller to: control
valve
Be preferentially loaded, since it
receives the warmest return water
temperature.
Operate as a heater to make the Misconception 1: Existing coils cannot What is the coldest (or lowest)
desired leaving condenser water be reselected at higher temperature chilled-water supply temperature
temperature. The chilled water differences. possible before condensation
produced reduces the load on the forms within the pipe insulation?
central chillers. Solution 1: Coils are heat transfer media Often with existing pipe insulation,
that can be selected at many supply water temperature reduced
Meet its needed evaporator flow to 40F [4.4C] can be successful,
conditions. Table 1 shows a coil
requirements independent of other but perhaps not 36F [2.2C].
originally selected for a 10F [5.6C] chilled
chiller operation.
water T reselected to produce the same If coil control valves were oversized
cooling capacity. This can be done if the at a 10F [5.6C] T, they are even
entering water temperature is lower and more oversized at a higher T and
Case 3: Conversion of a results in a lower flow rate and higher lower flow rate. Valves may need to
Parallel-piped System to chilled-water T. This change has no effect be changed to allow good control.
on the airside of the system, but a
Series, and from substantial impact on the waterside.
Conventional to Misconception 2: Use of three-way
The advantages of series chillers (Figure 6) valves as the method of bypass can
Increased T. use more pump energy.
to produce the higher chilled-water T was
This 400-ton system includes two discussed earlier in Case 1.
water-cooled chillers piped in parallel. Solution 2: Yes, but this is mitigated
The chillers and air-handling coils were When making supply water temperature by a number of factors.
both selected with water temperatures and flow rate changes to existing systems,
consider the following factors: First, the system flow rate dropped
of 5444F. The system serves a by nearly 38 percent because of
school, which does not have a trained Many coils in air-handling units have the wider T across the coils and
plant operator on sitesimplicity is adequate heat transfer area to perform reduced water flow rate. This lower
beneficial. similarly to the data in Table 1. On the flow rate results in lower system
other hand, if a coil has limited heat pressure drop and pump power.
The school officials would prefer air- transfer capability (e.g., small, two-row
cooled chillers to eliminate cooling fan-coils), reselecting at a In many constant flow systems, its
tower maintenance requirements. They higher T is unlikely to work well. difficult to retrofit a separate
have decided to use 50 percent glycol
to keep the fluid from freezing in the Table 1. Air-handler coil reselection using low entering-water temperature
winter. No changes are to be made to original selection reselection
the airside of the system. In addition, capacity (MBh) [kW] 504 [148] 504 [148]
energy usage reductions are desired.
entering water temperature (F) [C] 44 [6.7] 41 [5.0]
For this scenario, lets examine some flow rate (gpm) [L/s] 101 [6.37] 63 [4.0]
common misconceptions that might foil leaving water temperature (F) [C] 54 [12.2] 57 [13.9]
a new engineer. water T (F) [C] 10 [5.5] 16 [8.0]
4 Trane Engineers Newsletter volume 432 providing insights for todays HVAC system designer
bypass, control valve and controller Figure 6. Retrofit VPF series chillers
Retrofit changes:
into the system. Leaving enough
three-way valves to allow the 57F (13.9C) 44F (6.7C) new chillers in series
providing insights for todays HVAC system designer Trane Engineers Newsletter volume 432 5
This article is based on a seminar presented by www.Trane.com/bookstore
Mick Schwedler, Trane and Jason Atkisson,
Affiliated Engineers,during the 2013 ASHRAE
annual meetings in Denver. The acknowledgment
Learn HVAC design strategies and earn credit
of Mr. Atkisson in this newsletter in no way
implies the endorsement of a specific system
provider or manufacturer by either Affiliated
Engineers or Mr. Atkisson. You can find this and
previous issues of the Engineers Newsletter at
www.trane.com/engineersnewsletter. To
comment, e-mail us at ENL@trane.com.
References
[1] American Society of Heating, Refrigerating
and Air-Conditioning Engineers. 2010. ASHRAE
Green Guide: The Design, Construction, and
Operation of Sustainable Buildings, 3rd ed.
Atlanta, GA: ASHRAE.
Air conditioning clinics. A series of Application manuals. Comprehensive
[2] Taylor, S. 2011. Optimizing Design & Control educational presentations that teach HVAC reference guides that can increase your
of Chilled Water Plants; Part 3: Pipe Sizing working knowledge of commercial HVAC
fundamentals, equipment, and systems. The
and Optimizing . ASHRAE Journal. systems. Topics range from component
53(12):22-34.
series includes full-color student workbooks,
which can be purchased individually. Approved combinations and innovative design
by the American Institute of Architects for 1.5 concepts to system control strategies,
[3] American Society of Heating, Refrigerating
and Air-Conditioning Engineers. 2008. (Health, Safety and Welfare) learning units. industry issues, and fundamentals. The
ASHRAE Guideline 22: Instrumentation for Contact your local Trane office to sign up for following are just a few examples. Please
Monitoring Central Chilled Water Plant training in your area. visit www.trane.com/bookstore for a
Efficiency, Appendix E. Atlanta, GA: ASHRAE. complete list of manuals available to order.
Engineers Newsletter Live. A series of 90-
Central Geothermal Systems discusses
minute programs that provide technical and
educational information on specific aspects of proper design and control of central
2014 HVAC design and control. Topics range from geothermal bidirectional cascade systems
that use borefields. This manual covers
Engineers
water- and airside system strategies to
ASHRAE standards and industry codes. central geothermal system piping, system
Trane, Trane believes the facts and suggestions presented here to be accurate. However, final design and
A business of Ingersoll Rand application decisions are your responsibility. Trane disclaims any responsibility for actions taken on
the material presented.